36E77619R0027-005.pdf
PDF 23 MB Posted
- Solicitation number
- 36E77619R0027
About this file
36E77619R0027 Attachment 4 - Final Dwgs CD Issued-VAMC Minneapolis IR 2-11-19.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77619C0040-000.docx | DOCX document | |
| 36E77619R0027-0005000.docx | DOCX document | |
| 36E77619R0027-0004001.docx | DOCX document | |
| 36E77619R0027-0004000.docx | DOCX document | |
| 36E77619R0027-0003005.pdf | ||
| 36E77619R0027-0003002.pdf | ||
| 36E77619R0027-0003000.docx | DOCX document | |
| 36E77619R0027-0003003.pdf | ||
| 36E77619R0027-0003001.docx | DOCX document | |
| 36E77619R0027-0003004.doc | DOC document | |
| 36E77619R0027-0002001.pdf | ||
| 36E77619R0027-0002000.docx | DOCX document | |
| 36E77619R0027-0001000.docx | DOCX document | |
| 36E77619R0027-001.docx | DOCX document | |
| 36E77619R0027-008.pdf | ||
| 36E77619R0027-006.pdf | ||
| 36E77619R0027-002.pdf | ||
| 36E77619R0027-010.pdf | ||
| 36E77619R0027-003.pdf | ||
| 36E77619R0027-011.pdf | ||
| 36E77619R0027-009.pdf | ||
| 36E77619R0027-007.pdf | ||
| 36E77619R0027-004.pdf | ||
| 36E77619R0027-012.docx | DOCX document | |
| 36E77619R0027-000.docx | DOCX document |
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PROJECT NAME:
SITE ADDRESS:
VA PROJECT NUMBER:
OWNER AND CONSULTANTS:
VICINITY MAP:
AE PROJECT NUMBER:
SITE MAP:
C
R e v it P ro je c ts
\1
B L D
G
M in n e a p o lis s t F lo o r_
R a d io lo g y
IR
R g b a rb a ri a e -m n .c o m
.r v t
/1
/2
:3
:1
P
M
1355-GI000
COVER SHEET RENOVATE RADIOLOGY -
UPGRADE INTERVENTIONAL
RADIOLOGY ROOMS
618-CSI-109
1/10/2019 GJB
RENOVATE RADIOLOGY - UPGRADE INTERVENTIONAL RAIOLOGY ROOMS
1 VETERANS DRIVE, MINNEAPOLIS, MN 55417
618-CSI-109
14721
VA COR:
CONTACT:
ADDRESS:
PHONE:
Mark Angell or Thomas Jennings
1 VETERANS DRIVE
MINNEAPOLIS, MN 55417
612-467-2653 or 612-467-5805
ARCHITECT:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
TOM OLESAK
PHONE: 763-412-4000
STRUCTURAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
AST ENGINEERING
7301 OHMS LANE, SUITE 215
EDINA, MN 55439
ZACHARY CRAIG
PHONE: 952-854-9302
MECH/ELEC/PLUMB/FIRE ENGINEER:
NAME:
ADDRESS:
CONTACT:
Dunham Engineering
50 SOUTH 6TH STREET, SUITE 1100
MINNEAPOLIS, MN 55402
JASON GOTTWALT (M) / CURT BARLAGE (E)
PHONE: 612-465-7648 / 612-465-7641
Revisions: Date:
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the state of Minnesota.
Signature:
Name: Tom Olesak
Date: 01/10/2019 License Number: 18157
█ ISSUED
NOT ISSUED
ISSUED FOR REFERENCE ONLY
ISSUED AS NOTED
R
N
SHEET ABBREVIATION AND NUMBERING
AE 1 1 1 - 01
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
FL
O
O R
LE
VE
L
SH
EE
T G
RO
UP
IN
G
ZO
NE
N
UM
BE
R
AE 111-01
ARCHITECTURAL ELEMENTS, PLAN, FIRST FLOOR, FLOOR PLAN, ZONE 1
QH 1 1 0 - 01
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
FL
O
O R
LE
VE
L
SH
EE
T G
RO
UP
IN
G
ZO
NE
N
UM
BE
R
QH110-01
EQUIPMENT HOSPITAL, PLAN, FIRST FLOOR, FLOOR PLAN, ZONE 1
DISCIPLINE
DESIGNATOR
SHEET TYPE
DESIGNATOR
FLOOR
LEVEL
SHEET
GROUPING
GI - GENERAL INFORMATION
AD- ARCHITECTURAL DEMOLITION
AS-ARCHITECTURAL SITE
AE-ARCHITECTURAL ELEMENTS
AF-ARCHTECTURAL FINISHES
AC-REFLECTED CEILING PLANS
IF-INTERIOR FURNISHINGS
QC-EQUIPMETN LAUNDRY
QF-EQUIPMENT FOOD SERVICE
QH-EQUIPMENT HOSPITAL
QL-EQUIPMENT LABORATORY
0 - GENERAL
1 - PLANS
2 - ELEVATIONS
3 - SECTIONS
4 - LARGE SCALE VIEWS
5 - DETAILS
6 - SCHEDULES & DIAGRAMS
0 - LOWER LEVEL
1 - FIRST FLOOR
2 - SECOND FLOOR
3 - THIRD FLOOR
4 - FOURTH FLOOR
GENERAL:
00-10 - TITLE SHEET, NOTES,
ABBREVIATIONS, SYMBOLS,
SCHEDULES
PLANS:
1 - FLOOR PLAN
2 - DIMENSION PLAN
ELEVATIONS:
01-10 - EXTERIOR ELEVATIONS
11-19 - INTERIOR ELEVATION
SECTIONS:
01-10 - BUILDING SECTIONS
11-19 - WALL SECTIONS
20-29 - STAIR SECTIONS & PLANS
DETAILS:
01-19 - EXTERIOR PLAN DETAILS
20-29 - EXTERIOR SECTION DETAILS
30-39 - ROOF DETAILS
40-49 - INTERIOR PLAN DETAILS
50-59 - INTERIOR SECTION DETAILS
60-69 - CEILING DETAILS
PLANS ONLY
AE 5 1 2
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
SH
EE
T G
RO
UP
IN
G
AE 501
ARCHITECTURAL ELEMENTS, EXTERIOR PLAN DETAILS
AF 6 7 0
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
SH
EE
T G
RO
UP
IN
G
AF 670
ARCHITECTURAL FINISHES, FINISH SCHEDULE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE PROJECT NUMBER:
C
R e v it P ro je c ts
\1
B L D
G
M in n e a p o lis s t F lo o r_
R a d io lo g y
IR
R g b a rb a ri a e -m n .c o m
.r v t
/1
/2
:3
:5
P
M
1355-GI001
SHEET INDEX RENOVATE RADIOLOGY -
UPGRADE INTERVENTIONAL
RADIOLOGY ROOMS
618-CSI-109
1/10/2019 GJB14721
SHEET INDEX - GENERAL
SHEET NO. SHEET TITLE 6
5%
D D
IS
SU
E
/2 8/
C
D
RE
VI
EW
2/
/2
C D
IS
SU
E
GI000 COVER SHEET █ █ █
GI001 SHEET INDEX █ █ █
GI002 ABBREVIATIONS █ █ █
GI003 GENERAL NOTES AND SYMBOLS █ █ █
GI010 FIRST FLOOR LIFE SAFETY PLAN █ █
GI020 PHASING & CONSTRUCTION BARRIER PLAN █ █
SHEET INDEX - ARCHITECTURAL
SHEET NO. SHEET TITLE 6
5%
D D
IS
SU
E
/2
C
D R
EV
IE
W
2/
/2
C D
IS
SU
E
AD111 FIRST FLOOR DEMOLITION FLOOR & CEILING PLANS █ █ █
AD550 DEMOLITION DETALS █
AE111 FIRST FLOOR PLAN █ █ █
AE112 FIRST FLOOR DIMENSION PLAN █ █ █
AE121 FIRST FLOOR INTERSTITIAL LEVEL DEMOLITION AND
FLOOR PLAN
AC111 FIRST FLOOR REFLECTED CEILING PLAN █ █ █
AE211 INTERIOR ELEVATIONS █ █ █
AE550 INTERIOR DETAILS █ █
AE601 INTERIOR PARTITION TYPES AND DETAILS █ █ █
AE602 DOOR SCHEDULE & ELEVATIONS AND MOUNTING HEIGHTS █ █
SHEET INDEX - INTERIOR
SHEET NO. SHEET TITLE 6
5%
D D
IS
SU
E
/2
C
D R
EV
IE
W
2/
/2
C D
IS
SU
E
AF101 FIRST FLOOR FINISH PLAN & SCHEDULE █ █
SHEET INDEX - EQUIPMENT
SHEET NO. SHEET TITLE 65
D D
IS
SU
E
/2
C
D R
EV
IE
W
2/
/2
C D
IS
SU
E
QH110 FIRST FLOOR FURNITURE & EQUIPMENT PLAN █ █
SHEET INDEX - MECHANICAL
SHEET NO. SHEET TITLE 65
D D
IS
SU
E
1/
/2
C
D R
EV
IE
W
2/
/2
C D
IS
SU
E
M-501 SIEMENS MECHANICAL DETAILS - BI-PLANE
1355-M001 MECHANICAL TITLE SHEET █
1355-MD115 1ST FLOOR IR HVAC & HYDRONIC DEMOLITION PLAN █
1355-MD116 1ST FLOOR IR INTERSTITIAL HVAC DEMOLITION PLAN █
1355-MD117 1ST FLOOR IR INTERSTITIAL HYDRONIC DEMOLITION PLAN █
1355-M101 BASEMENT INTERSTITIAL HYDRONIC PLANS █
1355-M115 1ST FLOOR IR HVAC & HYDRONIC PLAN █
1355-M116 1ST FLOOR IR INTERSTITIAL HVAC PLAN █
1355-M117 1ST FLOOR IR INTERSTITIAL HYDRONIC PLAN █
1355-M501 MECHANICAL DETAILS █
