3b.Appendix B-TreeMeasurement_R2 RMRP BPA.pdf
PDF 931 KB Posted
- Solicitation number
- 12363N22Q4038
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation is for a Blanket Purchase Agreement (BPA) to establish multiple awards for the Rocky Mountain Restoration Project (RMRP) Stewardship Program across several National Forests in Colorado and South Dakota. Services may include cut and removal of sawtimber, non-sawtimber, biomass, as well as mastication, hand cutting, piling, and road maintenance. Integrated Resource Service Contracts, Service-based contracts, and restoration service contracts will be issued under this BPA. Quotes for future Call Orders will be sent only to BPA awardees. Proposals for this BPA are due by June 6, 2022 and must be emailed to the points of contact listed. Registration in the System for Award Management is required to be eligible for award.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 1 OF 15
APPENDIX B - TREE MEASUREMENT
STEWARDSHIP CONTRACT TIMBER REMOVAL SPECIFICATIONS
BT1.0 CONTRACT AREA
BT1.1 Contract Area Map BT1.2 Claims
BT2.0 TIMBER SPECIFICATIONS
BT2.1 Included Timber BT2.11 Standard Timber BT2.12 Substandard Timber BT2.13 Damaged Timber BT2.131 Damaged by Contractor BT2.13.2Negligent or Willful Damage BT2.134 Minor Damage by Natural Causes BT2.14 Unintentionally Cut Timber BT2.15 Construction Timber BT2.16 Other Material BT2.2 Utilization and Removal of Included Timber BT2.3 Timber Designations BT2.31 Clearcutting Units BT2 32 Construction Clearing BT2.3.21 Road Clearings BT2.322 Other Authorized Clearings BT2.33 Overstory Removal Units BT2.34 Understory Removal Units BT2.35 Individual Trees BT2.37 Designation Changes BT2.4 Quantity Estimate
BT3.0 RATES OF PAYMENT
BT3.1 Current Contract Rates BT3.4 Other Payment Rates BT3.41 Material and Quantities Not in Division AT BT3.42 Timber Cut Through Mistake BT3.43 Undesignated Timber Damaged Without Negligence BT3.44 Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut BT3.45 Liquidated Damages
BT4.0 PAYMENTS
BT4.1 Amount Payable for Timber BT4.2 Integrated Resource Account BT4.215 Deposits When Payment Guaranteed
BT6.0 OPERATIONS
BT6.33 Safety BT6.4 Conduct of Logging BT6.41 Felling and Bucking BT6.411 Felling in Clearings BT6.412 Stump Heights BT6.414 Limbing
BT6.42 Skidding and Yarding BT6.421 Rigging BT6.422 Landings and Skid Trails BT6.423 Skidding on Roads BT6.424 Arches and Dozer Blades BT6.63 Temporary Roads BT6.64 Landings BT6.65 Skid Trails and Fire Lines BT6.66 Current Operating Areas BT6.67 Erosion Control Structure Maintenance BT6.7 Slash Disposal BT6.8 Measuring **BT6.842 Product Identification
BT8.0 OTHER CONDITIONS
BT8.1 Title and Liability BT8.11 Title Passage BT8.12 Liability for Loss BT8.5 Sale of Other Materials
WO-CT5.12# – USE OF ROADS BY CONTRACTOR (9/04)
R2-CT5.36# - SNOW REMOVAL (11/2006)
R2-CT6.6# - EROSION PREVENTION AND CONTROL
(11/2006)
R2-CT6.7# - SLASH TREATMENT. (4/03)
R2-CT6.83# - PRODUCT ACCOUNTABILITY. (10/03)
R2-CT6.853 - LOADS ALTERED IN ROUTE (11/2006)
WO-CT8.66# – USE OF TIMBER (Option 1). (9/04)
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 2 OF 15
Division AT
Location and Area:
This Contract Area of 1,000 acres is more or less located in N/A (To be defined in Call Orders)
Volume Estimate and Utilization Standards
Species Group Product Estimated Quantity *
Unit of Measure
Minimum Specifications Merchantable Tree Piece Required to be Removed
Diameter Breast High
(d.b.h.)
(inches)
Number of
Minimum Pieces per Tree
Length
(feet)
Diameter Inside
Bark at Small End
(inches)
Net Scale in % Gross
Scale 1/
N/A - To be determined in Call Orders
Sawtimber
Non-saw
NA
CCF
CCF
8.0
5.0
6.5
6.0
4.0
10.67
Timber Subject to Agreement
Total Quantity 1/ Enter Merchantability Factor (Merch. Factor) or Net Scale in % of Gross Scale, whichever is appropriate.
Timber Designations, acres are approximate:
Number Acres Clearcutting Units (B2.31) Overstory Removal Units (B2.33) Understory Removal Units (B2.34) Individual Trees (B2.35) 500 Designation by Description or Prescription (C2.351-C2.355)
High Stumps
Species Product Maximum Stump Height (inches)
All Saw-timber & Non-saw 12 inches
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 3 OF 15
Roads
Name and Date of Governing Road Specifications: Not Applicable
Project Design Class
Approx.
Length
(mi./km.)
Sheet Numbers and
Approval Date
Performance Responsibility
Survey Design Const.
Staking1/ Road No. Name
1/ Indicate timing, i.e., before clearing (BC) or after clearing (AC).
