36E77618B0089-0005001.docx

DOCX document 18 MB Posted

Attached to
4th Floor - Water Leak Damage Remediation - San Diego
Solicitation number
36E77618B0089
Issued by

About this file

36E77618B0089 0005 SD WLDR 4th Floor Technical Questions Tracking Spreadsheet FINAL 9-21-18.docx

View the file

Other files

File Type Posted
36E77618C0039-000.docx DOCX document
36E77618B0089-0005000.docx DOCX document
36E77618B0089-0004001.docx DOCX document
36E77618B0089-0004000.docx DOCX document
36E77618B0089-0003000.docx DOCX document
36E77618B0089-0003001.pdf PDF
36E77618B0089-0003002.pdf PDF
36E77618B0089-0002000.docx DOCX document
36E77618B0089-0002002.pdf PDF
36E77618B0089-0002004.pdf PDF
36E77618B0089-0002003.pdf PDF
36E77618B0089-0002001.pdf PDF
36E77618B0089-0001000.docx DOCX document
36E77618B0089-009.pdf PDF
36E77618B0089-005.pdf PDF
36E77618B0089-010.docx DOCX document
36E77618B0089-006.pdf PDF
36E77618B0089-008.pdf PDF
36E77618B0089-003.docx DOCX document
36E77618B0089-007.pdf PDF
36E77618B0089-004.pdf PDF
36E77618B0089-000.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36E77618B0089 – SD WLDR 4th Floor TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET

ITEM

NO.

DATE QUESTION RECEIVED
DATE QUESTION ANSWERED
QUESTION
GOVERNMENT RESPONSE
1.
8/24/18
9/11/18

Sheet AI301 Note “H” says the exam lights are to be Bergholt Chromophare F300 or equal and that the contractor is to “coordinate” installation with the manufacturer. Note “G” on the same page also says we are to “coordinate” the installation with the manufacturer. Sheet AI302 “equipment and furniture schedule” item 2 & 2A says the exam light and operating boom light are VA furnished and installed by the “contractor.”

0. Based upon the note on sheet AI301, we assume the “contractor” is actually the VA’s equipment “vendor” who is furnishing the lights, and we, as the general contractor, are only required to coordinate the installation of the structural members and install the power for the lights? Please confirm if this interpretation is correct. If it is not correct and we, the general contractor are to install the VA furnished lights physically, please provide a complete copy of the vendor's installation instructions for the lights & booms we are to install?

Per equipment and furniture schedule the VA shall purchase exam lights. The contractor shall coordinate the location of the exam lights with the manufacturer and the reflected ceiling plan. The installation prep for the lights shall be done by the contractor. The exam light vendor shall install the exam lights.

1.
8/24/18
9/11/18
Please note that the exam lights and operating boom light are not shown on the reflective ceiling plan (sheet AE104) nor are they shown on the electrical lighting plan sheet EL104. Currently, the electrical lighting plan does not indicate that we are to provide any electrical power to these exam lights/booms. Please tell us if we are to provide power and if we are, please provide a revised plan that tells us what circuit we are to connect each of them to and if there are any wall switches that need to be installed for them. Will the government provide an overlay to ensure that there is not going to be a conflict?

Contractor shall coordinate the light in the field with ceiling mounted items.

Power for exam lights is shown on the Power Plan EP104 (rather than the lighting plan). Contractor shall provide a junction box and power from the circuit indicated on sheet EP104. Junction boxes shown on sheet EP104 are notated with “CLG. EXAM LT.” Coordinate mounting with Manufacturer recommendations and other disciplines. Switch for control of these lights shall be integral to the unit.

1.
8/24/18
9/11/18
As for the patient lift listed as note “G” on Sheet AI301, sheet AI302 note 18 says the lift are contractor furnished contractor installed. Based upon note “G” on sheet AI301 this appears to be a mistake. Please confirm that the general contractor is only supposed to coordinate the installation of the patient lift, as note “G” says. If we are in fact furnishing and installing the patient lift, please note that the electrical drawings don’t show any power for the patient lifts, and based upon past experience the patient lift will require power. Assuming power is needed regardless of who is installing the lifts, please provide a revised plan that shows the electrical to the lifts.

