Exhibit U - DUNE Cold Lab Egress Doors - Existing Electrical Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- 378077GMK
About this file
These are electrical design and construction documents for the Fermi National Accelerator Laboratory (a United States Department of Energy facility), prepared by design consultants ARUP, Terra Engineering, and CCS, with Perkins+Will as the architecture firm. The documents consist of electrical ground floor plans, enlarged electrical room details, isometric views, and comprehensive panel schedules dated October 31, 2023 (Record Set Revision 1).
The electrical infrastructure includes four primary electrical rooms: the Main Electrical Room (G460), Emergency Electrical Room (G480), MDF Room (G490), and an Electrical Room (G113). The system is configured with 480Y/277V three-phase power distribution, fed through multiple switchboards (SWBD-IERC-A1, SWBD-IERC-B1), transformers (TR-IERC series), and protected by various distribution panels and circuit breakers. Critical infrastructure includes a UPS system (UPS-IERC-B1) with associated panels (PHP-UPS-B1-1) serving sensitive equipment loads, emergency power capability, and extensive receptacle circuits throughout the facility. Panel schedules detail 225-amp to 600-amp rated enclosures with demand factors ranging from 58% to 125%, supplying laboratory equipment, HVAC systems, lighting controls, server equipment, and specialized scientific instrumentation. The electrical systems support interconnected building subsystems including chilled water equipment, generators with annunciator monitoring, and integrated emergency shutdown capabilities tied to UPS and HVAC shunt trip mechanisms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 01 to RFP NO 378077GMK .pdf | ||
| RFP 378077GMK Sam.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
AT-6
N2-4 VAC-4 CA-4 CAT-6
CAT-6
C
AT-6
N2 -4
VA
C
-4 C
A-
C A
T- 6N2-4
V
AC
-4 C
A-4 C
AT-6
N2 -4
VA
C
-4 C
A-
C A
T-
N2-4
VA
C -4
C A-4
C
AT-6
C
AT-6 C
A T-
6 C
AT-6 C
A T-
6C
AT-6 C
A T-
N2-4
VA
C -4
C A-4
C
AT-6
CAT-6CAT-6
CAT-6CAT-6
N2-4 VAC-4 CA-4 CAT-6
N2-4 VAC-4 CA-4 CAT-6
CAT-6
CAT-6
CAT-6
CAT-6
N2-4VAC-4CA-4CAT-6
N2-4VAC-4CA-4CAT-6
C
AT-6
C
AT
-6 C
A T-
C
AT-6
C
AT-6
C
AT
-6 C
A T-
C
AT-6
C
AT-6
C
AT
-6 C
A T-
N2-4 VAC-4 CA-4 CAT-6
N2-4 VAC-4 CA-4 CAT-6
N2-4 VAC-4 CA-4 CAT-6
CAT-6
1 2 3 4 5 6 7 8 9 10 11 12 13 14
A'
A
B
D
E
F
C
E10-00b
E08-00a
MATCH LINE
M
AT
C H
L
IN
E
0.5
E09-00a
E10-00a
E11-01a
E12-00a 1E08-00b
E09-00b
E11-00b
E12-00b
CCD TESTING PROJECT LAB
G623
CORRIDOR WEST
CORR-W
GOWNING
G671
PROJECT LAB CORE
G211
STAGING
G535
ARGON CUBE
G044
PROJECT LAB HPgTPC
G161STAIR 2
ST02
SUPPORT LAB
G121
LOBBY
G001
STAIR 1
ST01
CONFERENCE ROOM
G771GREAT HALL
G563
EQUIPMENT CHASE S
G295