1355-M601 MECHANICAL ELECTRICAL SCHEDULES █
1355-MGD11
1ST FLOOR IR MEDICAL GAS DEMOLITION PLAN █
1355-MGD11
1ST FLOOR IR INSTERSTITIAL MEDICAL GAS DEMOLITION PLAN █
1355-MG113 1ST FLOOR IR MEDICAL GAS PLAN █
1355-MG114 1ST FLOOR IR INTERSTITIAL MEDICAL GAS PLAN █
SHEET INDEX - PLUMBING
SHEET NO. SHEET TITLE 65
D D
IS
SU
E
1/
/2
C
D R
EV
IE
W
2/
/2
C D
IS
SU
E
1355-P102 BASEMENT IR INTERSTITIAL PLUMBING PLAN
1355-P113 1ST FLOOR IR PLUMBING PLAN █
1355-P114 1ST FLOOR IR INTERSTITIAL PLUMBING PLAN
SHEET INDEX - ELECTRICAL
SHEET NO. SHEET TITLE 6
5%
D D
IS
SU
E
/2
C
D R
EV
IE
W
2/
/2
C D
IS
SU
E
E-101 SIEMENS ELECTRICAL RACEWAY PLAN - BI-PLANE
E-102 SIEMENS ELECTRICAL DIMENSION PLAN - BI-PLANE
E-501 SIEMENS ELECTRICAL SCHEDULES & DETAILS - BI-PLANE
SHEET INDEX - STRUCTURAL
SHEET NO. SHEET TITLE 6
5%
D D
IS
SU
E
/2
C
D R
EV
IE
W
2/
/2
C D
IS
SU
E
S100 TITLE SHEET X
S200 LEVEL 1 STRUCTURAL PLAN X
S201 LEVEL 1 INTERSTITIAL STRUCTURAL PLAN X
S202 LEVEL 2 STRUCTURAL PLAN X
S300 STRUCTURAL SECTIONS AND DETAILS X
S301 DETAILS X
SHEET INDEX - VENDOR
SHEET NO. SHEET TITLE CD
IS
SU
E
A-101 SIEMENS ARCHITECTURAL EQUIPMENT PLAN - BI-PLANE R
A-102 SIEMENS EQUIPMENT REFLECTED CEILING PLAN - BI-PLANE R
S-101 SIEMENS STRUCTURAL FLOOR PLAN - BI-PLANE R
S-102 SIEMENS STRUCTURAL CEILING PLAN - BI-PLANE R
E-101 SIEMENS ELECTRICAL RACEWAY PLAN - BI-PLANE R
E-102 SIEMENS ELECTRICAL DIMENSION PLAN - BI-PLANE R
E-501 SIEMENS ELECTRICAL SCHEDULES & DETAILS - BI-PLANE R
M-501 SIEMENS MECHANICAL DETAILS - BI-PLANE R
Revisions: Date:
ARCHITECTURAL ABBREVIATIONS
A/C
A/C UNIT
A/E
AAMA
AAP
AB
ABC
ACI
ACS DR
ACS FLR
ACS PNL
ACST
AD
ADA
ADC
ADDL
ADDN
ADH
ADJ
ADMIN
AFF
AFG
AFS
AGC
AGGR
AHJ
AHR
AHU
AIA
AISC
ALT
ALT NO
ALUM
AMT
ANOD
ANSI
ANT
AP
APA
APC
APPD
APPROX
AR
ARCH
ASB
ASI
ASKLR
ASPH
ASSN
ASTM
AT
ATCH
ATM
AUTO
AUX
AV
AVG
AW
AWI
AWPA
AWS
B PL
BAT
BD
BD FT
BEV
BHMA
BI FLD DR
BITUM
BKG
BLD
BLDG
BM
BOT
BRCG
BRDG
BRDG JST
BRG
BRG PL
BRKT
BRZ
BSMT
BTWN
BUR
C CONC
C TO C
CAB
CAC
CB
CBB
CCD
CCTV
CCW
CD
CEM
CEM PLAS
CER
CF
CF/CI
CF/OI
CFLG
CFMF
CG
CGSFU
CH
CHEM
CHFR
CHK
CI
CIP
CIR
CIRC
CJ
CL
CLDG
CLG
CLR
CM
CMU
AIR CONDITION
AIR CONDITIONING UNIT
ARCHITECT/ENGINEER
AMERICAN ARCHITECTURAL MANUFACTURERS ASSN
ALARM ANNUNCIATOR PANEL
ANCHOR BOLT
AGGREGATE BASE COURSE
AMERICAN CONCRETE INSTITUTE
ACCESS DOOR
ACCESS FLOOR
ACCESS PANEL
ACOUSTIC
AREA DRAIN
AMERICANS WITH DISABILITIES ACT
AUTOMATIC DOOR CLOSER
ADDITIONAL
ADDITION
ADHESIVE
ADJACENT, ADJOINING, OR ADJUSTABLE
ADMINISTRATION
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ABOVE FINISHED SLAB
ASSOCIATED GENERAL CONTRACTORS
AGGREGATE
AUTHORITY HAVING JURISDICTION
ANCHOR
AIR HANDLING UNIT
AMERICAN INSTITUTE OF ARCHITECTS
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALTERNATE
ALTERNATE NUMBER
ALUMINUM
AMOUNT
ANODIZE
AMERICAN NATIONAL STANDARDS INSTITUTE
ANTENNA
ACCESS PANEL
AMERICAN PLYWOOD ASSOCIATION
ARCHITECTURAL PRECAST CONCRETE
APPROVED
APPROXIMATE
AS REQUIRED
ARCHITECT
ASBESTOS
ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AUTOMATIC SPRINKLER
ASPHALT
ASSOCIATION
AMERICAN SOCIETY FOR TESTING AND MATERIALS
ACOUSTICAL CEILING TILE
ATTACHMENT
AUTOMATIC TELLER MACHINE
AUTOMATIC
AUXILIARY
AUDIO VISUAL
AVERAGE
ACID WASTE
ARCHITECTURAL WOODWORKING INSTITUTE
AMERICAN WOOD PRESERVERS' ASSOCIATION
AMERICAN WELDING SOCIETY
BASE PLATE
BATTEN
BOARD
BOARD FEET (FOOT)
BEVEL
BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BIFOLDING DOORS
BITUMINOUS
BACKING
BUILD
BUILDING
BEAM OR BENCHMARK
BOTTOM
BRACING
BRIDGING
BRIDGING JOIST
BEARING
BEARING PLATE
BRACKET
BRONZE
BASEMENT
BETWEEN
BUILT-UP ROOFING
CAST CONCRETE
CENTER TO CENTER
CABINET
CEILING ATTENUATION CLASS
CATCH BASIN OR CORNER BEAD
CEMENTITIOUS (BACKER) BOARD
CONSTRUCTION CHANGE DIRECTIVE
CLOSED CIRCUIT TELEVISION
COUNTERCLOCKWISE
CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CEMENT
CEMENT PLASTER
CERAMIC
CONTRACTOR FURNISHED
CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CONTRACTOR FURNISHED/OWNER INSTALLED
COUNTERFLASHING
COLD-FORMED METAL FRAMING
CORNER GUARD
CERAMIC GLAZED STRUCTURAL FACING UNITS
COAT HOOK
CHEMICAL
CHAMFER
CHECK
CAST IRON
CAST-IN-PLACE
CIRCLE
CIRCULAR
CONSTRUCTION JOINT OR CONTROL JOINT
CENTER LINE
CLADDING
CEILING
CLEAR
CONSTRUCTION MANAGEMENT
CONCRETE MASONRY UNIT
CNR
CNTR
CRTP
CO
CO2
COL
COM
COMB
COMM
COMP
CONC
CONC FLR
COND
CONF
CONN
CONSTR
CONT
CONTR
COORD
CORR
CPM
CPRS
CR
CRS
CRSI
CSB
CSG
CSI
CSK
CSMT
CSWK
CTG
CTR
CTRL
CTV
CU FT
CU IN
CU YD
CURT
CYL
CYL L
D
DAT
DBL
DBL GLZ
DCS
DP
DEG
DEL
DEMO
DEPT
DET
DF
DIA
DIAG
DIFF
DIM
DIR
DISP
DIST
DIV
DL
DOC
DR
DR CL
DR FR
DR OPNG
DS
DSGN
DW
DWG
E
EA
EFF
EFS
EIFS
EJ
EL
ELAST
ELEC
ELEC DR OP
ELEV
EMER
EMER SHR
ENCL
ENGR
ENVIR
EO
EPA
EPDM
EPO
EPS
EQ
EQL SP
EQUIP
EQUIV
ERD
ESC
ESMT
ESP
EST
ETC
EW
EWC
EWS
EXH
EXIST
EXP
EXP BT
EXST GR
EXT
EXT GR
CORNER
COUNTER
COUNTERTOP
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
COMMON
COMBINATION, COMBINED
COMMUNICATION
COMPONENT
CONCRETE
CONCRETE FLOOR
CONDENSER OR CONDITION
CONFERENCE
CONNECT
CONSTRUCTION
CONTINUE
CONTRACTOR
COORDINATE
CORRIDOR
CRITICAL PATH METHOD
COMPRESSIBLE
CRASH RAIL
COLD ROLLED STEEL
CONCRETE REINFORCING STEEL INSTITUTE
CONCRETE SPLASH BLOCK
CASING
CONSTRUCTION SPECIFICATIONS INSTITUTE
COUNTER SUNK
CASEMENT
CASEWORK
COATING
CENTER
CONTROL
CABLE TELEVISION
CUBIC FEET
CUBIC INCH
CUBIC YARD
CURTAIN
CYLINDER
CYLINDER LOCK
DEPTH OR PENNY (NAIL)
DATUM
DOUBLE
DOUBLE GLAZE
DIAPER CHANGING STATION
DECORATIVE PANEL
DEGREE
DELETE
DEMOLITION
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIFFERENCE OR DIFFUSER
DIMENSION
DIRECTION
DISPENSER
DISTANCE
DIVIDE OR DIVISION
DEAD LOAD
DOCUMENT
DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DOOR CLOSER
DOOR FRAME
DOOR OPENING
DOWNSPOUT
DESIGN
DISHWASHER
DRAWING
EAST
EACH
EFFICIENCY
EXTERIOR FINISH SYSTEM
EXTERIOR INSULATION AND FINISH SYSTEM
EXPANSION JOINT
ELEVATION
ELASTOMERIC
ELECTRIC
ELECTRIC DOOR OPENER
ELEVATOR
EMERGENCY
EMERGENCY SHOWER
ENCLOSURE
ENGINEER
ENVIRONMENT
ELECTRICAL OUTLET
ENVIRONMENTAL PROTECTION AGENCY
ETHYLENE PROPYLENE DIENE MONOMER
EMERGENCY POWER OFF
EXPANDED POLYSTYRENE BOARD (INSULATION)
EQUAL
EQUALLY SPACED
EQUIPMENT
EQUIVALENT
EXISTING ROOF DRAIN
ESCAPE OR ESCUTCHEON
EASEMENT
ESPECIALLY
ESTIMATE
AND SO FORTH OR ET CETERA
