36E77619B0013-0001001.pdf
PDF 2 MB Posted
- Solicitation number
- 36E77619B0013
About this file
36E77619B0013 0001 Attachment 3 - Drawings.pdf
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
II.
E
F
II.
0 ., 17'-10"
I
6'-1"
R.DRAIN
�R.DRAIN
R.D �
46'-0" l:lR.DRAIN
MECH. EQUIP.
OR CURB
7'-9"
170'-0"
76'-1"
ROOF AREA: 11,202 SF +/-
DETAILS ON SHEET AE-103 ARE APPLICABLE FOR
THE EXISTING CONDITIONS FOR THIS PROJECT.
CONTACT ARCHITECT/CCR DURING BIDDING IF A
CONDITION IS NOT COVERED ON AE-103.
ALL EXISTING COPING CAPS MUST BE
CHECKED AND RESECURED IF REQUIRED.
REPAIR ALL COPING JOINTS TO A LIKE NEW
CONDITION.
NEW ROOF WALK-WAY
ROLL (36" WIDE) BY
ROOFING MANUFACTURER
90'-0"
---,---------- SLOPE ROOF TO DRAINS- ----,_
ADD CRICKETS BETWEEN
DRAINS: TYP. ALL LOCATIONS
24'-0"
MECH. EQUIP.
"===l=
=�=:''\a'!�""'"�" =r
=l=
==.cf
""'-cr.---\- _j__
----n=I, � ·' I / 9 71 \, /,l.. R.DRAIN'-/ 0 II \MECH. EQU,,.-. R.DRAIN
R.DRAIN / �
R.DRAIN
I\ : ->------t------------------ i.::::::::::::::::::::J
XXX
44'-0"
(D ROOF PLAN - BLDG. 1
AREA: 12,275 V.I.F 3/32 = 1'
Revisions:
13'-10"
Date:
90'-0"
147'-10"
NORTH
CONSULTANT
22'-2"
ARCHITECT/ENGINEER OF RECORD
A/E:
Paul Lorenz, AIA Salisbury VA
STAMP
6 7 8
ROOF PLAN NOTES
WORK SHALL INVOLVE THE REMOVAL OF THE EXISTING METAL FLASHINGS, GUTTERS/DOWNSPOUTS, PADS/PAYERS, COATINGS, DAMAGE CURBS, PENETRATION BOOTS, CANTS, AND ACCESSORIES DOWN TO THE ROOF DECK AS REQUIRED ... CANT MAY CONTAIN ASBESTOS MATERIALS AND PROPER PRECAUTIONS ARE TO BE TAKEN WHEN REMOVING, ALONG WITH PROPER DISPOSAL. N,ff HOLES OR VOIDS IN THE CONCRETE SHALL BE PATCHED
WITH QUICK DRYING CONCRETE 00. Af3 REQUIRED TO PROVIDE A SUITABLE ROOF DECK FOR THE INSTAUATION OF A NEW KEE ROOFING MEMBRANE. PROVIDE AND INSTALL NEW ROOF BOARD COMPATIBLE WITH KEE ROOFING, AND INSULATION. ALL INSTALLATION PROCEDURES AND PRODUCTS SHALL BE IN ACCORDANCE WITH lHE MANUFACTURER'S WRITTEN RECOMMENDATIONS. #ff ITEM NOT DETAILED SHALL BE CONSTRUCTED IN A METHOD APPROVED BY NRCAAND THE ROOFING SYSTEM MANUFACTURER. ANY ELECTRICAL OR MECHANICAL WORK REQUIRED FOR THIS WORK SHALL BE lHE RESPONSIBILITY OF THE CONTRACTOR. CCNTRACTOR TO PROVIDE A 72 HOUR NOTICE REGARDING Af.JV LJTILITY INTERRUPTIONS.
CONTRACTOR TO REMOVE EXISTING UNUSED CURBS. IF DECK PENETRATIONS OR DUCT PENETRATIONS ARE LESS lHAN 'l IN EllHER DIRECTION COVER OPENING WITH¾" STEEL PLATE ANCHORED TO DECK AND COVER WITH NEW INSULATION/MEMBRANE. IF OPENINGS EXCEED 'Z IN EITHER DIRECTION PROVIDE AND INSTALL NEW CURBS AND METAL COVER 'CAP'. SEE DETAILS lHIS SHEET.
