36E77619R0080-002.doc

DOC document 29 KB Posted

Attached to
36E77619R0080 - Fayetteville D-Wing Renovation
Solicitation number
36E77619R0080
Issued by

About this file

36E77619R0080 Attachment 1 SOW for Dental.doc

View the file

Other files

File Type Posted
36E77619R0080-0007000.docx DOCX document
36E77619R0080-0006000.docx DOCX document
36E77619R0080-0005001.pdf PDF
36E77619R0080-0005000.docx DOCX document
36E77619R0080-0004004.pdf PDF
36E77619R0080-0004001.pdf PDF
36E77619R0080-0004003.pdf PDF
36E77619R0080-0004000.docx DOCX document
36E77619R0080-0004002.pdf PDF
36E77619R0080-0003000.docx DOCX document
36E77619R0080-0002000.docx DOCX document
36E77619R0080-0001000.docx DOCX document
36E77619R0080-012.pdf PDF
36E77619R0080-008.pdf PDF
36E77619R0080-006.pdf PDF
36E77619R0080-005.pdf PDF
36E77619R0080-011.docx DOCX document
36E77619R0080-009.pdf PDF
36E77619R0080-001.docx DOCX document
36E77619R0080-004.pdf PDF
36E77619R0080-010.docx DOCX document
36E77619R0080-003.pdf PDF
36E77619R0080-007.pdf PDF
36E77619R0080-000.docx DOCX document
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

March 11, 2019 VAMC Fayetteville, NC

I. PROJECT DATA:

TITLE: Renovate D-Wing Basement for Dental PROJECT No: 565-161

Contracting Officer’s Representative (COR): Zachary Swavely, Facilities Management Service (910-822-7930)

Requestor: Wendy Gillis, Chief, Facilities Management Service (910-822-7933) Construction duration: 365 Days Outline of Scope of Work:

The Contractor shall provide all supervision, labor, materials, and equipment necessary to complete Project 565-161, Renovate D-Wing Basement for Dental at the Fayetteville Veterans Affairs Medical Center in accordance with the plans and specifications. The project entails the renovation of approximately 18,100 GSF of D and A wings on the basement level of Building no. 1 and will also add approximately 1,082 SF of new mechanical space. The work includes but is not limited to the following: demolition of interior walls, ceiling grid, HVAC, plumbing, electrical, flooring, etc.; framing, drywalling, finishing and painting; mechanical; electrical; plumbing; exterior improvements; etc. Will also add approximately 1,082 SF of new mechanical space. Performance of this work shall meet all State, Federal, and Veterans Affairs regulations and requirements as indicated in the plans and specifications.

Specific duties will include but are not limited to the following:

· Contractor shall completely prepare site for building operations, including demolition and removal of existing structures and perform work as required by the drawings and specifications.

· Visits to the site by Bidders may be made only by appointment with the VISN6 Centralized Acquisition Services Contracting Specialist or his designated COR.

· All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. Bidders are to report to the COR to obtain day badges. Upon award of the contract, VA issued Contractor work badges are to be requested from the COR prior to commencing any work. Badges must always be worn when at the facility. (Any ID badge that is lost must be reported to the COR.)

· VA warehouse will not receive or store any project related equipment or materials.

· Hours of Operation: Work will be performed between the hours of 7:00am-5:00pm, Monday-Friday. Some work may be performed at different hours when approved by COR.