4-09 TKI Taxiway A Rehab Phase II - Disadvantage Business Enterprise Forms.pdf
PDF 356 KB Posted
- Attached to
- TKI Taxiway A Rehabilitation Phase II
- Solicitation number
- 26-46ITB
- Issued by
- Collin County, Texas
About this file
Summary
This is a Disadvantaged Business Enterprise (DBE) forms and requirements document issued by the Texas Department of Transportation, Aviation Division, for the City of McKinney's TKI Taxiway A Rehabilitation Phase II project. The document establishes the federal DBE program requirements applicable to this federally-aided contract, which carries an Engineer's Opinion of Probable Construction Cost of $9,061,000. The DBE Participation Plan must be submitted and received no later than 5 calendar days from bid opening and should be sent to AVNRFQ@txdot.gov. The project is subject to a 0% DBE participation goal, though contractors are required to comply with all applicable DBE program regulations and submit proper documentation regardless of the goal percentage.
The document outlines comprehensive DBE compliance obligations for contractors, including the designation of a DBE liaison officer, electronic submission of contract documents through the Compliance Tracking System (eGrants), and monthly reporting of all DBE payments until subcontracting activity is complete. Contractors must ensure that all DBE firms used on the contract are certified through the Texas Unified Certification Program and perform a Commercially Useful Function. Key requirements include prompt payment to subcontractors within 10 days of receipt of payment, maintenance of records for three years following contract completion, and adherence to regulations governing DBE participation credit calculations for manufacturers, regular dealers, and trucking services. Failure to comply with DBE requirements constitutes material breach of contract and may result in contract termination, payment deductions, or other remedies deemed appropriate by the Department.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISADVANTAGED
BUSINESS ENTERPRISE
Disadvantaged Business Enterprise in Federal-Aid Contracts
1. DESCRIPTION
The purpose of this Special Provision is to carry out the U.S. Department of
Transportation's (DOT) policy of ensuring nondiscrimination in the award and administration of DOT-assisted Contracts and creating a level playing field on which firms owned and controlled by individuals who are determined to be socially and economically disadvantaged can compete fairly for DOT-assisted Contracts.
2. DISADVANTAGED BUSINESS ENTERPRISE IN FEDERAL-AID CONTRACTS
2.1. Policy. It is the policy of the DOT and the Texas Department of Transportation, Aviation Division (Department) that DBEs, as defined in 49 CFR Part 26, Subpart A, and the Department's DBE Program, will have the opportunity to participate in the performance of Contracts financed in whole or in part with federal funds. The DBE requirements of 49 CFR Part 26, and the Department’s DBE Program, apply to this
Contract as follows.
The Contractor will solicit DBEs through reasonable and available means, as defined in 49 CFR Part 26, Appendix A, and the Department's DBE Program, or show a good faith effort to meet the DBE goal for this Contract.
The Contractor, subrecipient, or subcontractor will not discriminate on the basis of race, color, national origin, or sex in the performance of this Contract. Carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted
Contracts. Failure to carry out these requirements is a material breach of this Contract, which may result in the termination of this Contract or such other remedy as the
Department deems appropriate.
The requirements of this Special Provision must be physically included in any subcontract.
By signing the Contract proposal, the Bidder is certifying that the DBE goal as stated in the proposal will be met by obtaining commitments from eligible DBEs or that the
Bidder will provide acceptable evidence of good faith effort to meet the commitment.
2.2. Definitions.
2.2.1. Administrative Reconsideration. A process by which the low bidder may request reconsideration when the Department determines the good faith effort (GFE) requirements have not been met.
2.2.2. Commercially Useful Function (CUF). A CUF occurs when a DBE has the responsibility for the execution of the work and carrying out such responsibilities by actually performing, managing, and supervising the work.
2.2.3. Disadvantaged Business Enterprise (DBE). A for-profit small business certified through the Texas Unified Certification Program in accordance with 49 CFR Part 26, that is at least 51% owned by one or more socially and economically disadvantaged individuals, or in the case of a publicly owned business, in which is at least 51% of the stock is owned by one or more socially and economically disadvantaged individuals, and whose management and daily business operations are controlled by one or more of the individuals who own it.
2.2.4. DBE Joint Venture. An association of a DBE firm and one or more other firms to carry out a single business enterprise for profit for which purpose they combine their property, capital, efforts, skills, and knowledge, and in which the DBE is responsible for a distinct, clearly defined portion of the work of the Contract and whose share in the capital contribution, control, management, risks, and profits of the joint venture are commensurate with its ownership interest.