EXISTING A.ASHING (TO INCLUDE FLASHING BETWEEN WALLSJROOF) TO BE INSPECTED AS TO ITS COMPATIBILITY AND SUITABILITY WllH KEE ROOFING. FL.ASHING AS PART OF lHIS PROJECT SHALL ALSO BE WARRANTED.
DO NOT USE 'PITCH POCKET OR 'SEALANT POCKIT IN LIEU OF BASE FLASHINGS; USE UQUIO APPLIED OR CAP/BOOT FLASHINGS.
DO NOT TERMINATE BASE A.ASHING OR MEMBRANE EDGE EXPOSED IN REGLErS ON HORIZONTAL OR SLOPED WASH SURFACES, TERMINATE ONLY UNDER CAP FLASHING OR COPING COVERS.
PLACE KEE WALK PADS (3' WIDE) AROUND ALL ROOF MOUNTED MECH. EQUIPMENT EXCEPT FOR FANS/ETC. LESS lHAN 3' SQUARE.
PROVIDE ENCLOSED DUST CHLJTES WITH CONTROL GATES FROM THE ROOF TO CARRY DEBRIS TO DUMPSTER OR TRUCK AND TO GOVERN lHE FLOW OF DEBRIS.
FURNISH ANO INSTALL NEW TAPERED ROOF INSULATION TO CREATE POSITIVE SLOPE TO EXISTING ROOF DRAINS. MAINTAIN A MINIMUM OF 1-1/2 INCHES OF INSULATION IN All AREAS. DRAWING SHOWN DOES NOT INDICATE ALL ROOF SLOPES AND CRICKETS. IT IS THE RESPONSIBILITY OF THE ROOF CONTRACTOR TO PROVIDE A ROOF PLAN DEPICTING PROPER SLCf'ES WITH OUT AREAS lHAT WOULD CREATE BIRDBAlHS. INSULATION
SLOPES TO CREATE A 'SUMP' AROUND EXISTING DRAINS.
lHICKNESS OF ANY NEW/REPLACEMENT INSULATION SHALL MATCH EXISTING.
CONTRACTOR TO INSURE ALL EXISTING ROOF DRAINS FUNCTION AS REQUIRED. CONTRACTOR IS RESPONSIBLE TO CLEARAf>N DRAIN OR LEADER OBSTRUCllONS.
NOT ALL MECHANICAL EQUIPMENT, VENTS, PIPES, FANS, ETC. ARE SHOWN. ROOFING CCNTRACTOR IS RESPONSIBLE FOR THE PROPER INSTALLATION, REPLACEMENT AND OR REWORK OF FL.ASHING, VENTS, CURBS, STACKS, ANO ROOFING FOR/ON All EXISTING MECHANICAL EQUIPMENT.
WHERE EXISTING, THE LIGHTNING PROTECTION SYSTEM IS UL CERTIFIED; ANY MODIFICATIONS TO THE EXISTING SYSTEM SHALL BE DONE BY A CERTlFIED LIGHTNING PROTECTlON PROFESSIONAL IN ORDER TO MAINTAIN lHE UL CERTIFICATION.
CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, LABOR AND MATERIALS TO REMOVE, RELOCATE, OR TEMPORARILY SUPPORT ALL EXISTlNG EQUIPMENT TOAI..LOW FOR ROOFING OPERATIONS.
LAY-DOWN AREA TBD. ALL LAWN/TURF SHALL BE REPAIRED BACK TO ORIGINAL CONDmON AT lHE END OF CONSTRUCTION. ANY BUILDING DAMAGES SHALL BE REPAIRED BACK TO 00.IGINAL CONDITION. ALL STORAGE AREAS SHALL BE PROTECTED BY AN ENCLOSED CHAIN LINK FENCE \o\'ITH A LOCK. ALL LADDERS AND LIFT EQUIPMENT SHALL BE DOWN AND SECURED WHEN NOT IN USE. THE SAFETY OF VETERANS, STAFF AND VISITORS MUST BE ASSURED AT All llMES.