EACH WAY
ELECTRIC WATER COOLER
EYE WASH STATION
EXHAUST
EXISTING
EXPANSION OR EXPOSED
EXPANSION BOLT
EXISTING GRADE
EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXTERIOR GRADE
F
FA
FAB
FAC
FACIL
FAS
FAS BD
FCU
FCO
FCTY
FD
FDC
FDTN
FE
FEC
FF
FF EL
FF&E
FHC
FHP
FIG
FIL
FIN
FIN FLR
FIN GR
FIN WD
FIXT
FL
FLASH
FLDG
FLEX
FLG
FLR
FLR FIN
FLR SK
FLUOR
FLUOR FIX
FM
FM-G
FO
FOC
FOF
FOM
FOS
FOUNT
FOW
FP
FR
FR SNK
FREQ
FRMG
FRP
FRZ
FS
FSB
FSTNR
FT
FTG
FURG
FURN
FUT
FVC
GA
GAL
GALV
GALV STL
GB
GC
GD
GDR
GEN
GFRC
GFRG
GFRP
GI
GL
GL BLK
GLU LAM
GP
GR FL
GRAN
GRTG
GSB
GSM
GSU
GT
GUAR
GUT
GYP
GYP BD
GYP PLAS
H
HAZ MAT
HB
HC
HCWD
HDBD
HDO
HDR
HDW
HDWD
HEPA
HEX
HGR
HM
HMD
HMDF
HMF
HNDRL
HO
HORIZ
HOSP
HP
HPD
HPDL
HQ
HS
HSE
HSKPG
FAHRENHEIT OR FEMALE
FIRE ALARM
FABRIC
FACTOR
FACILITY
FASCIA
FASCIA BOARD
FAN COIL UNIT
FLOOR CLEANOUT
FACTORY
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FACE
FINISH FLOOR ELEVATION
FURNITURE, FIXTURE, AND EQUIPMENT
FIRE HOSE CABINET
FULL HEIGHT PARTITION
FIGURE
FILLET
FINISH
FINISH FLOOR
FINISH GRADE
FINISH WOOD
FIXTURE
FLOORLINE
FLASHING
FOLDING
FLEXIBLE
FLOORING
FLOOR
FLOOR FINISH
FLOOR SINK
FLUORESCENT
FLUORESCENT FIXTURE
FACTORY MUTUAL
FACTORY MUTUAL GLOBAL
FINISHED OPENING
FACE OF CONCRETE OR FACE OF CURB
FACE OF FINISH
FACE OF MASONRY
FACE OF SLAB OR FACE OF STUD
FOUNTAIN
FACE OF WALL
FIRE PROTECTION OR FIREPROOF
FIRE RATING, FIRE RESISTANT, OR FRAME
FLUSHING RIM SINK
FREQUENCY
FRAMING
FIBERGLASS REINFORCED PLASTIC
FREEZER
FEDERAL SPECIFICATION
FOLDING SHOWER BENCH
FASTENER
FEET OR FOOT
FOOTING
FURRING
FURNISH OR FURNITURE
FUTURE
FIRE VALVE CABINET
GAGE OR GYPSUM ASSOCIATION
GALLON
GALVANIC OR GALVANIZED
GALVANIZED STEEL
GRAB BAR
GENERAL CONTRACTOR
GUARD
GUARD RAIL
GENERAL OR GENERATOR
GLASS-FIBER-REINFORCED CONCRETE
GLASS-FIBER-REINFORCED GYPSUM
GLASS-FIBER-REINFORCED PLASTIC
GALVANIZED IRON
GLASS
GLASS BLOCK
GLUED LAMINATED WOOD
GRAB BAR
GROUND FLOOR
GRANITE
GRATING
GYPSUM SHEATHING BOARD
GALVANIZED SHEET METAL
GLAZED STRUCTURAL UNIT
GROUT
GUARANTEE
GUTTER
GYPSUM
GYPSUM BOARD
GYPSUM PLASTER
HIGH OR HUMIDISTAT
HAZARDOUS MATERIALS
HOSE BIBB
HOLLOW CORE
HOLLOW CORE WOOD DOOR
HARDBOARD
HIGH DENSITY OVERLAY
HEADER
HARDWARE
HARDWOOD
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEXAGON
HANGER
HOLLOW METAL
HOLLOW METAL DOOR
HOLLOW METAL DOOR AND FRAME
HOLLOW METAL FRAME
HANDRAIL
HOLD OPEN
HORIZONTAL
HOSPITAL
HIGH PRESSURE
HYGIENE PRODUCT DISPOSAL
HIGH PRESSURE DECORATIVE LAMINATE
HEADQUARTERS
HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HOUSE
HOUSEKEEPING
HST
HSS
HT
HVAC
HVY
HW
HYD
HYDR
IAQ
IBC
IC
ICW
ID
ID NO
ILLUM
INCL
IND
INFO
INSUL
INT
INTL
IWH
JAN
KD
KIT
KO
KPL
L
LAB
LAD
LAM
LAM GL
LAU
LAV
LBR
LBS
LCS
LD BRG
LDR
LED
LF
LIB
LIN
LIQ
LKR
LKR RM
LL
LMST
LRG
LRV
LT
LT GA
LT SW
LT WT
LTG
LTNG
LVD
LVR
LWC
LWIC
LYR
MACH
MACH RM
MAINT
MAN
MATL
MATV
MAX
MBD
MCB
MD
ME
MEAS
MECH
MECH RM
MED
MEK
MEMB
MEMO
MEZZ
MF
MFD
MFG
MFR
MFR REC
MGT
MIC
MID
MIL STD
MIN
MIR
MISC
MIT
MKR
ML
MLDG
MLWK
mm
MO
MOD
MOD BIT
MON
MOPR
MR
MS
MTD
MTG
MTL
MULL
MW
MWP
HOIST
HOLLOW STRUCTURAL STEEL
HEIGHT
HEATING, VENTILATING, AND AIR CONDITIONING
HEAVY
HOT WATER
HYDRANT
HYDRAULIC
INDOOR AIR QUALITY
INTERNATIONAL BUILDING CODE
INFECTION CONTROL
INFECTION CONTROL WALL
INSIDE DIAMETER
IDENTIFICATION NUMBER
ILLUMINATION
INCLUDED
INDEPENDENT OR INDUSTRIAL
INFORMATION
INSULATION
INTERIOR
INTERNATIONAL
INSTANTANEOUS WATER HEATER
JANITOR
KILN DRIED OR KNOCKED DOWN
KITCHEN
KNOCKOUT
KICKPLATE
ANGLE
LABORATORY
LADDER
LAMINATE
LAMINATED GLASS
LAUNDRY
LAVATORY
LUMBER
POUND
LOCKABLE CHARTING STATION/MED CABINET
LOAD-BEARING
LEADER
LIGHT EMITTING DIODE
LINEAR FEET (FOOT)
LIBRARY
LINEAR
LIQUID
LOCKER
LOCKER ROOM
LEAD LINED
LIMESTONE
LARGE
LOUVERED ROOF VENT
LIGHT
LIGHT GAGE
LIGHT SWITCH
LIGHTWEIGHT
LIGHTING
LIGHTNING
LOUVERED
LOUVER
LIGHTWEIGHT CONCRETE
LIGHTWEIGHT INSULATING CONCRETE
LAYER
MACHINE
MACHINE ROOM
MAINTENANCE
MANUAL
MATERIAL
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
MARKER BOARD
METAL CORNER BEAD
DECK
MECHANICAL ENGINEER
MEASURE
MECHANICAL
MECHANICAL ROOM
MEDICAL, MEDIUM
METHYL ETHYL KETONE
MEMBRANE
MEMORANDUM
MEZZANINE
MILL FINISH
MANUFACTURED
MANUFACTURING
MANUFACTURER
MANUFACTURER'S RECOMMENDATION
MANAGEMENT
MICROPHONE
MIDDLE
MILITARY STANDARD
MINIMUM
MIRROR
MISCELLANEOUS
MITER
MARKER
METAL LATH
MOLDING (MOULDING)
MILLWORK
MILLIMETER
MASONRY OPENING
MODEL, MODIFY OR MODULE
MODIFIED BITUMEN
MONITOR
MOP RACK
MOISTURE RESISTANT
MOP SINK
MOUNTED
MOUNTING
METAL
MULLION
MICROWAVE
MEMBRANE WATERPROOFING
N
NA
NAT
NATL
NC
NCOMBL
NEC
NEG
NEMA
NEUT
NFC
NFPA
NIC
NO
NOM
NR
NRC
NRCA
NRP
NS
NUM
O/O O
OA
OC
OCC
OCT
OD
OD
OF/CI
OFD
OFF
OF/OI
OH
OH DR
OPH
OPNG
OPP
OPR
OPT
OR
ORD
ORG
ORIG
ORN
OSHA
OUT
OZ
P
PAR
PARA
PART
PAT
PB
PBD
PC
PCA
PCC
PCCP
PCD
PCF
PCP
PCT
PED
PEN
PEND
PERF
PERIM
PERP
PHAR
PHOTO
PKG
PL
PL GL
PLAM
PLAS
PLBG
PLYWD
PMTL
PNEU
PNL
PO
POLY
PP
PR
PRCST
PREFAB
PREFIN
PRELIM
PREP
PRESS
PREV
PRKG
PRMLD
PROJ
PROP
PSF
PSI
PT
PTD
PTN
PTS
PVC
PVG
PWR
QA
QC
QRY
QTR
QTY
QUAD
QUAL
R
RA
RAD
RBM
RBR
NORTH
NOT APPLICABLE
NATURAL
NATIONAL
NOISE CRITERIA OR NURSE CALL
NONCOMBUSTIBLE
NATIONAL ELECTRICAL CODE
NEGATIVE
NATIONAL ELECTRICAL MANUFACTURERS ASSN
NEUTRAL
NATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NATIONAL ROOFING CONTRACTORS ASSOCIATION
NONREMOVABLE
NARROW STILE
NUMERAL
OUT TO OUT
OXYGEN
OUTSIDE AIR OR OVERALL
ON CENTER
OCCUPY
OCTAGON
OUTSIDE DIAMETER, OUTSIDE DIMENSION
OUTSIDE DIAMETER/OUTSIDE DIMENSION
OWNER FURNISHED/CONTRACTOR INSTALLED
OVERFLOW DRAIN
OFFICE
OWNER FURNISHED/OWNER INSTALLED
OVERHANG
OVERHEAD (COILING) DOOR
OPPOSITE HAND
OPENING
OPPOSITE
OPERABLE
OPTIONAL
OPERATING ROOM OR OUTSIDE RADIUS
ORDNANCE OR OVERFLOW ROOF DRAIN
ORGANIC
ORIGINAL
ORNAMENTAL
OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION
OUTLET
OUNCE
PAINT
PARALLEL OR PARAPET
PARAGRAPH
PARTIAL
PATTERN
PUSHBUTTON
PARTICLEBOARD
PIECE, POLYCARBONATE OR PORTLAND CEMENT
PORTLAND CEMENT ASSOCIATION
PRECAST CONCRETE
CONCRETE PAVEMENT
PAPER CUP DISPENSER
POUNDS PER CUBIC FOOT
PORTLAND CEMENT PLASTER
PRIVACY CURTAIN TRACK
PEDESTAL
PENETRATE
PENDANT
PERFORATED
PERIMETER
PERPENDICULAR
PHARMACY
PHOTOGRAPH
PACKAGE
PROPERTY LINE
PLATE GLASS
PLASTIC LAMINATE
PLASTER OR PLASTIC
PLUMBING
PLYWOOD
PAINTED METAL
PNEUMATIC