Specification sheets with itemized construction codes also attached
Schedule of Payment Units
Payment Unit
Number Approx. Acres
To be Paid for at Flat Rates Total
Flat Rate Payment
Total Required
Deposits For Slash Disposal
Species Products Quantity Unit of
Measure
NA - To be determined in Call Orders
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 4 OF 15
APPLICABLE REGIONAL CLAUSES MAY BE ADDED
UNITED STATES DEPARTMENT OF AGRICULTURE
Forest Service
TIMBER REMOVAL SPECIFICATIONS
CLAUSES FOR TREE MEASUREMENT TIMBER REMOVAL CONTRACTS
(Applicable to Contracts to be Measured Before Felling)
This Division is organized into Parts, Sections, Subsections, and Items. These are numbered in accordance with the following scheme: Part BTl.0, Section BTl.1, Subsection BTl.11, and Item BTl.111. References to a Part include all Sections, Subsections, and Items within that Part; references to a Section include all Subsections and Items within that Section; and references to a Subsection include all Items within that Subsection. Cross references within this contract cite the reference number of the applicable Division, Part, Section, Subsection, and Item. Descriptive headings used are not to be considered in determining the rights and obligations of the parties hereunder. The Standard Clauses in this Division are subject to Specific Conditions of the contract stated in Division AT. Wherever appropriate, Specific Conditions established in Division AT are herein cited by reference number. References to Standard Clauses also apply to Special CT Clauses with the same numbers. These clauses are applicable only to the timber removal portion of the <<forest name>> NFs BPA Stewardship Contract except where otherwise specifically referenced. “Timber” when used in this appendix includes timber and other products.
BT1.0—CONTRACT AREA
BT1.1 Contract Area Map. The boundaries of “Contract Area” and any Payment Unit thereof, are as shown on the attached “Contract Area Map” that is made a part hereof, and were, before contract solicitation, designated on the ground by Forest Service to meet the anticipated needs of the parties. The location of Contract Area and its approximate acreage are stated in Division AT. Payment Units may be revised and additional ones may be established only by written agreement. Upon Contractor’s request, Forest Service shall subdivide Payment Units to reduce them to a size that can be logged within 60 days at Contractor’s normal rate of logging.
Where applicable, the following are also identified on Contract Area Map:
(a) Identified claims limiting Contractor’s rights under BT1.2.
(b) Payment Units where timber is to be Measured or Marked after date of contract solicitation and approximate location of sample Marked timber under BT2.36 and BT2.4.
(c) Boundaries of Clearcutting Units, Overstory Removal Units, and Understory Removal Units under BT2.3.
(d) Diameter limits for Overstory Removal Units and Understory Removal Units under BT2.33 and BT2.34.
(e) Areas where leave trees are Marked to be left un-cut under BT2.35.
(f) Specified Roads
(g) Sources of base course, surface rock, and rock riprap listed in the Schedule of Items.
(h) Roads where log hauling or use is prohibited or restricted.
(i) Roads and trails to be kept open.
(j) Improvements to be protected.
(k) Locations of known wildlife or plant habitat and cave resources to be protected.
(l) Locations of areas known to be infested with specific invasive species of concern.
(m) Maximum stump heights when more than one height is listed by areas in Division AT under BT6.412.
(n) Skidding or yarding methods specified under BT6.42.
(o) Streamcourses to be protected.
(p) Locations of meadows requiring protection.
(q) Locations of wetlands requiring protection.
(r) Locations of temporary roads to be kept open; and
(s) Other features.
BT1.2 Claims. Valid claims are excluded from Contract Area, except those on which timber cutting is authorized in writing by the claimant and except mining claims on which cutting is authorized by the Act of July 23, 1955 (30 USC 614). Claims that limit Contractor’s rights to operate under this contract and that Forest Service has been able to identify are shown on Contract Area Map. Contractor is not obligated to operate contrary to existing claim limitations. Forest Service shall designate boundaries of claims on the ground to the extent necessary to identify Included Timber.
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 5 OF 15
BT2.0—TIMBER SPECIFICATIONS
BT2.1 Included Timber. “Included Timber” consists of:
BT2.11 Standard Timber. Live and dead trees and portions thereof that meet Utilization Standards under BT2.2 and are designated for cutting under BT2.3.
BT2.12 Substandard Timber. Live and dead trees that:
(a) Do not meet Utilization Standards and
(b) Are located in Clearcutting Units or construction clearings or are otherwise designated for cutting.
BT2.13 Damaged Timber.
BT2.131 Damaged by Contractor. Undesignated live trees meeting Utilization Standards:
(a) Within 200 feet slope distance from centerline of roads constructed hereunder that are damaged by Contractor’s construction to the extent that considerable deterioration or mortality is imminent and are designated by Forest Service for felling before the nearest road segment is Substantially Completed or
(b) That are damaged by Contractor in logging or stewardship project operations and are subsequently Marked before Contractor has completed work in the immediate area.
By agreement, such trees may be left without charge if their removal would cause undue damage or be grossly uneconomic.
BT2.132 Negligent or Willful Damage. Undesignated timber meeting Utilization Standards and unnecessarily damaged or negligently or willfully cut by Contractor, if included by Contracting Officer.
