4-ADDENDUM.03.pdf

PDF 317 KB Posted

Attached to
Gunkle Mill Roof Replacement
Solicitation number
US.193081
Issued by
Chester County, Mcconnellsburg Borough, Pennsylvania

View the file

Other files

File Type Posted
1-BID SPEC 202511304.05.pdf PDF
3-Addendum.02.pdf PDF
6-Bid Tabulation 11340.05.pdf PDF
5-Pricing Section BT-07BE 1754329080.2866802.xlsx XLSX spreadsheet
2-Addendum.01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

011340.05 A3-1 ARRO

EAST WHITELAND TOWNSHIP – GUNKLE ROOF 07/29/2025

ARRO Consulting, Inc. July 29, 2025 108 West Airport Road Lititz, PA 17543

ADDENDUM NO. 3

EAST WHITELAND TOWNSHIP

GUNKLE MILL ROOF REPLACEMENT

In accordance with the requirements of the “Instructions to Bidders,” this Addendum shall be attached to and become a part of the Contract Documents for the above referenced project.

Concerning Addendum No. 2

(A)Addendum No. 2, dated July 17, 2025 – DELETE and REPLACE the first page of Addendum No. 2, the document heading incorrectly labeled it as Addendum No. 1 due to a clerical error, attached to this addendum

PennBid Project Changes

A. The PennBid Form: The PennBid Bid Form System BT-07BE has been updated to reflect the Addendum - 2 changes. Public Notice System Message was sent to suppliers on July 17, 2025 at 5:44 p.m.

B. The PennBid “Required Documents” was changed to “Optional” upon Public Q & A Question 7, on July 24, 2025. This pertained to the functionality of submission of the “Required Documents” in the PennBid System.

Miscellaneous (Public, Q & A, Clarifications, Pre-Bid Meeting Minutes etc.)

(A)Public Q & A Questions (not addressed in previous Addendums):

1. L.J. Paolella Construction asked “Please clarify the percentage (5% or 10%) and term for the Maintenance Bond (1 year or 2yr).”

A. Answer 1.: Township clarified 5% Bond for a term for the Maintenance Bond of

(1) one year.

2. L.J. Paolella Construction asked “What should be uploaded under PennBid tab labeled “Required Documents?”

B. Answer 2.: Information on required documents to upload can be found in the Invitation to Bid (Document 00010).

011340.05 A3-2 ARRO

3. L.J. Paolella Construction asked “What should be uploaded under the PennBid tab “Experience Questionnaire” – the Contractor’s Questionnaire or the Sub’s Questionnaire?”

C. Answer 3.: A Contractor’s Questionnaire shall be uploaded from all bidders. Sub Questionnaire’s should be uploaded if Bidder will be using a subcontractor on any portion of the project.

4. L.J. Paolella Construction asked “We have noticed, with other projects, that if the Pricing sheet is modified prior to the due date, Pennbid does not alert bidders to these changes. Is there a way that an alert could be sent out through Pennbid if the quantities, etc. happen to change on the Pricing sheet?”

D. Answer 4.: Updated pricing documents can be found in the posted Addendums.

5. L.J. Paolella Construction asked “Please be advised that Addendum 2 is labeled as Addendum 1 in the PDF.”

E. Answer 5.: Thank you. This clerical error will be fixed, and upon the closing of the Q&A will be addressed via an Addendum.

6. L.J. Paolella Construction asked “Invitation to Bid 00010 only states that a Bid Bond must be submitted with the bid. What exactly should be uploaded under the PennBid tab labeled "Required Documents?”

F. Answer 6.: The Township requires Bid Form (00300), Bid Bond (00350), Experience Questionnaire (00400), Proposed Subcontractors (00450 and 00450A) if applicable, Non-collusion Affidavit (00460), Bidders Affidavit (00461) and Worker’s Comp Affidavit (00462). All documents that are in the “Bidding Forms” section of the project manual shall be submitted with the bid.

7. L.J. Paolella Construction asked “Our question is not being answered. There is a REQUIRED tab on Pennbid that asks us to submit "Required Documents" with the bid. We can't skip over that tab - something must be uploaded there. All other documents you listed as needing to be uploaded with the bid have their own tab for upload. What are the "Required Documents" that need to be uploaded there?”

G. Answer 7.: This has been fixed. You can PDF the entire "Required Documents" and upload, however it is not required, it has been changed to "Optional.”

8. F.W. Houder Inc. asked “Any work required for the chimney masonry restoration?”

H. Answer 8.: No chimney work is required.

011340.05 A3-3 ARRO

9. F.W. Houder Inc. asked “Why is Cedar Breather listed on the addendum if the existing roof is on lath?”

I. Answer 9: The Cedar Breather ventilation mat was included in the specification to accommodate potential conditions where solid sheathing is encountered or required during construction. In such cases, Cedar Breather may be necessary to ensure adequate ventilation beneath the cedar shingles in accordance with best practices and manufacturer guidance. However, where the existing roof system is installed over lath (skip sheathing), Cedar Breather is not required. In all cases, the installation of roofing components shall follow the cedar shingle manufacturer’s published installation instructions and recommendations to ensure proper system performance and warranty compliance.

10. F.W. Houder Inc. asked “Don’t the gutters have to be replaced if the cedar below the gutters runs under the existing gutters?”

J. Answer 10.: The existing Yankee Gutters are to be reused.

BIDDERS MUST ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPECIFIED

PLACE ON THE BID FORM. THE ABSENCE OF THIS ACKNOWLEDGMENT WILL BE

CAUSE FOR REJECTION OF THE BID.

011340.05 A2-1 ARRO

EAST WHITELAND TOWNSHIP – GUNKLE ROOF 07/11/2025

ARRO Consulting, Inc. July 17, 2025 108 West Airport Road Lititz, PA 17543

ADDENDUM NO. 2

EAST WHITELAND TOWNSHIP

GUNKLE MILL ROOF REPLACEMENT

In accordance with the requirements of the “Instructions to Bidders,” this Addendum shall be attached to and become a part of the Contract Documents for the above referenced project.

Concerning the Project Manual

(A)Section 00300 – DELETE and REPLACE in its entirety, attached to this addendum

(B)Section 01010 – DELETE and REPLACE in its entirety, attached to this addendum

Miscellaneous (Public, Q & A, Clarifications, Pre-Bid Meeting Minutes etc.)

(A) Mandatory Pre-Bid Meeting Sign-In Sheet; attached to this addendum.

(B) Meeting Questions & Answers:

- 1. What is to be done with any leftover material?

o Left over material can be left on site, or can be dropped of at the Township Building (209 Conestoga Road Frazer, PA 19355).

- 2. What are the expectations for protection fence?

o Fence shall be placed as needed around any site features that could be damaged during the course of the project (i.e. water wheel).

- 3. What are the expectations for building interior protection during construction?

o The building will remain locked during construction, and the Township understands that debris will fall during the course of the project. The Township will allow access to the building at the end of construction for the contractor to perform final cleanup.

- 4. There is only one ridge board on one side of the roof. Does the Township want a ridge board installed on the other side of the roof?

o No. The intent of the project is to remove the existing roof and replaced in kind.

- 5. Does any of the existing facia need replaced.

o No. This was recently replaced by the Township.

- 6. Will any testing be required for this project?

o No testing is anticipated for this project.