EQUIPMENT CHASE N
G165
PEDESTRIAN PASSAGEWAY
G500
MDF ROOM
G490
TOILETS
G109A
TOILETS
G109B
TOILETS
G359B
TOILETS
G099B
TOILETS
G099A
WELLNESS
G351
STORAGE
G371
TOILETS
G359C
TOILETS
G359A
EQUIPMENT CHASE
G325
ELEV. 1
EL01ELECTRICAL
G113
PANTRY
G111
SOURCE ROOM / STORAGE
G523
SUPPORT LAB
G583
VESTIBULE
G000
CORRIDOR SOUTH
CORR-S
CORRIDOR EAST
CORR-E
CORRIDOR NORTH
CORR-N
ELEV. 2
EL02
DARK ROOM
G585
MAIN ELECTRICAL ROOM
G460
WATER SERVICE
G430
MAIN EMERGENCY ELECTRICAL
ROOM
G480
STAGING
WG-01
W.H.CONNECTION
WG-02
GOWNING
G123
W.H. EAST/WEST CORRIDOR
WG-03
VESTIBULE
G420
JANITOR
G112
PROJECT LAB CORE
G211
GOWNING
G671
SUPPORT LAB
G121
DEFERRED FIT OUT G-WEST
G-WEST
DUNE & MKIDS ELECTRONICS
G291
ANTE ROOM
G361
ANTE ROOM CORRIDOR
G361A CMB-S4 DETECTOR ASSEMBLY
G251
ASIC DEVELOPMENT & TESTING
G301 EED TESTING
G271EED TESTING
CORR-T
DUNE & MKIDS ELECTRONICS
CORR-U
CMB-S4 DETECTOR ASSEMBLY
CORR-V
ASIC DEVELOPMENT & TESTING
CORR-X
CHECKED
APPROVED
DRAWN
DESIGNED
A/E CONSULTANT DATE
REVISIONS
FERMI NATIONAL ACCELERATOR LABORATORY
UNITED STATES DEPARTMENT OF ENERGY
DRAWING NO.SCALE: REV.
CONSULTANTS
35 E Upper Wacker Dr Suite1800 Chicago, IL 60601 t 312.849.5610 www.arup.com
1815 S. Meyers Road Suite 1070 Oakbrook Terrace, IL 60181 t 800.443.8607 f 630.678.0858 www.ccsdifference.com
225 W. Ohio Street 4th Floor Chicago, IL 60654 t 312.467.0123 f 312.467.0220 www.terraengineering.com
ARUP CCSTERRA
NORTH AMERICA LTD.
2-6-1
KEYPLAN
B A
GROUNDC
\\g lo ba l.a ru p .
co m
\a m er ic as \J ob s\
C H
I \2
0\
-0
0\
In t e rn al
P ro je ct
D at a\ 4-
R ec or d C op ie s of
O ut go in g D oc um en ts
\2
3-
-3
R ec or d
D oc um en ts \N ew fo ld er
\2
9_
Fe rm ila b _
EL
EC
_R
_d et ac he d.
rv t
1/16" = 1'-0" E07-00
ELECTRICAL GROUND FLOOR PLAN
OVERALL
AMT
AMT
EJD
EJD
410 North Michigan Avenue t 312.755.0770 f 312.755.0775 www.perkinswill.com
1/16" = 1'-0"1 ELECTRICAL GROUND FLOOR OVERALL PLAN
0 8' 16' 32'
NN
REV NO ISSUE DATE
1 RECORD SET 10.31.2023
http://www.arup.com http://www.ccsdifference.com http://www.terraengineering.com http://www.perkinswill.com
J
SP
D-
J
SP
D-
J C24
M M
JC0
M
J
SPD-3
J C04
JC1
J C2
J C2
J
SP
D-
J
SP
D-
J C04
J C07
J C08
J C09
J
SPD-2
J
SPD-3
J
SPD-3
1 2
DD
E
CC
SWBD-IERC-B1-A1
TR-IERC-B1-A
LP
-IE
RC
-A
1-
PH
P-
IE
RC
-A 1-
PP
-IE
RC
-A
1-
A1TR-IERC-A1-A
TR-IERC-A
TR-IERC-B
SWBD-IERC-A1
SWBD-IERC-B1
FDS-IERC-A
FDS-IERC-B
PP
-IE
RC
-A
1- A1
: 1
PP-IERC-A1-A1: 17
PP-IERC-A1-A1: 17 PP-IERC-A1-A1: 17
PP
-IE
RC
-A
1- A1
: 1
PP
-IE
RC
-A
1- A1
: 1
PP-IERC-A1-A1: 17
SPACE RESERVED
FOR LIGHTING
CONTROLS
PP
-IE
RC
-A
1- A1
: 5
PP
-IE
RC
-A
1- A1
: 6
PP
-IE
RC
-A
1- A1
: 6
MAIN ELECTRICAL ROOM
G460
1 2
A
B
EPO SWITCH TIED TO
UPS + HVAC SHUNT TRIP
L6-30 RECEPTACLES
MOUNTED TO THE TOP OF THE
LADDER RACK
APPROXIMATELY 7'-6" AFF.