Per the equipment and furniture schedule, the lifts on this floor shall be purchased and installed by the contractor. The intent of note “G” is to notify the contractor that there will be coordination with the lift manufacturer.

Power for lifts is also shown on sheet EP104. Receptacles for lift power are notated with “LIFT 96”” indicating that they are intended for the lift and shall be mounted at 96” A.F.F. In our experience these are generally battery powered and require only a 120v receptacle to charge.

1.
8/24/18
9/11/18

9/21/18 Will the Contractors Superintendent be allowed to also serve in the roles for SSHO and CQC, or will a separate individual be required for either of these positions?

No, separate individuals for each

1.
8/24/18
9/11/18
Specification Section 01 91 00 – General Commissioning Requirements, Part 1.9 states that the VA will appoint the company to act as the Commissioning Agent (CxA) for this project. Will the VA confirm they will hire the CxA for this project and that this will not be a cost to the Contractor?

VA will provide 3rd party commissioning agent. General contractor shall be responsible for facilitating commissioning per specification requirements.

1.
8/24/18
9/11/18
Sheet GI001, Bid Alternates indicates there are two (2) Bid Alternates for this project. RFP, Page 5 of 49 Pricing Schedule depicts one Base Bid Price Line. Will the VA confirm there is only one Base Bid Line Item required for this solicitation, or issue a Revised Pricing Schedule?

Alternate bids have been removed from the contract requirements complete. Please refer to revised 010000 General Requirements Specification.

1.
8/24/18
9/11/18
Has any mold been discovered due to the water leak damage? Will any mold remediation be required? If so, will the VA provide the scope of work and specifications for Mold Remediation?

Mold was found on one hard lid ceiling Please include spot remediation and repair of hard lid ceiling.

1.
8/28/18
9/11/18

9/21/18 The statement of requirements below is an addition to our typical and standard VA CQC manager requirements, in that we must have someone on the job site full time for each respective discipline and the person must have a degree, and/or extensive experience. These types of requirements are difficult, if not impossible to achieve and will add tens of thousands of dollars to the project cost, if not more. There is also a Special Inspector specification that almost duplicates this QC matrix, so we would end up having a CQC, and QC specialist, and a Special Inspector. Is the VA expecting the Contractor to include the costs for what certainly appear to be duplicitous quality control personnel? Will the VA consider deleting these costly CQC requirements for this project and only requiring the more standard CQC and Material Testing / Special Inspection requirements, or can the CQC fulfill the role of the QC Specialists, or can the Site Supt. act as the CQC without the addition of the QC Specialists? See the cut and paste excerpt below:

01 45 00 3.4 C. CQC Personnel: In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist in the CQC System Manager for the following areas, as applicable: electrical, mechanical, civil, structural, environmental, architectural, materials technician submittals clerk, Commissioning Agent/LEED specialist, and low voltage systems. These individuals or specified technical companies are employees of the prime or subcontractor; be responsible to the CQC System Manager; be physically present at the construction site during work on the specialized personnel’s areas of responsibility; have the necessary education or experience in accordance with the Experience Matrix listed herein. These individuals can perform other duties but need to be allowed sufficient time to perform the specialized personnel’s assigned quality controls duties as described in the CQC Plan. A single person can cover more than one area provided that the single person is qualified to perform QC activities in each designated and that workload allows.

AE does not agree with this assessment.

Clarification of the intent of this section as follows:

The requirement is to have an individual on site during the work of these trades that has either:

1.A degree as described in the Experience Matrix with 2 years of construction experience.

Or

2.A technician with no degree but 5 years’ experience.

While work is being performed on that trade. This individual may perform other duties including installation.