BT2.134 Minor Damage by Natural Causes. Undesignated trees within Contract Area and meeting Utilization Standards, in amounts that become insect infested, windthrown, suffer serious damage, or die, as designated by agreement.
BT2.14 Unintentionally Cut Timber. Trees within or immediately adjacent to Contract Area or to road construction or other authorized clearing outside Contract Area, not designated for cutting under BT2.3 but that are cut through mistake by Contractor, when included by Contracting Officer.
BT2.15 Construction Timber. Trees to be used for construction under this contract.
BT2.16 Other Material. Species or products not listed in the contract, upon written approval of Forest Service.
BT2.2 Utilization and Removal of Included Timber. “Utilization Standards” for trees and minimum pieces are stated in Division AT. To meet minimum tree specifications, trees must equal or exceed tree diameters listed in Division A and contain at least one minimum piece. Except for timber required or authorized to be left, Contractor shall fell and buck such trees and shall remove from Contract Area all pieces that:
(a) Meet minimum piece standards in Division AT or
(b) Do not meet such standards but would have qualified as part of minimum pieces if bucking lengths were varied to include such material.
BT2.3 Timber Designations. Timber designated for cutting shall be confined to Contract Area, except as otherwise provided in BT2.131, BT2.14, BT2.15, and BT2.32. Contract Area Map indicates Payment Units, if any, where Marking under BT2.35 is to be done after contract advertisement, except for construction clearing under BT2.23, designation changes under BT2.37, and damaged timber. The boundaries of Clearcutting Units, Overstory Removal Units, and Understory Removal Units were plainly Marked on ground before contract advertisement and are shown on Contract Area Map. Boundary trees shall not be cut. Such units where Measuring is to be completed after date of contract advertisement are also shown. The number of units and approximate acreage of timber designations are stated in Division AT.
BT2.31 Clearcutting Units. All trees that meet Utilization Standards within “Clearcutting Units” are designated for cutting.
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 6 OF 15
BT2.32 Construction Clearing. All timber is designated for cutting that is within the clearing limits of roads constructed hereunder or is in other authorized clearings. All dead or unstable live trees are designated for cutting that are sufficiently tall to reach Contractor’s landings, work areas, or the roadbed of Specified and Temporary Roads when Marked in advance of work in the immediate area. Pieces meeting Utilization Standards from such dead or unstable live trees shall be removed unless there is agreement that to do so could damage the road.
BT2.321 Specified Road Clearings. Timber within the clearing limits of Specified Roads is within separate Payment Units, as shown on Contract Area Map, and the quantities are in Division AT. These Payment Units are subject to revision, as specified in BT2.37. The quantities of dead or unstable trees designated outside the clearing limits are not included in Division AT.
BT2.322 Other Authorized Clearings. Timber within authorized clearings for Temporary Roads, landings, or other construction clearings is designated for cutting. Quantities of such timber are not included in Division AT.
BT2.33 Overstory Removal Units. All trees within “Overstory Removal Units” are designated for cutting when they meet Utilization Standards and equal or exceed the diameter limits shown on Contract Area Map.
BT2.34 Understory Removal Units. All trees within “Understory Removal Units” are designated for cutting when they meet Utilization Standards and are smaller than the diameter limits shown on Contract Area Map.
BT2.35 Individual Trees. All trees to be cut, other than in the units described in BT2.31, BT2.32, BT2.33, and BT2.34, are Marked or designated by description. Trees are “Marked” when individually designated by Forest Service with paint marks above and below stump height. Contract Area Map indicates areas plainly identified on the ground where leave trees are Marked to be left uncut.
BT2.37 Designation Changes. Within Contract Area, minor adjustments may be made in boundaries of cutting units or in the timber individually Marked for cutting when acceptable to Contractor and Forest Service.
BT2.4 Quantity Estimate. The estimated quantities of timber by species designated for cutting under BT2.3 and expected to be cut under Utilization Standards are listed in Division AT. Estimated quantity in Division AT does not include the following:
(a) Damaged timber under BT2.13.
(b) Unintentionally cut timber under BT2.14.
(c) Construction timber under BT2.15 cut outside of Payment Units and removed from construction use for utilization by Contractor.
(d) Timber within clearing limits of Temporary Roads or other authorized clearings and that is not designated under BT2.31, BT2.33, BT2.34, or BT2.35; or
(e) Dead or unstable live trees that are sufficiently tall to reach Contractor’s landings, work areas, or the roadbed of Specified Roads under BT2.32.
Estimated quantities for such timber not included in Division AT shall be determined as stated herein.
If Contract Area Map shows Payment Units where Marking or Measuring is to be completed after date of con-tract advertisement, the objective of Forest Service shall be to designate for cutting in such Payment Units sufficient timber so that Contract Area shall yield the approximate estimated quantities by species or species groups stated in Division AT.
However, the estimated quantities stated in Division AT are not to be construed as guarantees or limitations of the timber quantities to be designated for cutting under the terms of this contract.
BT3.0—RATES OF PAYMENT
BT3.1 Current Contract Rates. Included Timber that is Released for Cutting shall be paid for at Current Contract Rates determined under this Section. “Current Contract Rates” shall be Flat Rates. Flat Rates shall be those listed in Division AT or B2 of the Schedule of Items. In the event contract time is adjusted, Current Contract Rates shall be continued in the same manner as immediately prior to the adjustment period.