(TYP.)
UPS-IERC-B1
PH
P-
UP
S-
B1 -1
TR
-U
PS
-B
1- 1-
A
PP
-U
PS
-B
1- 1-
A1PP-IERC-A1-A1: 32
PP
-IE
RC
-A
1- A1
: 3
PP-IERC-A1-A1: 32
PP-IERC-A1-A1: 32 PP-IERC-A1-A1: 32
PP-UPS-B1-1-A1: 51
PP-IERC-A1-A1: 32
PP-IERC-A1-A1: 32
PP
-U
PS
-B
1- 1-
A1 : 1
,3
PP
-U
PS
-B
1- 1-
A1 : 5
,7
PP
-U
PS
-B
1- 1-
A1 : 9
,11
PP
-U
PS
-B
1- 1-
A1 : 1
3,1
PP
-U
PS
-B
1- 1-
A1 : 1
7,1
PP
-U
PS
-B
1- 1-
A1 : 2
1,2
PP
-U
PS
-B
1- 1-
A1 : 2
5,2
PP
-U
PS
-B
1- 1-
A1 : 2
9,3
PP
-U
PS
-B
1- 1-
A1 : 3
3,3
PP
-U
PS
-B
1- 1-
A1 : 3
7,3
PP
-U
PS
-B
1- 1-
A1 : 4
1,4
PP
-U
PS
-B
1- 1-
A1 : 4
5,4
PP
-U
PS
-B
1- 1-
A1 : 4
6,4
PP
-U
PS
-B
1- 1-
A1 : 4
2,4
PP
-U
PS
-B
1- 1-
A1 : 3
8,4
PP
-U
PS
-B
1- 1-
A1 : 3
4,3
PP
-U
PS
-B
1- 1-
A1 : 3
0,3
PP
-U
PS
-B
1- 1-
A1 : 2
6,2
PP
-U
PS
-B
1- 1-
A1 : 2
2,2
PP
-U
PS
-B
1- 1-
A1 : 1
8,2
PP
-U
PS
-B
1- 1-
A1 : 1
4,1
PP
-U
PS
-B
1- 1-
A1 : 1
0,1
PP
-U
PS
-B
1- 1-
A1 : 6
,8
PP
-U
PS
-B
1- 1-
A1 : 2
,4
PP
-IE
RC
-A 1-
A1 : 3
PP
-IE
RC
-A
1- A1
: 3
PP
-IE
RC
-A
1- A1
: 4
PP
-IE
RC
-A
1- A1
: 5
PP
-IE
RC
-A
1- A1
: 5
PP
-IE
RC
-A
1- A1
: 4
PHP-UPS-B1-1: 1,3,5
PP
-IE
RC
-A
1- A1
: 3
PP
-IE
RC
-A
1- A1
: 4
PP
-IE
RC
-A
1- A1
: 4
PP
-IE
RC
-A
1- A1
: 4
PP
-IE
RC
-A
1- A1
: 5
PP
-IE
RC
-A
1- A1
: 5
MDF ROOM
G490
E
S-
PP
-IE
RC
-B 1-
1- 1-
A2
TR-IERC-A1-3-A
PP
-IE
RC
-B
1- A1
-1
PP
-IE
RC
-B
1- A1
-1
PHP-IERC-B1-1-4
PP-IERC-A1-3-A1
PHP-IERC-A1-2
PHP-IERC-A1-3 E-PP-INV-A1-3-A1
ETR-INV-A1-3-A
PP-IERC-A1-3-A1: 14
PP-IERC-A1-3-A1: 14
PP-IERC-A1-3-A1: 14 E-PP-INV-A1-3-A1: 1
SPACE RESERVED
FOR LIGHTING
CONTROLS
