3c Drawings Sta Jones Beach (P24016976) and Sta Shinnecock (P24008351).pdf

PDF 8 MB Posted

Attached to
DREDGE MULTIPLE SITES AT U. S. COAST GUARD SECTOR LONG ISLAND SOUND, STATION JONES BEACH, FREEPORT, NY
Solicitation number
70Z0G125BSLIS0149
Issued by

About this file

These drawings detail a maintenance dredging project for two U.S. Coast Guard stations located in New York: Station Jones Beach in Freeport, Nassau County, and Station Shinnecock in Hampton Bays, Suffolk County. The project involves two base bid items (BBIs) for mechanical dredging of boat basins and entrance channels, with an estimated total dredge volume of 16,300 cubic yards of silt and sand. At Station Jones Beach, approximately 10,500 cubic yards will be dredged, while Station Shinnecock requires approximately 5,800 cubic yards of dredging.

For each location, the contractor must construct a confined dewatering facility (CDF) to temporarily process dredged material, using bermed, straw bale, and/or silt fence perimeters with sediment trap outlets. After dewatering, the dredged material must be transported to a state-approved upland disposal facility. The project requires all in-water work to be completed within the permitted October 1 to December 31 dredge window, with specific requirements to restore the site to its previous condition, including dismantling temporary facilities and placing loam and seed. The dredging will be performed to specified horizontal and vertical limits shown in the project drawings, with careful attention to protecting existing infrastructure and maintaining U.S. Coast Guard station operations throughout the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAWING INDEX

SHEET ID SHEET NO. LOCATION SHEET TITLE

G-001 01 ALL COVER SHEET

G-002 02 ALL LEGEND AND ABBREVIATIONS

G-003 03 ALL GENERAL NOTES

C-101 04 STA JONES BEACH DREDGE PLAN AND SECTIONS - 1

C-102 05 STA SHINNECOCK DREDGE PLAN AND SECTIONS - 2

C-501 06 ALL STANDARD DETAILS

C-901 07 ALL SITE PHOTOGRAPHS

U.S. COAST GUARD

CIVIL ENGINEERING

CEU PROVIDENCE

PROJECT DESCRIPTION:

THE PROJECT INCLUDES TWO (2) BASE BID ITEMS (BBIs) AS SUMMARIZED BELOW. THIS

SUMMARY IS NOT AN EXHAUSTIVE LIST OF ALL SCOPE ITEMS, ESPECIALLY INCIDENTAL

WORK, AND IS INTENDED TO BE A GENERAL SUMMARY ONLY. REFER TO THE DRAWINGS

AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND DETAILS ON THE FULL

PROJECT SCOPE OF WORK.

BBI NO. 1:

PROVIDE ALL SUPERVISION, LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO

PERFORM MAINTENANCE DREDGING OF THE BOAT BASIN AND ENTRANCE CHANNEL AT

U.S. COAST GUARD STA JONES BEACH. THE DREDGE VOLUME IS ESTIMATED TO BE

APPROXIMATELY 10,500 CUBIC YARDS (CY), WITH MATERIAL CONSISTING OF SILT AND

SAND. THE CONTRACTOR SHALL COMPLETE WORK USING MECHANICAL DREDGING

TECHNIQUES TO THE HORIZONTAL AND VERTICAL LIMITS SHOWN ON THE DRAWINGS. THE

CONTRACTOR SHALL CONSTRUCT A CONFINED DEWATERING FACILITY (CDF) AT THE

UPLAND LOCATION SHOWN TO TEMPORARILY DEWATER DREDGED MATERIAL. THE CDF

SHALL CONSIST OF A BERMED, STRAW BALE, AND/OR SILT FENCE PERIMETER AND

INCLUDE A PIPE OUTLET SEDIMENT TRAP FOR RETURN FLOW WATER AND A STABILIZED

CONSTRUCTION ACCESS WAY. ONCE SUITABLY DEWATERED, THE CONTRACTOR SHALL

TRANSPORT DREDGED MATERIAL TO A STATE-APPROVED UPLAND DISPOSAL FACILITY.

THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND RETAINING A DISPOSAL

FACILITY TO ACCEPT THE DREDGE MATERIAL FOR FINAL DISPOSAL. AFTER DREDGING IS

COMPLETED, THE CONTRACTOR SHALL DISMANTLE THE CDF AND ALL OTHER TEMPORARY

FACILITIES AND RESTORE THE AREA TO ITS PREVIOUS CONDITION AND ELEVATION AND

PLACE LOAM AND SEED. THE CONTRACTOR SHALL COMPLETE ALL WORK IN

ACCORDANCE WITH THE CONTRACT DOCUMENTS AND THE FEDERAL, STATE, AND LOCAL

REGULATORY PERMITS RECEIVED FOR THE PROJECT. ALL WORK IN-WATER SHALL BE

COMPLETED WITHIN THE PERMITTED OCTOBER 1 TO DECEMBER 31 DREDGE WINDOW.

BBI NO. 2:

PROVIDE ALL SUPERVISION, LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO

PERFORM MAINTENANCE DREDGING OF THE BOAT BASIN AND ENTRANCE CHANNEL AT

U.S. COAST GUARD STA SHINNECOCK. THE DREDGE VOLUME IS ESTIMATED TO BE

APPROXIMATELY 5,800 CUBIC YARDS (CY), WITH MATERIAL CONSISTING OF SILT AND

SAND. THE CONTRACTOR SHALL COMPLETE WORK USING MECHANICAL DREDGING

TECHNIQUES TO THE HORIZONTAL AND VERTICAL LIMITS SHOWN ON THE DRAWINGS. THE

CONTRACTOR SHALL CONSTRUCT A CONFINED DEWATERING FACILITY (CDF) AT THE

UPLAND LOCATION SHOWN TO TEMPORARILY DEWATER DREDGED MATERIAL. THE CDF

SHALL CONSIST OF A BERMED, STRAW BALE, AND/OR SILT FENCE PERIMETER AND

INCLUDE A PIPE OUTLET SEDIMENT TRAP FOR RETURN FLOW WATER AND A STABILIZED

CONSTRUCTION ACCESS WAY. ONCE SUITABLY DEWATERED, THE CONTRACTOR SHALL

TRANSPORT DREDGED MATERIAL TO A STATE-APPROVED UPLAND DISPOSAL FACILITY.

THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND RETAINING A DISPOSAL

FACILITY TO ACCEPT THE DREDGE MATERIAL FOR FINAL DISPOSAL. AFTER DREDGING IS

COMPLETED, THE CONTRACTOR SHALL DISMANTLE THE CDF AND ALL OTHER TEMPORARY

FACILITIES AND RESTORE THE AREA TO ITS PREVIOUS CONDITION AND ELEVATION AND

PLACE LOAM AND SEED. THE CONTRACTOR SHALL COMPLETE ALL WORK IN

ACCORDANCE WITH THE CONTRACT DOCUMENTS AND THE FEDERAL, STATE, AND LOCAL

REGULATORY PERMITS RECEIVED FOR THE PROJECT. ALL IN-WATER WORK SHALL BE

COMPLETED WITHIN THE PERMITTED OCTOBER 1 TO DECEMBER 31 DREDGE WINDOW.