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 7 OF 15
BT3.4 Other Payment Rates.
BT3.41 Material and Quantities Not in Division AT. Incidental amounts of products or portions of trees of species that do not meet Utilization Standards may be removed without charge. Such material may be purposely removed in more than incidental amounts without charge upon written approval of Contracting Officer, and subject to agreement on deposits if needed for road maintenance and use. Other species or products not listed may be cut and removed upon written approval of Contracting Officer and subject to agreement on rates of payment. Timber for which the quantity is not included in the estimate, shall be paid for at Current Contract Rates and Required Deposits.
BT3.42 Timber Cut Through Mistake. Undesignated timber meeting Utilization Standards, cut by Contractor through mistake and included by Contracting Officer under BT2.14, shall be removed and paid for at Current Contract Rates and Required Deposits, unless such material is not listed in Division AT. In such event, Contracting Officer, in accord with standard Forest Service methods, shall establish rates to be paid.
BT3.44 Undesignated Timber Damaged Without Negligence. Undesignated timber meeting Utilization Standards, damaged without negligence by Contractor and designated by Forest Service under BT2.131, shall be cut, removed, and paid for at Current Contract Rates and Required Deposits.
BT3.45 Undesignated Timber Unnecessarily Damaged or Negligently or Willfully Cut. Undesignated timber meeting Utilization Standards and unnecessarily damaged or negligently or willfully cut by Contractor, if included by Forest Service under BT2.132, shall be cut, removed, and paid for at Current Contract Rates and Required Deposits that are in addition to liquidated damages under BT3.46. If such timber is of a species or size not listed in Division AT or is of a quality different from designated timber, Contracting Officer shall establish payment rates in accord with standard Forest Service methods.
BT3.46 Liquidated Damages. Unnecessary damage to or negligent or willful cutting of undesignated timber, as described in BT3.45, on portions of Contract Area cut over under this contract is likely to cause substantial silvicultural or other damage to the National Forest. It will be difficult, if not impossible, to determine the amount of such damage.
Therefore, Contractor shall pay as fixed, agreed, and liquidated damages an amount equivalent to the amount payable at Current Contract Rates. If designated by Contracting Officer, Contractor shall remove such dam-aged or cut timber and pay for it at Current Contract Rates.
BT4.0—PAYMENTS
BT4.1 Amount Payable for Timber. Except as provided in BT3.1, Current Contract Rates and Required Deposits in effect when a Payment Unit is Released for Cutting shall be applied to the timber quantities to determine the amount Contractor shall pay. A “Payment Unit” is a portion of Contract Area established for payment purposes.
BT4.2 Integrated Resource Account. “Integrated Resource Account” is an account maintained by Forest Service of all Contractor’s deposits, credits, payment guarantees, and the charges for:
(a) Timber at Current Contract Rates.
(b) Slash disposal and road maintenance at Required Deposit rates.
(c) Stewardship Credits established; and
(e) Other charges provided in this contract.
Cash deposits and Stewardship Credits earned shall be recorded currently in such account.
Charges for timber cut shall be made when Forest Service prepares and furnishes to Contractor periodic statements of volume and value of such timber cut and Scaled. Charges against Stewardship Credits shall be limited to timber value more than Required Deposits. Required Deposits and Other Charges shall be paid in cash.
Contractor shall make cash deposits to meet Contractor’s obligations within 15 days of billing by the Forest Service.
Deposits shall be made to Forest Service, USDA, by mail or delivery to the address shown on the bill for collection.
BT4.215 Deposits When Payment Guaranteed. To the extent payment guarantee is provided under Clause entitled, “PRODUCT PAYMENT GUARANTEE” requirements for advance cash deposits shall be waived for the value of Product on contract area that is cut, but not removed, and for the value of Products removed from contract area, up to limit of
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 8 OF 15
remaining stewardship credits to be earned and exchanged for value of included product except for Required Deposits and Associated Charges. Associated charges shall be waived for not more than one monthly billing period.
BT6.0—OPERATIONS
BT6.33 Safety. Contractor’s Operations shall facilitate Forest Service’s safe and practical inspection of Contractor’s Operations and conduct of other official duties on Contract Area. Contractor has all responsibility for compliance with safety requirements for Contractor's employees.
In the event that Contracting Officer identifies a conflict between the requirements of this contract or agreed upon methods of proceeding hereunder and State or Federal safety requirements, the contract shall be modified and Contractor may request an adjustment in Current Contract Rates to compensate for the changed conditions.
Unless otherwise agreed in writing, when Contractor’s Operations are in progress adjacent to or on Forest Service controlled roads and trails open to public travel, Contractor shall furnish, install, and maintain all temporary traffic controls that provide the user with adequate warning of hazardous or potentially hazardous conditions associated with Contractor’s Operations. Contractor and Forest Ser-vice shall agree to a specific Traffic Control Plan for each individual project prior to commencing operations. Devices shall be appropriate to current conditions and shall be covered or removed when not needed. Except as otherwise agreed, flagmen and devices shall be as specified in the “Manual on Uniform Traffic Control Devices for Streets and Highways” (MUTCD) and as shown on Plans, Contract Area Map, Traffic Control Plan, or in specifications attached hereto.
