3c_Chiller SOW July 2026.docx

DOCX document 34 KB Posted

Attached to
HVAC Cooling Chiller System Repair
Solicitation number
70Z02726QPORT0001
Issued by

About this file

This is a Statement of Work (SOW) for HVAC chiller system repair services at USCG Air Station Atlantic City in Egg Harbor Township, New Jersey. The contractor must replace a Daiken model AGZ100D chiller compressor and heat exchange system, with work commencing no later than five days after notice to proceed and completion required within 10 working days of contract award. Specific deliverables include providing and installing a reconditioned 80 AMP breaker for compressor #2, installing a new Core Sense controller, conducting multiple leak searches on condenser coils, supplying and installing 88 pounds of R-410A refrigerant, cleaning condenser coils, installing a new pecker head cover, and performing system startup. The contractor is responsible for all labor, materials, equipment, transportation, supervision, permit fees, overtime, municipal fees, electrical power wiring, and any other items necessary to complete the project.

Site visits are strongly encouraged and can be arranged through James Smith (609-677-2197, james.h.smith@uscg.mil) or Tim Anderson (timothy.a.anderson@uscg.mil), who serves as the Contracting Officer's QA Evaluator (QAE) representative and primary point of contact. The contractor must provide detailed employee lists five days prior to work commencement, comply with all federal, state, and local regulations including OSHA safety requirements (29 CFR 1910 and 1926) and EPA environmental regulations (40 CFR), obtain all required licenses and permits, maintain Material Safety Data Sheets for all chemicals, and ensure daily cleanup of the site. Work outside regular hours requires written approval from the QAE representative. The quote is due to the specified POCs no later than August 24, 2026 at 11:59 PM EST.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to replace chiller compressor and heat exchange located at USCG Air Station Atlantic City, FAA Technical Center, Bldg. 350, Atlantic City Intl. Airport, Egg Harbor Township, NJ 08234

2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT five (5) days after notice to proceed and work diligently to complete the entire work ready for use by 10 working days after contract award.

3. SCOPE OF WORK:

The contractor shall provide all labor, transportation, and supervision necessary to perform the work as described herein. All work shall be conducted per this scope of work and all applicable federal, state, and local laws, regulations, codes and directives. This summary is not all-inclusive and delineates only those work items deemed as major to the contract. Additional work items not listed below, though necessary to attain the completed project, shall be included in the contract.

A. Daiken model #AGZ100D, Serial # STNU140800069, Equipment # 33450 B. Provide and install a reconditioned 80 AMP breaker for compressor #2. They no longer make these breakers and can only get reconditioned.

C. Provide and install a new Core Sense controller for compressor #2.

D. Supply labor and materials to provide multiple leak searches in the condenser coils. There is not a 100 percent guarantee that they can be fixed once found.

E. Provide and install 88 pounds of R-410A refrigerant into system.

F. Provide labor and materials to clean the condenser coils.

G. Provide and install a new pecker head cover for a compressor.

H. Provide startup of system.

I. Permit fees, overtime, municipal fees, electrical power wiring, drawings or surveys or any other items not specifically mentioned above

4. SITE VISIT: All bidders are strongly encouraged to visit the site field to verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with James Smith 609-677-2197 james.h.smith@uscg.mil / Alternate POC is Tim Anderson @ timothy.a.anderson@uscg.mil

5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project James Smith 609-677-2197 james.h.smith@uscg.mil Inquiries concerning any phase of the specification before or after award shall be made to (609-677-2197.

6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.

7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.

8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.

9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.

10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.

11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.

12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station’s regular hours, he may submit his request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.

13. UPON COMPLETION OF WORK: Contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.

14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The Air Station Atlantic City Security Officer will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.

15. SAFETY REQUIREMENTS:

1. Responsibilities:

a. All contractors working at Air Station Atlantic City shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Air Station Safety Officer prior to starting work.

b. Written notification must be provided to the Air Station Safety Office, LCDR Ron Richards in their capacity as Air Station Safety Officer of any activity that could potentially cause fire or explosion or those changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the Air Station grounds, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Air Station Safety Officer.

c. There shall be NO SMOKING in any building on the Air Station Grounds. A designated smoking area has been established and shall be the only area utilized for smoking purposes.

d. Contractor shall provide all required safety equipment needed to complete the job, to include safety glasses, rubber gloves, etc. Material Safety Data Sheets for all chemicals utilized shall be provided to the contract upon award. Contractor shall ensure that appropriate clothing is worn by their employees while on Air Station Atlantic City grounds.

2. Rights:

a. Every employee working on Air Station Atlantic City grounds has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.

16. ENVIRONMENTAL PROTECTION REQUIREMENTS:

a. All contractors working on Air Station Atlantic City shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist. Tim Anderson timothy.a.anderson@uscg.mil

b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on Air Station Atlantic City. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.

d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.