A1 VICINITY MAP

SCALE: NTS A3 STA JONES BEACH LOCATION MAP

SCALE: NTS A6 STA SHINNECOCK LOCATION MAP

SCALE: NTS

CG SEC LIS

29599163 DREDGE MULTIPLE SITES (FY26)

CG STA JONES BEACH (24016976)

FREEPORT, NASSAU COUNTY, NEW YORK

CG STA SHINNECOCK (24008351)

HAMPTON BAYS, SUFFOLK COUNTY, NEW YORK

NORTH

PLAN

TR

UE

N

NORTH

PLAN

TR

UE

N

NORTH

PLAN

TR

UE

N

AutoCAD SHX Text

DREDGE MULTIPLE SITES (FY26)

AutoCAD SHX Text

CG STA JONES BEACH & CG STA SHINNECOCK

AutoCAD SHX Text

FREEPORT & HAMPTON BAYS

AutoCAD SHX Text

NY

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

STA JONES BEACH, STA SHINNECOCK

AutoCAD SHX Text G-001

AutoCAD SHX Text 29599163

AutoCAD SHX Text P29599163

AutoCAD SHX Text

P29599163G-001.DWG

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CIVIL ENGINEERING UNIT PROVIDENCE

AutoCAD SHX Text

475 KILVERT ST., SUITE 100

AutoCAD SHX Text

WARWICK, RI 02886

AutoCAD SHX Text

DAVID J. ARPIN, PE

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DD

AutoCAD SHX Text

MICHAEL P. CAROSOTTO, PE

AutoCAD SHX Text

MICHAEL P. CAROSOTTO, PE

AutoCAD SHX Text

DAVID C. DILL, PE

AutoCAD SHX Text 1:1

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

MAY 2025

AutoCAD SHX Text

U.S. COAST GUARD

AutoCAD SHX Text

CIVIL ENGINEERING

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

AutoCAD SHX Text

MARK

AutoCAD SHX Text

EDITED BY:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

TECHNICAL DIRECTOR

AutoCAD SHX Text

BRANCH CHIEF

AutoCAD SHX Text

APPROVING OFFICER DATE

AutoCAD SHX Text

PLOTTING SCALE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

USCG DRAWING N0.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

USCG PROJECT NO.

AutoCAD SHX Text

USCG FILENAME

AutoCAD SHX Text

A/E COMPANY:

AutoCAD SHX Text

CONSULTING A/E:

AutoCAD SHX Text

PROJECT ENGINEER:

AutoCAD SHX Text

A/E PROJECT NO.:

AutoCAD SHX Text

SHEET ID

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text U

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text

ENGINEERING UNIT

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text X

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text

PROVIDENCE

AutoCAD SHX Text

CIVIL

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text D

AutoCAD SHX Text G

AutoCAD SHX Text T

AutoCAD SHX Text G

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text

SOUND

AutoCAD SHX Text

LONG ISLAND

AutoCAD SHX Text

PROVIDENCE

AutoCAD SHX Text

HARTFORD

AutoCAD SHX Text

HUDSON RIVER

AutoCAD SHX Text

LONG ISLAND

AutoCAD SHX Text

MASS.

AutoCAD SHX Text R.I.

AutoCAD SHX Text

CONN.

AutoCAD SHX Text

BLOCK

AutoCAD SHX Text

ISLAND

AutoCAD SHX Text N.Y.

AutoCAD SHX Text

PA.

AutoCAD SHX Text N.J.

AutoCAD SHX Text

AutoCAD SHX Text 908E

AutoCAD SHX Text 908C

AutoCAD SHX Text 909D

AutoCAD SHX Text

JONES BEACH

AutoCAD SHX Text

USCG STA

AutoCAD SHX Text

JONES

AutoCAD SHX Text

BAY

AutoCAD SHX Text

AutoCAD SHX Text

RIVERHEAD HAMPTON BAYS RD.

AutoCAD SHX Text

E MONTAUK HWY

AutoCAD SHX Text

PONQUOGUE AVE.

AutoCAD SHX Text

BAY AVE.

AutoCAD SHX Text

LYNN AVE.

AutoCAD SHX Text

PONQUOGUE BRIDGE

AutoCAD SHX Text

DUNE RD.

AutoCAD SHX Text

BEACH RD.

AutoCAD SHX Text

SHINNECOCK

AutoCAD SHX Text

BAY

ELEVATION

SECTION

DETAIL

CROSS-REFERENCE LEGEND

INDICATES REFERENCE QUADRANT SHEET LOCATION

SHEET WHERE SECTION/DETAIL/ELEVATION

IS TAKEN

INDICATES REFERENCE QUADRANT ON DESTINATION SHEET

SHEET WHERE SECTION IS SHOWN

INDICATES REFERENCE QUADRANT ON DESTINATION SHEET

SHEET WHERE DETAIL IS SHOWN

INDICATES REFERENCE QUADRANT ON DESTINATION SHEET

SHEET WHERE ELEVATION IS SHOWN

X# X-#

X# X-#

X# X-#

X# X-#

VIEW TITLE SAMPLE

SCALE: AS NOTED

X#

PLAN VIEW TITLE SAMPLE

SCALE: AS NOTED

INDICATES REFERENCE QUADRANT SHEET LOCATION

INDICATES REFERENCE

QUADRANT SHEET LOCATION

INDICATES DIRECTION AND

DATE PHOTO WAS TAKEN

X# X-#

PHOTO TITLE SAMPLE

ORITENTATION, DATE

INDICATES PHOTO DESCRIPTION

INDICATES SHEET WHERE PHOTO

LOCATION IS DOCUMENTED

ABBREVIATIONS

APPROX. APPROXIMATE

ASTM AMERICAN SOCIETY FOR TESTING & MATERIALS

BM BENCHMARK

BMP BEST MANAGEMENT PRACTICES

CDF CONFINED DEWATERING FACILITY

CEU CIVIL ENGINEERING UNIT

CL CENTER LINE

COMM COMMUNICATIONS

CONC CONCRETE

CONT CONTINUOUS

COR CONTRACTING OFFICER REPRESENTATIVE

DIA/Ø DIAMETER

DWG DRAWING

E EAST

EA EACH

EL ELEVATION

EX EXISTING

F&I FURNISH AND INSTALL

FT FOOT/FEET

HORIZ HORIZONTAL

IN INCH(ES)

KO CONTRACTING OFFICER

LBS POUNDS

LF LINEAR FEET

LOD LIMITS OF DISTURBANCE

MAX MAXIMUM

MHW MEAN HIGH WATER

MHHW MEAN HIGHER HIGH WATER

MIN MINIMUM

MLW MEAN LOW WATER

MLLW MEAN LOWER LOW WATER

MSL MEAN SEA LEVEL

MTL MEAN TIDE LEVEL

N NORTH

NAD83 NORTH AMERICAN DATUM OF 1983

NAVD88 NORTH AMERICAN VERTICAL DATUM OF 1988

NE NORTH EAST

NO. NUMBER

NTS NOT TO SCALE

NW NORTH WEST

NYSDEC NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION

NYSDOS NEW YORK STATE DEPARTMENT OF STATE

NYSDOT NEW YORK STATE DEPARTMENT OF TRANSPORTATION

OC ON CENTER

OIC OFFICER IN CHARGE

PCF POUNDS PER CUBIC FOOT

R&D REMOVE AND DISPOSE

R&R REMOVE AND REINSTALL

R&S REMOVE AND STOCKPILE

REQ'D REQUIRED

S SOUTH

SE SOUTH EAST

SF SQUARE FEET

SPECS SPECIFICATIONS

STA STATION

SW SOUTH WEST

TYP TYPICAL

UG UNDERGROUND

U.S. UNITED STATES

USACE UNITED STATES ARMY CORPS OF ENGINEERS

USCG UNITED STATES COAST GUARD

W WEST

w/ WITH

& AND

@ AT

' FEET/FOOT

" INCHES

< LESS THAN

> GREATER THAN OR EQUAL

% PERCENTAGE

± PLUS/MINUS

NORTH

PLAN

TRUE N

PLAN NORTH

TRUE NORTH

AutoCAD SHX Text

SHEET ID

AutoCAD SHX Text

DREDGE MULTIPLE SITES (FY26)