BT6.4 Conduct of Logging. Unless otherwise specifically provided herein, Contractor shall fell trees designated for cutting and shall remove the portions that meet Utilization Standards, as provided in BT2.2, prior to acceptance of Payment Unit for completion of logging. Forest Service may make exceptions for occasional trees inadvertently not cut or trees or pieces not removed for good reason, including possible damage to forest resources or gross economic impracticability at the time of removal of other timber. Logging shall be conducted in accordance with the following, unless other clauses set forth requirements to meet special or unusual logging conditions:
BT6.41 Felling and Bucking. Felling shall be done to minimize breakage of Included Timber and damage to residual timber. Unless agreed otherwise, felling shall be done by saws or shears. Bucking shall be done to permit removal of all minimum pieces set forth in Division AT. Contractor may buck out cull material when necessary to produce pieces meeting Utilization Standards. Such bucked out material shall contain a minimum amount of sound wood, not in excess of the net Measure in percentage of gross Measure, or based on the merchantability factor, whichever is stated in Division AT. If necessary to assess extent of defect, Contractor shall make sample saw cuts or wedges.
BT6.411 Felling in Clearings. Insofar as ground conditions, tree lean, and shape of clearings permit, trees shall be felled so that their tops do not extend outside Clearcutting Units, construction clearings, and areas of regeneration cutting.
BT6.412 Stump Heights. Stumps shall not exceed, on the side adjacent to the highest ground, the maximum heights set forth in Division AT except that occasional stumps of greater heights are acceptable when Contractor determines that they are necessary for safe and efficient conduct of logging. Unless otherwise agreed, Contractor shall re-cut high stumps so they will not exceed heights specified in Division AT and shall dispose of severed portions in the same manner as other logging debris. The stump heights shown in Division AT were selected with the objective of maximum reasonable utilization of the timber, unless Contract Area Map shows special areas where stump heights are lower for aesthetic, land treatment, or silvicultural reasons.
BT6.414 Limbing. When Forest Service determines it is necessary to minimize damage to the residual stand during skidding, Contractor shall cut exposed limbs from products prior to skidding. Contractor may leave un-cut those limbs that cannot be cut with reasonable safety.
BT6.42 Skidding and Yarding. Methods of skidding or yarding specified for particular areas, if any, are indicated on Contract Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding.
BT6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees designated for cutting.
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 9 OF 15
BT6.422 Landings and Skid Trails. Location of all landings, tractor roads, and skid trails shall be agreed upon prior to their construction. The cleared or excavated size of landings shall not exceed that needed for efficient skidding and loading operations.
BT6.433 Skidding on Roads. Products may be skidded on permanent roads authorized for hauling only by prior written agreement.
BT6.424 Arches and Dozer Blades. Skidding tractors equipped with pull-type arches or dozer blades wider than tractor width or C-frame width, whichever is greater, shall not be used in residual timber outside Clearcutting Units and other authorized clearings, except on constructed tractor roads or landings, unless there is written agreement that residual timber will not be damaged materially by such use.
BT6.63 Temporary Roads. As necessary to attain stabilization of roadbed and fill slopes of Temporary Roads, Contractor shall employ such measures as out-sloping, drainage dips, and water-spreading ditches.
After a Temporary Road has served Contractor’s purpose, Contractor shall give notice to Forest Service and shall remove bridges and culverts, eliminate ditches, out-slope roadbed, remove ruts and berms, effectively block the road to normal vehicular traffic where feasible under existing terrain conditions, and build cross ditches and water bars, as staked or otherwise marked on the ground by Forest Service. When bridges and culverts are removed, associated fills shall also be removed to the extent necessary to permit normal maximum flow of water.
BT6.64 Landings. After landings have served Contractor’s purpose, Contractor shall ditch and slope them to permit water to drain or spread. Unless agreed otherwise, cut and fill banks around landings shall be sloped to remove overhangs and otherwise minimize erosion.
BT6.65 Skid Trails and Fire Lines. Contractor shall construct cross ditches and water-spreading ditches on tractor roads and skid trails, where staked or otherwise marked on the ground by Forest Service. Forest Service shall designate cross ditching on Contractor-built fire lines prior to or during construction. By agreement, Contractor may use other comparable erosion control measures, such as backblading skid trails, in lieu of cross ditching.
BT6.66 Current Operating Areas. Where logging, road construction, or other stewardship project work is in progress but not completed, unless agreed otherwise, Contractor shall, before operations cease annually, remove all temporary log culverts and construct temporary cross drains, drainage ditches, dips, berms, culverts, or other facilities needed to control erosion.
Such protection shall be provided, prior to end of October 15, for all disturbed, unprotected ground that is not to be disturbed further prior to end of operations each year, including roads and associated fills, tractor roads, skid trails, and fire lines. When weather permits operations during October 16 – July 15, inclusive Contractor shall keep such work on any additional disturbed areas as up to date as practicable.
BT6.67 Erosion Control Structure Maintenance. During the period of this contract, Contractor shall provide maintenance of soil erosion control structures con-structed by Contractor until they become stabilized, but not for more than 1 year after their construction. Contractor shall not be responsible for repair of such structures damaged by other National Forest users whose activities are not a part of Contractor’s Operations.