PANEL
POST OFFICE, PURCHASE ORDER
POLYETHYLENE (PLASTIC)
PUSH PLATE
PAIR
PRECAST
PREFABRICATE
PREFINISH
PRELIMINARY
PREPARATION
PRESSURE
PREVIOUS
PARKING
PREMOLDED
PROJECT
PROPERTY
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PORCELAIN TILE OR PRESSURE TREATED
PAPER TOWEL DISPENSER
PARTITION
PNEUMATIC TUBE STATION
POLYVINYL CHLORIDE (PLASTIC)
PAVING
POWER
QUALITY ASSURANCE
QUALITY CONTROL
QUARRY
QUARTER
QUANTITY
QUADRANT
QUALITY
RADIUS OR RISER
RETURN AIR
RADIATOR
REINFORCED BRICK MASONRY
RUBBER
RC
RCP
RCVR
RD
REC
RECD
RECPT
RECT
REF
REFR
REG
REINF
REP
REPL
REQ
REQD
RET
REV
RFG
RFI
RFP
RFS
RL
RLG
RM
RM LT
RND
RO
ROW
RS
RSV
RT
RV
RVS
RWL
SA
SALV
SAMP
SAN
SB
SBS
SBSTR
SC
SCH
SCHED
SCHEM
SCP
SCRN
SCT
SCWD
SD
SDG
SECT
SEG
SEL
SEP
SF
SFTWD
SGD
SGL
SHR
SHR HD
SHRD
SHT
SHTHG
SHV
SIM
SJ
SJI
SK
SKLT
SLDG
SLNT
SM
SMK
SND INS
SPEC
SPKLR
SPKR
SPLY
SPR
SQ
SQ IN
SQ YD
SSF
SST
ST
STC
STD
STIF
STL JST
STL LNTL
STL PL
STL RF DK
STL TB
STL TR
STNLS
STOR
STR
STRUCT
STRUCT STL
SUB
SURF
SUSP
SUSP CLG
SW
SWDR
SYM
SYNTH
SYS
REMOTE CONTROL
REFLECTED CEILING PLAN
RECEIVER
ROAD OR ROOF DRAIN
RECESSED
RECEIVED
RECEPTACLE
RECTANGLE
REFERENCE OR REFRIGERATOR
REFRACTORY, REFRIGERATION
REGISTER
REINFORCE
REPAIR
REPLACE
REQUIRE
REQUIRED
RETURN
REVISION
ROOFING
REQUEST FOR INFORMATION
REQUEST FOR PROPOSAL
ROOM FINISH SCHEDULE
ROOF LEADER
RAILING
ROOM
NURSE CALL LIGHT/ROOM LIGHT
ROUND
ROUGH OPENING
RIGHT OF WAY
ROUGH SAWN
RESILIENT SHEET VINYL
RIGHT
ROOF VENT
REVERSE
RAIN WATER LEADER
SUPPLY AIR
SALVAGE
SAMPLE
SANITARY
SPLASH BLOCK
STYRENE BUTADIEN STYRENE
SUBSTRATE
SHARPS CONTAINER
SCHOOL
SCHEDULE
SCHEMATIC
SCUPPER
SCREEN
SHOWER CURTAIN TRACK
SOLID CORE WOOD DOOR
SMOKE DETECTOR/SOAP DISPENSER
SIDING
SECTION
SEGMENT
SELECT
SEPARATE
SQUARE FOOT (FEET)
SOFTWOOD
SLIDING GLASS DOOR
SINGLE
SHOWER
SHOWER HEAD
SHOWER DRAIN
SHEET
SHEATHING
SHELVING
SIMILAR
SCORED JOINT
STEEL JOIST INSTITUTE
SKETCH
SKYLIGHT
SLIDING
SEALANT
SHEET METAL
SMOKE
SOUND INSULATION
SPECIFICATION
SPRINKLER
SPEAKER
SUPPLY
SINGLE PLY ROOF SYSTEM
SQUARE
SQUARE INCH
SQUARE YARD
SOLID SURFACE
STAINLESS STEEL
STAIRS OR STREET
SOUND TRANSMISSION CLASS
STANDARD
STIFFENER
STEEL JOIST
STEEL LINTEL
STEEL PLATE
STEEL ROOF DECK
STEEL TUBE
STEEL TRUSS
STAINLESS
STORAGE
STRINGERS
STRUCTURAL
STRUCTURAL STEEL
SUBSTITUTE
SURFACE
SUSPEND
SUSPENDED CEILING
SWITCH
SWING DOOR
SYMBOL
SYNTHETIC
SYSTEM
T T&M
TB
TBD
TECH
TEL
TEMP
THERM
THK
THRES
THRU
THRUOUT
TMPD
TMPD GL
TN
TO
TO FDN
TOB
TOM
TOP
TOS
TOW
TPD
TRANS
TRTD
TS
TSTAT
TV
TYP
U
UC
UGND
UL
ULT
UNFIN
UNO
UPS
UR
UTIL
UV
VAC
VAR
VEH
VENT
VERT
VEST
VFD
VIC
VID
VIF
VNR
VOC
VOL
VR
VTR
W/ W/O
WBL
WC
WD
WDW
WF
WFR
WFS
WH
WHSE
WP
WPM
WR
WS
WSCT
WT
X BRACE
XPS
YD
TREAD OR THERMOSTAT
TIME AND MATERIALS
TOWEL BAR
TACK BOARD
TECHNICAL
TELEPHONE
TEMPERATURE OR TEMPORARY
THERMAL
THICKNESS
THRESHOLD
THROUGH
THROUGHOUT
TEMPERED
TEMPERED GLASS
TRUE NORTH
TOP OF ___
TOP OF FOUNDATION
TOP OF BEAM
TOP OF MASONRY
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
TOILET PAPER DISPENSER
TRANSOM
TREATED
TUBE STEEL
THERMOSTAT
TELEVISION
TYPICAL
HEAT TRANSFER COEFFICIENT
UNDERCUT
UNDERGROUND
UNDERWRITERS LABORATORIES
ULTIMATE
UNFINISH
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
URINAL
UTILITY
ULTRAVIOLET
VACUUM
VARIES
VEHICLE
VENTILATION
VERTICAL
VESTIBULE
VARIABLE FREQUENCY DRIVE
VICINITY
VIDEO
VERIFY IN FIELD
VENEER
VOLATILE ORGANIC COMPOUND
VOLUME
VAPOR RETARDER
VENT THROUGH ROOF
WITH
WITHOUT
WOOD BLOCKING
WATER CLOSET
WOOD
WINDOW
WIDE FLANGE
WOOD FRAME
WOOD FURRING STRIPS
WATER HEATER
WAREHOUSE
WATERPROOFING
WATERPROOF MEMBRANE
WEATHER RESISTANT
WEATHERSTRIP OR WALL SCONCE
WAINSCOT
WEIGHT OR WINDOW TREATMENT
CROSS BRACE
EXTRUDED POLYSTYRENE BOARD
YARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE PROJECT NUMBER:
C
R e v it P ro je c ts
\1
B L D
G
M in n e a p o lis s t F lo o r_
R a d io lo g y
IR
R g b a rb a ri a e -m n .c o m
.r v t
/1
/2
:3
:2
P
M
1355-GI002
ABBREVIATIONS RENOVATE RADIOLOGY -
UPGRADE INTERVENTIONAL
RADIOLOGY ROOMS
618-CSI-109
1/10/2019 GJB14721Revisions: Date:
GENERAL NOTES
1. THE ARCHITECTURAL DRAWINGS SHOW PRINCIPAL AREAS AND LIMITS OF
CONSTRUCTION WHERE WORK MUST BE ACCOMPLISHED UNDER THIS CONTRACT.
INCIDENTAL WORK MAY BE NECESSARY IN AREAS NOT SHOWN ON ARCHITECTURAL
DRAWINGS DUE TO CHANGES AFFECTING ELECTRICAL, MECHANICAL AND PLUMBING
ALONG WITH OTHER SYSTEMS. THIS INCIDENTAL WORK SHALL BE PART OF THIS
CONTRACT, AND ALL TRADES SHALL INSPECT THESE AREAS, ASCERTAIN WORK
REQUIRED AND DO THE WORK IN ACCORDANCE OF CONTRACT REQUIREMENTS AT NO
ADDITIONAL COST.
2. CONTRACTORS SHALL VISIT THE SITE DURING BIDDING TO BECOME FAMILIAR WITH
THE EXISTING CONDITIONS. THE GENERAL CONTRACTOR SHALL LOCATE, INSPECT
AND FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS
PRIOR TO DEMOLITION AND CONSTRUCTION. NOTIFY ARCHITECT IMMEDIATELY OF
ANY DISCREPANCIES.
3. DO NOT SCALE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY OF ANY
DISCREPANCIES. WHEREVER OPENINGS ARE CUT THROUGH FIRE RATED
PARTITIONS, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR FOR WHOM
THE HOLE IS CUT TO PATCH AND REPAIR ANY OPENING TO MAINTAIN THE
INTEGRITY OF THE FIRE RATING.
4. GENERAL CONTRACTOR TO CHECK MECHANICAL DRAWINGS FOR EXISTING PIPES
AND DUCTS FURRED IN WALLS. VERIFY SIZE AND LOCATION WITH MECHANICAL
CONTRACTOR PRIOR TO PROCEEDING WITH REMODELING.
5. FIREPROOFING SHALL BE UNPIERCED. ANY SUBCONTRACTOR PENETRATING THE
FIREPROOFING SHALL BE REQUIRED TO REPLACE FIREPROOFING TO THE ORIGINAL
CONDITION AND FIRE RATING, AT THE SUBCONTRACTORS EXPENSE.
6. EQUIPMENT UNIT DIMENSIONS ARE FOR PRODUCT DESCRIPTION ONLY,
VERIFY SIZE WITH MANUFACTURER.
7. ALL DIMENSIONS PERTAINING TO MECHANICAL OR ELECTRICAL SERVICES OR
EQUIPMENT SHALL BE VERIFIED WITH THE RESPECTIVE TRADE.
8. ALL CONTRACTORS THAT PENETRATE AND/OR DISTURB ANY AREAS AT EXISTING
CONDITIONS SHALL PATCH AREA TO MATCH EXISTING ADJACENT AREA OR SURFACE
AND PREPARE FOR SCHEDULED FINISH APPLICATION. COORDINATE WORK WITH
GENERAL CONTRACTOR PRIOR TO PROCEEDING.
9. VERIFY HEIGHTS AND LOCATIONS OF ACCESS PANELS (AP) AND COORDINATE TYPES
WITH TRADES WHICH REQUIRE THEM.
10. PROVIDE LINTELS AND FRAMING FOR GRILLES, LOUVERS, AND ROOF VENTS AS
REQUIRED BY MECHANICAL CONTRACTOR, VERIFY SIZE AND LOCATION.
