4-04 Required Form-Pricing Sheet.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
South Temple Waterline Improvements Line A-1
Solicitation number
Bid #94-01-25
Issued by
Bell County, Texas

About this file

This document is a bid schedule for two city infrastructure projects by the City of Temple, Texas, specifically the South Temple Waterline Improvements Line A-1 and the Pepper Creek Wastewater Extension and Equalization Basin. The South Temple Waterline Improvements project involves constructing approximately 7,690 linear feet of 36-inch diameter ductile iron pipe (DIP) waterline, including associated components such as gate valves, fittings, fire hydrant assemblies, and a connection to an existing waterline. The project scope includes comprehensive site preparation, trench safety planning, stormwater pollution prevention, traffic control, record drawings, pre- and post-construction video documentation, and erosion control measures.

The bid schedule provides a detailed line-item breakdown with 24 separate items for the waterline project and additional items for the wastewater extension project. Each item specifies quantities, units of measurement, and placeholders for unit pricing. The document allows bidders to price out individual components, with a total bid calculation combining both project parts. While specific pricing details are left blank, the schedule indicates that mobilization, bonds, and insurance are not to exceed 5% of the base bid amount. The project appears to be funded through municipal infrastructure investment, with technical specifications requiring compliance with state and federal regulations, including OSHA safety standards and Texas Commission on Environmental Quality (TCEQ) permitting requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-1

CITY OF TEMPLE
SOUTH TEMPLE WATERLINE IMPROVEMENTS LINE A-1
BID SCHEDULE
EstimatedUnitTotal Amount
No.QuantityUnitDescriptionPrice(in numerals)

1 100% LS Mobilization, Bonds and Insurance, not-to-exceed 5% of the Base Bid Amount, Complete For $ $

2 77 STA Provide Labor, Equipment, Tools and Supervision to Complete Preparation of Right-of-way, Complete For $ $

3 100% LS Submit Trench Safety Plan prepared and signed by P.E., in Conformance with State Law and OSHA, Complete For $ $

4 7,690 LF Implement and Follow Trench Safety Plan (Pipe), Complete For $ $

5 100% LS Prepare Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality (TCEQ), Complete For $ $

6 100% LS For Preparing and Submitting a Control Plan prepared and signed by a P.E. for Vehicular Traffic, Complete for $ $

7 100% LS Implement and Administer Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian), Complete For $ $

8 100% LS Provide Record Drawings (As Builts), Complete For $ $

9 100% LS Provide Video of Right-of-way Pre-Construction and Post Construction Site Conditions for the Total Project, Complete For $ $

10 7,690 LF Provide Clean-up and Final Grading Along Final Pipeline Route, Complete For $ $

11 7,690 LF Furnish and Install 36" Diameter DIP Waterline, including Thrust Restraint, Complete For $ $

12 6 EA Furnish and Install Ductile Iron Fittings (90°, 45°, 22.5°, 11.25° Bends), 36-inch Diameter, Complete For $ $

13 1 EA Furnish and Install 36-inch Plug, Complete For $ $

14 3 EA Furnish and Install 36-inch Gate Valve, Complete For $ $

15 1 EA Furnish and Install 6-inch Air and Vacuum Release Valve, Complete For $ $

16 2 EA Furnish and Install Fire Hydrant Assembly, Complete For $ $

17 50 LF Furnish and Install Concrete Encasement by Open Cut, Complete For $ $

18 1 EA Remove Existing Plug and Connect to Existing 36'' Waterline, Complete For $ $

19 100 LF Furnish, Install, Maintain and Remove Silt Fence as required in the Stormwater Pollution Prevention Plan, Complete For $ $

20 120 LF Furnish, Install, Maintain and Remove Rock Berm as required in the Stormwater Pollution Prevention Plan, Complete For $ $

21 42,670 SY Furnish & Install Hydro Mulch Seeding For Permanent Erosion Control, Including water to Establish & Sustain Growth, Complete For $ $

22 100% LS For All Materials, Equipment, Tools & Labor Neccesarry for Pressure Testing Water Pipe, Including Any Necessary Repairs, Complete For $ $

23 100% LS Furnish & Install Temporary Sampling Stations for Microbiological Testing in accordance with AWWA C-651, Complete For $ $

24 100% LS Furnish & Install Temporary Flush Assembly, Complete For $ $

TOTAL BID (ITEMS 1 - 24): $

2022-152-30 Page &P &D

Part B

CITY OF TEMPLE
PEPPER CREEK WASTEWATER EXTENSION AND EQUALIZATION BASIN
BID SCHEDULE
Part B
EstimatedUnitTotal Amount
No.QuantityUnitDescriptionPrice(in numerals)
1100%LSMobilization, Bonds and Insurance, not-to-exceed 5% of the Base Bid Amount, Complete For$$

2 100% LS Prepare Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality (TCEQ), Complete For $ $

3 100% LS Provide Video of site Pre-Construction and Post Construction Site Conditions for the Total Project, Complete For $ $

4 100% LS Provide Project Record Drawings (As Builts), Complete For $ $

ERROR:#REF! LF Furnish and Install Chain Link Fence with 6 Strand Barb Wire, Complete For $ $

ERROR:#REF! LF Furnish and Install Barbed Wire Fence including all connections to existing and abandonment of fence line, Complete for $ $

TOTAL PART B (ITEMS 1 - 8): $

TOTAL PART A + B: $ ERROR:#VALUE!

2 100% LS Prepare Trench Safety Plan in Conformance with State Law and OSHA, Sealed by a Licensed Professional Engineer in the State of Texas, Complete For $ $

3 LF Implement and Follow Trench Safety Plan (Pipe), Complete For $ $

10 100% LS Furnish and Install Water Quality Sampling Station, Including tap, supply line, and meter box assembly, Complete For $ $

11 100% LS For Furnishing All Materials, Equipment, Tools and Labor Necessary for Microbiological Testing in accordance with AWWA C-651, Complete For $ $

12 100% LS For Furnishing All Materials, Equipment, Tools and Labor Necessary for Pressure Testing Water Pipe, Including Any Necessary Repairs, Complete For $ $

13 100% LS For Furnishing All Materials, Equipment, Tools and Labor Necessary for Flushing Water Pipe, Including Any Necessary Repairs, Complete For $ $

ERROR:#REF! SY Furnish and Install 4" Crushed Stone, Complete For $ $

ERROR:#REF! SY Furnish and Install Asphalt Acess Drive, Complete For $ $

ERROR:#REF! SY Furnish and Install Gravel Acess Drive, Complete For $ $

ERROR:#REF! LF Provide and Install 24-inch Diameter DIP Water Line, including Thrust Restraint, Complete For $ $

ERROR:#REF! EA Furnish and Install 24" Gate Valve, Complete For $ $

ERROR:#REF! EA Furnish and Install 24" Tee, Complete For $ $

ERROR:#REF! EA Furnish and Install 24" Plug, Complete For $ $

ERROR:#REF! EA Furnish and Install 24" x 12" Reducer, Complete For $ $

ERROR:#REF! LF Furnish and Install 12" Diameter PVC Water Line, including Thrust Restraint, Complete For $ $

ERROR:#REF! EA Furnish and Install 12" Gate Valve, Complete For $ $

ERROR:#REF! EA Furnish and Install 12" Tee, Complete For $ $

ERROR:#REF! EA Furnish and Install 12" Plug, Complete For $ $

9 LF Furnish, Install, Maintain and Remove Silt Fence as required in the Stormwater Pollution Prevention Plan, Complete For $ $

2021-146-30 Page &P

File details come from the government source that posted it. Updated .