AutoCAD SHX Text

CG STA JONES BEACH & CG STA SHINNECOCK

AutoCAD SHX Text

FREEPORT & HAMPTON BAYS

AutoCAD SHX Text

NY

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text

LEGEND AND ABBREVIATIONS

AutoCAD SHX Text

STA JONES BEACH, STA SHINNECOCK

AutoCAD SHX Text G-002

AutoCAD SHX Text 29599163

AutoCAD SHX Text P29599163

AutoCAD SHX Text

P29599163G-002.DWG

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CIVIL ENGINEERING UNIT PROVIDENCE

AutoCAD SHX Text

475 KILVERT ST., SUITE 100

AutoCAD SHX Text

WARWICK, RI 02886

AutoCAD SHX Text

DAVID J. ARPIN, PE

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DD

AutoCAD SHX Text 1:1

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

MAY 2025

AutoCAD SHX Text

US COAST GUARD

AutoCAD SHX Text

CIVIL ENGINEERING

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

AutoCAD SHX Text

MARK

AutoCAD SHX Text

EDITED BY:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

PLOTTING SCALE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

USCG DRAWING N0.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

USCG PROJECT NO.

AutoCAD SHX Text

USCG FILENAME

AutoCAD SHX Text

A/E COMPANY:

AutoCAD SHX Text

CONSULTING A/E:

AutoCAD SHX Text

PROJECT ENGINEER:

AutoCAD SHX Text

A/E PROJECT NO.:

SHEET ID

GENERAL NOTES:

1. THERE ARE TWO SITE LOCATIONS FOR THIS PROJECT AS SUMMARIZED BELOW:

1.1. CG STA JONES BEACH IS LOCATED IN FREEPORT, NEW YORK.

1.2. CG STA SHINNECOCK IS LOCATED IN HAMPTON BAYS, NEW YORK.

2. THESE DRAWINGS ARE NOT INTENDED TO REPLACE THE SPECIFICATIONS. SEE

SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. ALL WORK SHALL CONFORM TO THE

REQUIREMENTS OF THESE DRAWINGS AND SPECIFICATIONS.

3. UTILITY SIZES AND LOCATIONS, WHEN SHOWN ON THESE DRAWINGS, ARE CONSIDERED

APPROXIMATE. THE ACTUAL SIZE AND LOCATION OF UTILITIES MAY VARY FROM THOSE

SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATIONS OF ALL

UTILITIES, GRADES, AND DIMENSIONS PRIOR TO THE START OF WORK. THE CONTRACTOR

SHALL NOTIFY THE COR OF ANY DISCREPANCIES, IN WRITING, PRIOR TO BEGINNING

AFFECTED WORK. THE CONTRACTOR SHALL MAKE PROVISIONS TO ENSURE UTILITY LINES

ARE PROTECTED AND REMAIN IN CONTINUOUS OPERATION, UNLESS OTHERWISE NOTED.

4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO CONTACT DIG SAFELY NEW YORK AND

THE USCG COR A MINIMUM OF 72 HOURS BEFORE COMMENCING WITH ANY EXCAVATION OR

DREDGE RELATED WORK, IN ORDER THAT ALL AFFECTED UTILITY COMPANIES ARE NOTIFIED.

CONTRACTOR SHALL VERIFY THAT ALL THIRD PARTY UTILITY OWNERS HAVE RESPONDED.

5. EXISTING CONSTRUCTION, INCLUDING UTILITIES, DRAINAGE, AND OTHER MISCELLANEOUS

WORK WHICH IS TO REMAIN, SHALL BE UNDISTURBED AND PROTECTED. HOWEVER, SOME

UTILITIES MAY REQUIRE TEMPORARY REMOVAL TO PERFORM THE WORK. REINSTALL

TEMPORARILY REMOVED UTILITIES OR REPLACE WITH NEW MATERIALS IN-KIND BY QUALIFIED

PERSONNEL.

6. ALL UTILITY LINES, INCLUDING THOSE MARKED ABANDONED, SHALL BE TREATED AS LIVE

UNTIL CONFIRMED OUT OF SERVICE BY THE CONTRACTOR.

7. LIMITED WATER AND POWER ARE AVAILABLE ON SITE. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PROVIDING CONNECTIONS AS NEEDED IN COORDINATION WITH THE COR.

8. RIGHT-OF-WAY LINES, LEASE LINES, AND EASEMENT LINES, WHEN SHOWN ON THESE

DRAWINGS, ARE CONSIDERED APPROXIMATE AND WERE OBTAINED FROM LOCAL

MUNICIPAL/COUNTY GIS AND HISTORIC RECORDS.

9. AS PART OF THIS PROJECT, THE USCG HAS OBTAINED ENVIRONMENTAL PERMITS FROM THE

USACE, NYSDEC, AND NYSDOS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADHERING

TO THE CONDITIONS PROVIDED WITHIN THESE DOCUMENTS, COPIES OF WHICH ARE

PROVIDED IN THE SPECIFICATIONS. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING

REQUIRED PERMITS NOT OTHERWISE ACQUIRED BY THE USCG AND LISTED IN THESE

DOCUMENTS.

10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING

THE SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK.

SAFETY PROVISIONS SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL

REGULATIONS. THESE REQUIREMENTS SHALL APPLY CONTINUOUSLY AND SHALL NOT BE

LIMITED TO NORMAL WORKING HOURS.

11. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DEVELOP DREDGING AND DISPOSAL

PROCEDURES AND SEQUENCING TO ENSURE THE PROTECTION OF EXISTING AND PROPOSED

STRUCTURES AND THE SAFETY AND PROTECTION OF STATION PERSONNEL, CONSTRUCTION

PERSONNEL, AND THE PUBLIC, UNLESS OTHERWISE DIRECTED BY THE KO. THIS INCLUDES

THE ADDITION OF NECESSARY TEMPORARY SUPPORTS (E.G., BRACING, SHORING, SHEETING,

GUYS, TIEDOWNS, ETC.) IF REQUIRED. SUCH TEMPORARY MATERIAL SHALL BE DESIGNED BY

THE CONTRACTOR AND SHALL REMAIN THE PROPERTY OF THE CONTRACTOR AND REMOVED

FOLLOWING CONSTRUCTION.

12. THE WORK SHALL BE CONDUCTED IN A MANNER THAT WILL MINIMIZE INTERRUPTIONS TO THE

DAILY OPERATIONS OF USCG STA JONES BEACH AND USCG STA SHINNECOCK OPERATIONS.

13. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD

BEFORE ORDERING ANY MATERIAL, COMMENCING ANY FABRICATION, OR PERFORMING ANY

WORK. THE CONTRACTOR SHALL NOTIFY THE USCG KO, IN WRITING, OF ANY CONDITIONS OR

DIMENSIONS WHICH VARY FROM THOSE SHOWN IN THE DRAWINGS AND INCORPORATE SUCH

VARIATIONS IN THE CONSTRUCTION AS APPROVED BY THE USCG.

14. WATER ELEVATIONS AT THE PROJECT SITES ARE TIDAL AND WILL VARY.

15. THE PROJECT DREDGE LOCATIONS ARE LOCATED WITHIN FEMA FLOOD ZONES AND WILL BE

INUNDATED DURING THE 100 YEAR FLOOD. REFER TO THE DRAWINGS FOR 100-YEAR FLOOD

ELEVATIONS.

