36E77619B0005-0001002.pdf
PDF 1 MB Posted
- Attached to
- Renovate 8W Hematology & Oncology - Iowa City
- Solicitation number
- 36E77619B0005
About this file
36E77619B0005 0001 Mechanical Addendum.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77619C0063-000.docx | DOCX document | |
| 36E77619B0005-0003000.docx | DOCX document | |
| 36E77619B0005-0003001.pdf | ||
| 36E77619B0005-0002003.docx | DOCX document | |
| 36E77619B0005-0002001.doc | DOC document | |
| 36E77619B0005-0002002.pdf | ||
| 36E77619B0005-0002000.docx | DOCX document | |
| 36E77619B0005-0001001.pdf | ||
| 36E77619B0005-0001000.docx | DOCX document | |
| 36E77619B0005-007.pdf | ||
| 36E77619B0005-002.docx | DOCX document | |
| 36E77619B0005-006.pdf | ||
| 36E77619B0005-005.docx | DOCX document | |
| 36E77619B0005-004.zip | ZIP file | |
| 36E77619B0005-003.zip | ZIP file | |
| 36E77619B0005-001.docx | DOCX document | |
| 36E77619B0005-000.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
F
F
F
F
F
F
S S
S
SS
S S
SS
S S
S S
S
SS
S S
S S
S S
SS
S S
S S
J
K
L
M
N
P
R
T
12 13 14 15 16 17 18 19 20A 21 22
SERVICE CHIEF
8W06
EQUIP. ROOM
8W08
STAFF TOILET
8W10
STAFF TOILET
8W12
AUTHORIZED STAFF ONLY
8W14
CLEAN SUPPLY
8W14A
PHARMACY
8W19
NON-HAZARDOUS
COMPOUNDING
8W19A
ANTEROOM
8W19B
HAZARDOUS COMPOUNDING
8W19C
CHEMO STOR.
8W19D
CORRIDOR
8CW02
CORRIDOR
8CW02
CORRIDOR
8CW03
EXAM ROOM
8W18D
EXAM ROOM
8W18C
EXAM ROOM
8W18B
EXAM ROOM
8W18A
EXAM ROOM
8W16
SOILED HOLDING
8W15
PROCEDURE ROOM
8W17
TOILET
8W17A
CLINIC WORKROOM
8W18F
EXAM ROOM
8W18E
NURSES
STATION/AUTHORIZED
STAFF ONLY
8W13
WAITING AREA
8W13A
TOILET
8W11B
SCALE
8W11A
VITALS
8W11
FAMILY ROOM
8W09
PROVIDER WORKROOM
8W07
CASE MANAGER
8W05
CORRIDOR
8CW01
ELEC
8W09A
ELECT.
8W04
CORRIDOR
8CW01A
EXISTING ELEVATOR LOBBY
8CW01B
EXISTING OIT
8CW100
STAIR
8ST01
HAC
8W21
PHARMACY HAC
8W20
EX. TOILET
8W25C
STAFF
8W25E
STAFF
8W25A
INFUSION
8W25G
EX. NURSE STATION
8W25
EX. TREATMENT
8W25D
EXISTING TOILET
EXISTING TREATMENT
8W25F
STAIR
8ST04
E X
IS
T
IN
G
S H
A F
T
S
B x
8x8
16x816x1220x14 x
6x4
6x4
8x6
8"ø
12x10 x x
8"ø
8"ø
8"ø
8"ø
8"ø
12x4
12x10
8"ø
8"ø
8"ø
8"ø
8"ø
12x8 x
FCU-8W12
TU-8W19D
TU-8W17A
TU-8W17
TU-8W18F
H4-8W
FCU-8W18D
FCU-8W18C
FCU-8W18A
FCU-8W16
FCU-8W09
FCU-8W07
FCU-8W14
FCU-8W06
FCU-8W08
FCU-8W14A
FCU-8W13
FCU-8W11
6x6
6x6
"ø x
16x12 x
12x8
12x8
8"ø
6"ø
8"ø x x
20x10
8"ø
12x10
12x10
12x10 x
6x4
8"ø
SD2 330
SD2 330
SD2 330
10x12
SD2 330RG1
SD2 330
FCU-8W05
SD2 330SD2 300
SD1 80
SD2 350
SD2 210
