This document contains details for a federal construction solicitation to repair building deficiencies at the Sioux Falls VA Medical Center. The project includes design-build services to evaluate and repair the roof, gutters, downspouts, flashing, scuttles, capstone, tuckpointing, and expansion joints of Building 5 to cure water and air intrusion issues. The Department of Veterans Affairs will issue a request for proposal as a service-disabled veteran-owned small business set-aside. Offerors other than service-disabled veteran-owned small businesses will be ineligible. The solicitation is scheduled for release on March 6, 2020, with a performance period of approximately 450 calendar days. The construction value is estimated between $3-5 million. All questions must be submitted in writing by the specified due date.
36E77620R0023 ATTACHMENT 3 - 01 00 00 General Requirements - Final.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77620R0023-0003000.docx | DOCX document | |
| 36E77620R0023-0002000.docx | DOCX document | |
| 36E77620R0023-0001001.docx | DOCX document | |
| 36E77620R0023-0001000.docx | DOCX document | |
| 36E77620R0023-076.pdf | ||
| 36E77620R0023-063.pdf | ||
| 36E77620R0023-072.doc | DOC document | |
| 36E77620R0023-062.pdf | ||
| 36E77620R0023-064.pdf | ||
| 36E77620R0023-066.docx | DOCX document | |
| 36E77620R0023-067.docx | DOCX document | |
| 36E77620R0023-060.docx | DOCX document | |
| 36E77620R0023-071.docx | DOCX document | |
| 36E77620R0023-073.doc | DOC document | |
| 36E77620R0023-061.docx | DOCX document | |
| 36E77620R0023-074.docx | DOCX document | |
| 36E77620R0023-075.pdf | ||
| 36E77620R0023-069.docx | DOCX document | |
| 36E77620R0023-077.pdf | ||
| 36E77620R0023-070.docx | DOCX document | |
| 36E77620R0023-068.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12-01-18
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
| 1.1 SAFETY REQUIREMENTS | 1 |
| 1.2 GENERAL INTENTION | 1 |
| 1.3 STATEMENT OF BID ITEM(S) | 2 |
| 1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR | 3 |
| 1.5 CONSTRUCTION SECURITY REQUIREMENTS | 3 |
| 1.6 OPERATIONS AND STORAGE AREAS | 6 |
| 1.7 ALTERATIONS | 14 |
| 1.8 DISPOSAL AND RETENTION | 15 |
| 1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS | 17 |
| 1.10 RESTORATION | 19 |
| 1.11 PHYSICAL DATA | 20 |
| 1.12 PROFESSIONAL SURVEYING SERVICES | 20 |
| 1.13 LAYOUT OF WORK | 21 |
| 1.14 AS-BUILT DRAWINGS | 23 |
| 1.15 WARRANTY MANAGEMENT | 23 |
| 1.16 USE OF ROADWAYS | 30 |
| 1.17 RESIDENT ENGINEER'S FIELD OFFICE | 31 |
| 1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT | 35 |
| 1.19 TEMPORARY USE OF EXISTING ELEVATORS | 37 |
| 1.20 TEMPORARY USE OF NEW ELEVATORS | 38 |
| 1.21 TEMPORARY TOILETS | 39 |
| 1.22 AVAILABILITY AND USE OF UTILITY SERVICES | 40 |
| 1.23 NEW TELEPHONE EQUIPMENT | 42 |
| 1.24 TESTS | 42 |
| 1.25 INSTRUCTIONS | 43 |
| 1.26 GOVERNMENTFURNISHED PROPERTY | 45 |
| 1.27 RELOCATED // EQUIPMENT // ITEMS // | 46 |
| 1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT | 47 |
| 1.29 CONSTRUCTION SIGN | 48 |
| 1.30 SAFETY SIGN | 48 |
| 1.31 PHOTOGRAPHIC DOCUMENTATION | 49 |
| 1.32 FINAL ELEVATION Digital Images | 53 |
| 1.33 HISTORIC PRESERVATION | 54 |
| 1.34 VA TRIRIGA CPMS | 54 |
12-01-18 ii
1.1 safety requirements Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
| A. | Contractor shall completely prepare site for demolition and removal of existing materials and furnish labor and materials and perform work as required by drawings and specifications. |
| B. | Visits to the site by Offerors may be made in accordance with the solicitation and Contracting Officer. |
| C. | Before placement and installation of work subject to tests by testing laboratory retained by contractor, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than five (5) calendar days unless otherwise designated by the COR. |
| D. | All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. |
| E. | Training: |
| 1. | All employees of general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and /or other relevant competency training, as determined by VA CP with input from the ICRA team. |
| 2. | Submit training records of all such employees for approval before the start of work. |
1.3 STATEMENT OF BID ITEM(S)
Item I: Design and Construction Documents A. Contractor shall provide the complete design to Repair Building 5 Exterior Deficiencies within the Sioux Falls VA Medical Center (VAMC). See Scope of Work (SOW)and SOW Attachments for further details.