EQUIPMENT
E.11
E.11
S-PHP-IERC-B1-1-3
PP-IERC-A1-3-A1: 30
PP-IERC-A1-3-A1: 32
E-PHP-INV-A1-3
E-PP-INV-A1-3-A1: 2,4,6
S-PP-IERC-B1-1-1-A2: 56,58,60
E-PP-INV-A1-3-A1: 3
ELECTRICAL
G113
1 2
S-
AT
S-
IE
RC
-A
1-
S-
PH
P-
IE
RC
-A
1- 1-
1 S-ATS-IERC-B1-1
E-INV-IERC-A1-1
S-
DH
P-
IE
RC
-B
1- 1-
STR-IERC-B1-1-1-A
S-
PP
-IE
RC
-B 1-
1- 1-
A1
ET
R-
IN
V-
A1 -1
-A
E-
PH
P-
IN
V- A1
-1
E-
PP
-IN
V-
A1 -1
-A
E-
PP
-IN
V-
A1 -1
-A 1:
PP
-U
PS
-B
1- 1-
A1 : 4
E-
PP
-IN
V-
A1 -1
-A 1:
E-
PP
-IN
V- A1
-1 -A
1:
E-
PP
-IN
V-
A1 -1
-A 1:
PP
-U
PS
-B
1- 1-
A1 : 4
PP-UPS-B1-1-A1: 49
PP
-U
PS
-B
1- 1-
A1 : 4
E.11E.11E.11
E.11
E-PP-INV-A1-1-A1: 2,4,6E-PHP-INV-A1-1: 7,9,11
S-PP-IERC-B1-1-1-A1: 56,58,60
GE
NE
RA
TO
R
AN
NU
NC
IA
TO
R
PP-UPS-B1-1-A1: 49
MAIN EMERGENCY ELECTRICAL
ROOM
G480
CHECKED
APPROVED
DRAWN
DESIGNED
A/E CONSULTANT DATE
REVISIONS
FERMI NATIONAL ACCELERATOR LABORATORY
UNITED STATES DEPARTMENT OF ENERGY
DRAWING NO.SCALE: REV.
CONSULTANTS
35 E Upper Wacker Dr Suite1800 Chicago, IL 60601 t 312.849.5610 www.arup.com
1815 S. Meyers Road Suite 1070 Oakbrook Terrace, IL 60181 t 800.443.8607 f 630.678.0858 www.ccsdifference.com
225 W. Ohio Street 4th Floor Chicago, IL 60654 t 312.467.0123 f 312.467.0220 www.terraengineering.com
ARUP CCSTERRA
NORTH AMERICA LTD.
2-6-1
KEYPLAN
\\g lo ba l.a ru p .
co m
\a m er ic as \J ob s\
C H
I \2
0\
-0
0\
In t e rn al
P ro je ct
D at a\ 4-
R ec or d C op ie s of
O ut go in g D oc um en ts
\2
3-
-3
R ec or d
D oc um en ts \N ew fo ld er
\2
9_
Fe rm ila b _
EL
EC
_R
_d et ac he d.
