3-Addendum.02.pdf

PDF 905 KB Posted

Attached to
Gunkle Mill Roof Replacement
Solicitation number
US.193081
Issued by
Chester County, Mcconnellsburg Borough, Pennsylvania

View the file

Other files

File Type Posted
1-BID SPEC 202511304.05.pdf PDF
6-Bid Tabulation 11340.05.pdf PDF
5-Pricing Section BT-07BE 1754329080.2866802.xlsx XLSX spreadsheet
4-ADDENDUM.03.pdf PDF
2-Addendum.01.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

011340.05 A2-1 ARRO

EAST WHITELAND TOWNSHIP – GUNKLE ROOF 07/11/2025

ARRO Consulting, Inc. July 17, 2025 108 West Airport Road Lititz, PA 17543

ADDENDUM NO. 1

EAST WHITELAND TOWNSHIP

GUNKLE MILL ROOF REPLACEMENT

In accordance with the requirements of the “Instructions to Bidders,” this Addendum shall be attached to and become a part of the Contract Documents for the above referenced project.

Concerning the Project Manual

(A)Section 00300 – DELETE and REPLACE in its entirety, attached to this addendum

(B)Section 01010 – DELETE and REPLACE in its entirety, attached to this addendum

Miscellaneous (Public, Q & A, Clarifications, Pre-Bid Meeting Minutes etc.)

(A)Mandatory Pre-Bid Meeting Sign-In Sheet; attached to this addendum.

(B) Meeting Questions & Answers:

- 1. What is to be done with any leftover material?

o Left over material can be left on site, or can be dropped of at the Township Building (209 Conestoga Road Frazer, PA 19355).

- 2. What are the expectations for protection fence?

o Fence shall be placed as needed around any site features that could be damaged during the course of the project (i.e. water wheel).

- 3. What are the expectations for building interior protection during construction?

o The building will remain locked during construction, and the Township understands that debris will fall during the course of the project. The Township will allow access to the building at the end of construction for the contractor to perform final cleanup.

- 4. There is only one ridge board on one side of the roof. Does the Township want a ridge board installed on the other side of the roof?

o No. The intent of the project is to remove the existing roof and replaced in kind.

- 5. Does any of the existing facia need replaced.

o No. This was recently replaced by the Township.

- 6. Will any testing be required for this project?

o No testing is anticipated for this project.

011340.05 A2-2 ARRO

EAST WHITELAND TOWNSHIP – GUNKLE ROOF 07/11/2025

- 7. Will a drip edge be needed?

o No. The intent of the project is to remove the existing roof and replaced in kind.

- 8. What warranty guarantees are required? This will be difficult since underlayment and waterproofing are not part of the project.

o The Township understands that standard water damage warranties are difficult to guarantee with cedar shingle. The standard warranties against wind and debris damage will be sufficient to the Township.

BIDDERS MUST ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPECIFIED

PLACE ON THE BID FORM. THE ABSENCE OF THIS ACKNOWLEDGMENT WILL BE

CAUSE FOR REJECTION OF THE BID.

11340.05 00300-1 ARRO

EAST WHITELAND TOWNSHIP – GUNKLE ROOF (PennBid)

DOCUMENT 00300

BID FORM

BIDDER (Name and Address):

PROJECT IDENTIFICATION: GUNKLE MILL ROOF REPLACEMENT

CONTRACT IDENTIFICATION: GENERAL CONSTRUCTION

THIS BID IS SUBMITTED TO: EAST WHITELAND TOWNSHIP

209 Conestoga Road Frazer, PA 19355

1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Bidding Documents for the Contract Price and within the Contract Time(s) and in accordance with the other terms and conditions of the Bidding Documents.

2. Bidder accepts all of the terms and conditions of the Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for a period of 60 days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. Thirty-day extensions of the date for the award may be made by the mutual written consent of the Owner and the apparent Successful Bidder. Bidder agrees, if required by Owner prior to and as a condition of Contract award, to execute and sign any documents related to financing of the Project. Bidder will sign and submit the Agreement with the Bonds and other documents required by the Bidding Documents within 15 days after the date of Owner's Notice of Intent to Award.

3. In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:

3.1 Bidder has examined copies of all the Bidding Documents and of the following Addenda (receipt of all which is hereby acknowledged):

Date Number

11340.05 00300-2 ARRO

3.2 Bidder has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, and furnishing of the Work;

3.3 Bidder is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work.

3.4 Bidder has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in Paragraph 4.2.1 of the General Conditions. Bidder acknowledges that such reports and drawings are not Bidding Documents or Contract Documents and may not be complete for Bidder's purposes. Bidder acknowledges that Owner and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to Underground Facilities at or contiguous to the site. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site or otherwise which may affect cost progress, performance, or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder and safety precautions and programs incident thereto. Bidder does not consider that any additional examinations, investigations, explorations, tests, studies, or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price, and other terms and conditions of the Bidding Documents and Contract Documents.