SD2 265
SD2 250SD2 250
SD2 90
SD2 150SD2 150SD2 150
SD2 150
SD2 150
SD2 150
SD2 50
SD2 50
SD2 300
SD2 150
SD2 150
SD2 150 SD2 200
x
RG1
RG1
RG1
RG1
RG1
RG1 400
RG1
RG1
RG1
RG1
RG1
RG1
RG1
RG1
RG1
RH1 270
FD
FSD
FCU-8CW01A
FCU-8CW01B RG1
RG1
SD2 150
SD2 150
RG2 800
RG3 300
RG3 300
SD2 300
RG1 300
FCU-8CN01
6x4
6x4
12x8
EG1 130
FCU-8CW100
SD1 200
EG 75
EG 75
FCU-8W13A
FCU-8W11B
SD1 100
EG1 110
SD2 200
SD1 100
SD1 100
SD1 100
TAB-8-12
TAB-8-13
CAP EXHAUST DUCT
8"ø
8"ø 8"ø
14x6
12x8
8"ø
M-401
RG2 550
FD
EG1 75
6x6
SG1 400
RG3 400
8x8
6x4
8x8
6"ø
TU-8W15
TU-8W18E
7"ø 8"ø
10x10
6x4
6x4
6x4
8x6
8"ø
SD1 100
SD1 80
6"ø
8"ø
6"ø
10x8
6x6
6x6 x
6x4
6"ø
6x6
EG2 300
EG1 100
EG2 280
EG2 200
EG2 250
FD
10"ø
# KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
1-8W-
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
/3
/2
:3
:1
P
M
M-101
EIGHTH FLOOR MECHANICAL NEW
WORK PLAN
4 14RCM JT
Renovate 8W for Hematology and Oncology
601 Highway 6 West, Iowa City, IA 52246
06/12/2019
100% CONSTRUCTION DOCUMENTS
636A8-18-00118-023
0 4 8 16 NORTH
PLAN
01 1" STEAM HOSE FROM HUMIDIFIER STEAM
OUTLET TO DUCT HUMIDIFIER DISTRIBUTION
TUBE. PROVIDE STAINLESS STEEL
WATERTIGHT DUCT 6'-0" DOWNSTREAM OF
HUMIDIFIER DISTRIBUTION TUBE.
02 CAP 12x8 AND SEAL FOR FUTURE
CONNECTION.
03 ENLARGE EXISTING 6" HIGH PENETRATION
THROUGH EXIST. CONCRETE BEAM TO 12"
HIGH. DO NOT ENCROACH ON BOTTOM 10"
OR TOP 10" OF BEAM. X-RAY BEAM BEFORE
WORK IS DONE TO AVOID EXISTING
REINFORCEMENT.
04 ENLARGE DUCT TO 12/10 AND CONNECT TO
PAN AT BOTTOM OF JOIST AND TO TOP OF
EXIST. RETURN DUCT. EXISTING ACCESS
PANEL PROVIDES ACCESS.
05 CONNECT 12/10 TO EXISTING PAN AT
BOTTOM OF JOIST.
06 PROVIDE TEMPERATURE HUMIDITY AND AIR
PRESSURE DEVICES FOR MONITORING THIS
ROOM THROUGH THE BUILDING
AUTOMATION SYSTEM (BAS).
07 PROVIDE SENSORS AT ALL PHARMACY
MINCO REFRIGERATORS AND CONNECT TO
THE BAS. FOR MONITORING.
08 BALANCE OUTDOOR AIR IN 6X4 DUCT TO
EACH FCU TO 30 CFM. FCU-8W13A SHALL
HAVE OUTDOOR AIR BALANCED TO 100 CFM
09 EXISTING TO REMAIN.
10 PROVIDE 1/2" DIAMETER STEEL SECURITY
BARS INSIDE DUCT WELDED VERTICALLY
AND HORIZONTALLY AT 6" O.C. GRILL MAY BE
USED IF CONSTRUCTED OF 9 GAUGE
EXPANDED STEEL. ALIGN BARS WITH WALL
PENETRATION.
11 MAINTAIN EXISTING POINTS TO REMAIN
CONNECTED INCLUDING EXISTING
NUTRITION REFRIGERATOR CONNECTED TO
BAS.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BLDG. 1Scale: 1/8" = 1'-0"
EIGHTH FLOOR MECHANICAL NEW WORK PLAN
A SHADED AREAS NOT IN SCOPE.
