36S79725R0001 0002_1.docx
DOCX document 47 KB Posted
- Attached to
- 6515--Upper Artificial Limbs
- Solicitation number
- 36S79725R0001
About this file
This is an Amendment to a Previous Solicitation (Standard Form 30) for solicitation number 36S79725R0001 issued by the Department of Veterans Affairs, National Acquisition Center (NAC), located in Hines, Illinois (ZIP Code 60141). The amendment extends the response deadline to April 2, 2026 at 4:00 PM Central Time and provides updates to the Performance Work Statement (PWS) and answers to vendor questions regarding upper artificial limbs procurement.
The solicitation covers Prosthetic Terminal Devices (PTD), Prosthetic Wrist Units (PWU), Prosthetic Elbow Units (PEU), Prosthetic Limb Suspension (PLS), Prosthetic Components & Accessories (PCA), and Partial Hand Components and Accessories (PHCA). Key requirements clarified in this amendment include: contractors may provide training at government medical centers or through electronic means (CD-ROM, videoconference, internet-based learning), with a minimum of two seats reserved for DLC personnel at in-person training; satisfaction periods are mandatory for all products regardless of cost; delivery timeline exceptions for products with multiple SKU variations may be granted case-by-case; FDA-regulated medical devices require documented certification (ISO 9001 and/or ISO 13485); and annual DLC training may be conducted virtually. The VA confirmed this is a new national contract with no historical volume data available to establish volume discount benchmarks, though historical dollar sales figures from the Prosthetic and Sensory Aids Service (PSAS) have been provided. The Product Service Code is 6515 and NAICS Code is 339113.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36S79725R0001 0001_1.docx | DOCX document | |
| 36S79725R0001 0001.docx | DOCX document | |
| ATTACHMENT D.2- PAST PERFORMANCE QUESTIONAIRE.pdf | ||
| Attachment D.1 Price Schedule.xlsx | XLSX spreadsheet | |
| 36S79725R0001_1.docx | DOCX document | |
| Attachment D.4_VA MOU ISA Approved Final Template-09092020.docx | DOCX document | |
| 36S79725R0001.docx | DOCX document | |
| Attachment D.3_Secure File Transfer and Electronic Data Interchange.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBJECT*
Upper Artificial Limbs
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 60141 |
| SOLICITATION NUMBER* |
| 36S79725R0001 |
| RESPONSE DATE/TIME/ZONE |
| 04-02-2026 16:00 CENTRAL TIME, CHICAGO, USA |
| ARCHIVE |
| 45 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
SET-ASIDE
| PRODUCT SERVICE CODE* |
| 6515 |
| NAICS CODE* |
| 339113 |
| CONTRACTING OFFICE ADDRESS |
| VA NAC / 003B6A |
PO Box 76 1st Ave., One Block N of 22nd
Hines IL 60141
POINT OF CONTACT*
PLACE OF PERFORMANCE
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
Questions Answered , PWS updates Amendment to a Previous Combined Solicitation
| *= Required Field |
| Amendment to a Previous Combined Solicitation |
Page 1 of
Amendment to a Previous Combined Solicitation
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
VA NAC / 003B6A
PO Box 76 1st Ave., One Block N of 22nd Hines IL 60141 Department of Veterans Affairs OPAL / National Acquisition Center Building 37 1st Avenue, One Block North of Cermak Hines IL 60141 To all Offerors/Bidders
36S79725R0001
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 04-02-2026 16:00 CDT
Page 1 of Page 1 of
Questions Answered , PWS updates Updates to the PWS:
MINIMUM TECHNICAL REQUIREMENTS (ARTIFICIAL LIMBS – UPPER EXTREMITY PRODUCT(S) #11
B.15 CONTRACT PRODUCT TRAINING
e) Location(s):
(1) Contractors are encouraged to provide training at Government medical centers or by electronic means including recorded material (e.g., CD-ROM) or telecommunication media (videoconference), or Internet-based distance learning. Training may be held at the contractor’s facility, business office, or hotel. Facility means the contractor’s home office, manufacturing plant, or a wholly owned subsidiary facility where customer service personnel are located.
(2) The contractor shall reserve a minimum of two (2) seats for DLC personnel to attend any in-person training.
1. Is there an opportunity or interest in fabrication services? Custom options?
Yes, there is an opportunity for fabrication and assembly services, particularly in relation to partial hand prostheses. The vendor providing the specified components will be responsible for assembly services when applicable.
2. Due to the cost of some of the products, it is not possible to offer a satisfaction period. We request that products be subject to the warranty policy and not a satisfaction period.
Unfortunately, a satisfaction period is a mandatory requirement and all products must adhere to the satisfaction period specified.
3. There are specific products that are not kept in inventory due to the many SKU's/variations associated with the product. These products may require longer than a 5-day delivery. Are there exceptions to this statement?
Exceptions to the delivery timeline for products with many SKU variations can be made on a case-by-case basis by reaching out to the CO and COR
4. Is ISO 9001 and/or ISO 13485 mandatory to be considered? Is there an alternative to being ISO certified?
FDA regulated medical devices require documented certification.
5. If we have devices that include both the terminal device and the wrist within one part number, should we put this just under the terminal device tab.
Yes, placing it under the terminal device tab would be acceptable.
6. Do you have any information or reports regarding volume? As we look at volume discounts, it would be good to see what the volume is in Upper Limb that the VA already sees?
This will be a new national contract, so there is no anticipated volume of orders available at this time. While historical data from the Prosthetic and Sensory Aids Service (PSAS) has been provided, it only includes dollar sales figures and does not specify the number of orders. Therefore, we do not have specific volume information regarding Upper Limb national orders at this time.
7. Can the annual training at the DLC be done virtually?
Training can be done virtually.
image1.png
File details come from the government source that posted it. Updated .