36E77618R0077-0002001.pdf

PDF 58 KB Posted

Attached to
Repair Exterior Improvements - Sioux Falls Design-Build - 438-18-500
Solicitation number
36E77618R0077
Issued by

About this file

36E77618R0077 0002 Technical Questions Tracking Spreadsheet - 7-9-18.pdf

View the file

Other files

File Type Posted
36E77618R0077-0003000.docx DOCX document
36E77618R0077-0003001.pdf PDF
36E77618R0077-0002003.pdf PDF
36E77618R0077-0002000.docx DOCX document
36E77618R0077-0002002.pdf PDF
36E77618R0077-0001004.dwg DWG drawing
36E77618R0077-0001000.docx DOCX document
36E77618R0077-0001003.pdf PDF
36E77618R0077-0001002.pdf PDF
36E77618R0077-0001001.doc DOC document
36E77618R0077-013.docx DOCX document
36E77618R0077-017.pdf PDF
36E77618R0077-004.pdf PDF
36E77618R0077-008.docx DOCX document
36E77618R0077-007.docx DOCX document
36E77618R0077-010.docx DOCX document
36E77618R0077-005.pdf PDF
36E77618R0077-009.doc DOC document
36E77618R0077-015.docx DOCX document
36E77618R0077-003.docx DOCX document
36E77618R0077-011.doc DOC document
36E77618R0077-006.docx DOCX document
36E77618R0077-014.docx DOCX document
36E77618R0077-012.docx DOCX document
36E77618R0077-001.docx DOCX document
36E77618R0077-002.doc DOC document
36E77618R0077-016.pdf PDF
36E77618R0077-000.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 36E77618R0077 SIOUX FALLS REPAIR EXTERIOR DEFICIENCIES D_B TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET

ITEM

NO.

DATE

QUESTION

RECEIVED

DATE

QUESTION

ANSWERED

QUESTION GOVERNMENT RESPONSE

1. 6.19.18 7.9.18 Tasks 6-10 do not appear to correspond with written descriptions. Task 10 does not appear on key map. Please clarify.

A revised plan set and statement of work has been provided to clarify

2. 6.19.18 7.9.18 Assume that the VA will provide the legal description/title work to aid the completion of the boundary survey. Please confirm

The VA will provide a legal description/title to aid in the boundary survey.

3. 6.19.18 7.3.18 Assume that the VA will provide existing utility mapping of the campus. Please confirm.

The following documents are included in Amendment 0001:

Topo (Phase 1- 3) 3d Areas 1-4 (1) Topo (Phase 1- 3) 3d

4. 6.21.18 6.23.18 In the solicitation documents, SOW Attachment #2, page 2, Task 10 Add Sidewalk, there is a reference to “ sidewalk with retaining….” Please clarify/confirm the location of Task 10 in the SOW Site Drawings document also provided as part of the solicitation documents.

A revised plan set and statement of work has been provided to clarify the nine tasks.

5. 6.27.18 7.9.18 Due to the lack of design-build opportunities throughout the region, it is nearly impossible for a SDV company to reflect previous project experience as a complete design build team. Will the VA accept project experience from both the SDV general contractor and the designer even if they were not part of a single team in lieu of the above stated requirement (and not result in lower rating).

Additionally, will the VA consider allowing the inclusion of non-design build projects (still meeting the $500k threshold) from a SDV company in the project experience factor due to the overall lack of opportunities made available?

If a prime contractor does not have Design-Build experience, they are permitted to provide up to three relevant non-Design-Build projects that are completed for improvement of concrete street and parking projects similar in size and scope to this project. The designer for the team can also provide up to three relevant projects that fall under the requested criteria for the project. A maximum of total six (6) projects may be submitted for Factor 1 Experience. This same direction also applies to Factor 3 Past Performance.