B DIAGONAL HATCH AREA DENOTES FUTURE
CONSTRUCTION.
REVISION 1 07-30-19
DocuSign Envelope ID: CA3DCFB0-EECC-475B-AFF1-3C2606808C80
7/31/2019
S S
S S
S
SS
J
K
18 19 20 20A
J
K
18 19 20A
PHARMACY
8W19
NON-HAZARDOUS
COMPOUNDING
8W19A
ANTEROOM
8W19B
HAZARDOUS COMPOUNDING
8W19C
CHEMO STOR.
8W19D
SD2 150
SD2 150
SD2 200
RH1 270
RG1 500
RG2 800
RG3 300
RG3 300
RG2 550
SD2 150
PRESSURIZATION: NEGATIVE
SA: 1200 CFM EA: 1300 CFM
OA: 600 CFM RA: 0 CFM
FLOW DIFFERENTIAL: -100 CFM
PRESSURIZATION: NEGATIVE
SA: 200 CFM EA: 270 CFM
OA: 100 CFM RA: 0 CFM
FLOW DIFFERENTIAL: -70 CFM
PRESSURIZATION: POSITIVE
SA: 960 CFM EA: 800 CFM
OA: 400 CFM RA: 0 CFM
FLOW DIFFERENTIAL: +100 CFM
PRESSURIZATION: POSITIVE
SA: 660 CFM EA: 550 CFM
OA: 300 CFM RA: 0 CFM
FLOW DIFFERENTIAL: +110 CFM
PRESSURIZATION: POSITIVE
SA: 450 CFM EA: 0 CFM
OA: 225 CFM RA: 400 CFM
FLOW DIFFERENTIAL: +50 CFM
SH-1-400
SH-1-400
SH-1-400
SH-1-400 SH-1-400
SH-1-330
SH-1-330
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
1-8W-
/3
/2
:3
:1
P
M
M-601
MECHANICAL SCHEDULES
13 14RCM WRS
Renovate 8W for Hematology and Oncology
601 Highway 6 West, Iowa City, IA 52246
06/12/2019
100% CONSTRUCTION DOCUMENTS
636A8-18-00118-023
1. FAN POWERED HEPA DIFFUSER WITH CHARGE TEST PORTS, ROOM-SIDE ACCESSIBLE PREFILTER AND HEPA FILTER AND FAN. PROVIDE VARIABLE SPEED FAN WITH ECM MOTOR, 120 V, 300 W. SIMILAR TO ENVIRCO MAC10...
NOTES:
SH-1 HEPA SUPPLY DIFFUSER WITH FAN 400 [ 190 ] 660 [ 310 ] 0.700 [ 180 ] SURFACE 24 X 48 [ 305 x 203 ] 10 ø [305 ø ] 50 Db NONE WHITE 1
SG-1 SUPPLY REGISTER 80 [ 38 ] 400 [ 190 ] 0.090 [ 23 ] WALL 12 x12 [ 305 x 203 ] 12 x 12 [254 x 152] 25 OBD WHITE -----
SD-3 LOUVERED FACE 110 [ 52 ] 380 [ 180 ] 0.090 [ 23 ] CEILING 24 x 24 [ 600 x 600 ] 10 ø [254 ø] 22 NONE WHITE -----
SD-2 LOUVERED FACE 70 [ 33 ] 280 [ 130 ] 0.100 [ 25 ] CEILING 24 x 24 [ 600 x 600 ] 8 ø [203 ø] 23 NONE WHITE -----
SD-1 LOUVERED FACE 40 [ 19 ] 160 [ 76 ] 0.080 [ 20 ] CEILING 24 x 24 [ 600 x 600 ] 6 ø [152 ø] 19 NONE WHITE ----
CFM [L/s] CFM [L/s] IN WG [Pa]
MIN MAX
IN x IN [mm x mm] IN [mm ]
MARK TYPE
AIR FLOW
MAX APD
MOUNTING
PANEL/FRAME SIZE NECK SIZE
NC DAMPER FINISH NOTES
AIR DEVICE SCHEDULE (SUPPLY)
3. FAN POWERED HEPA EXHAUST GRILLE WITH ROOM-SIDE ACCESSIBLE PREFILTER AND HEPA FILTER AND FAN. PROVIDE VARIABLE SPEED FAN WITH EC MOTOR, 120 V, 200 W. SIMILAR TO ENVIRCO MAC10 RFAC. LOCATED IN HAZARDOUS STORAGE ROOM...