rv t
1/4" = 1'-0" E40-01
ENLARGED ELECTRICAL PLANS -
GROUND FLOOR BOH
AMT
AMT
KPC
KPC
410 North Michigan Avenue t 312.755.0770 f 312.755.0775 www.perkinswill.com
1/4" = 1'-0"4 MAIN ELECTRICAL ROOM G460 - ENLARGED PLAN
1/4" = 1'-0"2 MDF ROOM G490 - ENLARGED PLAN
1/4" = 1'-0"3 ELECTRICAL ROOM G113 - ENLARGED PLAN
1/4" = 1'-0"1 EMERGENCY ELECTRICAL ROOM G480 - ENLARGED PLAN
5 MAIN ELECTRICAL ROOM G460 ISOMETRIC ABOVE
6 MAIN ELECTRICAL ROOM G460 ISOMETRIC BELOW
REV NO ISSUE DATE
1 RECORD SET 10.31.2023
http://www.arup.com http://www.ccsdifference.com http://www.terraengineering.com http://www.perkinswill.com
CHECKED
APPROVED
DRAWN
DESIGNED
A/E CONSULTANT DATE
REVISIONS
FERMI NATIONAL ACCELERATOR LABORATORY
UNITED STATES DEPARTMENT OF ENERGY
DRAWING NO.SCALE: REV.
CONSULTANTS
35 E Upper Wacker Dr Suite1800 Chicago, IL 60601 t 312.849.5610 www.arup.com
1815 S. Meyers Road Suite 1070 Oakbrook Terrace, IL 60181 t 800.443.8607 f 630.678.0858 www.ccsdifference.com
225 W. Ohio Street 4th Floor Chicago, IL 60654 t 312.467.0123 f 312.467.0220 www.terraengineering.com
ARUP CCSTERRA
NORTH AMERICA LTD.
2-6-1
KEYPLAN
\\g lo ba l.a ru p .
co m
\a m er ic as \J ob s\
C H
I \2
0\
-0
0\
In t e rn al
P ro je ct
D at a\ 4-
R ec or d C op ie s of
O ut go in g D oc um en ts
\2
3-
-3
R ec or d
D oc um en ts \N ew fo ld er
\2
9_
Fe rm ila b _
EL
EC
_R
_d et ac he d.
rv t
E60-28
ELECTRICAL PANEL SCHEDULESAMT
AMT
EJD
EJD
410 North Michigan Avenue t 312.755.0770 f 312.755.0775 www.perkinswill.com
NOTES:
TOTAL EST. DEMAND: 0 A
TOTAL CONN..: 0 A
TOTAL EST. DEMAND: 0 VA
TOTAL CONN. LOAD: 0 VA
MTR 0 VA 0.00% 0 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL AMPS: 0 A 0 A 0 A
TOTAL LOAD: 0 VA 0 VA 0 VA
41 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 42
39 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 40
37 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 38
35 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 36
33 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 34
31 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 32
29 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 30
27 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 28
25 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 26
23 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 24