11. STRUCTURAL, MECHANICAL, AND ELECTRICAL ABBREVIATIONS AND SYMBOLS MAY
DIFFER FROM ARCHITECTURAL. SEE RESPECTIVE SECTIONS AND/OR DRAWINGS FOR
DEFINITIONS.
12. AT MECHANICAL AND ELECTRICAL EQUIPMENT ROOMS, PROVIDE 3/4" FRT
PLYWOOD BACKING BEHIND ALL SURFACE MOUNTED FIXTURES AND
EQUIPMENT, UNLESS NOTED OTHERWISE.
13. CONTRACTOR SHALL EVALUATE INTEGRITY OF ALL PARTITIONS INDICATED BY
SYMBOLS ON THE LIFE SAFETY PLAN(S) WITHIN THE PROJECT SCOPE AND UPGRADE
AS REQUIRED. ALL FIRE RESISTIVE RATED WALLS SHALL BE CONSTRUCTED OF
MATERIALS / ASSEMBLIES MEETING THE RATING INDICATED, TERMINATE AT THE
DECK ABOVE WITH A TESTED HEAD OF WALL ASSEMBLY AND ALL PENETRATIONS
SHALL BE SEALED WITH A TESTED ASSEMBLY. ALL SMOKE PARTITIONS SHALL BE
CONSTRUCTED OF MATERIALS THAT RESIST THE PASSAGE OF SMOKE, TERMINATE AT
THE DECK ABOVE WITH A JOINT SEALED WITH FIRE CAULK AND ALL PENETRATIONS
SHALL BE SEALED WITH FIRE CAULK.
14. ALL HAMMER DRILLING AND NOISE PRODUCING ACTIVITIES SHALL OCCUR AFTER 5:00
PM AND BE COMPLETED BEFORE 6:00 AM.
15. ALL SHUT DOWNS AFFECTING PATIENT CARE SHALL OCCUR BETWEEN 8:00 PM AND
5:00 AM.
DEMOLITION GENERAL NOTES
1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING AND
SEQUENCING WITH THE OWNER. ANY INFORMATION REGARDING SEQUENCING
PROVIDED IN THESE DOCUMENTS IS FOR ARCHITECT - OWNER PLANNING PURPOSES
ONLY, UNLESS NOTED OTHERWISE.
2. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH ALL
TRADES FOR THE DEMOLITION WORK REQUIRED FOR THIS PROJECT.
3. WHERE PARTITIONS ARE INDICATED TO BE REMOVED, REMOVE PARTITION ALONG
WITH ALL ITEMS CONTAINED WITHIN, INCLUDING DOORS, FRAMES, HARDWARE,
SIDELIGHTS, WINDOWS, MECHANICAL AND ELECTRICAL EQUIPMENT, ETC. TO
STRUCTURE ABOVE, UNLESS NOTED OTHERWISE.
4. WHERE FLOOR FINISH IS INDICATED TO BE DEMOLISHED, REMOVE FINISH TO FLOOR
SLAB AS REQUIRED AND PREPARE SLAB SURFACE FOR SCHEDULED FINISHES WITHIN
AREA TO BE REMODELED, UNLESS NOTED OTHERWISE. SEE FINISH PLAN/SCHEDULE
FOR EXISTING FLOOR FINISHES TO REMAIN UNDISTURBED.
5. WHERE CEILING IS INDICATED TO BE DEMOLISHED, REMOVE CEILING
SUSPENSION SYSTEM ALONG WITH ALL ASSOCIATED MECHANICAL AND
ELECTRICAL ITEMS, UNLESS NOTED OTHERWISE. SEE MECHANICAL AND
ELECTRICAL DRAWINGS FOR EXTENT OF CONDUIT, PIPING AND DUCTWORK
DEMOLITION WITHIN AREA TO BE REMODELED.
6. WHERE INDICATED, REMOVE ALL WALL/PARTITION EXISTING FINISHES AND PREPARE
THE SURFACES FOR SCHEDULED FINISHES, SEE FINISH SCHEDULE FOR FINISHES.
7. ALL DISTURBED AREAS, WALLS, PARTITIONS, FLOORS, ETC, DAMAGED BY DEMOLITION
WORK SHALL BE PATCHED TO MATCH ADJACENT AREA.
8. OWNER RESERVES THE RIGHT OF FIRST REFUSAL OF ALL SALVAGED ITEMS SUCH AS:
DOORS, LIGHT FIXTURES, PLUMBING FIXTURES ETC.
9. SALVAGED ITEMS SCHEDULED FOR REUSE SHALL BE CLEANED, RESTORED AND/OR
REFINISHED TO LIKE NEW CONDITION, UNLESS NOTED OTHERWISE.
10. DO NOT REMOVE ANY EXISTING STRUCTURAL SUPPORT MEMBERS SUCH AS COLUMNS,
BEAMS, JOISTS, LOAD-BEARING PARTITIONS ETC, UNTIL ADEQUATE PERMANENT OR
TEMPORARY SUPPORT IS IN PLACE. ALL EXISTING STRUCTURAL MEMBERS SHALL BE
ADEQUATELY PROTECTED, COORDINATE WITH STRUCTURAL ENGINEER.
11. SEE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS FOR RELATED
DEMOLITION AND PREP WORK.
12. WALL AND CEILING MOUNTED ITEMS SHOWN DASHED, SUCH AS WALL CABINETS,
SHELVING, CUBICLE CURTAIN TRACKS, PROJECTION SCREENS ETC, SHALL BE
REMOVED, UNLESS NOTED OTHERWISE.
13. WITHIN ALL EXISTING ROOMS/SPACES RECEIVING SCHEDULED FLOOR, OR WALL, OR
CEILING FINISHES, REMOVE ALL EXISTING FLOOR, OR WALL, OR CEILING FINISHES
DOWN TO THE SUBSTRATE. INCLUDE THE REMOVAL OF ALL ITEMS LOCATED WITHIN
THE EXISTING FINISH REMOVALS UNO PATCH AND PREP ALL SUBSTRATES TO RECEIVE
SCHEDULED FINISHES. FOR ADDITIONAL INFORMATION, SEE KEYNOTED ITEMS, FINISH
PLANS AND/OR SCHEDULES, STRUCTURAL, MECHANICAL AND ELECTRICAL.
1. FIELD FINISH VENTS, GRILLES, ACCESS PANELS, PLUG STRIP, BASEBOARD RADIATION
ENCLOSURES, ELECTRICAL PANEL BOARDS (IN FINISHED SPACES) TO MATCH SURFACE
ON WHICH THEY OCCUR UNLESS OTHERWISE INDICATED. EXCEPTION: ITEMS WITH
FACTORY WHITE FINISH, OCCURRING ON WHITE ACT OR WHITE GYPSUM BOARD CEILING
SHALL NOT BE PAINTED. STAINLESS STEEL ITEMS SHALL NOT BE PAINTED
2. FIELD VERIFY ALL NEW CONDITIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR
TO INSTALLATION
3. LOCATE CHANGES IN FLOOR FINISH MATERIAL UNDER CENTERLINE OF CLOSED DOOR
UNLESS OTHERWISE INDICATED
4. PROVIDE CLEAR SILICONE SEALANT AT PERIMETER OF PLUMBING FLOOR DRAINS, CLEAN
OUTS, ETC IN RESILIENT AND CERAMIC TILE FLOORS
5. PROVIDE SEALANT TO HORIZONTAL AND VERTICAL INTERIOR CERAMIC TILE CORNERS,
COLOR TO MATCH GROUT COLOR
6. PROVIDE SEALANT AT JOINT BETWEEN COUNTER TOP, BACK OR SIDE SPLASH AND
WALLS
7. PROVIDE CLEAR SILICONE SEALANT AT THE BASE OF DOOR FRAME TO RESILIENT AND
CT FLOORING, TYP. SEE PLANS AND ROOM FINISH SCHEDULE FOR FLOOR FINISH
LOCATIONS
9. PAINT ALL EXISTING AND NEW DOOR AND WINDOW FRAMES IN CONSTRUCTION LIMITS
P-4, UNLESS NOTED OTHERWISE IN THE ROOM OPENING SCHEDULE
8. WOOD: PRE-FINISHED TO MATCH BUILDING STANDARD, REFER TO SPECIFICATION
9. CEILING HEIGHTS AND MATERIALS/FINISHES CALLED OUT IN ROOM FINISH SCHEDULE
ARE FOR ENTIRE CEILING OR MAJORITY OF THAT ROOM, UNLESS OTHERWISE
INDICATED. SEE REFLECTED CEILING PLAN FOR CHANGES IN CEILING MATERIAL AND
CEILING HEIGHT. PAINT ALL SURFACES OF SOFFIT SAME COLOR AS INDICATED
10. COLOR SELECTIONS ARE BASED ON USE OF PRODUCTS INDICATED IN MATERIALS
SCHEDULE. IF MANUFACTURERS OTHER THAN THOSE INDICATED ARE USED,ARCHITECT
MAY REVISE COLOR SELECTIONS OF OTHER FINISHES TO ENSURE PROPER
COORDINATION.
13. PAINT ALL FIRE EXTINGUISHER CABINETS TO MATCH COLOR OF THE ADJACENT WALLS
14. CEILING HEIGHTS ARE MEASURED FROM FINISH FLOOR
15. FOR FLOOR FINISH MATERIALS AND PATTERN, SEE ALSO INT FINISH PLAN
16. SEE INTERIOR ELEVATIONS FOR MORE FINISH INFO
FINISH PLAN GENERAL NOTES
RCP GENERAL NOTES
1. GENERAL CONTRACTOR TO COORDINATE ALL CEILING MOUNTED EQUIPMENT
SUPPORT REQUIREMENTS, LOCATIONS, DIMENSIONS, ETC WITH EQUIPMENT
SUPPLIER AND OWNER, PRIOR TO INSTALLATION.
2. ALL CEILING MOUNTED ITEMS SUCH AS LIGHT FIXTURES, GRILLES, DIFFUSERS,
SPEAKERS, EXIT LIGHTS, ETC SHALL BE LOCATED IN THE CENTER OF ACT
PANELS, GPBD SOFFITS AND/OR PLASTER SOFFIT BAYS, UNLESS NOTED
OTHERWISE. COORDINATE WITH MECHANICAL AND ELECTRICAL DRAWINGS.
3. FINISHED GPBD SOFFITS SHALL EXTEND 1" BEYOND FACE AND EXPOSED ENDS OF
WALL CABINETS, FULL-HEIGHT CABINETS, ETC UNLESS NOTED OTHERWISE.
COORDINATE CABINET DIMENSIONS WITH SUPPLIER. GPBD FASCIA/SOFFIT
DETAILS ARE REFERENCED FROM THE REFLECTED CEILING PLAN.
4. SEE MECHANICAL DRAWINGS FOR SPRINKLER HEAD TYPES AND LOCATIONS.
CENTER ALL HEADS IN ACT UNLESS NOTED OTHERWISE.