2. PROVIDE FILTER RETURN GRILLE WITH HINGED, LOUVERED GRILLE ACCESSIBLE FROM THE ROOM SIDE.. PROVIDE MERV 8 PLEATED FILTER PLUS A SPARE.
1. PROVIDE LOUVERED DESIGN WITH ANGLED BLADES SPACED AT 1/2" ON CENTER.
NOTES:
RH-1 HEPA RETURN GRILLE 900 [ 420 ] 1500 [ 710 ] 0.20 50 LAY-IN 24 x 24 [ 406 x 406 ] 24 X 24 [ 356 x 356 ] 25 - WHITE 3
RG-2 FILTER RETURN GRILLE 900 [ 420 ] 1500 [ 710 ] 0.20 50 LAY-IN 24 x 24 [ 406 x 406 ] 24 X 24 [ 356 x 356 ] 25 - WHITE 2
RG-1 FILTER RETURN GRILLE 400 [ 190 ] 400 [ 190 ] 0.20 50 LAY-IN 24 x 12 [ 356 x 356 ] 24 x 12 [ 305 x 305 ] 25 - WHITE 2
EG-2 EXHAUST GRILLE 200 [ 94 ] 450 [ 210 ] 0.10 25 WALL 12 x 12 [ 305 x 305 ] 12 x 12 [ 254 x 254 ] 15 OBD WHITE 1, 2
EG-2 EXHAUST GRILLE 800 [ 380 ] 1000 [ 470 ] 0.10 25 WALL 24 x 10 [ 305 x 305 ] 24 X 10 [ 254 x 254 ] 15 OBD WHITE 1
EG-1 EXHAUST GRILLE 70 [ 33 ] 250 [ 120 ] 0.10 25 WALL 8 x 8 [ 254 x 254 ] 8 x 8 [ 203 x 203 ] 13 OBD WHITE 1
CFM [L/s] CFM [L/s] IN WG [Pa] IN x IN [mm x mm] IN x IN [mm x mm]
MIN MAXMARK TYPE
AIR FLOW
MAX APD
MOUNTING
PANEL/FRAME SIZE NECK SIZE
NC DAMPER FINISH REMARKS
AIR DEVICE SCHEDULE (EXHAUST/RETURN)
Scale: 1/4" = 1'-0"
EIGHTH FLOOR ROOM PRESSURIZATION PLAN 0 2 4 8 NORTH
PLAN
1. PROVIDE VARIABLE SPEED DRIVE AND DUCT FLANGE.
NOTE
8W-RF-101 NINTH FLOOR CLOSET... PHARMACY 1-AHU1 3800 [ 1800 ] 1.5 [ 380 ] INLINE CENTRIF. BI II 16 [ 400 ] 45% DIRECT 1725 1.8 2 [ 2 ] 1 208 1725 VARIABLE 1
CFM [L/s] IN [Pa] IN [mm] BHP HP [kW]
TYPE WHEEL CLASS
DIAMETER
MIN % EFF DRIVE
FAN MAX
RPM
NOMINAL...
PHASE VOLT RPM
SPEED
CONTROL
MARK LOCATION
AREA AND/OR BLDG
SERVED
SYSTEM AND/OR
SERVICE
AIR FLOW TSP
FAN MOTOR ELECTRICAL
CONTROL
SEQUENCE
REMARKS
FAN SCHEDULE
1-HU-8W14A STAFF LOUNGE 8W14 CLEAN STORAGE 8W14A 1-FCU-8W14A ELEC-STEAM DOM. CW 5 [ 2 ] 65 [ 18 ] 1.7 208 1 10 Automatic drain and fill controls, Provide two extra cylinders lbs/hr [kg/hr] °F [°C] KW VOLTS PHASE AMPS
