36L79722Q0018 0001.docx
DOCX document 97 KB Posted
- Attached to
- 3695--Mountain Home, TN TCPF Laundry Equipment
- Solicitation number
- 36L79722Q0018
- Issued by
-
Department of Veterans Affairs
About this file
This document is an amendment to a request for quote (RFQ) for laundry equipment for the Veterans Affairs Medical Center in Mountain Home, Tennessee. The RFQ is seeking quotes for lines items 0001 through 0008, which include delivery and installation of laundry equipment within 260 days of the effective contract date. The equipment must be delivered within 120 days of the effective date, and installation must take place within 140 days of delivery. Installation is required to be continuous Monday through Friday, excluding federal holidays, until complete. Training is also required, consisting of a minimum of two hours for both operators and maintenance personnel on each line item, with training sessions not to be concurrent. The total contract duration is 260 days from the effective date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36L79722Q0018 Updated Technical Specifications Amendment 0003.docx | DOCX document | |
| 36L79722Q0018 0003.docx | DOCX document | |
| 36L79722Q0018 Updated Statement of Work Amendment 0003 .docx | DOCX document | |
| 36L79722Q0018 0002.docx | DOCX document | |
| 36L79722Q0018 Updated Technical Specifications Amendment 0002.docx | DOCX document | |
| 36L79722Q0018 Updated Statement of Work Amendment 0002.docx | DOCX document | |
| 36L79722Q0018_1.docx | DOCX document | |
| 36L79722Q0018_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 36L79722Q0018
Amendment 0001
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
09-14-2022
36L797 Department of Veterans Affairs OPAL/National Acquisition Center Building 37 1st Avenue, One Block North of Cermak Hines, IL 60141
To all Offerors/Bidders
36L79722Q0018 09-13-2022
X
Request for Quote (RFQ) 36L79722Q0018 is amended to insert and replace Section B.2, Statement of Work, subsection 1.3., Contract Duration. Refer to page 2 for the updated verbiage.
Monique Lara Contract Specialist
FROM:
1.
1.3. Contract Duration
Line items 0001-0008 shall be delivered and installed within 238 days after the effective date of the contract. Delivery dates specified may be adjusted by the Contracting Officer (CO) to coincide with the date the TCPF will be ready to receive installation. The CO will advise the contractor of the new delivery date at least 45 days prior to the original or adjusted delivery date(s). Deliveries, cranes, or haulage will be arranged with the Contracting Officer Representative (COR).
The equipment shall be delivered within 90 days after the award date. Installation of the equipment shall take place no more than 140 days after the delivery date. The five (5) days onsite shakedown and three (3) days onsite training are included in the installation timeframe. Training shall consist of two (2) hours each per line item for both operator and maintenance personnel at a minimum. Training shall not be conducted concurrently. The total contract duration is 238 days from contract award.
Note: Installation shall be continuous, without interruption, Monday through Friday, excluding Federal holidays, until all installation and testing work has been completed. Installation may take place on the weekends if pre-approval is given by the COR.
TO:
1.3. Contract Duration
Line items 0001-0008 shall be delivered and installed within 260 days after the effective date of the contract. Delivery dates specified may be adjusted by the Contracting Officer (CO) to coincide with the date the TCPF will be ready to receive installation.
The equipment shall be delivered within 120 days after the effective date of the contract. Installation of the equipment shall take place no more than 140 days after the delivery date. The five (5) days onsite shakedown and three (3) days onsite training are included in the installation timeframe. Training shall consist of two (2) hours each per line item for both operator and maintenance personnel at a minimum. Training shall not be conducted concurrently. The total contract duration is 260 days after the effective date of the contract.
Note: Installation shall be continuous, without interruption, Monday through Friday, excluding Federal holidays, until all installation and testing work has been completed. Installation may take place on the weekends if pre-approval is given by the COR.
File details come from the government source that posted it. Updated .