B. The Contractor shall furnish all labor, material, equipment, design, and construction services necessary to provide the required documents for construction including Drawings, Specifications, construction cost estimates, and other documents as necessary in accordance with the SOW, Attachments and all Specifications associated with this procurement.
| ITEM II: Construction: Contractor shall provide all construction related activities such as pre-construction, site-prep, general construction, alterations, necessary removal of existing materials, renovations, post-construction services, project close-out and any other required elements of work to provide a complete and usable facility. |
| Contractor shall furnish all labor, material, equipment, and supervision to perform all required elements of work in accordance with the SOW, Specifications and all applicable attachments. |
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
| A. | AFTER AWARD OF CONTRACT, required specifications, SOW and any attachments will be furnished electronically. Drawing and specification will be in Adobe PDF format. |
| B. | Hard Copy drawings and specifications may be made by the Contractor, at the Contractor’s expense, from electronic files furnished by the Issuing Contracting Officer |
1.5 CONSTRUCTION SECURITY REQUIREMENTS
| A. | Security Plan: |
| 1. | The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project. |
| 2. | The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations. |
| B. | Security Procedures: |
| 1. | General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site. |
| 2. | For working outside the “regular hours” as defined in the contract, the General Contractor shall give a minimum notice of 3 calendar days to the Project Manager so that security/escort arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section. |
| 3. | All employees of general contractor and subcontractors shall comply with VA security management program and obtain badging from Engineering prior to starting any construction. |
| 3. | No photography of VA premises is allowed without written permission of the Contracting Officer or COR. |
| 4. | VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer. |
| C. | Guards: N/A |
| D. | Key Control: |
| 1. | The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action. |
| E. | Document Control: |
| 1. | Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”. |
| 2. | The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project. |
| 3. | Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request. |
| 4. | These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer. |
| 5. | All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA. |
| 6. | Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”. |
| 7. | All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS). |
| a. | Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system. |
| b. | “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed. |
| F. | Motor Vehicle Restrictions – Removed completely. |
1.6 OPERATIONS AND STORAGE AREAS
| A. | The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance. |
| B. | Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed. |
| C. | The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads. |
| D. | Working space and space available for storing materials shall be coordinated with the COR. |
| E. | Workers are subject to rules of Medical Center applicable to their conduct. |
| F. | Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space. |
| 1. | Do not store materials and equipment in other than assigned areas. |
| 2. | Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than three (3) calendar days. Provide unobstructed access to Medical Center areas required to remain in operation. |
| 3. | Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements. |
G. Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by Project Manager.
| 1. | No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of Project Manager. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without an Energized Circuit Permit issued by the Project Manager. | |
| 2. | Contractor shall submit a request to interrupt any such services to Project Manager, in writing, 25 days in advance of proposed interruption. | |
| 3. | Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours. | |
| 4. | Major interruptions of any system must be requested, in writing, at least 25 calendar days prior to the desired time and shall be performed as directed by the Project Manager. | |
| 5. | In case of a contract construction emergency, service will be interrupted on approval of Project Manager. Such approval will be confirmed in writing as soon as practical. | |
| 6. | Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor. | |
| G. | Phasing: To ensure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to ensure accomplishment of this work in successive phases mutually agreeable to COR and Contractor. Building No. 1 will be occupied during performance of work, but immediate areas of alterations will be vacated. | |
| J. | When a building is turned over to Contractor: Not applicable. | |
| L. | Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces. | |
| M. | To minimize interference of construction activities with flow of Medical Center traffic, comply with the following: | |
| 1. | Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval. | |
| 2. | Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR | |
| N. | Coordinate the work for this contract with other construction operations as directed by the COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS. |
1.7 ALTERATIONS
| A. | Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply Service, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, all to the Contracting Officer. |
| 3. | Shall note any discrepancies between drawings and existing conditions at site. |
| 4. | Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur, and which have been agreed upon by Contractor and COR. |
| B. | Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR 852.236-88). |
| D. | Protection: Provide the following protective measures: |
| 1. | Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery. |
| 2. | Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated. |
| 3. | Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed. |
1.8 DISPOSAL AND RETENTION
| A. | Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows: |
| 1. | Reserved items which are to remain property of the Government are identified on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to reinstallation and reuse. Store such items where directed by the COR. |
| 2. | Items not reserved shall become property of the Contractor and be removed by the Contractor. |
| 3. | Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are not required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation. |
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS
| A. | The Contractor shall preserve and protect all structures and equipment on or adjacent to the work site which are not to be removed and which do not unreasonably interfere with the work required under this contract. |
| B. | The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor. |
| C. | Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and "Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements. |
1.10 RESTORATION
| A. | Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified. |
| B. | Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work. |
| C. | At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment. |
| D. | Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2). |
1.11 PHYSICAL DATA
| A. | Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. |
| D. | Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site. |
1.12 PROFESSIONAL SURVEYING SERVICES: N/A
1.13 LAYOUT OF WORK: N/A
1.14 AS-BUILT DRAWINGS
| A. | The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications. |
| B. | All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR to review, as often as requested. |
| C. | Contractor shall deliver two approved completed sets of as-built drawings within 15 calendar days after each completed phase and after the acceptance of the project by the COR. |
| D. | Paragraphs A, B, & C shall also apply to all shop drawings. |
1.15 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of Construction at least 30 days before the project completion. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period of one year. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. Procedure and status of tagging of all equipment covered by extended warranties.