PROVIDE AND INSTALL WALK PADS/PATHS TO PROVIDE A COMPLET E WALK PATH TO AND AROUND EACH AHU, CHILLER, FANS, E TC
Drawing Title Phase
Office of Construction BLDG. 1 ROOF PLAN BID DOCUMENTS and Facilities Management Approved: Project Director
VA
U.S. Department of Veterans Affairs
Project Title
ROOF REPLACEMENT:
BLDGS.1, 3, &4
I Location • Salisbury VA: Salisbury, NC I Issue Date Checked
3.4.19 Chkd By EJ
il:L ______________________________________ .'.:::======================--======================::::'...'.==========::::'...-------------=======================::'..'.::================'...::::======='...::::===='..'.:::==
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Project Number 659-19-102
Building Number
BLDG.1, 3, &4
Drawing Number
AE-100
B
C
D
E
F
N
N
1 2
39•.5• 31'-0"
R.DRAIN
53'-10 11/16"
ROOF AREA: 19,000 SF+/-
DETAILS ON SHEET AE-103 ARE APPLICABLE FOR
THE EXISTING CONDITIONS FOR THIS PROJECT.
CONT ACT ARCHITECT/CCR DURING BIDDING IF A
CONDITION IS NOT COVERED ON AE-103,
ALL EXISTING COPING CAPS MUST BE CHECKED
AND RESECURED IF REQUIRED. REPAIR
ALL COPING JOINTS TO A LIKE NEW CONDITION
11 '-1 : .4"
318'-6"
68'-4 1/8"
,. 38'-u" I, 12'- 3/a•
54'-2 3/8"
30'-2 15/16"
R.DRAIN
�-----------------� R.DRJ 1iN , OR.DRAIN OR.DRAIN SCUPPER= 0
R.DRAIN R.D�I� Q 0
---------- I! --;:1f_·�t-::_-=,-- SLOPE ROOF TO DRAINS
.,, ADD CRICKETS BETWEEN
DRAINS: TYP. ALL LOCATIONS
MECH. EQUIP, NEW ROOF WALK-WAY__/
ROLL (38" WIDE) BY
ROOFING MANUFACTURER
MECH. EQUIP. I
� "" ' I
'i= ��= = = = = = = ==;:.,:=== =ir7r== = = =��� = = = = = = = =r7L'i=\'.-__L_, 0 R.D�N "" MEcH. EQ u _1P_.
r. scuPPER L
"--NEW ROOF WALK-WAY
f f-
SCUPPE
R.DRAIN
I
ROLL (36" WIDE) BY
ROOFING MANUFACTURER
ROOFDRAINQ
SCUPPER
' I I
I/
R.DRAIN
SCUPPER
I/
I I ;;I;-
SLOPE ROOF TO __,
DRAINS- w
ADD CRICKETS
BETWEEN 0
DRAINS: TYP. ALL ' w /
LOCATIONS
r R.DRAIN
49'-2" 32'-2" 55'-6 3/8"
(D ROOF PLAN - BLDG. 3
AREA: 22,935 SF V.I.F. ¾211 = 1 '-0
I ROOF PLAN NOTES I
WCRK SHALL INVOLVE THE REMOVAL OF THE EXISTING METAL FLASHINGS, GlJTTERS/DOWNSPOlJTS, PADS/PAVERS, COATINGS, DAMAGE CURBS, PENETRATION BOOTS, CANTS, AND ACCESSORIES DOWN TO lHE ROOF DECK AS REQUIRED ... CANT MAY CONTAIN ASBESTOS MATERIALS AND PROPER PRECAUTIONS ARE TO BE TAKEN WHEN REMOVING, ALONG Vv1TH PROPER DISPOSAL.. ANY HOLES OR VOIDS IN lHE CONCRETE SHALL BE PATCHED WITH QUICK DRYING CONCRETE OR AS REQUIRED TO PROVIDE A SUITABLE ROOF DECK FOR THE INSTAI..LATION OF A NEW KEE ROOFING MEMBRANE. PRO\IIDE AND INSTALL NEW ROOF BOARD COMPATIBLE Vv1TH KEE ROOFING, AND INSULATION. All INSTALLATION PROCEDURES AND PRODUCTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN RECOMMENDATIONS. ANY ITEM NOT DETAILED SHALL BE CONSTRUCTED IN A METHOD /IPPROVED BY NRCAAND THE ROOFING SYSTEM MANUFACTURER ANY 8.ECTRICAL OR MECHANICAL WORK REQUIRED FOR THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR TO
PROVIDE A 72 HOUR NOTICE REGARDING N-'.Y UTILITY INTERRUPTIONS.