2.2.5. DOT. The U.S. Department of Transportation, including the Office of the Secretary, the Federal Highway Administration (FHWA), the Federal Transit Administration
(FTA), and the Federal Aviation Administration (FAA).
2.2.6. Federal-Aid Contract. Any Contract between the Department and a Contractor that is paid for in whole or in part with DOT financial assistance.
2.2.7. Good Faith Effort. All necessary and reasonable steps to achieve the contract goal which, by their scope, intensity, and appropriateness to the objective, could reasonably be expected to obtain sufficient DBE participation, even if not fully successful. Good faith efforts are evaluated prior to award and throughout performance of the Contract.
For guidance on good faith efforts, see 49 CFR Part 26, Appendix A.
2.2.8. North American Industry Classification System (NAICS). A designation that best describes the primary business of a firm. The NAICS is described in the North
American Industry Classification Manual—United States, which is available on the
Internet at the U.S. Census Bureau website: http://www.census.gov/naics/.
2.2.9. Race-Conscious. A measure or program that is focused specifically on assisting only DBEs, including women-owned businesses.
2.2.10. Race-Neutral DBE Participation. Any participation by a DBE through customary competitive procurement procedures.
http://www.census.gov/naics/
2.2.11. Texas Unified Certification Program (TUCP) Directory. An online directory listing all DBEs currently certified by the TUCP. The Directory identifies DBE firms whose participation on a Contract may be counted toward achievement of the assigned DBE
Contract goal.
2.3. Contractor’s Responsibilities.
2.3.1. DBE Liaison Officer. Designate a DBE liaison officer who will administer the
Contractor’s DBE program and who will be responsible for maintenance of records of efforts and contacts made to subcontract with DBEs.
2.3.2. Compliance Tracking System (CTS). The awarded bidder will be required to electronically submit contract documents, pay request forms, change order requests, certified payroll, DBE/HUB reports and insurance certificates to the Engineer of
Record. Signing the Bid Form certifies that the bidder meets the eGrants minimum system requirements in the External User Manual found at http://www.txdot.gov/government/funding/egrants- 2016/aviation.html.
2.3.3. Apparent Low Bidder. If the DBE documentation was not submitted with the bid, the apparent low bidder must submit a DBE plan and commitments to satisfy the DBE goal or submit good faith effort Form 2603 and supporting documentation demonstrating why the goal could not be achieved, in whole or part, no later than 5 calendar days after bid opening. The means of transmittal and the risk of timely receipt of the information will be the bidder’s responsibility and no extension of the 5- calendar-day timeframe will be allowed for any reason. The apparent low bidder may use the
DBE forms provided in the bid document and must follow the instructions on the commitment form.
2.3.4. DBE Contractor. A DBE Contractor may receive credit toward the DBE goal for work performed by its own forces and work subcontracted to DBEs. In the event a DBE subcontracts to a non-DBE, that information must be reported monthly.
2.3.5. DBE Committal. Only those DBEs certified by the TUCP are eligible to be used for goal attainment. The Department maintains the TUCP DBE Directory.
A DBE must be certified on the day the commitment is considered and at time of subcontract execution. It is the Contractor’s responsibility to ensure firms identified for participation are approved certified DBE firms.
http://www.txdot.gov/government/funding/egrants-
The Bidder is responsible to ensure that all submittals are checked for accuracy. Any and all omissions, deletions, and/or errors that may affect the end result of the commitment package are the sole liabilities of the bidder.
Commitments in excess of the goal are considered race-neutral commitments.
2.3.6. Good Faith Effort Requirements. A Contractor who cannot meet the Contract goal, in whole or in part, must make adequate good faith efforts to obtain DBE participation as so stated and defined in 49 CFR Part 26, Appendix A.
2.3.6.1. Administrative Reconsideration. If the Department determines that the apparent low bidder has failed to satisfy the good faith efforts requirement, the Department will notify the Bidder of the failure and will give the Bidder an opportunity to provide written documentation or argument concerning the issue of whether it met the goal or made adequate good faith efforts to do so.
The Bidder must request an administrative reconsideration of that determination within 3 days of the date of receipt of the notice. The request must be submitted directly to the McKinney National Airport, 1508 Industrial Blvd, McKinney, TX
75069.
If a request for administrative reconsideration is not filed within the period specified, the determination made is final and further administrative appeal is barred.
