This document is an Amendment to Solicitation (Amendment No. 04) for the Tunnel Transfer Line Fabrication project (RFP# 370471-DSF) issued by Fermi National Accelerator Laboratory. The amendment provides responses to seven technical questions from potential bidders, clarifies subcontracting allowances, and indicates that Fermilab will provide specific components like check valves and a 12-PIN hermetic connector. Two additional drawing files (F10241037_DWG and F10252563_DWG) have been uploaded to the shared files, and bidders are instructed to acknowledge this amendment prior to the opening date of September 19, 2025. The amendment allows subcontracting of work, with the requirement that subcontractors meet all Statement of Work requirements, and suggests that bidders propose their own delivery schedule which will be evaluated as part of the overall proposal.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT TO SOLICITATION
AMENDMENT NO.
DATE OF AMENDMENT:
September 4, 2025
SOLICITATION NO.
RFP# 370471-DSF
DATE ISSUED:
July 31, 2025
PROJECT NO.
N/A
OPENING DATE:
September 19, 2025
TITLE OF PROJECT: Tunnel Transfer Line Fabrication
Bidders must acknowledge this Addendum prior to the hour and date set forth in the solicitation as indicated in the RFP, Section 6.
If by virtue of this Addendum you desire to change a bid already submitted, such change may be made by telegram or letter, provided such telegram or letter makes reference to the Solicitation and this Amendment and is received prior to the time set for opening.
The above reference Solicitation is amended as follows:
The following additional files have been uploaded to the shared files and are included as attachments to this Amendment Document:
F10241037_DWG
F10252563_DWG
The following responses required additional time and are provided to all potential offers:
QUESTIONS AND ANSWERS:
1. Can you clarify whether the sub-contracting of some amount of work is allowed in this contract – i.e. 6-7 modules out of 27 modules to be manufactured by other company under our sub-contract?. If yes, what is the maximum limit of work (in terms of %) allowed to be sub-contracted? And which administrative/Technical documents to be submitted along with our Bid of sub-contractor – i.e. past experience, workshop capacity etc.
ANSWER: Subcontracting some amount of work is allowed. Please state very clearly in the proposal what work will be subcontracted out, who will be the subcontractor, etc. Your subcontractor shall meet all the requirements of the SoW.
2. Can you please clarify the check valves in Warm manifolds are Free issued or contractor has to buy it? If it is in the scope of contractor, could you please share the model no. or specifications?
ANSWER: FNAL will provide the check valve.
3. Details of Drawing no. FC0124972 for DISC is not clear in main Assembly of F10225452 - Turnaround Can. Kindly provide details for it.
ANSWER: Disc is 2” OD X 0.12 THICK _ 304 SS material.
4. Can you please clarify whether 12-PIN HERMETIC CONNECTOR, DT SERIES FLG MT will be Free issued by Fermilab or under the scope of contractor? If it is under the scope of contractor, could you please provide model no.
or specifications?
ANSWER: FNAL will provide this connector.
5. We propose following schedule against requested in Technical specifications. Can you confirm if a proposed schedule against the Technical specifications is acceptable?
ANSWER: Please propose your delivery schedule in your bid. This will be evaluated together with the rest of the proposal.
6. Drawing no. F10241037 for WELDMENT, HTTS RETURN, LB650 L1 which is Sub Assembly of F10241032 - THERMAL SHIELD, & VACUUM VESSEL ASSEMBLY, TTL BAYONET CAN LB650 L1 and it includes in Main Assembly of F10235167 - LB650 L1 TTL Module drawing is not received from client. Please provide assembly drawing for it.
ANSWER: The requested drawing is included both as an attachment to this Amendment and has been uploaded to the shared files.
7. As a follow-up to Amendment 3, Question #8:
We can’t find a top assembly for the Turnaround Can Warm Manifold. Please ask if there is one and if so, to please provide it.
ANSWER: File F10252563_DWG is included both as an attachment to this Amendment and has been uploaded to the shared files.
All other terms and conditions remain unchanged.