FLOW EWTMARK LOCATION AREA AND/OR BLDG SERVED SYSTEM AND/OR SERVICE TYPE SOURCE OF MAKEUP WATER
WATER CONDITIONS
ELECTRICAL
REMARKS
STEAM HUMIDIFIER SCHEDULE
REVISION 1 07-30-19
2. PROVIDE TWO-WAY CONTROL VALVE.
1. PROVIDE 24 V TRANSFORMER, CONTROLS BOX., COIL ACCESS DOOR AND INLET FLOW PROBE.
NOTES:
TU-8W19A
INPATIENT PHARMACY
8W19
NONHAZARDOUS
COMPOUNDING 18W19A
EXISTING 8W 9 660 [ 310 ] 660 [ 310 ] 55 [ 13 ] 90 [ 32 ] 150 [ 66 ] 2.5 [ 10 ] 10 [ 30 ] 0.75 [ 19 ] CV HW 2 1, 2
TU-8W19
INPATIENT PHARMACY
8W19
INPATIENT PHARMACY
8W19 EXISTING 8W 8 450 [ 210 ] 450 [ 210 ] 55 [ 13 ] 90 [ 32 ] 150 [ 66 ] 1.7 [ 7 ] 10 [ 30 ] 0.75 [ 19 ] CV HW 2 1, 2
TU-8W18F
CLINIC WORKROOM
8W18F CLINIC WORKROOM 8W18F AHU1-102 7 300 [ 140 ] 100 [ 47 ] 55 [ 13 ] 90 [ 32 ] 150 [ 66 ] 0.4 [ 2 ] 10 [ 30 ] 0.75 [ 19 ] VAV HW 2 1, 2
TU-8W18E EXAM 8W18E EXAM 8W18E AHU1-102 7 330 [ 160 ] 120 [ 57 ] 55 [ 13 ] 90 [ 32 ] 150 [ 66 ] 0.5 [ 2 ] 10 [ 30 ] 0.75 [ 19 ] VAV HW 2 1, 2
TU-8W17A TOILET 8W17A TOILET 8W17A AHU1-102 6 180 [ 85 ] 100 [ 47 ] 55 [ 13 ] 90 [ 32 ] 150 [ 66 ] 0.4 [ 2 ] 10 [ 30 ] 0.75 [ 19 ] VAV HW 2 1, 2
TU-8W17 PROCEDURE ROOM 8W17 PROCEDURE ROOM 8W17 AHU1-102 8 350 [ 170 ] 300 [ 140 ] 55 [ 13 ] 90 [ 32 ] 150 [ 66 ] 1.2 [ 4 ] 10 [ 30 ] 0.75 [ 19 ] VAV HW 2 1, 2
TU-8W15 CORRIDOR 8CW03 SOILED HOLDING 8W15 AHU1-102 6 180 [ 85 ] 100 [ 47 ] 55 [ 13 ] 90 [ 32 ] 150 [ 66 ] 0.4 [ 2 ] 10 [ 30 ] 0.75 [ 19 ] VAV HW 2 1, 2
CFM [L/s] CFM [L/s] °F [°C] °F [°C] °F [°C] GPM [L/m] FT [kPa] IN [mm] TYPE ROWS
MAX MIN EAT LAT EWT FLOW MAX WPD PIPE SIZE TO COIL
MARK LOCATION EXISTING ZONE SERVED
SYSTEM AIR
HANDLING
INLET SIZE
DIA.
AIR FLOW HOT WATER HEATING COIL
CONTROL
TYPE
REHEAT COIL
REMARKS
SINGLE DUCT AIR TERMINAL UNIT SCHEDULE
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
1-8W-
/3
/2
:3
:1
P
M
M-602
MECHANICAL SCHEDULES
14 14RCM WRS
Renovate 8W for Hematology and Oncology
601 Highway 6 West, Iowa City, IA 52246
06/12/2019
100% CONSTRUCTION DOCUMENTS
636A8-18-00118-023
2. PROVIDE 120V TO 24V TRANSFORMER, TWO WAY CONTROL VALVE FOR HEATING AND CHILLED WATER, BACNET COMPATIBLE CONTROLLER.
1. AUTOMATIC FAN SPEED CONTROL WITH OVERRIDE SELECTOR. ADJUST FAN SPEED TO DELIVER THE COOLING SUPPLY AIRFLOW QUANTITY SHOWN ON THE PLAN DRAWING.