If a reconsideration request is timely received, the reconsideration decision will be made by the DBE liaison officer or, if the DBE liaison officer took part in the original determination, the Department Division Director will appoint another employee to perform the administrative reconsideration. The employee will hold a leadership position and will report directly to the Division Director.
The meeting or written documentation must be provided or held within 7 days of the date the request was submitted.
The Department will provide to the Bidder a written decision if the Bidder did or did not make adequate good faith efforts to meet the Contract goal. The reconsideration decision is final and is not administratively appealed to DOT.
2.3.7. Determination of DBE Participation. The work performed by the DBE must be reasonably construed to be included in the work area and NAICS work code identified by the Contractor in the approved commitment.
Participation by a DBE on a Contract will not be counted toward DBE goals until the amount of the participation has been paid to the DBE.
Payments made to a DBE that was not on the original commitment may be counted toward the Contract goal if that DBE was certified as a DBE before the execution of the subcontract and has performed a Commercially Useful Function.
The total amount paid to the DBE for work performed with its own forces is counted toward the DBE goal. When a DBE subcontracts part of the work of its Contract to another firm, the value of the subcontracted work may be counted toward DBE goals only if the subcontractor is itself a DBE.
DBE Goal credit for the DBE subcontractors leasing of equipment or purchasing of supplies from the Contractor or its affiliates is not allowed. Project materials or supplies acquired from an affiliate of the Contractor cannot directly or indirectly (second or lower tier subcontractor) be used for DBE goal credit.
If a DBE firm is declared ineligible due to DBE decertification after the execution of the
DBE’s subcontract, the DBE firm may complete the work and the DBE firm's participation will be counted toward the Contract goal. If the DBE firm is decertified before the DBE firm has signed a subcontract, the Contractor is obligated to replace the ineligible DBE firm or demonstrate that it has made good faith efforts to do so.
The Contractor may count 100% of its expenditure to a DBE manufacturer. According to 49 CFR 26.55(e)(1)(i), a DBE manufacturer is a firm that operates or maintains a factory or establishment that produces, on the premises, the materials, supplies, articles, or equipment required under the Contract and of the general character described by the specifications.
The Contractor may count only 60% of its expenditure to a DBE regular dealer. According to 49 CFR 26.55(e)(2)(i), a DBE regular dealer is a firm that owns, operates, or maintains a store, warehouse, or other establishment in which the materials, supplies, articles, or equipment of the general character described by the specifications and required under the
Contract are bought, kept in stock, and regularly sold or leased to the public in the usual course of business. A firm may be a regular dealer in such bulk items as petroleum products, steel, cement, gravel, stone, or asphalt without owning, operating, or maintaining a place of business if the firm both owns and operates distribution equipment for the products. Any supplementing of regular dealers' own distribution equipment must be by a long-term lease agreement and not on an ad hoc or contract-by-contract basis. A long-term lease with a third-party transportation company is not eligible for 60% goal credit.
With respect to materials or supplies purchased from a DBE that is neither a manufacturer nor a regular dealer, the Contractor may count the entire amount of fees or commissions charged for assistance in the procurement of the materials and supplies, or fees or transportation charges for the delivery of materials or supplies required on a job site.
A Contractor may count toward its DBE goal a portion of the total value of the Contract amount paid to a DBE joint venture equal to the distinct, clearly defined portion of the work of the Contract performed by the DBE.
2.3.8. Commercially Useful Function. It is the Contractor’s obligation to ensure that each DBE used on federal-assisted contracts performs a commercially useful function on the Contract.
The Department will monitor performance during the Contract to ensure each DBE is performing a CUF.
Under the terms established in 49 CFR 26.55, a DBE performs a CUF when it is responsible for execution of the work of the Contract and is carrying out its responsibilities by actually performing, managing, and supervising the work involved.
With respect to material and supplies used on the Contract, a DBE must be responsible for negotiating price, determining quality and quantity, ordering the material, installing the material, if applicable, and paying for the material itself.
With respect to trucking, the DBE trucking firm must own and operate at least one fully licensed, insured, and operational truck used on the Contract. The DBE may lease trucks from another DBE firm, including an owner-operator who is certified as a DBE. The DBE who leases trucks from another DBE receives credit for the total value of the transportation services the lessee DBE provides on the Contract. The DBE may also lease trucks from a non-DBE firm, including from an owner-operator. The DBE that leases trucks equipped with drivers from a non-DBE is entitled to credit for the total value of transportation services provided by non- DBE leased trucks equipped with drivers not to exceed the value of transportation services on the Contract provided by DBE-owned trucks or leased trucks with DBE employee drivers. Additional participation by non- DBE owned trucks equipped with drivers receives credit only for the fee or commission it receives as a result of the lease arrangement.