16. ALL AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THEIR ORIGINAL

CONDITION BY THE CONTRACTOR, UNLESS OTHERWISE NOTED.

17. THE CONTRACTOR SHALL OBTAIN, DAILY, A BURNING PERMIT FROM THE USCG FOR ALL

WELDING AND TORCH CUTTING.

18. CONTRACTOR INITIATED CHANGES SHALL BE SUBMITTED IN WRITING TO THE COR FOR

APPROVAL PRIOR TO FABRICATION AND CONSTRUCTION. PROPOSED CONTRACTOR

CHANGES SHOWN ON SHOP DRAWINGS ONLY WILL NOT SATISFY THIS REQUIREMENT.

ENVIRONMENTAL PROTECTION PLAN:

1. IN ORDER TO PROTECT THE STATIONS AND THEIR SURROUNDING WATER BODIES FROM

HAZARDOUS MATERIALS RELEASES DURING THE COMPLETION OF THIS PROJECT, THE

CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING PREVENTATIVE MEASURES TO AVOID

ANY ENVIRONMENTAL IMPACTS. THESE MEASURES SHALL INCLUDE, BUT NOT BE LIMITED TO:

1.1. ALL EQUIPMENT PROPOSED TO BE UTILIZED BY THE CONTRACTOR SHALL BE IN GOOD

WORKING CONDITION AND INSPECTED DAILY FOR LEAKS.

1.2. A SPILL KIT AND ABSORBENT MATERIALS AND CONTAINMENT BOOM SHALL BE ON SITE AT

ALL TIMES DURING CONSTRUCTION OPERATIONS.

1.3. ALL FUEL TRANSFER OPERATIONS SHALL BE CONDUCTED IN AN EFFICIENT AND SAFE

MANNER IN ACCORDANCE WITH THE CONTRACTOR'S OPERATIONS MANUAL AND THE

REQUIREMENTS SPECIFIED. OIL ABSORBENT DIAPERS SHALL BE PLACED UNDER ALL

EQUIPMENT DURING FUELING OPERATIONS.

1.4. ALL HYDRAULIC EQUIPMENT OPERATING ON SITE SHALL HAVE VEGETABLE BASED,

NON-TOXIC, NON-POLLUTING, AND BIO-DEGRADABLE HYDRAULIC FLUID.

1.5. ALL EQUIPMENT SHALL BE PROPERLY MAINTAINED AND RECORDED IN WEEKLY LOGS AS

TO REQUIREMENTS FOR AND ACTUAL MAINTENANCE COMPLETED.

2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CLEANUP AND REMEDIATION OF

HAZARDOUS MATERIAL RELEASES.

LAYOUT:

1. THE HORIZONTAL CONTROL DATUM FOR THIS PROJECT IS THE US STATE PLACE COORDINATE

SYSTEM NAD 1983, LONG ISLAND LAMBERT - ZONE 3104. US SURVEY FEET

2. THE VERTICAL CONTROL DATUM FOR THIS PROJECT IS MLLW.

3. WATERSIDE CONTOURS SHOWN ON THESE PLANS ARE REFERENCED TO MLLW, UNLESS

OTHERWISE NOTED.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING CONTROL MONUMENTATION

ON SITE IN ORDER TO PERFORM REQUIRED LAYOUT WORK AND THE DETERMINATION OF

DREDGE LIMITS.

5. THE CONTRACTOR SHALL MAINTAIN ADEQUATE SURVEY CONTROL THROUGHOUT

CONSTRUCTION TO ESTABLISH AND MAINTAIN ALL LINES AND ELEVATIONS.

DREDGING:

1. COORDINATE WITH THESE DRAWINGS AND SECTION 35 20 23, DREDGING.

TEMPORARY ENVIRONMENTAL CONTROLS:

1. COORDINATE WITH THESE DRAWINGS AND SECTION 01 57 19, TEMPORARY ENVIRONMENTAL

CONTROLS.

2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE AND MAINTAIN ENVIRONMENTAL

CONTROLS AS REQUIRED BY FEDERAL, STATE, AND MUNICIPAL REGULATIONS AND PERMITS.

ENVIRONMENTAL CONTROLS SHALL INCLUDE, BUT NOT BE LIMITED TO SEDIMENTATION,

TURBIDITY, AND DUST.

CONSTRUCTION SEQUENCING:

1. CONTRACTOR CONSTRAINTS TO SEQUENCING ARE AS FOLLOWS:

A. STA JONES BEACH AND STA SHINNECOCK ARE ACTIVE USCG INSTALLATIONS AND WILL

MAINTAIN CONTINUOUS OPERATION THROUGHOUT THE COMPLETION OF THIS PROJECT.

ACCORDINGLY, THE CONTRACTOR SHALL NOT INTERFERE WITH UNIT OPERATIONS OR

IMPEDE UPLAND OR WATER BASED ACCESS. THE CONTRACTOR SHALL BE RESPONSIBLE

FOR OBTAINING APPROVAL TO BEGIN EACH PHASE OF WORK IN COORDINATION WITH THE

COR AND EACH UNIT'S ENGINEERING PETTY OFFICER.

2. AREAS OF THE FACILITIES NOT UNDER CONSTRUCTION SHALL REMAIN IN OPERATION DURING

CONSTRUCTION. KEEP ALL CONSTRUCTION ACTIVITIES AND PERSONNEL CLEAR OF FACILITY

OPERATIONS.

AutoCAD SHX Text

SHEET ID

AutoCAD SHX Text

DREDGE MULTIPLE SITES (FY26)

AutoCAD SHX Text

CG STA JONES BEACH & CG STA SHINNECOCK

AutoCAD SHX Text

FREEPORT & HAMPTON BAYS

AutoCAD SHX Text

NY

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text

STA JONES BEACH, STA SHINNECOCK

AutoCAD SHX Text G-003

AutoCAD SHX Text 29599163

AutoCAD SHX Text P29599163

AutoCAD SHX Text

P29599163G-003.DWG

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CIVIL ENGINEERING UNIT PROVIDENCE

AutoCAD SHX Text

475 KILVERT ST., SUITE 100

AutoCAD SHX Text

WARWICK, RI 02886

AutoCAD SHX Text

DAVID J. ARPIN, PE

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DD

AutoCAD SHX Text 1:1

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

MAY 2025

AutoCAD SHX Text

US COAST GUARD

AutoCAD SHX Text

CIVIL ENGINEERING

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

AutoCAD SHX Text

MARK

AutoCAD SHX Text

EDITED BY:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

PLOTTING SCALE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

USCG DRAWING N0.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

USCG PROJECT NO.

AutoCAD SHX Text

USCG FILENAME

AutoCAD SHX Text

A/E COMPANY:

AutoCAD SHX Text

CONSULTING A/E:

AutoCAD SHX Text

PROJECT ENGINEER:

AutoCAD SHX Text

A/E PROJECT NO.:

SHEET ID

-5

-6

-7

-8

-9

-8

-7

-9

-10

-7

-1

-2

-3

-4

-5

-6

-7

-6

-7-8 -6 -5 -4

-1

-9

-10

-7 -8

-9

-12-11 -10

-6

-5

MHHW

EL. 4.58'

EL. -8'

PROJECT DEPTH

EL. -9'

PROJECT DEPTH

+ 1' OVERDEPTH

50' 100'0

A3

DREDGE PLAN

SCALE: 1" = 50'-0"

TABLE 1

MAINTENANCE DREDGING BOUNDARY

COORDINATES

POINT ID EASTING (FT) NORTHING (FT)

A 1,107,692 154,557

B 1,107,807 154,575

C 1,107,981 154,881

D 1,107,573 155,382

E 1,107,401 155,356

F 1,107,763 154,911

G 1,107,720 154,852

H 1,107,648 154,840

A B

C

D

E

F

G

JONES BAY

EBB

FLOOD

H

BOAT BASIN AND ENTRANCE

CHANNEL MAINTENANCE

DREDGE LIMITS,

166,400± SF (3.8 ACRES)

A9 C-101

DREDGE LIMITS

WITHIN

ENTRANCE

CHANNEL

1 1

A9

TYPICAL DREDGE SECTION

SCALE: NTSA1

VERTICAL DATUM CONVERSION DIAGRAM

SCALE: NTS

NOTES:

1. THE ELEVATION DATA SHOWN WAS TAKEN FROM THE NOAA ONLINE

VERTICAL DATUM TRANSFORMATION TOOL AT COORDINATES 40.591192°

-73.554629°.