NOTES
FCU-8CN01 ELEVATOR LOBBY 8CN01 HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8CW01B ELEVATOR LOBBY 8CW01 HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8CW01A ELEVATOR LOBBY 8CW01 HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8W18D EXAM ROOM 8W18D HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8W18C EXAM ROOM 8W18C HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8W18B EXAM ROOM 8W18B HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8W18A EXAM ROOM 8W18A HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8W16 EXAM ROOM 8W16 HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8W13 NURSES STATION 8W13 HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8W14A CLEAN SUPPLY 8W14A HORIZONTAL RECESSED 300 LOW [ 140 ] 0.2 [ 50 ] 7.6 [ 2 ] 6.2 [ 2 ] 78 [ 26 ] 65 [ 18 ] 1.3 [ 17 ] 48 [ 9 ] 10.0 [ 30 ] 6.5 [ 2 ] 70 [ 21 ] 0.6 [ 2 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 ECM MOTOR 1, 2
FCU-8W14 STAFF LOUNGE 8W14 HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1200 ECM MOTOR 1, 2
FCU-8W13A WAITING AREA 8W13A HORIZONTAL RECESSED 700 HIGH [ 330 ] 0.2 [ 50 ] 19.0 [ 6 ] 15.0 [ 4 ] 78 [ 26 ] 65 [ 18 ] 2.5 [ 33 ] 48 [ 9 ] 10.0 [ 30 ] 30.0 [ 9 ] 70 [ 21 ] 2.6 [ 10 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 ECM MOTOR 1, 2
FCU-8W12 STAFF TOILET 8W10, 8W12 HORIZONTAL RECESSED 300 LOW [ 140 ] 0.2 [ 50 ] 6.5 [ 2 ] 8.3 [ 2 ] 78 [ 26 ] 65 [ 18 ] 1.1 [ 14 ] 48 [ 9 ] 10.0 [ 30 ] 6.5 [ 2 ] 70 [ 21 ] 0.6 [ 2 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8W11 VITALS 8W11 HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8CW100 OIT HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8W09 FAMILY ROOM 8W09 HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8W08 EQUIPMENT ROOM 8W08 HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8W07 OFFICE 8W07 HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8W06 SERVICE CHIEF 8W06 HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
FCU-8W05 OFFICE 8W05 HORIZONTAL RECESSED 400 MEDIUM [ 190 ] 0.2 [ 50 ] 12.5 [ 4 ] 9.2 [ 3 ] 78 [ 26 ] 65 [ 18 ] 2.1 [ 28 ] 48 [ 9 ] 10.0 [ 30 ] 12.0 [ 4 ] 70 [ 21 ] 1.0 [ 4 ] 150 [ 66 ] 10.0 [ 30 ] 11 0.15 [ 110 ] 1 120 1150 ECM MOTOR 1, 2
CFM SPEED [L/s] IN WG [Pa] MBTUH [W] MBTUH [W] °F [°C] °F [°C] GPM [L/s] °F [°C] FT [kPa] MBTUH W °F [°C] GPM [L/m] °F [°C] FT [kPa] MERV RATING HP [W]
Db Wb
MIN SENS CAPACITY MIN TOTAL CAPACITY
EAT
FLOW EWT WPD MIN CAPACITY EAT Db FLOW EWT WPD POWER
PHASE VOLT RPM SPEED CONTROL REMARKS
MARK LOCATION TYPE
FAN AIR FLOW EXTERNAL APD
COOLING REQUIREMENTS HEATING REQUIREMENTS
FILTER
FAN MOTOR
FOUR PIPE FAN COIL UNIT SCHEDULE
1. SET EXISTING TAB-8W110C TO THE REVISED CFM OF 770 AND NEW EXHUAST VALVE EAV-8W110C TO THE CFM SHOWN ON THE DRAWING TO MAINTAIN THE NEGATIVE PRESSURE OFFSET.
Notes:
EAV-BW110c ROOM BW110C CV 10 [ 250 ] 950 [ 450 ] 1000 [ 470 ] 1.2 [ 300 ] ELEC BACNET CONSTANT EXHAUST 1
TAB-BW110 ROOM BW110 CV 8 [ 200 ] 430 [ 200 ] 600 [ 280 ] 1 [ 250 ] ELEC BACNET CONSTANT SUPPLY -
IN [mm] CFM [L/s] CFM [L/s] IN WG [Pa]