5. AT REMODELING WORK IN EXISTING ACT SUSPENSION SYSTEM, REMOVE EXISTING
PANELS, CUT AS REQUIRED FOR CONSTRUCTION AND RE-INSTALL.
REPLACE ALL DAMAGED AND / OR EXTREMELY SOILED PANELS WITH ACT TO MATCH
EXISTING.
DEMOLITION PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
DE1 REMOVE (LEAD LINED) DOOR/FRAME AND ASSOCIATED HARDWARE.
DE2 REMOVE BASE CABINETS, COUNTERTOP, UPPER CABINETS, TALL CABINET
AND / OR SHELVING.
DE3 REMOVE FLOORING. PREP FOR FINISHES AS SCHEDULED.
DE4
REMOVE UNISTRUT SYSTEM AND STEEL SUPPORT SYSTEM IN ITS
ENTIRETY TO STRUCTURE ABOVE AND THOUGH INTERSTITIAL SPACE.
PATCH HOLES AS REQUIRED.
DE5 REMOVE CEILING IN ITS ENTIRETY. SEE MECHANICAL AND ELECTRICAL FOR
ADDITIONAL INFORMATION
DE6 REMOVE CEILING AS REQUIRED FOR MECHANICAL WORK. SALVAGE FOR
REINSTALLATION. SEE MECHANICAL.
DE7
REMOVE GPBD SOFFIT. REMOVE BACKLIT IMAGE PANELS, FRAMES AND
ASSOCIATED LIGHT FIXTURE. SEE ELECTRICAL FOR ADDITIONAL
INFORMATION
DE8 REMOVE WALL MOUNTED BUMPERGUARD AT SOFFIT.
DE9 REMOVE PORTION OF CEILING GRID AS REQUIRED FOR WORK, SALVAGE
FOR REINSTALLATION. SEE PLAN FOR ADDITIONAL INFORMATION
DE10 REMOVE LINEAR WALL SCONCE LIGHT FIXTURE. PATCH & PREP FOR NEW
FINISHES. SEE ELECTRICAL FOR ADDITIONAL INFORMATION.
DE11
REMOVE GYPBD ONE SIDE OF PARTITION AS REQUIRED FOR MECHANICAL
WORK. SEE MECHANICAL/ELECTRICAL PLANS FOR ADDITIONAL
INFORMATION
DE12 CUT OPENING IN METAL STUD AND PLASTER WALL FOR DOOR AND FRAME
AS SCHEDULED
DE13 CUT OPENING IN METAL STUD AND GP BD WALL FOR DOOR AND FRAME AS
SCHEDULED
DE14 REMOVE PORTION OF HANDRAIL AS REQUIRED FOR WORK. SALVAGE FOR
MODIFICATION OF HANDRAIL AND REINSTALLATION
DE15 REMOVE ROOM SIGNAGE.
DE16 REMOVE WALL MOUNTED SHELF.
DE17 REMOVE WALL MOUNTED HOOKS AND WOOD RAIL. SALVAGE FOR
REINSTALLATION IN SAME LOCATION
DE18 REMOVE PORTION OF PARTITION AS REQUIRED. SEE PLAN
DE19 REMOVE INTERSTITIAL GYPSUM CONCRETE FLOOR, BAR JOIST AND WIDE
FLANGE BEAM. SEE STRUCTURAL FOR ADDITIONAL INFORMATION
DE20 REMOVE FLOOR MOUNTED EQUIPMENT / ELECTRICAL PEDESTAL
DE21 REMOVE CEILING TILE, GRID TO REMAIN
DE22 REMOVE UPPER CABINET IN PHASE 1. SALVAGE FOR REINSTALLATION IN
PHASE 2
FINISH PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH
FN1
FN2
FN3
PATCH VINYL WALLCOVERING TO MATCH EXISTING AS NECESSARY, VA
TO
PROVIDE. CONTRACTOR TO PROVIDE LABOR AND OTHER MATERIALS
PATCH FLOORING THIS AREA TO MATCH EXISTING AS NECESSARY, VA
TO
PROVIDE. CONTRACTOR TO PROVIDE LABOR AND OTHER MATERIALS
INSTALL SALVAGED HANDRAIL, IF ADDITIONAL PARTS AND PIECES ARE
NEEDED, MATCH EXISTING. VA TO SUPPLY, CONTRACTOR TO INSTALL.
REFLECTED CEILING KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
RC1 REINSTALL CEILING AND ALL MECHANICAL EQUIPMENT. SEE MECHANICAL
FOR ADDITIONAL INFORMATION
RC2 PROVIDE ACT-2 IN EXISTING GRID
FLOOR PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL
EXISTING DOOR
AND FRAME TO
REMAIN
DOOR
INTERIOR
BORROWED LIGHT
101B
101A
8'-0" DIMENSION LINE,
NOMINAL
8'-0" EXTENDED
DIMENSION LINE,
NOMINAL
AE2111A
INTERIOR
ELEVATION
INDICATOR TAG
2B
AE2O1
EXTERIOR
ELEVATION
INDICATOR TAG
1A
203 EQUIPMENT TAG
100 FLOOR ELEVATIONWALL TAG
OFFICE
ROOM NAME AND
NUMBER AE501
1A
DETAIL REFERENCE
TAG
AE2O1
EXTERIOR SECTION
REFERENCE TAG
1A
AE2O1
INTERIOR SECTION
REFERENCE TAG
1A
KEY NOTE
A
GRIDLINE
REVISION TAG
PR01
REVISION CLOUD
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
FP10
REFLECTED CEILING PLAN SYMBOLS
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
GBPD
CEILING /
SOFFIT
ACT CEILING
SYSTEM
EXISTING
ACT CEILING
SYSTEM
IV TRACK
CUBICLE
CURTAIN
TRACK
ACCESS
PANEL
2'-0" x 4'-0"
LIGHT FIXTURE
2'-0" x 2'-0"
LIGHT FIXTURE
PENDANT STRIP
LIGHT FIXTURE
PENDANT STRIP
LIGHT FIXTURE
RECESSED
LIGHT FIXTURE
MECHANICAL
SUPPLY GRILL
MECHANICAL
RETURN GRILL
WALL SCONCE
LIGHT FIXTURE
MECHANICAL
LINEAR SUPPLY
GRILL
CEILING
ELEVATION AND
FINISH
9'-0" AFF
ACT
DEMOLITION PLAN SYMBOLS
EXISTING WALL TO
REMAIN
WALL OR
PARTITION TO BE
REMOVED
EXISTING DOOR
AND FRAME TO
REMAIN
KEY NOTE
GRIDLINE
A
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
DE10
EXISTING DOOR
AND FRAME TO BE
DEMOLISHED
DASHED LINE
INDICATES ITEM TO
BE REMOVED (UNO)
SOUTH WALL FINISH
NORTH WALL FINISH
WEST WALL FINISH
EAST WALL FINISH
CEILING FINISH
FLOOR FINISH
BASE
REMARKS
AT ACOUSTICAL CEILING (TILE)
CT CERAMIC TILE
GWB (SC) GYPSUM WALLBACK SYSTEMS (SPECIAL COATING)
LVT LUXURY VINYL TILE
P PAINT
PT PORCELAIN TILE (FLOOR AND BASE)
RB RESILIENT BASE
RES RESINOUS EPOXY FLOORING
RES-W RESINOUS/EPOXY WALL/CEILING
RF RUBBER FLOORING
S SOLID SURFACE
SC SPECIAL COATING
SP SPECIAL FACED
WSF WELDED SEAM SHEET FLOORING (HEAT WELDED
WITH ROD)
ROOM FINISH LEGEND &
ABBREVIATIONS
MATERIAL INSTALL
DIRECTION
AF01 KEYNOTECORNER GUARD
WALL
PROTECTION
NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN
CG
VCTCPT
ACT-2
VSF-1
RB-1
P-1
P-2 P-1 P-1
FLOOR PLAN KEYED NOTES
NOTE: NOT ALL KEYED NOTES MAY BE USED ON EACH PLAN
FL1
REMOVE COUNTERTOP SUPPORT BRACKETS AS REQUIRED FOR
ELECTRICAL WORK. REPLACE WITH BRACKETS TO FIT AROUND EQUIPMENT
ELECTRICAL DUCT. SEE ELECTRICAL AND VENDOR DRAWINGS FOR
ADDITIONAL INFORMATION
FL2 REINSTALL SALVAGED WALL MOUNTED HOOKS AND WOOD RAIL IN SAME
LOCATION
FL3
PATCH PARTITION AS REQUIRED FROM MECHANICAL/ ELECTRICAL WORK.
FIELD VERIFY LEAD SHIELDING THICKNESS. MAINTAIN LEAD SHIELDING
THICKNESS AND HEIGHT AS REQUIRED AT PATCHING LOCATIONS. SEE
MECHANICAL/ELECTRICAL FOR ADDITIONAL INFORMATION
FL4 STAINLESS STEEL FLOOR PEDESTAL. FIELD VERIFY LOCATION WITH
OWNER AND COORDINATE WITH EQUIPMENT VENDOR AND ELECTRICAL
FL5
PATCH FLOOR / INTERSTITIAL DECK AS REQUIRED AT REMOVED
EQUIPMENT / MEC / ELEC. SEE MEP DRAWINGS FOR ADDITIONAL
INFORMATION
FL6
CORE DRILL AS REQUIRED FOR EQUIPMENT / MEP. COORDINATE WITH
EQUIPMENT DRAWINGS, EQUIPMENT SUPPLIER, STRUCTURAL AND MEP
DRAWINGS
FL7 REINSTALL CABINET DURING PHASE 2. COORDINATE WITH COR
FL8
PROVIDE BLOCKING FOR VENDOR SUPPLIED EQUIPMENT PATCH WALL AS
REQUIRED FROM BLOCKING INSTALLATION. SEE VENDOR EQUIPMENT
DRAWINGS FOR ADDITIONAL INFORMATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE PROJECT NUMBER:
C
R e v it P ro je c ts
\1
B L D
G
M in n e a p o lis s t F lo o r_
R a d io lo g y
IR
R g b a rb a ri a e -m n .c o m
.r v t
/1
/2
:3
:2
P
M
1355-GI003
GENERAL NOTES AND SYMBOLS RENOVATE RADIOLOGY -
UPGRADE INTERVENTIONAL
RADIOLOGY ROOMS
618-CSI-109
1/10/2019 GJB14721Revisions: Date:
LIFE SAFETY SYMBOLS
SMOKE BARRIER
1 HOUR FIRE
BARRIER
2 HOUR FIRE
BARRIER
3 HOUR FIRE
BARRIER
1 HOUR FIRE &
SMOKE BARRIER
2 HOUR FIRE &
SMOKE BARRIER
3 HOUR FIRE &
SMOKE BARRIER
HE
TRAVEL DISTANCE
100'-00"
TRAVEL DISTANCE
EA
ED
EXIT EXIT
HORIZONTAL EXIT
EXIT DISCHARGE
EXIT ACCESS
FIRE
EXTINGUISHER
FE
FIRE
EXTINGUISHER
CABINET
FEC
LIMITS OF
CONSTRUCTION
SMOKE
COMPARTMENT
BOUNDRY
HEALTH CARE
SUITE
NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN
OCCUPANCY
SEPERATION
SHAFT
ADJACENT SYMBOLS SHOW PARTITION
RATING AND DAMPER REQUIREMENTS
HAZARDOUS USE
ADJACENT SYMBOLS SHOW PARTITION RATING AND
DAMPER REQUIREMENTS. OPENINGS REQUIRE GASKET,
CLOSER & LATCH
EXIT PASSAGEWAY
RATE AS STAIR
ALL OPENINGS TO BE RATED AS STAIR SHAFT
CORRIDOR
WALLS TO LIMIT THE TRANSFER OF SMOKE
ADJUNCT CORRIDOR or PSYCHIATRIC AREA or CONSTUCTED WITH MIN. 4'-0" CLEAR
WITH (PER CHAPTER 19)
COMMON PATH OF TRAVEL
100'-00"
COMMON
PATH OF
TRAVEL
PROJECT DESCRIPTION
CODE SUMMARY
(description)
NOYES
APPLICABLE REGULATIONS
GENERAL TYPE OF PROJECT
NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)
2018 FGI GUIDELINES
2015 NFPA 101 (LIFE SAFETY CODE)
ABA STANDARDS (2015) (ABAAS)
2012 IBC
REMODEL
ADDITION
NEW BUILDING
VA BARRIER FREE DESIGN STANDARD (PG-18-13)
NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)
THE JOINT COMMISSION (TJC)
CENTER FOR MEDICARE/MEDICAID SERVICES (CMS)
NOYES
TESTRATING (HRS)
NOYES
(IBC Chapter 6)
(Section 8.3)
CHANGE OF OCCUPANCY?