No, separate individual for each

1.
9/05/18
9/19/18
Wood Doors – Acrovyn: The drawings make reference to a Finish Schedule on plans, as well as a Finish Section 09 06 00, both of which do not appear exist. We need to know the color to be provided for the Acrovyn doors is a standard color.
Specification Section 08 14 00, 2.2, B., 4. states: Color or Woodgrain Pattern: As selected by Architect from manufacturer’s full range of products. Custom colors are not included. Section 09 06 00 is not provided.
1.
9/05/18
9/19/18
Door 4049C: Door is Alum/Glass and HM Frames I detailed. Shouldn’t this also be an Aluminum frame?
Frame should be Aluminum by door manufacturer.
11.a-d.
9/05/18
9/19/18
Doors 4040A, 4040B, and 4046 – HW#4: Per details H3/J3 on AE601,

these are Aluminum/Glass “Barn” type doors, listed to have hollow metal frames.

a. Frames type 2 are detail. These frames should be Cased Openings. The Bard Door track is mounted on the outside face of the frames and adjacent walls. Please confirm.

b. Since the doors are Alum/Glass, we suggest the frames should also be Aluminum. Please respond. If frames are to be HM, doors can be Acrovyn Wood. Please respond.

c. HW#4 listed does not match the barn door hardware shown on details H3/J3 on AE601. Please review attached suggested Barn Door Hardware manufactured by KN Crowder, using Trimco Door Pulls.

d. Since there is no jamb for a lockset to engage, cylinder operated flushbolts – Adamsrite 1877, would be needed to lock these doors. Bolts would be thrown into the floor. See Adamsrite catalog cut attached and respond.

Doors and Frames:

Doors 4040A, 4040B and 4046 are detailed in H3 Head Detail at Sliding Door, J3 Jamb Detail at Sliding Door and S3 Sill Detail at Sliding door, with Frame type 2. These details depict a sliding door frame and door assembly mounted on the wall, with “dummy” Hollow Metal frame in the openings that closes off the opening for protection of the opening and consistency of appearance. The sliding door and frame should be aluminum.

Hardware:

Hardware set HW-4 should be revised to read:

· 1 Track and Roller set

· 2 Door pulls, one each side

· 2 Overhead Stops Integral with track hardware

· 3 Silencers

· 1 Cylinder Operated Flushbolt. 360degree turn of key throws or retracts the hex section bolt into the floor. Key can removed only when bolt is in a positively locked or unlocked position. Provide strike. Adams rite 1877 or approved equal.

12
9/05/18
9/19/18
Doors 4080 and 4081 @ Catwalk. Hardware is not specified. Please advise what hardware is to be provided.
Drawing A601, doors 4080 and 4080 revise hardware set to read HW-5D. Specification Section 087100 Door Hardware add door 4081 to Hardware Set HW 5D.
13
9/07/18
9/19/18
Sheet AE104, Exam Room 4049F depicts a patient lift on tracks passing thru a door frame. Will the VA provide a detail of the modification for the door frame header or will the lift need to be suspended below the top of the door frame?

See attached sketch for door head detail.