Fermi National Accelerator Laboratory Seth Fryar
Procurement Specialist
(630) 840-3665 sfryar@fnal.gov
P.O. Box 500 Batavia, IL 60510 Mail Station 312 mailto:sfryar@fnal.gov
6 F10242701 STRIP, TTL HTTS CONNECT WITH PEM NUTS, LB650 2
5 F10242307 TAB, THERMAL SHIELD INTERFACE 1
4 F10242210 STRIP, TTL HTTS CONNECT WITH PEM NUTS 4
3 F10239092 TAB FOR THERMAL SHIELD INTERFACE 4
2 F10235537 PIPE, HTTS RETURN, LB650 L1, 2" OD x SCH10, 304 SS 1 1 F10234969 PIPE, 3/4" x SCH10 304SS 1
ITEM FERMI # PART NAME QTY
PARTS LIST
294.71
124.98
145.18
165.87
186.44
TEMPLATE VERSION: 2021.08.02
REV REVISION CONTROL DOCUMENT DATES SIGNATURES
- F10241037---RCD
DRAWN
APPROVED
FERMI NATIONAL ACCELERATOR LABORATORY
UNITED STATES DEPARTMENT OF ENERGY
NAME
WELDMENT, HTTS RETURN, LB650 L1
SCALE SIZE DRAWING NUMBER SHEET REV
1:4 & D F10241037 1 OF 1 -AS SHOWN
UNLESS OTHERWISE SPECIFIED
±.X ±.XX ±.XXX ±X/X ±X°
.1 .02 .005 1/16 1
BREAK ALL SHARP EDGES, MAX: .015
DO NOT SCALE DRAWING
DIMENSIONS BASED ON: ASME Y14.5-2009
MAX MACHINE ALL SURFACES, Ra: 125
DRAWING UNITS: INCHES
THIRD ANGLE PROJECTION
DRAWN R.NOCEDA DATE 11-Apr-2025 CHECKED J.COGHILL DATE 16-May-2025 APPROVED V.PATEL DATE 16-May-2025
USED ON
F10241032, F10241324
MATERIAL
SEE PARTS LIST
GROUP: Technical Division - Design and Drafting CAGE CODE: OU5R6
DESCRIPTION: WELDMENT, HTTS RETURN, LB650 L1
PROJECT: PIP-II_Cryogenic_Distribution
CATEGORY: WELDMENT
DETAIL A
SCALE 1:2
DETAIL A
.105
3-6 3-6
6X
B
SECTION B-B
SCALE 1:5
4 PLCS.
TYP.
D
SECTION D-D
SCALE 1:5
.083
NOTE 4
NOTE 6
DETAIL C
DETAIL C
182.44
138.66
4X .07823.11
28.45
76.53
DETAIL E
DETAIL E
.50
4 PLACES
A
C
E
F
NOTES: (UNLESS OTHERWISE SPECIFIED)
1. ALL WELDS AND MANUFACTURING TOLERANCES MUST BE IN ACCORDANCE
WITH RELATED PRESSURE VESSEL CODES OF ASME B31.3 PROCESS PIPING,
NORMAL FLUID SERVICE.
2. ALL FILLET WELDS TO BE SMOOTH FOR COSMETIC APPEARANCE.
3. WELDMENT MUST BE FREE OF DIRT, GREASE, OIL AND CHIPS.
4. ALL WELDS TO BE VACUUM LEAK TIGHT. LEAK TEST: NO LEAK
SHALL BE DETECTABLE ON THE MOST SENSITIVE OF A HELIUM LEAK
DETECTOR WITH A MINIMUM SENSITIVITY OF 10 -9 TORR x LITER/SEC.
5. ITEM 6- PROTECT HOLES DURING THE WELDING PROCESS.
6. AS PART OF FERMILAB'S ACCEPTANCE CRITERIA, MATERIAL CERTIFICATION
MUST BE SUPPLIED. THE WELDMENT WILL NOT BE ACCEPTED WITHOUT
MATERIAL CERTIFICATIONS.
7. THE FOLLOWING DOCUMENTS WILL BE SUPPLIED WITH THE DELIVERY
OF THE WELDMENT:
A. WELD PROCEDURE SPECIFICATION (WPS).
B. PROCEDURE QUALIFICATION RECORDS (PQR).
C. WELDER PERFORMANCE QUALIFICATION (WPQ).
D. EXAMINATION REPORT.
8. MLI SHALL BE APPLIED ON THE OUTER SURFACES AS PER ED0040780.
TEMPLATE VERSION: 2021.08.06
REV REVISION CONTROL DOCUMENT DATES SIGNATURES
- F10252563---RCD
DRAWN
APPROVED
DRAWN V.PATEL DATE 29-Aug-2025 CHECKED W.SOYARS DATE 29-Aug-2025 APPROVED R.DHULEY DATE 29-Aug-2025
USED ON
F10239335
MATERIAL
GROUP: Technical Division - Cryogenic Support CAGE CODE: OU5R6
UNLESS OTHERWISE SPECIFIED
±.X ±.XX ±.XXX ±X/X ±X°
.1 .02 .005 1/16 1°
BREAK ALL SHARP EDGES, MAX: .015
DO NOT SCALE DRAWING
DIMENSIONS BASED ON: ASME Y14.5-2009
MAX MACHINE ALL SURFACES, Ra: 125
DRAWING UNITS: INCHES
THIRD ANGLE PROJECTION
FERMI NATIONAL ACCELERATOR LABORATORY
UNITED STATES DEPARTMENT OF ENERGY
NAME
SUPPORT FRAME AND WARM PIPING ASSEMBLY,
TURNAROUND CAN
SCALE SIZE DRAWING NUMBER SHEET REV
1:10 D F10252563 1 OF 1 -
DESCRIPTION: SUPPORT FRAME AND WARM PIPING ASSEMBLY, TURNAROUND CAN
PROJECT: PIP-II_Cryogenic_Distribution
CATEGORY: ASSEMBLY
2 F10243714 SUPPORT FRAME ASSEMBLY - TURNAROUND MANIFOLD 1
1 F10247879 WARM MANIFOLD VENDOR PIPING, TURNAROUND CAN 1
ITEM VENDOR \ NO PART NO PART NAME QTY
105.34
117.82
30.50
NOTES: (UNLESS OTHERWISE SPECIFIED)
1. ASSEMBLY MUST BE FREE OF DIRT, GREASE, OIL AND CHIPS.
2. ASSEMBLY TO BE FREE OF ALL SHARP EDGES, CORNERS, AND BURRS.
45.08