A DBE does not perform a CUF when its role is limited to that of an extra participant in a transaction, Contract, or project through which funds are passed in order to obtain the appearance of DBE participation. The Department will evaluate similar transactions involving non-DBEs in order to determine whether a DBE is an extra participant.
If a DBE does not perform or exercise responsibility for at least 30% of the total cost of its Contract with its own work force, or the DBE subcontracts a greater portion of the work than would be expected on the basis of normal industry practice for the type of work involved, the Department will presume that the DBE is not performing a CUF.
If the Department determines that a DBE is not performing a CUF, no work performed by such DBE will count as eligible participation. The denial period of time may occur before or after a determination has been made by the Department.
In case of the denial of credit for non-performance of a CUF, the Contractor will be required to provide a substitute DBE to meet the Contract goal or provide an adequate good faith effort when applicable.
2.3.8.1. Rebuttal of a Finding of No Commercially Useful Function. Consistent with the provisions of 49 CFR 26.55(c)(4) & (5), before the Department makes a final finding that no CUF has been performed by a DBE, the Department will notify the DBE and provide the DBE the opportunity to provide rebuttal information.
CUF determinations are not subject to administrative appeal to DOT.
2.3.9. Joint Check. The use of joint checks between a Contractor and a DBE is allowed with
Department approval. To obtain approval, the Contractor must submit a completed Form
2178, “DBE Joint Check Approval,” to the Department.
The Department will closely monitor the use of joint checks to ensure that such a practice does not erode the independence of the DBE nor inhibit the DBE’s ability to perform a
CUF. When joint checks are utilized, DBE credit toward the Contract goal will be allowed only when the subcontractor is performing a CUF in accordance with 49 CFR
26.55(c)(1).
Long-term or open-ended joint checking arrangements may be a basis for further scrutiny and may result in the lack of participation towards the Contract goal requirement if DBE independence cannot be established.
Joint checks will not be allowed simply for the convenience of the Contractor.
If the proper procedures are not followed or the Department determines that the arrangements result in a lack of independence for the DBE involved, no credit for the
DBE’s participation as it relates to the material cost will be used toward the Contract goal requirement, and the Contractor will need to make up the difference elsewhere on the project.
2.3.10. DBE Termination and Substitution. No DBE named in the commitment submitted under Section 2.3.5. will be terminated for convenience, in whole or part, without the
Department’s approval. This includes, but is not limited to, instances in which a
Contractor seeks to perform work originally designated for a DBE subcontractor with its own forces or those of an affiliate, a non-DBE firm, or with another DBE firm.
Unless consent is provided, the Contractor will not be entitled to any payment for work or material unless it is performed or supplied by the listed DBE.
The Contractor, prior to submitting its request to terminate, must first give written notice to the DBE of its intent to terminate and the reason for the termination. The Contractor will copy the Department on the Notice of Intent to terminate.
The DBE has 5 calendar days to respond to the Contractor’s notice and will advise the
Contractor and the Department of the reasons, if any, why it objects to the proposed termination of its subcontract and why the Department should not approve the prime
Contractor’s request for termination.
The Department may provide a shorter response time if required in a particular case as a matter of public necessity.
The Department will consider both the Contractor’s request and DBE’s stated position prior to approving the request. The Department may provide a written approval only if it agrees, for reasons stated in its concurrence document, that the Contractor has good cause to terminate the DBE. If the Department does not approve the request, the Contractor must continue to use the committed DBE firm in accordance with the Contract. For guidance on what good cause includes, see 49 CFR 26.53.
Good cause does not exist if the Contractor seeks to terminate, reduce, or substitute a
DBE it relied upon to obtain the Contract so that the Contractor can self-perform the work for which the DBE firm was engaged.
When a DBE subcontractor is terminated, make good faith efforts to find, as a substitute for the original DBE, another DBE to perform, at least to the extent needed to meet the established Contract goal, the work that the original DBE was to have performed under the Contract.
Submit the completed Form 4010, “DBE Termination Request,” and Form 4011 “DBE
Substitution Request,” within seven (7) days, which may be extended for an additional
7 days, if necessary, at the request of the Contractor. The Department will provide a written determination to the Contractor stating whether or not good faith efforts have been demonstrated. If the Department determines that good faith efforts were not demonstrated, the Contractor will have the opportunity to appeal the determination to the Aviation Division.