EL. -2.58'

EL. -2.41'

EL. -0.33'

EL. 0.00'

EL. 1.69'

EL. 2.00'

EL. -0.35'

MLLW

MLW

MTL

MSL

NAVD 88

MHW

MHHW

MEAN TIDAL

RANGE = 4.10'

EL. 0.00'

EL. 0.17'

EL. 2.25'

EL. 2.58'

EL. 4.27'

EL. 4.58'

EL. 2.23'

NAVD 88MLLW

EL. 8' TO 9'FEMA AE

FLOOD EL

EL. 10.58'

TO 11.58'

USCG STA JONES BEACH

BOAT BASIN

USCG STA JONES BEACH

ENTRANCE CHANNEL

EX. SHEET PILE GROIN

EX. BULKHEAD

EX. FLOATING

DOCK (TYP.)

EX. TRAVEL LIFT PIER

EX. REVETMENT

B9 C-101

EXISTING MUDLINE (TYP.), SIDE

SLOPES AND ELEVATIONS VARY

DREDGE LIMITS

WITHIN BOAT

BASIN

MLLW

EL. 0.00'

B9

TYPICAL DREDGE SECTION

SCALE: NTS

EX. SHEET

PILE GROIN

GENERAL NOTES:

1. DREDGING SHALL BE PERFORMED BY MECHANICAL DREDGING TECHNIQUES

USING A CLAM SHELL OR FIXED BUCKET LOADING ON A DREDGE MATERIAL

TRANSFER BARGE/SCOW.

2. CONTRACTOR SHALL CONSTRUCT A TEMPORARY CONFINED DEWATERING

FACILITY (CDF) AT THE LOCATION SHOWN AND PLACE DREDGED MATERIAL

WITHIN. ONCE SUITABLY DEWATERED, THE CONTRACTOR SHALL TRANSPORT

THE DREDGE MATERIAL OFFSITE TO A STATE-APPROVED UPLAND DISPOSAL

FACILITY AND THEN DISMANTLE THE CDF.

3. THE EXISTING BATHYMETRIC CONTOUR DATA SHOWN WAS OBTAINED DURING A

SURVEY COMPLETED BY CR ENVIRONMENTAL AND LLOYD COLLINS JV FOR THE

USCG CIVIL ENGINEERING UNIT PROVIDENCE ON MARCH 27, 2024 AND IS

CONSIDERED APPROXIMATE.

4. THE DATA DEPICTED ON THIS DRAWING SHOULD NOT BE USED FOR VOLUME

CALCULATION PURPOSES.

5. THE SPECIFIED PRE-DREDGE AND POST-DREDGE SURVEYS SHALL BE USED FOR

DETERMINING DREDGE VOLUMES FOR PAYMENT. REFER TO THE PROJECT

SPECIFICATIONS FOR MORE DETAILS.

6. THE CONTRACTOR SHALL DREDGE TO THE SPECIFIED DREDGE DEPTH UP TO

THE PERIMETER OF THE EXISTING SHEET PILE BULKHEAD AND SHEET PILE

GROIN AS SHOWN.

7. THE CONTRACTOR SHALL DREDGE TO THE SPECIFIED DREDGE DEPTH UP TO

THE PERIMETER OF THE EXISTING TRAVEL LIFT PIERS AND FLOATING DOCKS

WITHOUT RELOCATING THESE STRUCTURES. THE AREA BELOW THE TRAVEL

LIFT PIERS AND FLOATING DOCKS SHALL BE DREDGED AS CLOSE AS POSSIBLE

TO THE PROPOSED DREDGE DEPTH FROM THEIR OUTER PERIMETERS.

8. THE CONTRACTOR SHALL NOT DAMAGE THE EXISTING WATERFRONT

INFRASTRUCTURE. ANY DAMAGE IMPARTED TO THE EXISTING WATERFRONT

INFRASTRUCTURE SHALL BE REPAIRED TO ITS PREVIOUS CONDITION AND

FUNCTION BY THE CONTRACTOR AT NO COST TO THE GOVERNMENT.

9. THE CONTRACTOR SHALL COMPLETE THE REQUIRED DREDGING WITHIN

NORMAL WORKING HOURS BETWEEN 0700 AND 1700 WITHOUT IMPACTING THE

USCG OPERATIONS IN ANY WAY. THE CONTRACTOR SHALL COORDINATE WITH

THE COR AND AND THE STA JONES BEACH ENGINEERING PETTY OFFICER TO

DEVELOP A MUTUALLY AGREED UPON SCHEDULE TO ACCOMPLISH THE

PROPOSED DREDGING. THE CONTRACTOR SHALL RELOCATE ALL DREDGE

EQUIPMENT AWAY FROM ALL BERTHING AREAS NO LATER THAN 1700 EACH

WORKDAY TO ALLOW USCG BOATS TO RETURN TO THEIR NORMAL MOORING

LOCATIONS.

10. IF NECESSARY, WORK OUTSIDE OF REGULAR WORKING HOURS MAY BE

REQUESTED BY THE CONTRACTOR AND IS SUBJECT TO APPROVAL OF THE KO

AND THE STA JONES BEACH ENGINEERING PETTY OFFICER. SUBMIT REQUESTS

TO THE KO IN WRITING AND INCLUDE DETAILS OF THE PROPOSED ALTERNATE

WORK SCHEDULE.

11. THE CONTRACTOR SHALL KEEP ALL EQUIPMENT OFF OF AND AWAY FROM THE

GEOTHERMAL FIELD LOCATED ADJACENT TO THE TEMPORARY HAUL ROUTE.

TEMPORARY PIPE

OUTLET SEDIMENT TRAP

TEMPORARY CONFINED

DEWATERING FACILITY

TEMPORARY

STABILIZED

CONSTRUCTION

ACCESS

-9 -8 -7 -6

-9 -8

-7 -6

-5 -4

-9

-9

-8 -7

-6

-8 -7

-6

-9 -8

-7 -6

-5 -4

-3 -2

MHHW

EL. 4.58'

EXISTING MUDLINE, SIDE SLOPES

AND ELEVATIONS VARY

MLLW

EL. 0.00'

EL. -8'

PROJECT DEPTH

EL. -9'

PROJECT DEPTH

+ 1' OVERDEPTH

PROPOSED DREDGE LIMITS

EXISTING CONTOUR

PROPOSED CONTOUR

EXISTING BUILDING

PROPOSED TEMPORARY CONFINED DEWATERING FACILITY

PROPOSED TEMPORARY HAUL ROUTE

-5

CIVIL LEGEND

TEMPORARY HAUL ROUTE

DREDGE OFFLOAD AREA

TABLE 3

ESTIMATED DREDGE VOLUME

DREDGE LOCATION

DREDGE QUANTITY

(CY)

BOAT BASIN AND

ENTRANCE CHANNEL

(166,400± SF), EL. -8 FT

6,200

BOAT BASIN AND

ENTRANCE CHANNEL

(166,400± SF)

OVERDEPTH, EL. -9 FT

4,300

TOTAL 10,500

TABLE 2

CONFINED DEWATERING FACILITY (CDF)

BOUNDARY COORDINATES

POINT ID EASTING (FT) NORTHING (FT)

(1) 1,107,157 154,831

(2) 1,107,287 154,848

(3) 1,107,291 154,497

(4) 1,107,203 154,484

(2)

(3)(4)

(1)

MULTI MISSION

BUILDING

EX. PERIMETER

FENCE

BOATHOUSE

ASPHALT

PAVEMENT

CONCRETE PAVEMENT (TYP.)

