36E77618R0077-0003001.pdf
PDF 59 KB Posted
- Solicitation number
- 36E77618R0077
About this file
36E77618R0077 0003 S05 - Technical Questions Tracking Spreadsheet.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77618R0077-0003000.docx | DOCX document | |
| 36E77618R0077-0002003.pdf | ||
| 36E77618R0077-0002000.docx | DOCX document | |
| 36E77618R0077-0002001.pdf | ||
| 36E77618R0077-0002002.pdf | ||
| 36E77618R0077-0001004.dwg | DWG drawing | |
| 36E77618R0077-0001000.docx | DOCX document | |
| 36E77618R0077-0001003.pdf | ||
| 36E77618R0077-0001002.pdf | ||
| 36E77618R0077-0001001.doc | DOC document | |
| 36E77618R0077-013.docx | DOCX document | |
| 36E77618R0077-017.pdf | ||
| 36E77618R0077-004.pdf | ||
| 36E77618R0077-008.docx | DOCX document | |
| 36E77618R0077-007.docx | DOCX document | |
| 36E77618R0077-010.docx | DOCX document | |
| 36E77618R0077-005.pdf | ||
| 36E77618R0077-009.doc | DOC document | |
| 36E77618R0077-015.docx | DOCX document | |
| 36E77618R0077-003.docx | DOCX document | |
| 36E77618R0077-011.doc | DOC document | |
| 36E77618R0077-006.docx | DOCX document | |
| 36E77618R0077-014.docx | DOCX document | |
| 36E77618R0077-012.docx | DOCX document | |
| 36E77618R0077-001.docx | DOCX document | |
| 36E77618R0077-002.doc | DOC document | |
| 36E77618R0077-016.pdf | ||
| 36E77618R0077-000.docx | DOCX document |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 36E77618R0077 SIOUX FALLS REPAIR EXTERIOR DEFICIENCIES D_B TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET
ITEM
NO.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
1. 6.19.18 7.9.18 Tasks 6-10 do not appear to correspond with written descriptions. Task 10 does not appear on key map. Please clarify.
A revised plan set and statement of work has been provided to clarify
2. 6.19.18 7.9.18 Assume that the VA will provide the legal description/title work to aid the completion of the boundary survey. Please confirm
The VA will provide a legal description/title to aid in the boundary survey.
3. 6.19.18 7.3.18 Assume that the VA will provide existing utility mapping of the campus. Please confirm.
The following documents are included in Amendment 0001:
Topo (Phase 1- 3) 3d Areas 1-4 (1) Topo (Phase 1- 3) 3d
4. 6.21.18 6.23.18 In the solicitation documents, SOW Attachment #2, page 2, Task 10 Add Sidewalk, there is a reference to “ sidewalk with retaining….” Please clarify/confirm the location of Task 10 in the SOW Site Drawings document also provided as part of the solicitation documents.
A revised plan set and statement of work has been provided to clarify the nine tasks.
5. 6.27.18 7.9.18 Due to the lack of design-build opportunities throughout the region, it is nearly impossible for a SDV company to reflect previous project experience as a complete design build team. Will the VA accept project experience from both the SDV general contractor and the designer even if they were not part of a single team in lieu of the above stated requirement (and not result in lower rating).
Additionally, will the VA consider allowing the inclusion of non-design build projects (still meeting the $500k threshold) from a SDV company in the project experience factor due to the overall lack of opportunities made available?
If a prime contractor does not have Design-Build experience, they are permitted to provide up to three relevant non-Design-Build projects that are completed for improvement of concrete street and parking projects similar in size and scope to this project. The designer for the team can also provide up to three relevant projects that fall under the requested criteria for the project. A maximum of total six (6) projects may be submitted for Factor 1 Experience. This same direction also applies to Factor 3 Past Performance.
ITEM
NO.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
6. 7.12.18 7.12.18 Do the CPARS and PPQ’S attached in the proposal count towards the 25page count? With the questions and answers on July 9th we can provide up to 6 jobs.
3 for construction and 3 for design company. The CPARS and PPQ’s take most of the pages.
Tabs, cover page, cover letter & Table of Content are no longer part of page limitation.
Page limitation increased in Phase I to 30 pages.