21 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 22
19 SPARE -- 20 A 1 0 VA 0 VA 1 20 A -- SPARE 20
17 0 VA 1 20 A -- SPARE 18
15 0 VA 1 20 A -- SPARE 16
13 0 VA 1 20 A -- SPARE 14
11 0 VA 1 20 A -- SPARE 12
9 0 VA 1 20 A -- SPARE 10
7 0 VA 1 20 A -- SPARE 8
5 -- -- -- -- 0 VA 0 VA 1 20 A -- SPARE 6
3 -- -- -- -- 0 VA 0 VA 1 20 A -- SPARE 4
1 CHWP B-01 MTR 50 A 3 0 VA 0 VA 1 20 A -- SPARE 2
CKT CIRCUIT DESCRIPTION LC TRIP POLES A B C POLES TRIP LC CIRCUIT DESCRIPTION CKT
ENCLOSURE: Type 1
MOUNTING: SURFACE WIRE: 4 BUS RATING: 600
SUPPLY FROM: PHASE: 3 TYPE: MLO
LOCATION: VOLTS: 480Y/277V A.I.C. RATING: 42,000 AIC
PANEL: (E) EM-PHP-UF-2
MASTER PANEL SCHEDULE INDEX
PANELBOARD NAME SHEET NUMBER
(E) DHP-CL-1B E60-26
(E) EM-PHP-UF-2 E60-28
E-PHP-INV-A1-1 E60-05
E-PHP-INV-A1-2 E60-05
E-PHP-INV-A1-3 E60-28
E-PP-INV-A1-1-A1 E60-05
E-PP-INV-A1-3-A1 E60-05
LP-IERC-A1-1 E60-06
LP-IERC-A1-1-1 E60-06
MPZ-1 E60-26
PHP-CL-1E-2 E60-29
PHP-CL-1W-1 E60-29
PHP-IERC-A1-1 E60-11
PHP-IERC-A1-1-1 E60-07
PHP-IERC-A1-1-2 E60-08
PHP-IERC-A1-1-3 E60-06
PHP-IERC-A1-2 E60-11
PHP-IERC-A1-3 E60-06
PHP-IERC-B1-1-1 E60-10
PHP-IERC-B1-1-2 E60-07
PHP-IERC-B1-1-3 E60-07
PHP-IERC-B1-1-4 E60-10
PHP-IERC-B1-1-5 E60-30
PHP-IERC-B1-1-6 E60-30
PHP-IERC-B1-1-7 E60-09
PHP-UPS-B1-1 E60-28
PHP-UPS-B1-2 E60-24
PP-CL-1E-2 E60-32
PP-CL-1E-3 E60-29
PP-CL-1W-1 E60-29
PP-IERC-A1-1-3-A1 E60-13
PP-IERC-A1-1-3-A2 E60-13
PP-IERC-A1-1-A1 E60-12
PP-IERC-A1-1-A2 E60-12
PP-IERC-A1-3-A1 E60-18
PP-IERC-A1-A1 E60-18
PP-IERC-B1-1-2-A1 E60-19
PP-IERC-B1-1-6-A1 E60-32
PP-IERC-B1-1-6-A2 E60-33
PP-IERC-B1-2-A1-1 E60-19
PP-IERC-B1-2-A1-2 E60-20
PP-IERC-B1-2-A1-3 E60-20
PP-IERC-B1-2-A1-4 E60-21
PP-IERC-B1-2-A1-5 E60-21
PP-IERC-B1-2-A1-6 E60-22
PP-IERC-B1-2-A1-7 E60-22
PP-IERC-B1-2-A1-8 E60-23
PP-IERC-B1-A1-1 E60-14
PP-IERC-B1-A1-2 E60-14
PP-IERC-B1-A1-3 E60-14
PP-IERC-B1-A1-4 E60-14
PP-IERC-B1-A1-5 E60-15
PP-IERC-B1-A1-6 E60-09
PP-IERC-B1-A1-7 E60-15
PP-IERC-B1-A1-8 E60-15
PP-IERC-B1-A1-9 E60-15
PP-IERC-B1-A1-10 E60-16
PP-IERC-B1-A1-11 E60-16
PP-IERC-B1-A1-12 E60-16
PP-IERC-B1-A1-13 E60-16
PP-IERC-B1-A1-14 E60-17
PP-IERC-B1-A1-15 E60-17
PP-IERC-B1-A1-16 E60-17
PP-IERC-B1-A1-17 E60-32
PP-IERC-B1-A1-18 E60-31
PP-IERC-B1-A1-19 E60-31
PP-IERC-B1-A1-20 E60-31
PP-UPS-B1-1-A1 E60-24
PP-UPS-B1-1-B1 E60-28
PP-UPS-B1-2-A1 E60-24
S-PHP-IERC-A1-1-1 E60-25
S-PHP-IERC-A1-1-2 E60-25
