36E77619R0027-011.pdf
PDF 260 KB Posted
- Solicitation number
- 36E77619R0027
About this file
36E77619R0027 Attachment 10 - PRICE COST SCHEDULE.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77619C0040-000.docx | DOCX document | |
| 36E77619R0027-0005000.docx | DOCX document | |
| 36E77619R0027-0004001.docx | DOCX document | |
| 36E77619R0027-0004000.docx | DOCX document | |
| 36E77619R0027-0003005.pdf | ||
| 36E77619R0027-0003002.pdf | ||
| 36E77619R0027-0003000.docx | DOCX document | |
| 36E77619R0027-0003003.pdf | ||
| 36E77619R0027-0003001.docx | DOCX document | |
| 36E77619R0027-0003004.doc | DOC document | |
| 36E77619R0027-0002001.pdf | ||
| 36E77619R0027-0002000.docx | DOCX document | |
| 36E77619R0027-0001000.docx | DOCX document | |
| 36E77619R0027-001.docx | DOCX document | |
| 36E77619R0027-008.pdf | ||
| 36E77619R0027-006.pdf | ||
| 36E77619R0027-002.pdf | ||
| 36E77619R0027-010.pdf | ||
| 36E77619R0027-005.pdf | ||
| 36E77619R0027-003.pdf | ||
| 36E77619R0027-009.pdf | ||
| 36E77619R0027-007.pdf | ||
| 36E77619R0027-004.pdf | ||
| 36E77619R0027-012.docx | DOCX document | |
| 36E77619R0027-000.docx | DOCX document |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE/COST SCHEDULE
Offerors must quote a price on each Contract Line Item (CLIN). The government intends to award without discussions. However, the government reserves the right to establish a competitive range and enter into exchanges with parties whose offers lie within that range.
PRICE / COST SCHEDULE
Project Title: UPGRADE INTERVENTIONAL RADIOLOGY ROOMS
Project No: 618-CSI-109
Construction and Design
Division No. Division Price
General Requirements
Bonds and Insurance
Project Management
Job Superintendent
Site Safety and Planning
Dumpsters
Testing and Inspections
Existing Condition/Site Work
Demolition – Selective General Construction
Cast in Place Concrete
Structural Steel and Metal
Rough Carpentry
Finish Carpentry
Millwork
Applied Fireproofing
Fire Stopping
Joint Sealants
Hollow Metal Doors and Frames
Interior Wood Doors
Impact Resistant Wood Doors
Access Doors and Frames
Door Hardware
Automatic Door Operators
Glazing
Non-Structural Metal Framing
Gypsum Board Walls
Acoustical Ceilings
Resilient Base and Accessories
Resilient Sheet Flooring
Resilient Tile Flooring
Vinyl-Coated Wall Covering
Painting
Signage
Wall Protection
Toilet and Bath Accessories
Equipment – Metal Casework
Manufactured Metal Casework
Counter Tops
Radiation Protection
Wet-Pipe Sprinkler Systems
Plumbing
Plumbing Insulation
Medical Gas Systems
Heating, Ventilating & Air Conditioning General
Heating, Ventilating & Air Conditioning Insulation
Hydronic Piping
Direct Digital Controls
Electrical Systems
Telecommunications – Voice and Data
Nurse Call and Code Blue Systems
Fire Detection and Alarm Extension
Structural Strut
Miscellaneous
Divisions Subtotal
Profit and Over-Head
Total
File details come from the government source that posted it.