MARK LOCATION TYPE
SIZE DESIGN AIR FLOW MAX AIR FLOW APD AT MAX AIR FLOW
CONTROL TYPE CONNECT TO ECC APPLICATION NOTES
AIR FLOW CONTROL VALVE SCHEDULE
1. INSTALL REHEAT COIL DOWNSTREAM OF AIR CONTROL VALVE TAB-8W110.
Notes:
BW-HWC-110C ROOM 110C SEGREGATED COMPOUNDING REHEAT 430 [ 200 ] 700 [ 4 ] 0.2 [ 50 ] 0 [ -18 ] 55 [ 13 ] 11.8 [ 40 ] 1.2 [ ] 140 [ 60 ] 115 [ 46 ] 5 [ 15 ] 1
CFM [L/s] FPM [M/s] IN WG [Pa] °F [°C] °F [°C] MBH [kW] GPM [L/s] °F [°C] °F [°C] FT [kPa]
EAT LAT FLOW EWT LWT WPDMARK LOCATION AREA AND/OR BLDG SERVED APPLICATION
AIR FLOW MAX FACE VELOCITY APD
TEMPERATURES
TOTAL MIN CAPACITY
HOT WATER
REMARK
HEATING WATER COIL SCHEDULE
REVISION 1 07-30-19
S
SS
S S
SS
S S
S S
S
SS
S S
S S
S S
SS
S S
S S
J
K
L
M
N
P
R
T
12 13 14 15 16 17 18 19 20A 21 22
T
T
T
T
T T
T
T T
T
T
2"CHS
2"CHR
2"HHWR
2"HHWS
1 1/2"CHS
1 1/2"CHR
2"HHWR
2"HHWS
1 1/2"CHS
1 1/2"CHR
1 1/2"HHWR
1 1/2"HHWS
1 1/2"HHWR
1 1/2"HHWS
1 1/2"HHWR
1 1/2"HHWS
1 1/2"HHWS
1 1/2"HHWR
1 1/2"HHWS
1 1/4"HHWR
1 1/4"HHWS
1"HHWR
1"HHWS
1"CHS
1"CHR
1"HHWR
1"HHWS
1 1/2"CHS
1 1/2"CHR
3/4"HHWR
3/4"HHWS
3"HHWR
3"HHWS
OFFSET DOWN
BELOW BEAM (TYP)
1 1/2"HHWR
1 1/2"HHWS
1 1/2"CHR
1 1/2"CHS
1 1/2"CHS
1 1/2"CHR
1 1/2"HHWS
1 1/2"HHWR
1 1/2"HHWR
1 1/2"HHWS
1 1/2"CHR
1 1/2"CHS
"D
"D
1 1/2"HHWR
1 1/2"HHWS
1 1/2"CHR
1 1/2"CHS
1 1/2"HHWR
1 1/2"HHWS
1 1/2"CHR
1 1/2"CHS
1"D
1"CHR
1"CHS
1"D
FCU-8W14A
TU-8W19C
TU-8W17A
TU-8W17
TU-8W18F
H4-8W
FCU-8W18D
FCU-8W18C
FCU-8W18A
FCU-8W16
FCU-8W09
FCU-8W07
FCU-8W14
FCU-8W06
FCU-8W12
FCU-8W08
FCU-8W13
FCU-8W11
CORRIDOR
8CW01
CASE MANAGER
8W05
PROVIDER WORKROOM
8W07
FAMILY ROOM
8W09
VITALS
8W11
TOILET
8W11B
SCALE
8W11A
WAITING AREA
8W13A
CORRIDOR
8CW02
EXISTING OIT
8CW100
CORRIDOR
8CW01A
UTILITY ROOM
8W03
SERVICE CHIEF
8W06
EQUIP. ROOM
8W08
STAFF TOILET
8W12
STAFF TOILET
8W10 AUTHORIZED STAFF ONLY
8W14 CLEAN SUPPLY
8W14A
PHARMACY
8W19
CHEMO STOR.
8W19D
HAZARDOUS COMPOUNDING
8W19C
ANTEROOM
8W19B
NON-HAZARDOUS
COMPOUNDING
8W19A
EX. TOILET
8W25C
EX. NURSE STATION
8W25
EX. MEDICATION AND CLEAN
ROOM
8W25B
NURSES
STATION/AUTHORIZED
STAFF ONLY
8W13
SOILED HOLDING
8W15
PROCEDURE ROOM
8W17
TOILET
8W17A
CLINIC WORKROOM
8W18F
EXAM ROOM
8W18E
EXAM ROOM
8W18D
EXAM ROOM
8W18C
EXAM ROOM
8W18B
EXAM ROOM
8W18A
EXAM ROOM
8W16
STAIR
8ST04
PHARMACY HAC
8W20
HAC
8W21
ELECT.