CONTRACTOR TO REMOVE EXISTING UNUSED CURBS. IF DECK PENETRATIONS OR DUCT PENE'TRATIONS ARE LESS THAN 2' IN EITHER DIRECTION COVER OPENING WITH¾" STEEL PLATE ANCHORED TO DECK AND COVER WITH NEW INSULATION/MEMBRANE. IF OPENINGS EXCEED 2' IN EITHER DIRECTION PROVIDE AND INSTALL NEW CURBS AND METAL COVER 'CAP'. SEE DETAILS lHIS SHEET, EXISTING FLASHING (TO INCLUDE FLASHING BETWEEN WALLS/ROOF) TO BE INSPECTED AS TO ITS COMPATIBILITY AND SUITABILITY WITH KEE ROOFING. FLASHING AS PART OF THIS PROJECT SHALL ALSO BE WARRANTED.
DO NOT USE 'PITCH POCKET' OR 'SEALANT POCKET' IN LIEU OF BASE FLASHINGS; USE LIQUID APPLIED OR CAP/BOOT FLASHINGS.
DO NOT TERMINATE BASE FLASHING OR MEMBRANE EDGE EXPOSED IN REG LETS ON HORIZONTAL OR SLOPED WASH SURFACES, TERMINATE ONLY UNDER CAP FLASHING OR COPING COVERS.
PLACE KEE WALK PADS (3' WIDE) AROUND ALL ROOF MOUNTED MECH. EQUIPMENT EXCEPT FOR FANS/ETC. LESS THAN 3' SQUARE.
PROVIDE ENCLOSED DUST CHUTES WITH CONTROL GATES FROM THE ROOF TO CARRY DEBRIS TO DUMPSTER OR TRUCK AND TO GOVERN THE FLOW OF DEBRIS.
FURNISH AND INSTALL NEW TAPERED ROOF INSULATION TO CREATE POSITIVE SLOPE TO EXISTlNG ROOF DRAINS. MAINTAIN A MINIMUM OF 1-1/2 INCHES OF INSULATION IN ALl AREAS. DRAWING SHOWN DOES NOT INDICATE ALL ROOF SLOPES AND CRICKETS. IT IS THE RESPONSIBILITY OF THE ROOF CONTRACTOR TO PROVIDE A ROOF PLAN DEPICTING PROPER SLOPES WITH OUT AREAS THAT WOULD CREATE BIRDBATHS. INSULATION
SLOPES TO CREATE A 'SUMP' AROUND EXISTING DRAINS.
THICKNESS OF ANY NEW/REPLACEMENT INSULATION SHALL MATCH EXISTING.
CONTRACTOR TO INSURE ALL EXISTING ROOF DRAINS FUNCTION AS REQUIRED. CONTRACTOR IS RESPONSIBLE TO CLEARPN'(DRAIN OR LEADER OBSTRUCTIONS.
NOT ALL MECHANICAL EQUIPMENT, VENTS, PIPES, FANS, ETC. ARE SHOWN. ROOFING CONTRACTOR IS RESPONSIBLE FOR THE PROPER INSTALLATION, REPI..ACEtviENT AND OR REWORK OF FLASHING, VENTS, CURBS, STACKS, AND ROOFING FOR/ON ALL EXISTING MECHANICAL EQUIPMENT.
WHERE EXISTING, THE LIGHTNING PROTECTION SYSTEM IS UL CERTIFIED; ANY MODIFICATIONS TO THE EXISTING SYSTEM SHALL BE DONE BY A CERTIFIED LIGHTNING PROTECTION PROFESSIONAL IN ORDER TO MAINTAIN
THE UL CERTIFICATION.
CONTRACTOR SHALL PROVIDE All EQUIPMENT, LABOR AND MATERIALS TO REMOVE, RELOCATE, OR TEMPORARILY SUPPORT ALL EXISTING EQUIPMENT TO ALLOW FOR ROOFING OPERATIONS.
