36E77618R0077-0001002.pdf
PDF 66 KB Posted
- Solicitation number
- 36E77618R0077
About this file
36E77618R0077 0001 Technical Questions Tracking Spreadsheet - 07-03-2018.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77618R0077-0003000.docx | DOCX document | |
| 36E77618R0077-0003001.pdf | ||
| 36E77618R0077-0002003.pdf | ||
| 36E77618R0077-0002000.docx | DOCX document | |
| 36E77618R0077-0002001.pdf | ||
| 36E77618R0077-0002002.pdf | ||
| 36E77618R0077-0001004.dwg | DWG drawing | |
| 36E77618R0077-0001000.docx | DOCX document | |
| 36E77618R0077-0001003.pdf | ||
| 36E77618R0077-0001001.doc | DOC document | |
| 36E77618R0077-013.docx | DOCX document | |
| 36E77618R0077-017.pdf | ||
| 36E77618R0077-004.pdf | ||
| 36E77618R0077-008.docx | DOCX document | |
| 36E77618R0077-007.docx | DOCX document | |
| 36E77618R0077-010.docx | DOCX document | |
| 36E77618R0077-005.pdf | ||
| 36E77618R0077-009.doc | DOC document | |
| 36E77618R0077-015.docx | DOCX document | |
| 36E77618R0077-003.docx | DOCX document | |
| 36E77618R0077-011.doc | DOC document | |
| 36E77618R0077-006.docx | DOCX document | |
| 36E77618R0077-014.docx | DOCX document | |
| 36E77618R0077-012.docx | DOCX document | |
| 36E77618R0077-001.docx | DOCX document | |
| 36E77618R0077-002.doc | DOC document | |
| 36E77618R0077-016.pdf | ||
| 36E77618R0077-000.docx | DOCX document |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 36E77618R0077 SIOUX FALLS REPAIR EXTERIOR DEFICIENCIES D_B TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET
ITEM
NO.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
1. 6.19.18 Tasks 6-10 do not appear to correspond with written descriptions. Task 10 does not appear on key map. Please clarify.
2. 6.19.18 Assume that the VA will provide the legal description/title work to aid the completion of the boundary survey. Please confirm
3. 6.19.18 7/3/2018 Assume that the VA will provide existing utility mapping of the campus. Please confirm.
The following documents are included in Amendment 0001:
Topo (Phase 1- 3) 3d Areas 1-4 (1) Topo (Phase 1- 3) 3d
4. 6.21.18 In the solicitation documents, SOW Attachment #2, page 2, Task 10 Add Sidewalk, there is a reference to “ sidewalk with retaining….” Please clarify/confirm the location of Task 10 in the SOW Site Drawings document also provided as part of the solicitation documents.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
ITEM
NO.
DATE
QUESTION
RECEIVED
DATE
QUESTION
ANSWERED
QUESTION GOVERNMENT RESPONSE
15.
16.
17.
18.
19.
20.
21.
22.
23.
ITEM
File details come from the government source that posted it.