| D. | Contractor’s Response to Construction Warranty Service Requirements: |
| Following oral or written notification by the Contracting Officer, the Contractor shall respond to construction warranty service requirements in accordance with the “Construction Warranty Service Priority List” and the three categories of priorities listed below. If the Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established. |
1.16 USE OF ROADWAYS
| A. | For hauling, use only established public roads and roads on the Medical property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges. |
| B. | When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building operations. These roads may be used by all who have business thereon within zone of building operations. |
| C. | When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads leading thereto must be completed and available for use at time set for completion of such buildings or parts thereof. |
1.17 RESIDENT ENGINEER'S FIELD OFFICE: N/A
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
| A. | Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions: |
| 1. | Permission to use each unit or system must be given by the COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment. |
| 2. | Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014 Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces. |
| 3. | Units shall be properly lubricated, balanced, and aligned. Vibrations must be eliminated. |
| 4. | Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freezeup damage. |
| 5. | The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system. |
| 6. | All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government. // Boilers, pumps, feedwater heaters and auxiliary equipment must be operated as a complete system and be fully maintained by operating personnel. Boiler water must be given complete and continuous chemical treatment. // |
| B. | Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government. |
| C. | This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections. |
D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.
1.20 TEMPORARY USE OF NEW ELEVATORS – N/A
1.21 TEMPORARY TOILETS
A Contractor may have for use of Contractor's workers, such toilet accommodations as may be assigned to Contractor by the Medical Center. Contractor shall keep such places clean and be responsible for any damage done thereto by Contractor's workers. Failure to maintain satisfactory condition in toilets will deprive Contractor of the privilege to use such toilets.
1.22 AVAILABILITY AND USE OF UTILITY SERVICES
| A. | The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. |
| B. | The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines and associated paraphernalia and repair restore the infrastructure as required. |
| D. | Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials: |
| 1. | Obtain heat by connecting to Medical Center heating distribution system. |
| a. | Steam is available at no cost to Contractor. |
| E. | Electricity (for Construction and Testing): Furnish all temporary electric services. |
| 1. | Obtain electricity by connecting to the Medical Center electrical distribution system. The Electricity for all other uses is available at no cost to the Contractor. |
| F. | Water (for Construction and Testing): Furnish temporary water service. |
| 1. | Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the Contractor. |
| 2. | Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR discretion) of use of water from Medical Center's system. |
1.29 CONSTRUCTION SIGN
A. Contractor shall provide signage describing construction areas; actual construction location and access roads. This shall include adequate description stating access for authorized personnel only.
1.30 SAFETY SIGN
A. Contractor shall provide signage describing all necessary areas to keep bystanders safe during construction operations.
1.31 PHOTOGRAPHIC DOCUMENTATION
A. During the construction period through completion, provide photographic documentation of construction progress and at selected milestones including electronic indexing, navigation, storage and remote access to the documentation, as per these specifications.
B. Upon completion of the project, final copies of the documentation (the “Permanent Record”) with the indexing and navigation system embedded (and active) shall be provided in an electronic media format, typically a CD, DVD Or file sharing site that is compatible with VA network. Permanent Record shall have Building Information Modeling (BIM) interface capabilities. On-line access terminates upon delivery of the Permanent Record.
- E N D 01 00 00 -19