FIRE RESISTIVE CORRIDORS?
IBC I-A
HEALTHCARE
SHAFTS AND EXIT PASSAGEWAYS
OTHER
ROOF CONSTRUCTION
PRIME & SEC. FLOOR BEAMS, JOISTS
FLOOR/CEILING ASSEMBLY
FLOOR CONSTRUCTION
INTERIOR
NON-BEARING WALLS AND PARTITIONS
BEARING WALLS
COLUMNS
GIRDERS
TRUSSES
ROOF/CEILING ASSEMBLY
PRIME & SEC. ROOF BEAMS, JOISTS
EXTERIOR
INTERIOR BEARING WALLS
EXTERIOR BEARING WALLS
STRUCTURAL FRAME
SEPARATED OCCUPANCIES?
AREA SEPARATIONS / FIRE WALLS
FIRE BARRIER RATING(S)
SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)
INCIDENTAL USE AREA RATING(S)
FIRE-RESISTIVE REQUIREMENTS
SEE LIFE SAFETY PLANS
SEE PLANS
OCCUPANCY CLASSIFICATION(S)
TYPE(S) OF CONSTRUCTION
OCCUPANCIES
CONSTRUCTION TYPE(S)
MISCELLANEOUS
(If Remodeling)
2015 LSC (TABLE 6.1.14.1)
SEE LIFE SAFETY PLANS
See Life Safety Plans
3 ASTM E 119
NA NA
1.5
NA NA
INTERIOR FINISHES CLASSIFICATION
A or B
(LSC CH 12-42)
(LSC Chapter 18/19)LSC I (322)
OSHA STANDARDS
VA SEISMIC DESIGN REQUIREMENTS H-18-8
NATIONAL ELECTRIC CODE (NEC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
ENERGY POLICY ACT OF 2005 (EPAct)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS
FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE
RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433,434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL
ENVIRONMENTAL, ENERGY, AND TRANSPORTATION MANAGEMENT
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED
IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA
MASTER CONSTRUCTION SPECIFICATION
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE
STANDARD 62.1-2004
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE
STANDARD 15 -2007
VA FIRE PROTECTION DESIGN MANUAL
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
WALL & CEILING
I or IIFLOOR
ASTM E 119
ASTM E 119
ASTM E 119
ASTM E 119
ASTM E 119
ASTM E 119
ASTM E 119
ASTM E 119
1Q-117D
ELECTRICAL
1Q-116
IT
C1-137
HALLWAY
STAIR
1Q-115
OFFICE/
READING
1Q-114
OFFICE/
READING
1Q-113
OFFICE/
READING
C1-135
HALLWAY
1Q-119
CLASSROOM
1Q-117A Room 1Q-117B
Room C1-154
HALLWAY
1V-100A Room
1V-100B Room
1V-100C Room
1V-100D Room
1V-100E Room
C1-155 Room
1V-135 Room
1V-134 Room 1V-133
Room 1V-132 Room
1V-101 Room
1V-129 Room
1V-102 Room
C1-156 Room
1V-127 Room
1V-103 Room
1V-124 Room
1V-103A Room
1V-131 Room
1V-130 Room
1V-128 Room
1V-125 Room
1V-146 Room
1V-146A Room
C1-175 Room
C1-174 Room
1V-140 Room
1V-139 Room
1V-138 Room
1V-137 Room
1R-138 Room
1V-100H Room
1V-100G Room
1V-100F Room
C1-173 Room
C1-171 Room
1V-145 Room
1V-142 Room
C1-184A Room
C1-184 Room
1V-141 Room
1V-150A Room
1V-149 Room
1V-150 Room
1V-148 Room
1V-147 Room
1S-1 Room
1T-108 Room
1T-107 Room
C1-185 Room
C1-185A Room
C1-136
EXIT
C1-138
HALLWAY
1R-112 Room
1R-113 Room
1R-110 Room
1R-111 Room
1T-106
TOILET
1T-105
TOILET
1T-103 Room
1T-104 Room
1R-109 Room
1R-108 Room
1S-143 Room
1S-142 Room
1S-144 Room
1S-141 Room
1S-2 Room
C1-139
HALLWAY
C1-143 Room
C1-142
CHANGING
C1-141
CHANGING
CA-140
CHANGING
1R-125
GENERAL
RAD RM 3
1R-125A
CONTROL
1R-126
GENERAL
RAD RM 2
1R-132
GENERAL
RAD RM 4
1R-134
GENERAL
RAD RM 5
1R-136
IR 7
EQUIPMENT
1R-139
IR NEURO
ROOM 7
1R-141
CLEAN
STORAGE
1R-142
IR
VASCULAR
ROOM 8
1R-158
IR 8
EQUIPMENT
1R-140
CONTROL
1Q-112
OFFICE/
READING
1Q-111
OFFICE/
READING
1Q-110
OFFICE/
READING
1Q-109
OFFICE/
READING
1Q-107
OFFICE/
READING
C1-129B
HALLWAY
1R-143A
WOMANS
LOCKER
1R-143
WOMANS
TOILET
1R-145
BREAK
1R-146
MENS
TOILET
C1-133
HALLWAY
PACS
C1-132
VESTIBLUE
1R-133
OFFICE
1R-131
OFFICE
C1-131 Room
1R-127
GENERAL
RAD RM 1
C1-130 Room
1R-135 Room 1R-128A
Room
C1-144 Room
1R-117 Room
1R-118 Room
1R-119 Room
1R-120 Room
1R-121 Room
1R-122 Room
1R-123 Room
1R-124 Room
C1-145 Room
C1-194 Room
C1-194A Room
M-10
OR
ELEVATOR
1Q-100F
TOILET
1Q-100G
ULTRASOUND
1Q-100E
DRESSING
1Q-100H
MAMMOGRAPHY
1R-137B
PACS
OFFICE
1R-137C
TECH FILE
1Q-118 Room
1Q-117
MECHANICAL
1Q-117C Room
C1-153 Room
C1-152 Room
Room
1Q-125 Room
1V-107A Room 1V-107B
Room 1V-108 Room
1V-109 Room
1V-110 Room
1V-111 Room
C1-165 Room
1V-107C Room
1V-105 Room
1V-107 Room
1V-121 Room
1V-122 Room
1V-123 Room
1V-107P Room
1V-100 Room
1V-107J Room
1V-113 Room
1V-114 Room
1V-151 Room
1V-120 Room
1V-118 Room
1V-112 Room
1V-116 Room
C1-164 Room
C1-169 Room
C1-170 Room
1V-117 Room
1V-117A Room
C1-176A Room
C1-177 Room
C1-178 Room
C1-179 Room
C1-180 Room
1V-119 Room
C1-166 Room
C1-176 Room
C1-183 Room
C1-181 Room
M-5
SHAFT
C1-154A Room
1V-156 Room
C1-182 Room
C1-183A Room
E D
ED
E X
IT
E
X
IT
E D
EXIT
E X
IT
E
X
IT
ED
ED
E D
E D
E X
IT
EXIT EXIT EXIT
LI
M
IT
S
O F
CO
NS
TR
UC
TI
O
N
LIMITS OF CONSTRUCTION
HH GG FF EE DD CC BB AA Z Y X W V
MSCZ-1-M
6479 SF
PATIEINT CARE NON SLEEPING SUITE
4444 SF
PATIEINT CARE NON SLEEPING SUITE
8961 SF
NON PATIENT
CARE SUITE
6215 SF
PATIEINT CARE
NON SLEEPING
SUITE
744 SF
1C-139C
CONFRENCE
1C-139D
ULTRA
SOUND
MINOR
PROCEDURE1C-139B
PATIENT
PRREP
T R
A V
E L
D
IS
T A
N C
E
T R
A V
E L
D
IS
T A
N C
E
C O
M M
O N
P A
T H
O F
T R
A V
E L
COMMON PATH OF TRAVEL
80'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE PROJECT NUMBER:
C
R e v it P ro je c ts
\1
B L D
G
M in n e a p o lis s t F lo o r_
R a d io lo g y
IR
R g b a rb a ri a e -m n .c o m
.r v t
/1
/2
:3
:3
P
M
1355-GI010
FIRST FLOOR LIFE SAFETY PLAN RENOVATE RADIOLOGY -
UPGRADE INTERVENTIONAL
RADIOLOGY ROOMS
618-CSI-109
1/10/2019 GJB14721
3/32" = 1'-0"
FIRST FLOOR LIFE SAFETY PLAN
HH GG FF EE DD CC BB AA Z Y X W V
1Q-118 Room
1Q-117D
ELECTRICAL
1Q-116
IT
C1-137
HALLWAY
STAIR
1Q-115
OFFICE/
READING
1Q-114
OFFICE/
READING
1Q-113
OFFICE/
READING
C1-135
HALLWAY
1Q-119
CLASSROOM
1Q-117A Room 1Q-117B
Room
1Q-117C Room
C1-153 Room
C1-154
HALLWAY
C1-152 Room
Room
1Q-125 Room
1V-107A Room 1V-107B
Room 1V-108 Room
1V-109 Room
1V-110 Room
1V-111 Room
C1-165 Room
1V-107C Room
1V-105 Room
1V-107 Room
1V-121 Room
1V-122 Room
1V-123 Room
1V-107P Room
1V-100 Room
1V-100A Room
1V-100B Room
1V-100C Room
1V-100D Room
1V-100E Room
C1-155 Room
1V-135 Room
1V-134 Room 1V-133
Room 1V-132 Room
1V-101 Room
1V-129 Room
1V-102 Room
C1-156 Room
1V-127 Room
1V-103 Room
1V-124 Room
1V-103A Room
1V-107J Room
1V-113 Room
1V-114 Room
1V-151 Room
1V-120 Room
1V-118 Room
1V-112 Room
1V-116 Room
C1-164 Room
C1-169 Room
C1-170 Room
1V-117 Room
1V-117A Room
C1-176A Room
C1-177 Room
C1-178 Room
C1-179 Room
C1-180 Room
1V-131 Room
1V-130 Room
1V-128 Room
1V-125 Room
1V-146 Room
1V-146A Room
1V-119 Room
C1-175 Room
C1-174 Room
1V-140 Room
1V-139 Room
1V-138 Room
1V-137 Room
1R-138 Room
1V-100H Room
1V-100G Room
1V-100F Room
C1-173 Room
C1-171 Room
1V-145 Room
1V-142 Room
C1-184A Room
C1-184 Room
1V-141 Room
C1-166 Room
C1-176 Room