3.5 Bidder is aware of the general nature of Work to be performed by Owner and others at the site that relates to Work for which this Bid is submitted as indicated in the Bidding Documents and Contract Documents.

3.6 Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and drawings identified in the Bidding Documents and Contract Documents and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents and Contract Documents.

3.7 Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents and Contract Documents and the written resolution thereof by Engineer is acceptable to Bidder, and the Bidding Documents and Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.

3.8 This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm, or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder

11340.05 00300-3 ARRO

has not solicited or induced any person, firm or corporation to refrain from bidding;

and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.

3.9 That Bidder has reviewed all Bidding Documents and Addenda thereto and that it will complete all Work required thereby. Further, Bidder understands and acknowledges that if it has not reviewed all Bidding Documents and Addenda thereto, it will complete all such Work as if all Bidding Documents and Addenda and such Work shall not be the basis for additional compensation to the Bidder.

4. Bidder will complete the work in accordance with the Contract Documents for the following price(s):

Bid price (As described in Section 01010 of the Technical Specifications)

Lump Sum Contract Price:

(use words)

(figures)

Allowance Price (Replacing/repair underlying furring strips, approximately 40 LF):

____________________________________________per linear foot________ (use words)

(figures)

Allowance Price (Replacing/repair “Yankee Gutter” system to match existing materials and profile, approximately 40 LF):

____________________________________________per linear foot________ (use words)

(figures)

Allowance Price (Repair/ Inspect Existing Lightning Protection System to ensure system is “Installed and Functioning Properly” by a Qualified Company and Certify Use of Lightning Protection System (Lump Sum Figure):

(use words)

(figures)

11340.05 00300-4 ARRO

Total Bid Price (Lump Sum Contract Price + Allowances):

(use words)

(figures)

The quantities given above are not guaranteed. Final payment will be based on actual quantities. Any difference between estimated and final quantities, or increase in market value of Products and services, will not be considered reason for increase of unit prices.

5. Bidder agrees that the Work will be substantially complete on or before the dates or within the number of calendar days indicated in the Agreement.

Bidder accepts the provisions of the Agreement as to liquidated and other damages in the event of failure to complete the Work on time.

6. The apparent low Bidder and the next two lower Bidders shall submit, within (2) business days after the Bid opening, in hard copy, the Bid Form and the following documents, which are made a condition of this Bid, showing original signatures and seals.

Bidders shall attach a copy of the PennBid results to the Bid Form in lieu of duplicating the figures manually:

6.1 Required Bid Security in the form __________________________.

6.2 Experience Questionnaire and accompanying experience documentation ; Document 00400.

6.3 List of Proposed Subcontractors; Document 00450.

6.4 Evidence of Bidder's and its Subbidder(s) qualification to do business in the Commonwealth of Pennsylvania or covenant to obtain such qualification prior to and as a condition of award of the Contract (to be provided if Bidder/Subbidder is out of State).

7. Communications concerning this Bid will be addressed to (Bidder's Contact Person):

Phone: ( ) Fax: ( ) Company Email Address:

8. The terms used in this Bid are defined and have the meanings assigned to them in the General Conditions, as may be amended by the Supplementary Conditions, included as part of the Bidding Documents.

11340.05 00300-5 ARRO

9. Bidder acknowledges that the Bid Price is based on Products and methods described and named in the Drawings and Specifications.

11340.05 00300-6 ARRO

10. Bidder certifies that (s)he visited the site on_________, ____________, 2025.

SUBMITTED on _________________________________, 2025.

(If Bidder is an Individual)

Signature of Witness Signature of Individual

Trading and doing business as:

Name of Business

Address of Business

Type or print name below signature.

(If Bidder is a Limited Liability Company – All Members Must Sign)

Name of Company

Address of Company

Signature of Witness Signature of Member

Signature of Witness Signature of Member

Signature of Witness Signature of Member

Type or print name below each signature.

State below the names and addresses of all members.

11340.05 00300-7 ARRO

(If Bidder is a Partnership - All General Partners Must Sign)

Name of Partnership

Address of Partnership

Signature of Witness Signature of Partner

Signature of Witness Signature of Partner

Signature of Witness Signature of Partner

Type or print name below each signature.

State below the names and addresses of all partners.

11340.05 00300-8 ARRO

(If Bidder is a Corporation)

Attest:

Name of Corporation

Signature of Secretary or Assistant Secretary

Address of Principal Office

(Corporate Seal) State of Incorporation

Signature of President or Vice President

Type or print name below each signature.