BT6.7 Slash Disposal. Contractor’s timing of product removal and preparatory work shall not unnecessarily delay slash disposal. Specific slash disposal measures to be employed by Contractor are stated elsewhere herein and are in addition to Required Deposits for slash disposal.
BT6.8 Measuring. “Measuring” is the estimation of timber quantities using certain dimensions and applicable volume tables or formulae to determine the contents of trees or stands in a standard manner. Sampling may be on an individual tree or area basis. Examples of standard procedures are tree measurement, sample tree measurement, and area estimate. The quantity of timber designated or to be designated for cutting has been or shall be Measured, as specified in this contract
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 10 OF 15
BT6.842 Product Identification. For contracts west of the 100th meridian, before removal from Contract Area, unless Contracting Officer determines that circumstances warrant a written waiver or adjustment, Contractor shall:
(a) Hammer brand all products that are eight (8) feet or more in length and one-third (1/3) or more sound, on each end that is seven (7) inches or more in diameter.
(b) West of the 100th meridian, paint with a spot of highway-yellow paint all domestic processing products that are eight (8) feet or more in length and one-third (1/3) or more sound, on each end that is seven (7) inches or more in diameter. Each paint spot must be not less than three (3) square inches in size.
Contracting Officer shall assign brands and, if Contract Area is within a State that maintains a log brand register, brands shall be registered with the State. Contractor shall use assigned brand exclusively on logs from this contract until Contracting Officer releases brand. Contractor will furnish and apply highway-yellow paint of a lasting quality (oil-base or equivalent).
All hammer brands and/or highway-yellow paint must remain on logs until they are domestically processed. Contractor shall replace identifying marks if they are lost, re-moved, or become unreadable. Contractor may remanufacture products into different log lengths. Except for logs remanufactured as part of the mill in-feed process immediately before processing, remanufactured products must be rebranded with the assigned contract brand and repainted with highway-yellow paint, unless otherwise agreed to in writing by Contracting Officer. For such remanufactured products, Contracting Officer may approve use of a brand to be used exclusively as a catch brand, in lieu of the assigned contract brand.
BT8.0—OTHER CONDITIONS
BT8.1 Title and Liability.
BT8.11 Title Passage. All right, title, and interest in and to any Included Timber shall remain in Forest Service until it has been Measured, removed from Contract Area or other authorized cutting area, and paid for, at which time title shall vest in Contractor. Timber cut under the terms of clause Product Payment Guarantee, shall be considered to have been paid for.
Title to any Included Timber that has been Measured and paid for, but not removed from Contract Area or other authorized cutting area by Contractor on or prior to contract termination, shall remain in Forest Service.
BT8.12 Liability for Loss. If Included Timber is destroyed or damaged by an unexpected event that significantly changes the nature of Included Timber, such as fire, wind, flood, insects, disease, or similar cause, the party holding title shall bear the timber value loss resulting from such destruction or damage; except that such losses caused by insect or disease after felling of timber shall be borne by Contractor, unless Contractor is prevented from removing such timber for reasons by the Forest Service. Deterioration or loss of value of salvage timber is not an unexpected event.
In the event Included Timber to which Forest Service holds title is destroyed, Contractor will not be obligated to remove and pay for such timber. In the event Included Timber to which Forest Service holds title is damaged, Contracting Officer shall make an appraisal to determine for each species the difference between the appraised unit value of Included Timber immediately prior to the value loss and the appraised unit value of timber after the loss. Current Contract Rates in effect at the time of the value loss shall be adjusted by differences to become the redetermined rates.
There shall be no obligation for Forest Service to supply, or for Contractor to accept and pay for, other timber in lieu of that destroyed or damaged. This Subsection shall not be construed to relieve either party of liability for negligence.
BT8.5 Sale of Other Materials. Forest Service reserves the right to sell from Contract Area during the period of this contract any materials or products not subject to its terms, but shall not permit removal, possession, or use thereof that will materially interfere with Contractor’s Operations. Contractor shall not be obligated to do any work made necessary by the action of others.
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 11 OF 15
CT5.12# – USE OF ROADS BY CONTRACTOR. (9/04) Contractor’s use of existing roads identified on Contract Area Map by the following codes is prohibited or subject to restrictive limitations, unless agreed otherwise:
Code Use Limitations
X Hauling prohibited R Hauling restricted U Unsuitable for hauling prior to completion of agreed reconstruction P Use prohibited A Public use restriction W Regulation waiver
Roads coded A will be signed by Forest Service to inform the public of use restrictions. Contractor’s use of roads coded R, A, or W shall be in accordance with the following restrictions:
Restricted Road List
Road Number Road Name
Termini Map Legend
Description of Restrictions From To
NFSR 700
and
NFSR
701.0
Jct w/ Hwy86
End of Contract
Area R
No hauling will be allowed on weekends: from Friday at 5:00 PM until Monday 6:00 AM.
No hauling will be allowed on Federal holidays starting at 5:00 PM the day before the holiday to 6:00 AM the day after the holiday.
No hauling allowed when the road base or subgrade is water saturated and is not frozen.
CT5.36# - SNOW REMOVAL (11/2006)
Snow removal shall be done in a manner to preserve and protect the roads to insure safe and efficient transportation and to prevent unacceptable erosion damage to roads, streams, and adjacent lands.