LAY-DOWN AREA lBD. ALL LAWN/TURF SHALL BE REPAIRED BACK TO ORIGINAL CONDITION AT THE END OF CONSTRUCTION. ANY BUILDING DAMAGES SHALL BE REPAIRED BACK TO ORIGINAL CONDITION, ALL STORAGE AREAS SHALL BE PROTECTED BY AN ENCLOSED CHAIN LINK FENCE WITH A LOCK. ALL LADDERS AND LIFT EQUIPMENT SHALL BE DOWN AND SECURED WHEN NOT IN USE. THE SAFETYOF VETERANS, STAFF AND VISITORS MUST BE ASSURED AT All TIMES.
PROVIDE AND INSTALL WALK PADS/PATHS TO PROVIDE A COMPLETE WALK PATH TO AND AROUND EACH AHU, C HILLER, FANS, E TC
SLOPE ROOF TO DRAINS
ADD CRICKETS BETWEEN
DRAINS: TYP. ALL LOCATIONS
B, !RAIN
43'-2"
R.DRAIN �--�
�---------------------"'::>'-SL PE' OOF TO DRAINS----�-----------,RU.DRAIN
<o ROLL (36" WIDE) BY
NEW ROOF WALK-WAY
� ROOFING MANUFACTURER
AD CR CKETS BETWEEN
DR,lrt�S; TYP. ALL LOCATIONS
I / i==1== = = = = = =r= ==ii-7r==
==:==::;== = ==r= = = = = ==i'
R.DRAIN Q
/ _ MECH. EQUIP.
55'-9 1/16"
SLOPE ROOF TO
DRAINS-ADD
CRICKETS BETWEEN
DRAINS: TYP. ALL
LOCATIONS
t: SCUPPER
CJ
MECH. EQUIP.
QI .D• "N
31'·9 5/8"
NORTH
_ SCUPPER
QR.DRAIN
t----�I l� _____________ J __ ..,.
50'-10 15/16"
CONSULTANT ARCHITECT/ENGINEER OF RECORD
Drawing Title Phase
STAMP Office of
JOO(
Revisions: Date:
A/E:
Paul Lorenz, AIA Salisbury VA
Construction BLDG. 3 ROOF PLAN BID DOCUMENTS and Facilities Management Approved: Project Director
VA
U.S. Department of Veterans Affairs
Project Title
ROOF REPLACEMENT:
BLDGS. 1, 3, & 4
Location • Salisbury VA: Salisbury, NC
3.4.19 Chkd By
.:L __________________________________ '::::::===================::'..'::::===================='=========='-----------'==========================================='-= l lssue Date
I Checked
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Project Number
659-19-102 Building Number
BLDG.1, 3, &4
I
E:J Drawing Number
AE-101
B
C
D
E
F
OR.DRAIN
SLOPE ROOF TO DRAINS
ADD CRICKETS BETWEEN
DRAINS: TYP, ALL LOCATIONS
OR.DRAIN
I I
SCUPPER
,CLIPPER=
32'-2"
__ .\1 __ R.DRAIN
55'-6 3/8"
ROOF AREA: 19,800 SF+/-
DETAILS ON SHEET AE-103 ARE APPLICABLE FOR
THE EXISTING CONDITIONS FOR THIS PROJECT,
CONT ACT ARCHITECT/CCR DURING BIDDING IF A
CONDITION IS NOT COVERED ON AE-103,
ALL EXISTING COPING CAPS MUST BE CHECKED
AND RESECURED IF REQUIRED. REPAIR ALL
COPING JOINTS TO A LIKE NEW CONDITION.