EX. STA

ENTRANCE GATE

ASPHALT

PAVEMENT

GRASS

GRASS

GRASS

GRASS

EX. GREEN BUOY

(APPROX. LOCATION)

P&M EX. WEATHER STATION

F1 C-901

F7 C-901F9

C-901

D1 C-901

F3 C-901

F5 C-901

EX. BULKHEAD

D5

C-901GEOTHERMAL

FIELD

CB

D7 C-901

D3 C-901

D9 C-901

NORTH

PLAN

TR

UE

N

APPROX.SHORELINE

EX. FUEL TANKS

EX. MISC. TANKS/

EQUIPMENT

EX. OH LIGHT (TYP.)

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

AutoCAD SHX Text

MARK

AutoCAD SHX Text

EDITED BY:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

PLOTTING SCALE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

USCG DRAWING N0.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

USCG PROJECT NO.

AutoCAD SHX Text

USCG FILENAME

AutoCAD SHX Text

A/E COMPANY:

AutoCAD SHX Text

CONSULTING A/E:

AutoCAD SHX Text

PROJECT ENGINEER:

AutoCAD SHX Text

A/E PROJECT NO.:

AutoCAD SHX Text

SHEET ID

AutoCAD SHX Text

SHEET ID

AutoCAD SHX Text

DREDGE MULTIPLE SITES (FY26)

AutoCAD SHX Text

CG STA JONES BEACH

AutoCAD SHX Text

FREEPORT

AutoCAD SHX Text

NY

AutoCAD SHX Text

CIVIL

AutoCAD SHX Text

DREDGE PLAN AND SECTIONS - 1

AutoCAD SHX Text

STA JONES BEACH

AutoCAD SHX Text C-101

AutoCAD SHX Text 29599163

AutoCAD SHX Text P29599163

AutoCAD SHX Text

P29599163C-101.DWG

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CIVIL ENGINEERING UNIT PROVIDENCE

AutoCAD SHX Text

475 KILVERT ST., SUITE 100

AutoCAD SHX Text

WARWICK, RI 02886

AutoCAD SHX Text

DAVID J. ARPIN, PE

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DD

AutoCAD SHX Text 1:1

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

MAY 2025

AutoCAD SHX Text

US COAST GUARD

AutoCAD SHX Text

CIVIL ENGINEERING

-4

-7-6

-2

-5

-3

-4

-9-8

-10

-8

-4

-8

-5

-6

-7

-8

-8

-8

-8 -7

-3

-4

-5

-6

-7

-5

-8

-7

-9

-6

-5

-6

MHHW

EL. 3.17'

EL. -8'

PROJECT DEPTH

EL. -9'

PROJECT DEPTH

+ 1' OVERDEPTH

50' 100'0

A3

DREDGE PLAN

SCALE: 1" = 50'-0"

TABLE 4

MAINTENANCE DREDGING BOUNDARY

COORDINATES

POINT ID EASTING (FT) NORTHING (FT)

A 1,398,833 252,273 B 1,398,667 252,498 C 1,398,662 252,498 D 1,398,658 252,427 E 1,398,351 252,381 F 1,398,349 252,415 G 1,398,387 252,412 H 1,398,397 252,458 I 1,398,388 252,470 J 1,398,341 252,473 K 1,398,351 252,629 L 1,398,475 252,629 M 1,398,482 252,642 N 1,398,666 252,631 O 1,398,735 252,552 P 1,398,840 252,498 Q 1,398,852 252,483

A

BC

D

E

F

G

H

BOAT BASIN AND ENTRANCE

CHANNEL MAINTENANCE

DREDGE LIMITS,

100,300± SF (2.3 ACRES)

DREDGE LIMITS

WITHIN

ENTRANCE

CHANNEL

1 1

A9

TYPICAL DREDGE SECTION

SCALE: NTSA1

VERTICAL DATUM CONVERSION DIAGRAM

SCALE: NTS

NOTES:

1. THE ELEVATION DATA SHOWN WAS TAKEN FROM THE NOAA ONLINE

VERTICAL DATUM TRANSFORMATION TOOL AT COORDINATES 40.849746°

-72.503158°.

EL. -1.76'

EL. -1.63'

EL. -0.29'

EL. 0.00'

EL. 1.15'

EL. 1.41'

EL. -0.24'

MLLW

MLW

MTL

MSL

NAVD 88

MHW

MHHW

MEAN TIDAL

RANGE = 2.78'

EL. 0.00'

EL. 0.13'

EL. 1.47'

EL. 1.76'

EL. 2.91'

EL. 3.17'

EL. 1.52'

NAVD 88MLLW

EL. 12'FEMA AE

FLOOD EL EL. 13.76'

EXISTING MUDLINE, SIDE SLOPES

AND ELEVATIONS VARY

DREDGE LIMITS

WITHIN BOAT

BASIN

MLLW

EL. 0.00'

B9

TYPICAL DREDGE SECTION

SCALE: NTS

EX. SHEET PILE

BREAKWATER

6. THE CONTRACTOR SHALL DREDGE TO THE SPECIFIED DREDGE DEPTH UP TO

THE PERIMETER OF THE EXISTING WHARF AND BREAKWATERS AS SHOWN.

7. THE CONTRACTOR SHALL DREDGE TO THE SPECIFIED DREDGE DEPTH UP TO

THE PERIMETER OF THE EXISTING FLOATING DOCKS WITHOUT RELOCATING

THESE STRUCTURES. THE AREA BELOW THE FLOATING DOCKS SHALL BE

DREDGED AS CLOSE AS POSSIBLE TO THE PROPOSED DREDGE DEPTH FROM

THEIR OUTER PERIMETERS.

8. THE CONTRACTOR SHALL NOT DAMAGE THE EXISTING WATERFRONT

INFRASTRUCTURE. ANY DAMAGE IMPARTED TO THE EXISTING WATERFRONT

INFRASTRUCTURE SHALL BE REPAIRED TO ITS PREVIOUS CONDITION AND

FUNCTION BY THE CONTRACTOR AT NO COST TO THE GOVERNMENT.

9. THE CONTRACTOR SHALL COMPLETE THE REQUIRED DREDGING WITHIN

NORMAL WORKING HOURS BETWEEN 0700 AND 1700 WITHOUT IMPACTING THE

USCG OPERATIONS IN ANY WAY. THE CONTRACTOR SHALL COORDINATE WITH

THE COR AND AND THE STA SHINNECOCK ENGINEERING PETTY OFFICER TO

DEVELOP A MUTUALLY AGREED UPON SCHEDULE TO ACCOMPLISH THE

PROPOSED DREDGING. THE CONTRACTOR SHALL RELOCATE ALL DREDGE

EQUIPMENT AWAY FROM ALL BERTHING AREAS NO LATER THAN 1700 EACH

WORKDAY TO ALLOW USCG BOATS TO RETURN TO THEIR NORMAL MOORING

LOCATIONS.