8W04
HAC
8W02
EXISTING SHAFT
8SAW01
ELECT. CLOSET
8N01
ELEVATOR LOBBY
8CN01
EXISTING ELEVATOR LOBBY
8CS01
EXISTING PHARMACY
DUMBWAITER
8W01
ROOM
8S02
T T
T
T
T
T
T
T
CO
T
CO
T
2"HHWS
2"HHWR
1 1/4"CHR
1 1/4"CHS
CO
1/2"D
OFFSET
DOWN
T
CO
CO
FCU-8CW01A
FCU-8CW01B
3/4"HHWS
3/4"HHWR
3/4"CHR
3/4"CHS
3/4"D T
T T
TU-8W19
3/4" 3/4"
TU-8W19A
TU-8W19B
TU-8W19D
3/4"
3/4" 3/4"
3/4" 3/4" 3/4"
3/4" 3/4"
FCU-8CW100
TAB-8-13 TAB-8-12
1"D
EXISTING HHWS/R
PIPING
1/2"D
COORDINATE
LOCATION WITH
EXISTING ELECTRICAL
PANELS
3/4"CHR
3/4"CHS
3/4"HHWR
3/4"HHWS
FCU-8CN01
T
T
3/4"D
CO
CO
CO
EXISTING CHS/R
PIPING TO REMAIN
CO
M-401
M-301
M-301
T
1"D
1"D3/4"D
/4
"D
3/4"D
1"D
/4
"D
2"CHS
2"CHR
2"HHWR
2"HHWS
1"D3/4"D3/4"D
2"HHWS
2"HHWR
2"CHR
2"CHS
FCU-8W05
2"CHS
2"CHR
2"HHWS
2"HHWR
1"D
T
1 1/2"CHR
1 1/2"CHS
3/4"D
3/4"D
1"D
1"D
1"D
T
# KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
WALL RATING LEGEND
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420
1-8W-
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREAS S S S
/3
/2
:3
:2
P
M
MP101
EIGHTH FLOOR MECHANICAL NEW
WORK PIPING PLAN
5 14RCM WRS
Renovate 8W for Hematology and Oncology
601 Highway 6 West, Iowa City, IA 52246
06/12/2019
100% CONSTRUCTION DOCUMENTS
636A8-18-00118-023
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BLDG. 1
Scale: 1/8" = 1'-0"
EIGHTH FLOOR MECHANICAL PIPING PLAN
01 1-1/2" DRAIN DOWN TO AIR GAP FITTING IN
CHASE. SEE 1-8W-P-102 FOR CONTINUATION.
02 EXISTING TO REMAIN.
03 VALVE AND CAP 1-1/2" HHWS, 1-1/2" HHWR,
1-1/2" CHS, AND 1-1/2" CHR PIPING.
04 CONNECT 3/4" HHWS, 3/4" HHWR, 3/4" CHS, 3/4"
CHR, AND 1/2" DRAIN PIPING TO NEW FCU.
TYPICAL ALL.
05 CONNECT DRAIN PIPING TO EXISTING DRAIN
RISER IN CHASE.
06 VALVE AND CAP 2-1/2" HHWS, 2-1/2" HHWR FOR
FUTURE CONNECTION.
07 1/2" INSULATED DRAIN PIPING DOWN ALONG
WALL TO ABOVE MOP BASIN. TERMINATE 1"
ABOVE RIM.
08 CONNECT NEW 3/4" CHS/R AND 3/4" HHWS/R TO
EXISTING 3/4" PIPING NEAR THIS LOCATION.
09 INSTALL THERMOSTAT AFTER NEW WALL
FINISH IS COMPLETED.
10 STEAM PIPE FROM HUMIDIFIER OUTLET TO
DISTRIBUTION TUBE IN DUCT TO CLEAN
SUPPLY 8W14A. SEE 1-8W-M-101.
0 4 8 16 NORTH
PLAN
A SHADED AREAS NOT IN SCOPE.
B DIAGONAL HATCH AREA DENOTES FUTURE
CONSTRUCTION.
REVISION 1 07-30-19
| Sheets |
| M-101 - EIGHTH FLOOR MECHANICAL NEW WORK PLAN |
| M-601 - MECHANICAL SCHEDULES |
| M-602 - MECHANICAL SCHEDULES |
| MP101 - EIGHTH FLOOR MECHANICAL NEW WORK PIPING PLAN |
| 2019-07-31T15:44:10-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it.