S-PHP-IERC-B1-1-2 E60-26
S-PHP-IERC-B1-1-3 E60-26
S-PP-IERC-B1-1-1-A1 E60-27
S-PP-IERC-B1-1-1-A2 E60-27
S-PP-IERC-B1-1-2-A1 E60-25
S-PP-IERC-B1-1-2-A2 E60-09
S-PP-IERC-B1-1-2-B1 E60-09
WILSON HALL BASEMENT
CL-1
(L) DENOTES LOCKABLE CIRCUIT BREAKER
NOTES:
TOTAL EST. DEMAND: 8 A
TOTAL CONN..: 7 A
TOTAL EST. DEMAND: 6450 VA
RCPT 2180 VA 100.00% 2180 VA TOTAL CONN. LOAD: 5596 VA
LTG 3416 VA 125.00% 4270 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL AMPS: 8 A 11 A 2 A
TOTAL LOAD: 2048 VA 2878 VA 670 VA
17 SPARE -- 20 A 1 0 VA 0 VA -- -- -- SPACE 18
15 SPARE -- 20 A 1 0 VA 0 VA -- -- -- SPACE 16
13 SPARE -- 20 A 1 0 VA 0 VA -- -- -- SPACE 14
11 LTS: GROUND FLOOR EXIT SIGNS (L) LTG 20 A 1 110 VA 0 VA -- -- -- SPACE 12
9 LTS: EM LIGHTING LABS NORTH LTG 20 A 1 2318... 0 VA -- -- -- SPACE 10
7 LTS: EM LIGHTING CORRIDOR & BOH NORTH LTG 20 A 1 988 VA 0 VA -- -- -- SPACE 8
5 -- -- -- -- 560 VA 0 VA -- -- -- SPACE 6
3 -- -- -- -- 560 VA 0 VA -- -- -- SPACE 4
1 ETR-INV-A1-3-A RCPT 30 A 3 1060... 0 VA -- -- -- SPACE 2
CKT CIRCUIT DESCRIPTION LC TRIP POLES A B C POLES TRIP LC CIRCUIT DESCRIPTION CKT
ENCLOSURE: Type 1
MOUNTING: SURFACE WIRE: 4 BUS RATING: 400
SUPPLY FROM: E-PHP-INV-A1-1 PHASE: 3 TYPE: MLO
LOCATION: ELECTRICAL G113 VOLTS: 480Y/277V A.I.C. RATING: 42,000 AIC
PANEL: E-PHP-INV-A1-3
NOTES:
TOTAL EST. DEMAND: 35 A
TOTAL CONN..: 42 A
TOTAL EST. DEMAND: 12655 VA
TOTAL CONN. LOAD: 15310 VA
RCPT 15310 VA 82.66% 12655 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL AMPS: 53 A 39 A 36 A
TOTAL LOAD: 6257 VA 4677 VA 4377 VA
41 SPACE -- -- -- 0 VA 0 VA 1 20 -- SPARE 42
39 SPACE -- -- -- 0 VA 0 VA 1 20 -- SPARE 40
37 SPACE -- -- -- 0 VA 0 VA 1 20 -- SPARE 38
35 SPACE -- -- -- 0 VA 0 VA 1 20 -- SPARE 36
33 SPACE -- -- -- 0 VA 360 VA 1 20 RCPT RCPT - EQ CHASE SERVER 34
31 EQ CHASE SERVER RCPT 20 1 360 VA 360 VA 1 20 RCPT RCPT - EQ CHASE SERVER 32
29 EQ CHASE SERVER RCPT 20 1 360 VA 360 VA 1 20 RCPT RCPT - EQ CHASE SERVER 30
27 EQ CHASE SERVER RCPT 20 1 360 VA 360 VA 1 20 RCPT RCPT - EQ CHASE SERVER 28
25 EQ CHASE SERVER RCPT 20 1 360 VA 360 VA 1 20 RCPT RCPT - EQ CHASE SERVER 26
23 -- -- -- -- 90 VA 360 VA 1 20 RCPT EQ CHASE - CO2 SKID PLC 24
21 EQ CHASE SERVER RCPT 20 2 90 VA 1250... -- -- -- -- 22
19 -- -- -- -- 90 VA 1250... 2 20 RCPT RCPT - MICROBONDER G211 20
17 EQ CHASE SERVER RCPT 20 2 90 VA 733 VA -- -- -- -- 18
