3Rifle Falls Vault Toilet Replacement-PLANSr.pdf

PDF 952 KB Posted

Attached to
PMAA, RMRL, Vault Toilet Replacement
Solicitation number
DQ1 PMAA 2015001099 2
Issued by
Larimer County, Colorado

About this file

This is a project plan document for the Rifle Falls Vault Toilet Replacement project. The file contains installation plans, construction details, and directional information for a vault toilet replacement initiative at Rifle Falls. The document includes three main components: the Rifle Falls Vault Replacement Installation Plan, Dumpster Enclosure Construction Details, and directions to the project site. These materials provide the technical specifications and visual guidance necessary for contractors to understand the scope of work, including the removal and replacement of existing vault toilets and associated infrastructure improvements such as dumpster enclosure construction.

The document serves as a technical reference guide for project execution rather than a formal contract solicitation with pricing or award information. No specific contract terms, pricing structures, bidder requirements, response deadlines, or award dates are contained within this planning document. The materials appear to be preliminary construction documents intended to inform potential bidders of the project requirements and site conditions at Rifle Falls.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6Rifle Falls Vault Replacement - Installation Plan

8tioga_dwgs
9Dumpster Enclosure - Construction Details
7Rifle Falls_directions

File details come from the government source that posted it. Updated .