A. Description. Snow removal work by Contractor shall include:
1. Removal of snow from entire road surface width including turnouts.
2. Removal of snow slides, minor earth slides, fallen timber and boulders that obstruct normal road surface width including turnouts.
3. Maintain drainage so that the drainage system will function efficiently.
B. Performance. All items of snow removal shall be done currently as necessary to insure safe, efficient transportation.
Work shall be done in accordance with the following minimum standards of performance.
1. Removal of material. All debris, except snow and ice, that is removed from the road surface and ditches shall be deposited away from stream channels at agreed locations.
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 12 OF 15
2. During snow removal operations, banks shall not be undercut nor shall gravel or other selected surfacing material be bladed off the roadway surface.
3. Ditches and culverts shall be kept functional during and following roadway use.
4. Snow berms shall not be left on the road surface. Berms left on the shoulder of road shall be removed and/or drainage holes shall be opened and maintained. Drainage holes shall be spaced as required to obtain satisfactory surface drainage without discharge on erodible fills.
5. Dozers and skidders shall not be used to plow snow on system roads without written approval of Forest Service.
Upon approval, dozers and skidders must be equipped with shoes or runners to keep the plow blade a minimum of four inches above the road surface unless specifically removed from the requirements in writing.
6. Snow must not be removed to the road surface. A minimum four inch depth must be left to protect the roadway.
CT6.6# - EROSION PREVENTION AND CONTROL (11/2006)
A. Contractor shall locate Temporary Roads on locations approved by the Forest Service. Such location shall include the marking of road centerline or grade-line and the setting of such construction stakes as are necessary to provide a suitable basis for economical construction and the protection of National Forest lands.
B. Skidding with tractors within 100 feet of live streams shall not be permitted except in places designated in advance by Forest Service, and in no event shall skid roads be located in live or intermittent stream courses. Skid trails shall be located high enough out of draws, swales, and valley bottoms to permit diversion of runoff water to natural undisturbed forest ground cover.
C. Prior to periods of accelerated water runoff, especially during the spring runoff and periods of heavy rainfall, Contractor shall inspect and open culverts and drainage structures, construct special cross ditches for road runoff, and take other reasonable measures needed to prevent soil erosion and siltation of streams.
D. Temporary Road surface width shall be limited to truck bunk width plus four (4) feet, except for needed turnouts which shall not exceed two (2) times the bunk width plus four (4) feet. If shovels or cranes with revolving carriage are used to skid or load, Temporary Road surface width equal to track width plus tail swing shall be permitted.
E. Unless otherwise agreed in writing, Contractor shall keep erosion control work current with his operations under the sale and in any case not later than 15 days after completion of skidding on each payment unit or cutting unit.
CT6.7# - SLASH TREATMENT. (4/03)
Slash is defined as logs, tops, limbs, and other woody material, exclusive of stumps, which is created by the logging operation or contract line item work and remains on the ground after logging. In areas where Contractor-created slash is intermingled and inseparable from preexisting slash, slash disposal requirements shall apply to the pre-existing slash as well as the Contractor-created slash. Such areas are designated in the Contractor Slash Responsibility Table herein.
Slash created in the construction of Specified Roads shall not be considered as logging slash in this Section.
Unless otherwise agreed in writing, the Contractor shall perform the following work described below and/or as shown on the Contract Area Map and/or Slash Disposal Map within 30 days once skidding is substantially completed in a unit.
LANDING CLEAN-UP
A landing is considered a place where any logs or products are gathered for loading. Logs not meeting utilization standards accumulated at landings shall be decked or returned to the cutting unit as agreed to in writing by the Forest Service.
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 13 OF 15
Piles shall be reasonably compact and free of soil to facilitate burning. Piles shall be of a size and location which will not impair road use or result in damage to residual timber. Burn piles shall be located a minimum of 100 feet from ditches and protected streamcourses. Machine piles shall be a minimum 150 feet from any utility poles, overhead lines and private property. Piles will not be less than 10 feet in height and 12 feet in diameter. Piles shall not be greater than 20 feet high x 70 feet in diameter. All objects which extend more than 6 feet in any direction from the pile profile will be cut off and returned to the pile. Piles shall be located at least 25 feet from residual timber.
Landing debris along temporary roads within the cutting units may be piled in conjunction with temporary road construction slash.
LOP AND SCATTER
Trees or portions of trees (slash) shall be severed to lay within 24 inches of the ground. Activity slash shall be scattered away from and without unnecessary damage to residual trees. All scattered logs shall be limbed, placed away from trees and positioned so they will not roll. Other logging slash shall be scattered to reduce slash concentrations with slash being generally left within 24 inches of the ground and not in piles.
LOP AND SCATTER (INCIDENTAL AMOUNTS)
Incidental Slash includes occasional pieces that fall out of the skidder or broken tops. Incidental slash shall be scattered away from the bole and without damage to residual trees. All scattered pieces shall be limbed and positioned so they will not roll. Incidental slash shall be scattered to reduce concentrations and be left generally within 18 inches of the ground and not in piles. Jackstrawed bole wood 6 inches diameter or greater must be scattered and fully in contact with the ground. Individual boles of 6 inches or greater diameter can be left unbucked. Incidental slash shall be removed from the stream channel of perennial and intermittent streams.