15 -- -- -- -- 90 VA 733 VA -- -- -- -- 16
13 EQ CHASE SERVER RCPT 20 2 90 VA 733 VA 3 20 RCPT RCPT - WIREBONDER G211 14
11 -- -- -- -- 90 VA 733 VA -- -- -- -- 12
9 EQ CHASE SERVER RCPT 20 2 90 VA 733 VA -- -- -- -- 10
7 EQ CHASE SERVER RCPT 20 1 360 VA 733 VA 3 20 RCPT RCPT - WIREBONDER G211 8
5 EQ CHASE SERVER RCPT 20 1 360 VA 1200... 1 20 RCPT RCPT - WEDGEBONDER G211 6
3 EQ CHASE SERVER RCPT 20 1 360 VA 250 VA 1 20 RCPT RCPT - MANUAL WIREBONDER G211 4 1 EQ CHASE SERVER RCPT 20 1 360 VA 1200... 1 20 RCPT RCPT - MANUAL WIREBONDER G211 2
CKT CIRCUIT DESCRIPTION LC TRIP POLES A B C POLES TRIP LC CIRCUIT DESCRIPTION CKT
ENCLOSURE: Type 1 MAIN CB: 175 A
MOUNTING: SURFACE WIRE: 4 BUS RATING: 225 A
SUPPLY FROM: TR-UPS-B1-1-B PHASE: 3 TYPE: MCB
LOCATION: EQUIPMENT CHASE S G295 VOLTS: 208Y/120V A.I.C. RATING: 22,000 AIC
PANEL: PP-UPS-B1-1-B1
PROVIDE WITH SHUNT TRIP MAIN CIRCUIT BREAKER
NOTES:
TOTAL EST. DEMAND: 46 A
TOTAL CONN..: 76 A
TOTAL EST. DEMAND: 37967 VA
MTR 1587 VA 125.00% 1984 VA TOTAL CONN. LOAD: 63553 VA
RCPT 61966 VA 58.07% 35983 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND PANEL TOTALS
TOTAL AMPS: 86 A 73 A 71 A
TOTAL LOAD: 23752 VA 20095 VA 19705 VA
17 -- -- -- -- 4377... 0 VA 1 20 A -- SPARE 18
15 -- -- -- -- 4677... 0 VA 1 20 A -- SPARE 16
13 TR-UPS-B1-1-B RCPT 70 A 3 6257... 0 VA 1 20 A -- SPARE 14
11 -- -- -- -- 13312... 0 VA 1 20 A -- SPARE 12
9 -- -- -- -- 13812... 0 VA 1 20 A -- SPARE 10
7 TR-UPS-B1-1-A RCPT 70 A 3 14212... 0 VA 1 20 A -- SPARE 8
5 -- -- -- -- 167 VA 1850... -- -- -- -- 6
3 -- -- -- -- 167 VA 1440... -- -- -- -- 4
1 ENERGY METER RCPT 20 A 3 167 VA 3117... 3 100 A RCPT... PHP-UPS-IERC1-2 2
CKT CIRCUIT DESCRIPTION LC TRIP POLES A B C POLES TRIP LC CIRCUIT DESCRIPTION CKT
ENCLOSURE: Type 1
MOUNTING: SURFACE WIRE: 4 BUS RATING: 400
SUPPLY FROM: UPS-IERC-B1 PHASE: 3 TYPE: MLO
LOCATION: MDF ROOM G490 VOLTS: 480Y/277V A.I.C. RATING: 42,000 AIC
PANEL: PHP-UPS-B1-1
REV NO ISSUE DATE
1 RECORD SET 10.31.2023
http://www.arup.com http://www.ccsdifference.com http://www.terraengineering.com http://www.perkinswill.com
| E07-00 - ELECTRICAL GROUND FLOOR PLAN OVERALL |
| E40-01 - ENLARGED ELECTRICAL PLANS - GROUND FLOOR BOH |
| E60-28 - ELECTRICAL PANEL SCHEDULES |
File details come from the government source that posted it. Updated .