2.3.11. Reports and Records. By the 15th of each month and after work begins, report payments to meet the DBE goal and for DBE race-neutral participation on projects with or without goals. These payment reports will be required until all DBE sub-contracting or material supply activity is completed. Negative payment reports are required when no activity has occurred in a monthly period.
2.3.12. Notify the Department if payment to any DBE subcontractor is withheld or reduced.
Before receiving final payment from the Department, the Contractor must indicate a final payment on the compliance tracking system. The final payment is a summary of all payments made to the DBEs on the project. All records must be retained for a period of 3 years following completion of the Contract work and must be available at reasonable times and places for inspection by authorized representatives of the
Department or the DOT. Provide copies of subcontracts or agreements and other documentation upon request.
2.3.13. Failure to Comply. If the Department determines the Contractor has failed to demonstrate good faith efforts to meet the assigned goal, the Contractor will be given an opportunity for reconsideration by the Department.
A Contractor’s failure to comply with the requirements of this Special Provision will constitute a material breach of this Contract. In such a case, the Department reserves the right to terminate the Contract; to deduct the amount of DBE goal not accomplished by DBEs from the money due or to become due the Contractor; or to secure a refund, not as a penalty but as liquidated damages, to the Department or such other remedy or remedies as the Department deems appropriate.
2.3.14. Investigations. The Department may conduct reviews or investigations of participants as necessary. All participants, including, but not limited to, DBEs and complainants using DBE Subcontractors to meet the Contract goal, are required to cooperate fully and promptly with compliance reviews, investigations, and other requests for information.
2.3.15. Falsification and Misrepresentation. If the Department determines that a Contractor or subcontractor was a knowing and willing participant in any intended or actual subcontracting arrangement contrived to artificially inflate DBE participation or any other business arrangement determined by the Department to be unallowable, or if the
Contractor engages in repeated violations, falsification, or misrepresentation, the
Department may:
▪ refuse to count any fraudulent or misrepresented DBE participation;
▪ withhold progress payments to the Contractor commensurate with the violation;
▪ reduce the Contractor’s prequalification status;
▪ refer the matter to the Office of Inspector General of the US Department of Transportation for investigation; and/or
▪ seek any other available contractual remedy.
2.3.16. Prompt Payment. Texas Administrative Code, Title 43, Rule 9.208 requires contractors to promptly pay all subcontractors within 10 days after the date that the contractor receives payment for work performed by a subcontractor. In order to enforce Rule 9.208, the
Contractor shall list the name and amount of each subcontract including DBE subcontractors that are proposed to meet the DBE goal, if any, in the CTS. The contractor will report payments to each subcontractor on a monthly basis and list reasons for nonpayment in the CTS.
DBE PARTICIPATION PLAN
MUST BE SUBMITTED AND RECEIVED NO LATER THAN 5 CALENDAR DAYS FROM
BID OPENING at the following email address: AVNRFQ@txdot.gov
TxDOT Project No.: 2518MCKNY
Project Airport: McKinney National Airport
Percentage Goal: 0%
Contractor:
Contractor Bid Amount:
Notes:
I propose to use the following DBE Plan in accordance with the requirements of the Disadvantaged Business Enterprise
TX TAX
Vendor Number
(11 Digit #)
Name of
DBE Sub/Supplier*
Type of Work
Amount ($)
b) Total Dollar Value of Participation
Assurances Attachment of the bid document and intend to utilize the following DBE firm(s) in performance of the contract.
Commitment Agreement Forms from these DBE firm(s) are attached to this DBE Participation Plan.
*The VENDOR NUMBER(s) and SUBCONTRACTOR NAME(s) supplied on this report must match what appears in the
Texas Unified Certification Program (TUCP) Directory.
Acceptance of this DBE Participation Plan fulfills the requirements for only this DBE contract(s), between General Contractor and Subcontractor(s).
Signature of Company Official Date mailto:AVNRFQ@txdot.gov
Construction Contractors:
Please see the appropriate DBE Commitment Agreement or Good faith effort form below. There are three available DBE commitment forms.
1) DBE Commitment Agreement Form No. SMS.4901,
2) DBE Program Material/Supplier Form No. SMS.4901-MS and
3) DBE Trucking Commitment Form No. SMS.4901-T.
You must pick which commitment applies to your subcontract agreement. Then you and your DBE/s must complete the form and return it with the signed DBE plan by the required date.
4) Form 4000 Contractor’s Certification Good Faith Effort (if unable to meet specified goal)