LIMBING
Prior to skidding operations, Contractor shall cut all exposed limbs from Included Timber. Such topping and limbing shall be done to the top diameter of the utilization standards listed in Appendix B, Division A. All slash shall be generally within 24 inches of the ground and not in piles.
WHOLE TREE LOGGING
Whole tree logging includes cutting and removing the entire tree, including tops and branches, to the landing.
FALL LEANERS AND BROKEN TOPS
Contractor shall fall any damaged tree not meeting utilization standards set forth in Division A. A damaged tree is one that is larger than 2 feet in height, and has the top knocked out, is leaning more than 10 degrees, has less than one half of its original limbs, or has approximately 50 percent of bark removed from the circumference of the bole.
Trees over 2 feet or more in height after being pulled over in the felling or yarding/skidding operation shall be severed from the stump.
CT6.83# - PRODUCT ACCOUNTABILITY. (10/03)
1. Forest Service will issue to Purchaser or designated representative(s) serially numbered Product Removal Permit books for use only on this sale. Product Removal Permit books, whether used or unused, shall be accountable property of Forest Service and shall be returned to issuing Ranger District in accordance with the instructions contained on the cover of each book. Each Product Removal Permit which is not returned will be considered a lost load and charged for as described in B6.85 or B6.851, as appropriate.
2. Purchaser shall require all permits be filled out in ink, and otherwise completed, by an individual named in writing, showing the date loaded, sale brand, sale name, and destination where products will be unloaded. On the Load Permit, the month, day, and time the truck is loaded shall be punched out. Each permit will then be attached to the load in accordance with instructions on the inside cover of the Product Removal Permit book. Products will not be hauled from the Sale Area without the Load Permit attached to the load.
3. Before products are hauled, the truck driver must sign the Woods Permit in ink using legal signature.
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 14 OF 15
4. Each load will have the last three digits of the load receipt number painted on both ends of three logs with red paint. All loads that consist of a truck and pup(s) must have the last three digits of the load receipt painted on both ends of three logs on all subunits of the combination.
CT6.853 - LOADS ALTERED IN ROUTE (11/2006)
Loads of logs which are altered as a result of compliance with State Department of Transportation weight laws will be considered a non-verified load unless a Forest Service representative can verify the overweight load was totally delivered to the scaling site. If the load is verified by the Forest Service it may be processed through the normal sample selection process.
Unless otherwise agreed to, off-loaded logs will not be stored at the weigh station site. Off-loaded logs will be delivered immediately to the designated scaling site.
Logs will be off-loaded onto an empty truck and will have a log load removal receipt attached before proceeding from the weigh station. If logs are off-loaded onto another load of logs, both loads will be considered non-verified loads.
Since non-verified loads will be larger than the largest load in the sample in any given billing period, Contractor agrees to pay an amount equivalent to and in addition to the amount payable at Current Contract Rates.
Contractor is required to notify the Forest Service before off-loading of logs occurs
CT8.66# – USE OF TIMBER (Option 1). (9/04)
(a) This contract is subject to the Forest Resources Conservation and Shortage Relief Act of 1990, as amended (16 USC 620, et seq.).
(b) Except for NA determined pursuant to public hearing to be surplus, unprocessed Included Timber shall not be exported from the United States nor used in direct or indirect substitution for unprocessed timber exported from private lands by Contractor or any person as defined in the Act (16 USC 620e).
(c) Timber in the following form will be considered unprocessed:
(i) Trees or portions of trees or other roundwood not processed to standards and specifications suitable for end product use.
(ii) Lumber, construction timbers, or cants intended for remanufacturing not meeting standards defined in the Act (16 USC 620e); and
(iii) Aspen or other pulpwood bolts exceeding 100 inches in length.
(d) Unless otherwise agreed in writing, unprocessed Included Timber shall be delivered to a domestic processing facility and shall not be mixed with logs intended for export.
(e) Prior to award, during the life of this contract, and for a period of 3 years from Termination Date, Contractor shall furnish to Forest Service, upon request, records showing the volume and geographic origin of unprocessed timber from private lands exported or sold for export by Contractor or affiliates.
(f) Prior to delivering unprocessed Included Timber to another party, Contractor shall require each buyer, exchangee, or recipient to execute an acceptable agreement that will:
(i) Identify the Federal origin of the timber.
(ii) Specify domestic processing for the timber involved.
(iii) Require the execution of such agreements between the parties to any subsequent transactions involving the timber.
(iv) Require that all hammer brands and/or yellow paint must remain on logs until they are either legally exported or domestically processed, whichever is applicable; and
(v) Otherwise comply with the requirements of the Act (16 USC 620d).
(g) No later than 10 days following the execution of any such agreement between Contractor and another party, Contractor shall furnish to Forest Service a copy of each such agreement. Contractor shall retain, for 3 years from Termination Date, the records of all sales, exchanges, or dispositions of all Included Timber.
ROCKY MOUNTAIN RESTORATION PROJECT STEWARDSHIP BPA PAGE 15 OF 15
(h) Upon request, all records dealing with origin and disposition of Included Timber shall be made available to Contracting Officer.
(i) For breach of this Subsection, Forest Service may terminate this contract and take such other action as may be provided by statute or regulation, including the imposition of penalties. When terminated by Forest Service under this Subsection, Forest Service will not be liable for any Claim submitted by Contractor relating to the termination.