36E77618R0054 ATTACHMENT 2 - SOW - Site Prep for DR Rooms - Fargo - 437-CSI-500 - FINAL 2-23-2018.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77618R0054-00001001.pdf | ||
| 36E77618R0054-00001000.docx | DOCX document | |
| 36E77618R0054-008.zip | ZIP file | |
| 36E77618R0054-010.pdf | ||
| 36E77618R0054-013.docx | DOCX document | |
| 36E77618R0054-005.pdf | ||
| 36E77618R0054-006.pdf | ||
| 36E77618R0054-007.pdf | ||
| 36E77618R0054-002.docx | DOCX document | |
| 36E77618R0054-011.docx | DOCX document | |
| 36E77618R0054-004.docx | DOCX document | |
| 36E77618R0054-009.pdf | ||
| 36E77618R0054-012.docx | DOCX document | |
| 36E77618R0054-001.docx | DOCX document | |
| 36E77618R0054-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
437-CSI-500 Site Prep for DR Rooms – Fargo 2-23-18
437-CSI-500 Site Prep for DR Rooms – Fargo 2-15-18
Scope of Work for Design-Build Prepare Digital Radiography Rooms for Fargo, ND Project Number 437-CSI-500
Contractor shall provide Design-Build services to renovate and site prepare 3 rooms for the installation of new Samsung Digital X-Ray Radiography Systems in Fargo, ND.
A. General Design Requirements:
1. The Contractor shall completely survey all existing spaces affected by the renovation. Survey shall include architectural, electrical, mechanical (including medical gases), structural, and low voltage systems. Contractor shall not rely on Samsung equipment drawings to provide existing conditions, but shall verify.
2. The Contractor shall meet with site staff to review details of the equipment drawings and to gather comments after each design submission (SD, DD, CD). The Contractor shall include Facilities Engineering, Biomedical Engineering, Imaging, and Samsung in all design meetings. The Contractor shall also plan for a kick-off meeting with Facilities Engineering, Biomed, Imaging, and Samsung to walk the site, pull as-built drawings, more specifically set design requirements and understand the full scope of the project requirements.
3. All equipment shall be removed and disposed of by the construction contractor except for the existing X-ray system that will be removed by Samsung. The VA will not retain any equipment and it shall not be “abandoned in place.”
4. New and modified building automation controls shall be included to ensure all systems are operational.
5. Environmental conditions shall be maintained to other spaces.
6. Phased installation shall be required. The phasing shall be clearly depicted in both the 010000 specification section and the drawing set SOW Appendix 1.
7. The Contractor shall include radiation shielding calculations, design, and modifications, as needed. The Contractor shall consult with a registered radiation physicist to ensure room design meets requirement for specified equipment. Registered radiation physicist shall provide calculations and certification of architectural documents.
8. Fargo has a contracted radiation physicist that may be able to provide shielding design for that site. It is anticipated that the Contractor would hire the physicist outside of the VA contract for lead shielding design work. SOW Appendix 2 provides a list of required information to complete the shielding analysis and design.
9. The current shielding report (dated 6-19-17) for rooms 1B-35 and 1B-37 is SOW Appendix 3.
10. The X-ray system has been purchased by the VA. The Contractor shall coordinate all architectural, electrical, HVAC and structural changes with Samsung. Samsung drawings shall be “For Reference Only” and all construction requirements shall be clearly shown in the CD set.
11. Design documents shall clearly show all demo, existing, re-located, and new raceways, wireways, and cabling to/from equipment, lights, medical gases, monitors, sprinkler heads/distribution lines, smoke detectors, electrical outlets, patient lifts, HVAC grilles, speakers, etc.
12. Design documents shall clearly show all infection control requirements. The Contractor shall coordinate with the station multi-disciplinary committee and infection control prevention staff to design infection control requirements.