10. IF NECESSARY, WORK OUTSIDE OF REGULAR WORKING HOURS MAY BE

REQUESTED BY THE CONTRACTOR AND IS SUBJECT TO APPROVAL OF THE KO

AND THE STA SHINNECOCK ENGINEERING PETTY OFFICER. SUBMIT REQUESTS

TO THE KO IN WRITING AND INCLUDE DETAILS OF THE PROPOSED ALTERNATE

WORK SCHEDULE.

11. THE CONTRACTOR SHALL KEEP ALL HEAVY EQUIPMENT OFF OF AND AWAY

FROM SEPTIC SYSTEM LOCATED ADJACENT TO THE TEMPORARY HAUL

ROUTE.

12. THE CONTRACTOR SHALL LOCATE AND PROTECT EXISTING UNDERGROUND

UTILITIES FROM DAMAGE DUE TO CONSTRUCTION SURCHARGE LOADS.

PROTECTION MEASURES SHALL INCLUDE, BUT MAY NOT BE LIMITED TO THE

PLACEMENT OF TIMBER CRANE MATS ABOVE UTILITIES TO DISTRIBUTE LOADS.

13. THE CONTRACTOR SHALL BE AWARE OF AND PROTECT THE EXISTING

COMMUNICATIONS ANTENNAS.

-9 -8

-7 -6

-5 -4

-3 -2

MHHW

EL. 3.17'

EXISTING MUDLINE, SIDE SLOPES

AND ELEVATIONS VARY

MLLW

EL. 0.00'

EL. -8'

PROJECT DEPTH

EL. -9'

PROJECT DEPTH

+ 1' OVERDEPTH

PROPOSED DREDGE LIMITS

EXISTING CONTOUR

PROPOSED CONTOUR

EXISTING BUILDING

PROPOSED TEMPORARY CONFINED DEWATERING FACILITY

PROPOSED TEMPORARY HAUL ROUTE

UNDERGROUND ELECTRICAL LINE

UNDERGROUND COMMUNICATIONS LINE

UNDERGROUND STORM DRAIN

-5

CIVIL LEGEND

TABLE 6

ESTIMATED DREDGE VOLUME

DREDGE LOCATION

DREDGE QUANTITY

(CY)

BOAT BASIN AND

ENTRANCE CHANNEL

(100,300± SF), EL. -8 FT

2,100

BOAT BASIN AND

ENTRANCE CHANNEL

(100,300± SF)

OVERDEPTH, EL. -9 FT

3,700

TOTAL 5,800

I J

K

L

M N

O

P Q

EX. SOUTH BREAKWATER

EX. NORTH BREAKWATER

EX. TIMBER CLUSTER

DOLPHIN (TYP.)

EX. FLOATING

DOCK (TYP.)

EX. BOAT RAMP

BO

AT

M

AI

N

TE

N

AN

C E

BU

IL

D

IN

G

ASPHALT

PAVEMENT

STATION

BUILDING

ANTENNA

EX. FLOATING DOCK

EX. BULKHEAD

APPR

O

X.

SH

O

R

ELIN

E

EX. CONCRETE PAVEMENT

W H

AR

F

USCG STA SHINNECOCK

ENTRANCE CHANNEL

-9 -7-8

-9 -8

-7 -6

-5 -4

-9 -8

-7 -6

-5 -4

-9 -8

APPROX.

SHORELINE

SEPTIC

SYSTEM

LIMITS OF SEPTIC

SYSTEM, SEE NOTE 11

TABLE 5

CONFINED DEWATERING FACILITY (CDF)

BOUNDARY COORDINATES

POINT ID EASTING (FT) NORTHING (FT)

(1) 1,400,426 252,580

(2) 1,400,548 252,661

(3) 1,400,443 252,842

(4) 1,400,230 252,731

(5) 1,400,102 253,014

(6) 1,400,614 253,226

(7) 1,400,660 252,971

(8) 1,400,806 252,518

(9) 1,400,595 252,450

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(1)

ESD

BUILDING

LIG

HTHO

USE RO

AD

EX. STA

ENTRANCE

GATE

TEMPORARY HAUL ROUTE

DREDGE OFFLOAD AREA

USCG STA SHINNECOCK

BOAT BASIN

TEMPORARY

PIPE OUTLET

SEDIMENT TRAP

TEMPORARY CONFINED

DEWATERING FACILITY

EX. ANTENNA

EX. UNDERGROUND

BULKHEAD TIE-BACK

SYSTEM (TYP.)

GRASS

GRASS

GRASS

EX. RETAINING WALL

EX. PERIMETER FENCE

EX. GATE

TEMPORARY

STABILIZED

CONSTRUCTION

ACCESS

A9 C-102

B9 C-102

EX. RIPRAP

REVETMENT

EX. RIPRAP REVETMENT (TYP.)

SHINNECOCK

BAY

EB

B

FL

O

O D

EX. RED BUOY

(APPROX. LOCATION)

B1 C-901

B3 C-901

B5 C-901

B7 C-901

B9 C-901

A1 C-901

A3 C-901

A5,A7 C-901

A9 C-901

NORTH

PLAN

TR

UE

N

EX. DRY WELL

GENERAL NOTES:

1. DREDGING SHALL BE PERFORMED BY MECHANICAL DREDGING TECHNIQUES USING A CLAM

SHELL OR FIXED BUCKET LOADING ON A DREDGE MATERIAL TRANSFER BARGE/SCOW.

2. CONTRACTOR SHALL CONSTRUCT A TEMPORARY CONFINED DEWATERING FACILITY (CDF) AT

THE LOCATION SHOWN AND PLACE DREDGED MATERIAL WITHIN. ONCE SUITABLY DEWATERED,

THE CONTRACTOR SHALL TRANSPORT THE DREDGE MATERIAL OFFSITE TO A STATE-APPROVED

UPLAND DISPOSAL FACILITY AND THEN DISMANTLE THE CDF.

3. THE EXISTING BATHYMETRIC CONTOUR DATA SHOWN WAS OBTAINED DURING A SURVEY

COMPLETED BY CR ENVIRONMENTAL AND LLOYD COLLINS JV FOR THE USCG CIVIL ENGINEERING

UNIT PROVIDENCE ON MARCH 28, 2024 AND IS CONSIDERED APPROXIMATE.

4. THE DATA DEPICTED ON THIS DRAWING SHOULD NOT BE USED FOR VOLUME CALCULATION

PURPOSES.

5. THE SPECIFIED PRE-DREDGE AND POST-DREDGE SURVEYS SHALL BE USED FOR DETERMINING

DREDGE VOLUMES FOR PAYMENT. REFER TO THE PROJECT SPECIFICATIONS FOR MORE

DETAILS.

AutoCAD SHX Text F.P.

AutoCAD SHX Text F.P.

AutoCAD SHX Text

SD

AutoCAD SHX Text

UE

AutoCAD SHX Text

UE

AutoCAD SHX Text

CU

AutoCAD SHX Text

UE

AutoCAD SHX Text

UE

AutoCAD SHX Text

UE

AutoCAD SHX Text

CU

AutoCAD SHX Text

CU

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

AutoCAD SHX Text

MARK

AutoCAD SHX Text

EDITED BY:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

PLOTTING SCALE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

USCG DRAWING N0.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

USCG PROJECT NO.