R.DRAIN
__ ,__ ___ SLOPE ROOF TO DRAINS----�
---- ADD CRICKETS BETWEEN
C----------- DRAINS: TYP. ALL LOCATIONS
@I .DRAIN
SCUPF'ER, -
r,..----�-----------------�---1----�-·�,��---
'i1---------���r-�--------../-"-�------1---1--1·
�NEW ROOF WALK-WAY/
R.DRAIN0)
39'-6" 31'-0"
(D ROOF PLAN - BLDG. 4
AREA: 22,000 SF V.I.F. ¾2" = 1'-0
ROLL (36" WIDE) BY
ROOFING MANUFACTURER
R.DRAIN
53'-10 11/16"
R.DRAIN
l '
0 R.DRAIN
OR.DRAIN
218'-51/16"
43'-2"
R.DRAIN
O
I I
SCUPPER
NEW ROOF WALK-WAY
ROLL {36" WIDE} BY
ROOFING MANUFACTURER
R.DRAIN
55'-9 1/16"
0 • ' R.DHAl�I
31'-9 5/8"
- SCUPPER
SCUPPER
>-",.-'------'----I--- SLOPE ROOF TC• DRAINS• --++---J=I--<:
[D
ADD CRICKETS l:IETWEEN DRAINS: TYi>. ALL LOCATIONS
'1----------,'---------------1"'-c-------------------..
�NEW ROOF WALK-WAY
� ROLL (36" WIDE) BY
ROOFING MANUFACTURER
I I�------------� __ _,._
R.DRAIN
SLOPE ROOF TO DRAINS
ADD CRICKETS BETWEEN
DRAINS: TYP. ALL LOCATIONS
R.DRAINo
SCUPPERC:: OR.DRAIN OR.DRAIN
38'-6" l '
68'-4 1/8"
318'-6"
NORTH
OR.DRAIN
30'-2 15/16" 41'-3 15/16"
ROOF PLAN NOTES
WORK SHALL INVOLVE THE RE"40VAL OF THE EXISTING METAL FLASHINGS, GlJTTERSIOOWNSPOUTS, PADSJPAVERS, COATINGS, DAMAGE CURBS, PENETRATION BOOTS, CANTS, AND ACCESSORIES DOWN TO THE ROOF DECK
AS REQUIRED. •• CANT MAY CONTAIN ASBESTOS MATERIALS AND PROPER PRECALTTIONS ARE TO BE TAKEN WHEN REMOVING, ALONG WITH PROPER DISPOSAL. ANY HO..ES OR VOIDS IN THE CONCRETE SHALL BE PATCHED
WITH QUICK DRYING CONCRETE OR AS REQUIRED TO PROVIDE A SUITABLE ROOF DECK FOR THE INSTALLATION OF A NEW KEE ROOFING MEMBRANE. PROVIDE AND INSTALL NEW ROOF BOARD CCXIIIPATIBI..E WITH KEE
ROOFING, AND INSULATION. ALL INSTALLATION PROCEDURES AND PRODUCTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN RECCXIIIMENDATIONS. ANY ITEM NOT DETAILED SHALL BE CONSTRUCTED IN
A METHOD APPROVED BY NRCA AND THE ROOFING SYSTEM MANUFACT\JRER. ANY ELECTRICAL OR MECHANICAL WORK REQUIRED FOR THIS WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR TO
PROVIDE A 72 HOUR NOTICE REGARDING ANY UTILITY INTERRUPTIONS.
CONTRACTOR TO REMOVE EXISTING UNUSEO CURBS. IF DECK PENETRATIONS OR OUCT PENETRATIONS ARE LESS THAN 2' IN EITHER DIRECTION COVER OPENING WITH¾" STEEL PLATE ANCHORED TO OECK ANO COVER WITH NEW INSULATION/MEMBRANE. IF OPENINGS EXCEED 2' IN EITHER DIRECTION PROVIDE AND INSTALL NEW CURBS AND METAL COVER 'CAP'. SEE DETAILS THIS SHEET.
EXISTING FLASHING (TO INCWDE FL.ASHING BETWEEN WALLSJROOF) TO BE INSPECTED AS TO ITS COMPATIBILITY AND SUITABILITY WITH KEE ROOFING. FLASHING AS PART OF THIS PROJECT SHALL ALSO BE WARRANTED.
DO NOT USE 'PITCH POCKIT OR 'SEALANT POCKET' IN LIEU OF BASE FLASHINGS; USE LIQUID APPLIED OR CAP/BOOT FLASHINGS.
DO NOT TERMINATE BASE FLASHING OR MEMBRANE EDGE EXPOSED IN REG..ETS ON HORIZONTAL OR SLOPED WASH SURFACES, TERMINATE ONLY UNDER C/1,P FLASHING OR COPING COVERS.