B. Discipline Specific Requirements:
1. Architectural
a. Primary intent of work shall be site preparation for installation of Samsung X-ray equipment in accordance with equipment drawings. See SOW Appendix 4.
b. Design and construction shall include finishes for immediate and adjacent spaces affected by construction.
c. Design and construct all spaces using current VA design standards and design standards specific to the site. Contractor shall field verify all room measurements and impacted existing conditions.
d. Contractor shall be responsible for testing and verifying integrity of shielding for each space. If shielding upgrades are required, Contractor shall be responsible for design.
e. Contractor shall provide code compliance review. Drawing set shall include code analysis sheet.
f. All DR rooms shall have a minimum floor finish to ceiling finish dimension of 9’-2” in order to implement the full functionality of the Samsung X-ray equipment. Existing ceiling heights at Fargo:
1) 1B-31: 8’-8 ½”
2) 1B-35: 8’-7 ¼”
3) 1B-37: 8’-7 ½” (there is a north end soffit that is 36” deep, the ceiling is on 7’6” high in this area).
g. The Contractor shall verify ceiling heights listed and work with the station to design modifications to utility runs and the existing ceiling grid to optimize ceiling heights for installation of Samsung equipment. The Contractor shall account for these utility modifications in their pricing. If the Contractor finds during the site investigation and design process that the ceiling heights cannot be raised to 9’-2”, the DB Contractor shall facilitate a discussion with the VA Project Manager, Samsung, and the Contractor’s team to discuss and agree on a compromise solution that may limit equipment functionality.
h. Contractor shall verify delivery route from outside of building to destination and show route on drawings. Route shall show corridor widths, opening sizes, turning radii, and elevator size.
i. Contractor shall verify door openings are adequate with a minimum door size of 39” wide x 78” high.
j. Reflected ceiling plan shall show structural support, ceiling tiles/construction, overhead lighting, HVAC, sprinklers, speakers, detectors, RFID, etc.
k. Design shall include all reinforcement plates/unistrut necessary to install equipment. Unistruts shall be designed to meet the weight requirement of 1.2 tons.
l. Provide required maintenance and servicing clearances. Clearly indicate on floor plan.
m. Provide ceiling openings for maintenance access as required by Samsung equipment drawings.
n. Contractor shall design and construct control counter to include placement of all equipment, including: monitors, control room module, keyboard, etc.
o. Contractor shall show elevation of space under counter to include: imaging system, computer boxes, low shelf to hold equipment, etc.
p. Contractor shall design and construct all wall blocking for equipment mounting.
q. Contractor shall be provided with specific purchase orders for each site that will describe accessory items. Contractor shall be responsible for locating, detailing, and building accessory mounting systems.
r. Contractor shall include uni-strut channel covers.
s. Contractor shall salvage and re-use lead window for control room.
t. Contractor shall ensure lead shield door with adequate minimum opening. If opening does not meet minimum requirement, a new door system shall be designed and constructed within this scope of work.
u. Contractor shall ensure anchor bolts are used to fix each component to floor. Drill points shall be reviewed and approved. If the floor thickness is less than 7.8 inches, the Contractor shall recommend an alternative method, appropriate to the site, such as through bolts or chemical anchors.
v. Contractor shall coordinate electrical raceways and floor penetrations with all other work. See Samsung equipment drawings for cable access holes and minimum dimensions.
w. During construction and the installation of various wall mounted devices the existing lead lining may be compromised. The Contractor shall provide details for the repair of the lead lining in the walls. There is NO lead lining in the ceilings or floors.
x. X-Ray system table – A new table will be included as part of the new x-ray system. Contractor shall coordinate the location of the new table. Design shall include table base mounting details.
| r. | Lighting and structural support modifications shall be included in the design and construction. |
| s. | Relocations and modifications of HVAC, electrical and plumbing shall be included in the design and construction, as necessary to bring up to code or as needed to support new equipment. |
| t. | New data and phone cabling shall be included in the design and construction. |
| u. | Design and install Code Blue alarms in each room. |
| v. | Verify floor elevations and level per new x-ray system requirements. Provide leveling plan as required. |
| 2. | Interior Design |
a. Interior design shall include finishes to provide a safe, comforting space for veterans.
b. Contractor shall work with the VA Interior Designers for finish schedule. Provide color board for each site when finishes have been selected.