AutoCAD SHX Text

USCG FILENAME

AutoCAD SHX Text

A/E COMPANY:

AutoCAD SHX Text

CONSULTING A/E:

AutoCAD SHX Text

PROJECT ENGINEER:

AutoCAD SHX Text

A/E PROJECT NO.:

AutoCAD SHX Text

SHEET ID

AutoCAD SHX Text

SHEET ID

AutoCAD SHX Text

DREDGE MULTIPLE SITES (FY26)

AutoCAD SHX Text

CG STA SHINNECOCK

AutoCAD SHX Text

HAMPTON BAYS

AutoCAD SHX Text

NY

AutoCAD SHX Text

CIVIL

AutoCAD SHX Text

DREDGE PLAN AND SECTIONS - 2

AutoCAD SHX Text

STA SHINNECOCK

AutoCAD SHX Text C-102

AutoCAD SHX Text 29599163

AutoCAD SHX Text P29599163

AutoCAD SHX Text

P29599163C-102.DWG

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CIVIL ENGINEERING UNIT PROVIDENCE

AutoCAD SHX Text

475 KILVERT ST., SUITE 100

AutoCAD SHX Text

WARWICK, RI 02886

AutoCAD SHX Text

DAVID J. ARPIN, PE

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DD

AutoCAD SHX Text 1:1

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

MAY 2025

AutoCAD SHX Text

US COAST GUARD

AutoCAD SHX Text

CIVIL ENGINEERING

AutoCAD SHX Text -4

AutoCAD SHX Text

UE

AutoCAD SHX Text

CU

SD

DESIGNED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

AutoCAD SHX Text

MARK

AutoCAD SHX Text

EDITED BY:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

PLOTTING SCALE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

USCG DRAWING N0.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

USCG PROJECT NO.

AutoCAD SHX Text

USCG FILENAME

AutoCAD SHX Text

A/E COMPANY:

AutoCAD SHX Text

CONSULTING A/E:

AutoCAD SHX Text

PROJECT ENGINEER:

AutoCAD SHX Text

A/E PROJECT NO.:

AutoCAD SHX Text

SHEET ID

AutoCAD SHX Text

SHEET ID

AutoCAD SHX Text

DREDGE MULTIPLE SITES (FY26)

AutoCAD SHX Text

CG STA JONES BEACH & CG STA SHINNECOCK

AutoCAD SHX Text

FREEPORT & HAMPTON BAYS

AutoCAD SHX Text

NY

AutoCAD SHX Text

CIVIL

AutoCAD SHX Text

STANDARD DETAILS

AutoCAD SHX Text

STA JONES BEACH, STA SHINNECOCK

AutoCAD SHX Text C-501

AutoCAD SHX Text 29599163

AutoCAD SHX Text P29599163

AutoCAD SHX Text

P29599163C-501.DWG

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CIVIL ENGINEERING UNIT PROVIDENCE

AutoCAD SHX Text

475 KILVERT ST., SUITE 100

AutoCAD SHX Text

WARWICK, RI 02886

AutoCAD SHX Text

DAVID J. ARPIN, PE

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DD

AutoCAD SHX Text 1:1

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

MAY 2025

AutoCAD SHX Text

US COAST GUARD

CIVIL ENGINEERING

F1 C-101

STA JONES BEACH

SOUTHWEST, 14 APR 2025 F3 C-101

STA JONES BEACH

SOUTHEAST, 14 APR 2025 F5 C-101

STA JONES BEACH

NORTHEAST, 14 APR 2025 F7 C-101

STA JONES BEACH

NORTHWEST, 14 APR 2025 F9 C-101

STA JONES BEACH

NORTH, 14 APR 2025

D1 C-101

STA JB CDF AREA

NORTH, 14 APR 2025 D3 C-101

STA JB HAUL ROUTE AREA

WEST, 14 APR 2025 D5 C-101

STA JB OFFLOAD AREA

SOUTH, 14 APR 2025 D7 C-101

STA JB BOAT BASIN

NORTH, 14 APR 2025 D9 C-101

STA JB TRAVEL LIFT PIER

NORTHEAST, 14 APR 2025

B1 C-102

STA SHINNECOCK

EAST, 14 APR 2025 B3 C-102

STA SHINNECOCK

SOUTH, 14 APR 2025 B5 C-102

STA SHINNECOCK

EAST, 14 APR 2025 B9 C-102

STA SHINN BOAT BASIN

EAST, 14 APR 2025B7 C-102

STA SHINNECOCK

WEST, 14 APR 2025

A1 C-102

STA SHINN BOAT BASIN

WEST, 14 APR 2025 A3 C-102

STA SHINN OFFLOAD AREA

NORTHWEST, 14 APR 2025 A5 C-102

STA SHINN HAUL ROUTE AREA

EAST, 14 APR 2025 A7 C-102

STA SHINN HAUL ROUTE AREA

SOUTH, 14 APR 2025 A9 C-102

STA SHINN CDF AREA

NORTH, 14 APR, 2025

AutoCAD SHX Text

SHEET ID

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

AutoCAD SHX Text

MARK

AutoCAD SHX Text

EDITED BY:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text G

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

PLOTTING SCALE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

USCG DRAWING N0.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

USCG PROJECT NO.

AutoCAD SHX Text

USCG FILENAME

AutoCAD SHX Text

A/E COMPANY:

AutoCAD SHX Text

CONSULTING A/E:

AutoCAD SHX Text

PROJECT ENGINEER:

AutoCAD SHX Text

A/E PROJECT NO.:

AutoCAD SHX Text

SHEET ID

AutoCAD SHX Text

DREDGE MULTIPLE SITES (FY26)

AutoCAD SHX Text

CG STA JONES BEACH & CG STA SHINNECOCK

AutoCAD SHX Text

FREEPORT & HAMPTON BAYS

AutoCAD SHX Text

NY

AutoCAD SHX Text

CIVIL

AutoCAD SHX Text

SITE PHOTOGRAPHS

AutoCAD SHX Text

STA JONES BEACH, STA SHINNECOCK

AutoCAD SHX Text C-901

AutoCAD SHX Text 29599163

AutoCAD SHX Text P29599163

AutoCAD SHX Text

P29599163C-901.DWG

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CIVIL ENGINEERING UNIT PROVIDENCE

AutoCAD SHX Text

475 KILVERT ST., SUITE 100

AutoCAD SHX Text

WARWICK, RI 02886

AutoCAD SHX Text

DAVID J. ARPIN, PE

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DA

AutoCAD SHX Text

1DD

AutoCAD SHX Text 1:1

AutoCAD SHX Text

AS SHOWN

AutoCAD SHX Text

AutoCAD SHX Text

ISSUED FOR CONSTRUCTION

AutoCAD SHX Text

MAY 2025

AutoCAD SHX Text

US COAST GUARD

CIVIL ENGINEERING

P29599163G-001-(1) G-001
Sheets and Views
P29599163G-001-(1) G-001
P29599163G-002-(2) G-002
Sheets and Views
P29599163G-002-(2) G-002
P29599163G-003-(3) G-003
Sheets and Views
P29599163G-003-(3) G-003
P29599163C-101-(4) C-101
Sheets and Views
P29599163C-101-(4) C-101
P29599163C-102-(5) C-102
Sheets and Views
(5) C-102
P29599163C-501-(6) C-501
Sheets and Views
P29599163C-501-(6) C-501
P29599163C-901-(7) C-901
Sheets and Views
P29599163C-901-(7) C-901
2025-05-16T11:52:59-0400
DILL.DAVID.COLBY.1218495555
2025-05-20T12:50:29-0400
CAROSOTTO.MICHAEL.P.1021033398

File details come from the government source that posted it. Updated .