PLACE KEE WALK PADS (3' WIDE) AROUND ALL ROOF MOUNTED MECH. EQUIPMENT EXCEPT FOR FANS/ETC. LESS THAN 3' SQUARE.
PROVIDE ENCLOSED DUST CHUTES WITH CONTROL GATES FROM THE ROOF TO CARRY DEBRIS TO DUMPSTER OR TRUCK AND TO GOVERN THE FLOW OF DEBRIS.
FURNISH AND INSTALL NEW T.APERED ROOF INSULATION TO CREATE POSITIVE SLOPE TO EXISTING ROOF DRAINS. MAINTAIN A MINIMUM OF 1-112 INCHES OF INSULATION IN ALL AREAS. DRAWING SHOWN DOES NOT INDICATE ALL ROOF SLOPES AND CRICKETS. IT IS THE RESPONSIBILITY OF THE ROOF CONTRACTOR TO PROVIDE A ROOF PLAN DEPICTING PROPER SLOPES WITH OUT AREAS THAT WOULD CREATE BIRDBATHS. INSULATION
SLOPES TO CREATE A 'SUMP' AROUND EXISTING DRAINS.
THICKNESS OF N-N NEW/REPLACEMENT INSULATION SHALL MATCH EXISTING.
CONTRACTOR TO INSURE ALL EXISTING ROOF DRAINS FUNCTION AS REQUIRED. CONTRACTOR IS RESPONSIBLE TO a.EAR ANY DRAIN OR LEADER OBSTRUCTIONS.
NOT ALL MECHANICAL EQUIPMENT, VENTS, PIPES, FANS, ETC. ARE SHOl/vN. ROOFING CONTRACTOR IS RESPONSIBLE FOR THE PROPER INSTAllATION, REPLACEMENT AND OR REWORK OF FL.ASHING, VENTS, CURBS, STACKS, AND ROOFING FOR/ON ALL EXISTING MECHANICAL EQUIPMENT.
WHERE EXISTING, THE LIGHTNING PROTECTION SYSTEM 15 UL CERTIFIED; ANY MODIFICAllONS TO THE EXISTING SYSTEM SHALl BE DONE BY A CERTIFIED LIGHTNING PROTECTION PROFESSIONAL IN ORDER TO MDIINTAIN
THE UL CERTIFICATION.
CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, LABOR AND MATERIALS TO REMOVE, RELOCATE, OR TEMPORARILY SUPPORT All EXISTING EQUIPMENT TO ALLOW FOR ROOFING OPERATIONS.
LAY-DOWN AREA TBD. ALL LAWN/TURF SHALL BE REPAIRED BACK TO ORIGINAL CONDITION AT THE END OF CONSTRUCTION. AN'f BUILDING DAMAGES SHALL BE REPAIRED BACK TO ORIGINAL CONDITION. ALL STORAGE AREAS SHALL BE PROTECTED BY AN ENCLOSED CHAIN LINK FENCE WITH A LOCK All LADDERS AND LIFT EQUIPMENT SHALL BE OOWN AND SECURED WHEN NOT IN USE. THE SAFETY OF VETERANS, STAFF AND VISITORS
MUST BE ASSURED AT ALL TIMES.
PROVIDE AND INSTALL WALK PADS/PATHS TO PROVIDE A COMPLETE WALK PATH TO AND AROUND EACH AHU, CHILLER, FANS, ETC
CONSULTANT ARCHITECT/ENGINEER OF RECORD
Drawing TiUe Phase
STAMP Office of
XXX
Revisions: Date:
A/E:
Paul Lorenz, AIA Salisbury VA
Construction BLDG. 4 ROOF PLAN BID DOCUMENTS and Facilities Management Approved: Project Director
VA
U.S. Department of Veterans Affairs
Project Tille
ROOF REPLACEMENT:
BLDGS. 1, 3, & 4
Location
Salisbury VA: Salisbury, NC Issue Date Checked
3.4.19 Chkd By E:J
.:L __________________________________ '::::::===================::'.'::::===================='=========='-----------'==========================================='-'====::'.'::::==
VA FORM OB - 6231
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Project Number
659-19-102 Building Number
BLDG.1, 3, &4
Drawing Number
AE-102
| G-000 |
| AE.100 |
| AE.101 |
| AE.102 |
| AE.103 |
File details come from the government source that posted it.