State below the names and addresses of three principal officers.

END OF BID FORM

11340.05 01010-1 ARRO

SECTION 01010

SUMMARY OF WORK

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. Project Description.

B. Project Location.

C. Contractor's Use of Premises.

D. Work Sequence.

E. Special Requirements.

1.02 PROJECT DESCRIPTION

A. The Work covered under these Contract Documents consists of all labor, equipment, materials, and services necessary for the removal and replacement of the cedar shingle roof system on the Gunkle Mill.

B. The Work includes, but is not limited to, the following major components:

1. Complete removal and disposal of existing cedar shingle roofing system, underlayment, and associated flashing materials.

2. Protection, selective removal, and restoration of “Yankee Gutter” components.

3. Inspection and selective replacement of deteriorated roof decking and structural framing as required.

4. Installation of new ice and water shield, underlayment, and heavy cedar shingles in accordance with specifications.

5. Fabrication and installation of new flashing, counterflashing, and ridge caps.

6. Carpentry repair or replacement of fascia, soffits, rakes, and trim members, including surface preparation and painting.

7. Installation and maintenance of scaffolding and site protection measures throughout the duration of the Work.

8. Coordination of all submittals, inspections, and site access with the Owner’s

Representative.

11340.05 01010-2 ARRO

9. Inspection of existing lightning protection system and replacement of components as necessary to facilitate certification by a qualified contractor or third-party agency confirming proper installation and functionality.

1.03 PROJECT LOCATION

A. Project site is located at 86 Moores Road, Malvern, PA 19355. Northeast Corner of Conestoga Road and Moores Road.

1.04 CONTRACTOR'S USE OF PREMISES

A. Confine construction equipment, the storage of materials and equipment, and operations of workmen to within the Project site.

B. Storage of equipment and materials shall be as allowed under Paragraph A above.

Additional storage in excess of that available at the street shall be the responsibility of the Contractor. Additional payment will not be made for storing new Products, or excavated material off-site, or its transportation to the site when it is required.

C. Assume full responsibility for materials stored on site (including materials for which the Owner has made payment).

D. Transport materials remaining at the completion of the Project for which the Owner has made payment to a storage area designated by the Owner.

E. The Contractor shall limit his use of the premises to the Work indicated, so as to allow for Owner occupancy and use by the public.

1. Keep existing driveways and entrances serving the premises clear and available to the Owner and his employees at all times. Do not use these areas for parking or storage of materials.

2. Do not unreasonably encumber the site with materials or equipment. Confine stockpiling of materials and location of storage sheds to the areas designated by the Owner. If areas for storage are not available on-site, or if additional storage is necessary, obtain and pay for such storage off-site.

1.05 WORK SEQUENCE

A. Submit with initial progress schedule required by Section 01300, a detailed step-by-step Work sequence, which will achieve compliance with the requirements of this Section 01010.

B. Sequence construction operations to:

11340.05 01010-3 ARRO

1. Minimize inconvenience to businesses, public facilities, and residences located adjacent to the Project.

2. Maintain continuous access to the Project site for the Owner and the general public.

1.06 SPECIAL REQUIREMENTS

A. Contractor shall adhere to the East Whiteland Township Zoning, Building and Code Ordinances.

B. In the event that utility relocations or modifications are required during the Work, make arrangements with the affected utility company to perform such relocations or modifications. Cost of such utility relocations or modifications is considered part of the Contract Price(s) and no extra compensation will be allowed.

C. Obtain all necessary permits to complete construction of roof. Cost of such permits shall be included in the Contract Price(s).

D. The following restrictions, as applicable, shall be observed during all hours of Work:

1. Regular working hours for the Project are defined as 7 a.m. to 5 p.m. Monday through Friday.

2. No working during non-regular hours or on Saturday, Sunday, or any legal holiday, without Owner’s consent.

3. No jackhammers, heavy equipment, or similar noise generating equipment will be used between 7:00 P.M. and 7:00 A.M. without Owner’s consent.

4. Contractor shall shield adjacent properties from any supplemental lighting installed to illuminate work site.

5. Contractor shall be responsible for resolution of complaints from adjacent property owners regarding disturbances resulting from Contractor's performance of work.

6. All construction operations, including after hours, shall comply with Federal, State, and local noise and public nuisance regulations.

E. Contractor shall not work outside the limit of disturbance (LOD) boundary.

F. Contractor shall provide protection, in the form of fences, for existing trees and physical features scheduled to remain. Contractor shall provide protection of existing exterior and interior structures.

PART 2 - PRODUCTS

NOT APPLICABLE TO THIS SECTION

11340.05 01010-4 ARRO

PART 3 - EXECUTION

NOT APPLICABLE TO THIS SECTION

END OF SECTION