C1-183 Room
C1-181 Room
1V-150A Room
1V-149 Room
1V-150 Room
1V-148 Room
1V-147 Room
1S-1 Room
1T-108 Room
1T-107 Room
M-5
SHAFT
C1-185 Room
C1-185A Room
C1-154A Room
1V-156 Room
C1-182 Room
C1-183A Room
C1-136
EXIT
C1-138
HALLWAY
1R-112 Room
1R-113 Room
1R-110 Room
1R-111 Room
1T-106
TOILET
1T-105
TOILET
1T-103 Room
1T-104 Room
1R-109 Room
1R-108 Room
1S-143 Room
1S-142 Room
1S-144 Room
1S-141 Room
1S-2 Room
C1-139
HALLWAY
C1-143 Room
C1-142
CHANGING
C1-141
CHANGING
CA-140
CHANGING
1R-125
GENERAL
RAD RM 3
1R-125A
CONTROL
1R-126
GENERAL
RAD RM 2
1R-132
GENERAL
RAD RM 4
1R-134
GENERAL
RAD RM 5
1R-136
IR 7
EQUIPMENT
1R-139
IR NEURO
ROOM 7
1R-141
CLEAN
STORAGE
1R-142
IR
VASCULAR
ROOM 8 1R-158
IR 8
EQUIPMENT
1R-140
CONTROL
1Q-112
OFFICE/
READING
1Q-111
OFFICE/
READING
1Q-110
OFFICE/
READING
1Q-109
OFFICE/
READING
C1-129B
HALLWAY 1R-143
WOMANS
TOILET
1R-145
BREAK
1R-146
MENS
TOILET
C1-133
HALLWAY
PACS
C1-132
VESTIBLUE
1R-133
OFFICE
1R-131
OFFICE
C1-131 Room
1R-127
GENERAL
RAD RM 1
C1-130 Room
1R-135 Room 1R-128A
Room
C1-144 Room
1R-117 Room
1R-118 Room
1R-119 Room
1R-120 Room
1R-121 Room
1R-122 Room
1R-123 Room
1R-124 Room
C1-145 Room
C1-194 Room
C1-194A Room
M-10
OR
ELEVATOR
1Q-100F
TOILET
1Q-100G
ULTRASOUND 1Q-100H
MAMMOGRAPHY
1R-137C
TECH FILE
PHASE 1
PHASE 2
ALLOW 30 DAYS BETWEEN PHASE 1 AND PHASE 2. COORDINATE TIME WITH COR.
OVERLAP AREA OF PHASE 2 WORK IN CONTROL ROOM
PHASE 2
WORK IN 1R-140 TO BE BETWEEN 5:00PM AND 6:00AM ONLY. COORDINATE WITH COR.
INFECTION CONTROL RISK ASSESSMENT (ICRA) BY PROJECT AREA USE AND PHASE
PHASE 1:
CONSTRUCTION PROJECT ACTIVITY TYPE - C
PATIENT RISK GROUP - HIGH RISK
CONTROL PROCEDURE CLASS - III
PHASE 2:
CONSTRUCTION PROJECT ACTIVITY TYPE - C
PATIENT RISK GROUP - HIGH RISK
CONTROL PROCEDURE CLASS - III
INFECTION CONTROL GENERAL NOTES
1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL
INFORMATION
2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND
PARTICULATE MATTER TO THE CONSTRUCTION
AREA. CONSTRUCTION AREA PERIMETER NEEDS TO BE SEALED
COMPLETELY WITH MIN 4 MIL POLY AND DUCT TAPE DURING
CLASS II, III, OR IV OPERATIONS.
3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CLASS III OR
CLASS IV CONSTRUCTION OPERATIONS. EACH AREA TO BE UNDER
NEGATIVE PRESSURE (0.02"WC) DURING THESE OPERATIONS.
MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN
CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS
DIRECTED BY VA.
4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,
PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION
PERMIT" TO THE VA INFECTION CONTROL NURSE. UPON AUTHORIZATION,
PROCEED TO NEXT TYPE OF CONSTRUCTION. PROVIDE AT LEAST
10 WORKING DAYS NOTICE FOR EACH PERMIT.
5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER
FROM FLOOR TO DECK/FLOOR ABOVE. EXCEPTION. IF BARRIER
IS ADJACENT SMOKE, FIRE, OR EXISTING WALL CONSTRUCTION
WHICH WILL NOT BE DEMOLISHED AND TERMINATES TO FLOOR
OR DECK ABOVE, THEN CONSTRUCT IC BARRIER FROM FLOOR
TO ABOVE CORRIDOR CEILING WITH 4 MIL POLY BEING SEALED
ON ALL EDGES: FLOOR, TOP OF WALL, SIDES, AND ALL PENETRATIONS.
SEE DETAILS THIS SHEET. TAPE, MUD, SAND JOINTS AND PAINT ON NON-
CONSTRUCTION SIDE OF BARRIER.
6. GENERAL CONTRACTOR SHALL PROVIDE NEW CONSTRUCTION
ACCESS DOORS AT ALL BARRIERS. MAINTAIN ALL INFECTION CONTROL
STANDARDS. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY
BEFORE 7:00 A.M. AND AFTER 8:00 P.M.
7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA
PROVIDE NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS
LESS THAN 1000 SF, (2) TWO MINIMUM IN AREAS BETWEEN 1000 SF
AND 5000 SF, AND (3) THREE FOR AREAS BETWEEN 5000 SF AND
10000 SF. EGRESS IS TO BE MAINTAINED AT ALL TIMES.
8. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES
TO COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR
ACTUAL TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE
THE NUMBER OF UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING
THE CUBIC FEET IN THE REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING
THAT RESULT BY THE ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT
TO DETERMINE THE NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR
CHANGES PER HOUR. PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE
FAILURE AND/OR EMERGENCY IN AN ADJACENT AREA.
9. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED WALLS, CONSTRUCT
NEW SMOKE BARRIER/APPROPRIATE FIRE RATED WALLS PER NEW PLANS
OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE BARRIER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
AE PROJECT NUMBER:
C
R e v it P ro je c ts
\1
B L D
G
M in n e a p o lis s t F lo o r_
R a d io lo g y
IR
R g b a rb a ri a e -m n .c o m
.r v t
/1
/2
:3
:3
P
M
1355-GI020
PHASING & CONSTRUCTION
BARRIER PLAN
RENOVATE RADIOLOGY -
UPGRADE INTERVENTIONAL
RADIOLOGY ROOMS
618-CSI-109
1/10/2019 GJB14721
3/32" = 1'-0"
FIRST FLOOR INFECTION CONTROL & PHASING PLAN
DRAWING SYMBOLS
ABBREVIATIONS
STRUCTURAL NOTES
MNVA BLDG. 70 - RADIOLOGY RENOVATION
MINNEAPOLIS MN.
DRAWING INDEX
DRAWING NUMBER
DRAWING NAME
FOUNDATION PLAN
1/8"=1'-0" (AST S1000)
DRAWING SCALE
X
FACE BRICK
CONCRETE BLOCK
WOOD BLOCKING
EARTH/ COMPACT FILL
STEEL
WELDED WIRE FABRIC
STEPPED FOOTING
LOCATION
JOIST BOT. CHORD
EXTENSION
BEAM SPLICE LOCATION
ELEVATION OR WORK POINT
S---------S
JOIST BOLTED CONNECTION PER
OSHA REQUIREMENTS
BEAM MOMENT CONNECTION
S
NEW COLUMN NUMBER
EXISTING COLUMN NUMBER
SECTION NUMBER
SHEET NUMBER
A
S400
S400
24 SECTION NUMBER
SHEET NUMBER
ELEVATION NUMBER
SHEET NUMBERS400
CONCRETE
BIM IMAGE
ORIENTATION
REVISION CLOUD
AST DETAIL NUMBER
A
AB ANCHOR BOLT
ADD'L. ADDITIONAL
ALT. ALTERNATE
ARCH. ARCHITECT(URAL)
B
BLDG. BUILDING
BLK. BLOCK
BLKG. BLOCKING
BM. BEAM
BOT. BOTTOM
BRG. BEARING
BTWN. BETWEEN
C
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLR. CLEAR(ANCE)
CMU CONCRETE
MASONRY UNIT
COL. COLUMN
COMP. COMPOSITE
CONC. CONCRETE
CONN. CONNECTION
CONST. CONSTRUCTION
CONT. CONTINUOUS
COORD. COORDINATE
CTRD. CENTERED
I
INFO. INFORMATION
J
JBE JOIST BEARING
ELEVATION
JST. JOIST
JT. JOINT
K
K. KIP
KO KNOCK-OUT
KSI KIPS PER SQUARE
INCH
L
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
M
MAS. MASONRY
MATL. MATERIAL
MAX. MAXIMUM
MECH. MECHANICAL
MEZZ. MEZZANINE
MFG. MANUFACTURE(R)
MIN. MINIMUM
MISC. MISCELLANEOUS
MO MASONRY OPENING
N
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
S
S SOUTH
SCHED. SCHEDULE
SIM. SIMILAR
SJI STEEL JOIST INSTITUTE
SPA. SPACE(S)
SQ. SQUARE
STD. STANDARD
STL. STEEL
STRUCT. STRUCTURAL
T
TBE TOP OF BEAM ELEVATION
TDE TOP OF DECK ELEVATION
TEMP.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.