3. Structural
y. Contractor shall be responsible for design and detail of floor, wall, and ceiling structures in accordance with the weights, moments, and forces as shown in vendor’s design documents.
| b. | Contractor shall include all reinforcement plates/unistrut necessary to install equipment. Unistruts shall be designed to meet the weight requirement of 1.2 tons. |
| c. | Telespar anchoring shall be designed, specified, detailed and installed by the Contractor. |
| d. | X-Ray system table – A new table will be included as part of the new x-ray system. Contractor shall coordinate the location of the new table. The Contractor’s structural engineer shall review placement and support for the new table. Coordinate placement so conduits can be installed without modifications to floor beams. Design and installation shall include table base mounting. |
| e. | Wall stand base – Contractor shall include anchoring structure for the wall stand base. Structural engineer shall provide design of sufficient load bearing capacity. |
4. Electrical/Low Voltage
a. All existing electrical systems and components shall be field-verified by the Contractor’s electrical engineer.
b. All electrical work shall meet current National Electrical Code (NEC) requirements.
c. Design and Construction shall include all electrical plans, elevations, sections, details, diagrams and schedules showing existing power, new power, and low voltage.
d. Coordinate power requirements for the new X-ray system with Samsung equipment drawings. Review the existing power to the X-ray system and remove or replace as required. Electrical engineer shall design both normal and emergency power.
e. Contractor shall show all necessary normal and emergency service panels, circuits, cabling, wiring, conduit, relays, switches, and disconnects for a complete and usable electrical system to support the new suite including any new HVAC systems and ancillary equipment. All components shall be identified and labeled on design drawings.
f. Incoming power supply for Samsung equipment shall be dedicated back to source, isolated, and insulated from any other equipment such as elevators, generators, HVAC systems, etc.
g. Contractor shall design and construct 3-phase, 480V AC system as required by Samsung equipment.
h. Contract shall include all low voltage systems necessary to meet code and VA standards. The low voltage systems include; fire alarm, code blue, public address, voice, data, wireless systems, remote telemetry monitoring (power/data infrastructure only) and Radio-frequency identification (RFID)
i. Utilize site-specific construction specifications for low voltage and telecommunications.
| j. | Contractor shall coordinate electrical raceways and floor penetrations with all other work. See Samsung equipment drawings for cable access holes and minimum dimensions. |
| k. | Contractor shall coordinate with the equipment vendor to ensure the Fire Alarm System meets requirements. |
| l. | Contractor shall include fire alarm system with full area smoke coverage that is compatible with system at specific site. |
| j. | Contractor shall include necessary cable trays/ducts/conduits, correctly sized and located in accordance with vendor equipment drawings. |
| k. | Contractor shall follow lighting guidelines as described on vendor drawings. Overall general illumination shall be provided for cleaning and maintenance. Adjustable, glare-free, and reproducible light settings (dimmer with scale) shall be considered for rooms where diagnoses are made on monitors. |
| l. | X-Ray system table – A new table will be included as part of the new x-ray system. The Contractor shall coordinate raceways and power required to the new table. Coordinate placement so conduits can be installed without modifications to floor beams. |
m. Contractor shall include circuit breakers, emergency off button, warning light and door switch connections.
n. Contractor shall include layout for equipment cabling. There are cable length limitations that shall be assessed and described on drawings. Design shall include raceways and floor penetrations.
o. Contractor shall follow and describe all junction box and wire duct/raceway guidance provided in vendor drawings.
p. Contractor shall include wiring with tails and labeling as indicated in vendor drawings.
q. Contractor shall include circuit breakers that meet load current rating and short circuit current rating described in vendor drawings.
r. Electrical specifications shall include requirement to test and verify equipment power supply to ensure it meets vendor specifications.
s. Contractor shall include all grounding and bonding requirements.
| u. | Provide Code Blue Alarm System at the sites specified. |
| v. | Upgrade existing 120V systems to meet current National Electrical Code, (NEC). |
5. Mechanical
a. Field verify existing conditions. Design for installation and replacement/repair of ductwork, VAV boxes, controls, valves, and all other components, as needed.
b. Contractor shall include all mechanical plans, elevations, sections, details, schedules for controls, sequence of operations, pumps, valves, piping systems, gages and other devices to support the installation of the new mechanical systems.
c. Contractor shall take heat loads of new x-ray system equipment into account during HVAC design.
d. Design parameters shall be in accordance with Samsung equipment drawings; operating temperature = 50F – 104F, operating humidity = 30% - 75%.
e. Contractor shall study the capacity of existing air handling unit to support the required air exchanges.
f. Design for appropriate amount of air exchanges in accordance with VA HVAC design manual dated November 1, 2017.
g. The Contractor shall design and install necessary HVAC units to satisfy heating and cooling requirements to serve the equipment and people inside the space. The existing air handling unit that serves this space is in the basement mechanical room below.
| h. | Whenever possible, use existing piping inside the building to minimize installation cost and hospital disruption. |
| i. | Contractor shall design and install Building Automation System (BAS) infrastructure and software as required for any new mechanical equipment. |
| k. | Provide new Variable Air Volume (VAV) boxes with digital controls and incorporate them into the smoke control zoning as required. |
| l. | Rebalance existing supply, return, and exhaust for the immediate imaging area and adjacent spaces. Rebalance existing air handler as required. |
| m. | A complete “BAS Design” shall be provided, including; sequence of operations, instrumentation drawings, and points list. |
| n. | The design shall include all safety components required by the current ANSI/ASHRAE Safety Code. |
| o. | Provide all necessary isolation valves. Include replacement of existing isolation valves that may need replacement due to age. |
| p. | All equipment shall be specified to achieve the highest practical level of energy efficiency. |
| q. | Contractor shall include any required modifications to the fire sprinkler system. |
| s. | Contractor shall provide a commissioning plan with checklists for all HVAC equipment. |
C. Location Specific Requirements - FARGO: (3) Rooms 1B-31, 1B-35, 1B-37:
a. Redesign and construct room layouts as required and to accommodate new equipment and staff needs. Room 1B-31 does not currently contain a separate control room. Samsung equipment drawings provide a proposed solution for this space. Contractor shall provide design and construction of new control room.
b. Replace wall finishes and suspended ceiling.
c. Existing ceiling heights may not be adequate for equipment, so Contractor shall assess and address modifications in design. Minimum ceiling height is 9 feet, 2 inches.
d. Flooring shall be replaced. The new room finishes shall be proposed by the Contractor for VA review and shall be coordinated with both the VA Design Guides and Specifications as well as existing adjacent finishes, products and colors in mind. The Fargo VA shall approve all finish selections prior to the final design submission.
e. Provide new metal casework, similar to existing.
f. Contractor’s structural engineer shall review and field verify existing conditions for floor loading (both deck above and below) and support of new Samsung equipment and patient lift systems. Modify as required.
g. Review access through current doors.
1) The door into 1B-31 is in good condition and meets the minimum clearance requirement of 39” wide x 78” high. Relocate door or adjust swing of existing, as required.
2) The door into 1B-35 is in good condition and meets the minimum clearance requirement of 39” wide x 78” high. Relocate door or adjust swing of existing, as required.
3) The door into 1B-37 is in good condition and meets the minimum clearance requirement of 39” wide x 78” high. Relocate door or adjust swing of existing, as required.
h. Review condition and size of current electrical panel. Design and construct modifications and upgrades, as required to support equipment.
i. Contractor shall include fire alarm system with full area smoke coverage that matches existing.
j. Contractor shall review and field verify existing ceiling conditions. Modify or replace the existing system as required to accommodate the new x-ray system.
k. Provide and install an electronic door locking system.
l. Evaluate existing HVAC system and modify, as necessary, to support the new equipment. Additionally, design shall include testing, adjusting, and balancing, as well as commissioning of new equipment.
m. Existing medical gases (air, oxygen, vacuum) shall remain in place.
n. Salvage and re-install Nurse Call, as required, in all 3 rooms.
o. Design upgrade and replacement for existing Code Blue Alarm in all 3 rooms. System shall be designed to be compatible and interface with the existing VAMC systems.
| D. | Proposed Schedule (calendar days): |
| 1. | Notice to Proceed – D=Day |
| 2. | Design Initiated – D+7 |
| 3. | SD Submission – D+35 |
| 4. | SD Review by VA Complete – D+49 |
| 5. | DD Submission –D+70 |
| 6. | DD Review by VA Complete – D+84 |
| 3. | CD Submission –D+105 |
| 4. | CD Review Completed by VAMC – D+119 |
| 5. | Documents Complete (CD issue) – D+126 |
| 6. | Mobilization Complete – D+140 |
| 7 | Submittals Complete – D+140 |
| 8. | Construction Complete – D+280 |
Total Period of Performance – 280 calendar days
L. Appendices:
1. Specification Section 01 00 00 General Requirements
2. Shielding Requirements for Evaluation
3. Shielding Report - 6-19-17
4. Samsung Equipment Drawings - 6-6-17
End