14
9/10/18
9/19/18
Re: Section 081400, please provide color or brand of plastic laminate for the wood doors.
Brand to be door manufacturer’s standard to meet specification.
15
9/10/18
9/19/18
Provide estimated quantities of asbestos containing materials per Section 028213.13 para 1.1.2
Contractor shall confirm specification number. Estimated asbestos quantities are listed on Pg. 1 of specification section 028211. Contractor to provide unit pricing for additional materials that may be found.
16
9/10/18
9/19/18
Provide current asbestos and lead hazardous material reports for the 4nd floor: Limited Asbestos and Lead Bulk Sampling Letter prepared by Citadel, 9/11/15; Limited Moisture Investigation Report by Citadel, 8/7/15; Comprehensive Hazardous Materials Survey; VAMCSD Work Contract #VA262-14-P-8269 prepared by Encore, Jan 2015
See attachment. All reports have been included in the most recent report prepared by the design team attached in one file.
17
9/10/18
9/19/18
Confirm standard/ permissible work hours during construction.
Normal business hours are from 7 am – 6 pm. Work may be required outside these hours as dictated by the contract documents.
18
9/10/18
9/19/18
Is it the intent of the project to remove and replace the drop ceiling?
Ceilings are to be replaced where indicated on reflected ceiling plans. New ceilings are a dark line weight existing to remain are indicated with a grayscale line weight.
19
9/10/18
9/19/18
What is the fire alarm system (Make/Model) will we be tying into?
Edwards EST 3
20
9/10/18
9/19/18
Please verify that the Owner will be responsible for removing ALL equipment, unbolted furniture, personal effects, etc from the area prior to construction
Contractor will be responsible for removing items indicated on demolition sheets. VA will remove furniture.
21
9/10/18
9/19/18
Will 24-hour site security be required on this project for the total contract duration?
The contractor is required to develop a security plan to define the security procedures. No 24 hour security is anticipated to meet the requirements defined in Paragraph 1.5 of specification section 010000 General Requirements.
22
9/10/18
9/21/18
In reference to Specification 01 35 26 Safety Requirements, can the superintendent and the quality control manager be the same person for this project (if qualified by their resume)?
No, separate individual for each
23
9/10/18
9/19/18
The Interstitial space above the improvements will be exposed during the renovations and most of the hospital interstitial areas contain asbestos. Entry into this space requires special training and Personal Protective Equipment as well as decontamination upon exiting the space. Has the interstitial space above this scope of work been abated? Does the V.A. expect full abatement (or just spot abatement?) and new fireproofing of this area included in contractors’ pricing? The scope of demolition of the suspended ceilings will contaminate the entire renovated area with asbestos. No Scope of Work is included in the Solicitation outlining how the situation is to be handled. Will the asbestos containing material be encapsulated and then any contamination on ducts, equipment ceilings, etc… require clean-up and testing?.
The interstitial space has not been fully abated.

Contractor is to remove asbestos fire proofing/overspray and debris where defined by the contract documents and provide new fire proofing.

Prior to demolition contractor is to remove asbestos containing materials from ceiling tiles.

Contractor is to remove asbestos containing materials rather then encapsulating them unless otherwise noted in contract documents and encapsulate existing to remain materials once complete.

24
9/10/18
9/19/18
In reference to Specification 02 82 11-1 1.1.2 Extent of Work, Is it required that the contractor expense to hire a VPIH/CIH to perform monitoring, inspections and testing throughout the abatement processing?

Per Paragraph 2.2.3 the contractor is to hire a CPIH/CIH to manage, monitor and perform inspections.

The VA will be responsible for providing the VPIH/CIH if it chooses to do so.

25
9/17/18
9/19/18
The Fire Alarm System depicts only Audio/Visual devices. Will these devices be chime/strobes or speaker/strobes? What system (manufacturer / model) is currently installed at this facility?

Chimes not speaker.

Existing fire alarm: Edwards EST 3

26
9/17/18
9/19/18
What Nurse Call System is currently installed in this area? Are the new devices to tie to the existing Nurse Call System or will it be a stand-alone system?

This is a new stand-alone system.

27
9/14/18
9/21/18
Will the Site Superintendent for this project, if properly qualified, also be allowed to serve in the roles of CQC and SSHO or will either of those positions require a separate individual?

No, separate individual for each

28
9/14/18
9/19/18
Section 01 45 29 – Testing Laboratory Services and Section 01 45 35 – Special Inspections were included in the Project Manual for this solicitation. We are unclear as to what materials may require testing or special inspections for this project. Will the VA specify what materials or assemblies will require these services for this project?

Refer to the last page of the specification. Special inspections are required for sprayed on fire proofing. Include 10 Man-Days for inspections.

29
9/14/18
9/19/18
Section 01 91 00 – General commission Requirements, Part 1.9-A indicates that the VA will hire the Commissioning Agent (CxA) for this project. Will the VA confirm they will hire the CxA by separate contract and that this will not be a cost to the Contractor?

VA will hire commissioning agent.

30
9/14/18
9/19/18
Section 09 06 00 – Schedule for Finishes is listed in the Specifications Table of Contents but was not provided in the manual. This section typically specifies the colors, finishes, characteristics of various architectural elements. To assist with the bidding process and to avoid issues later, will the VA issue this missing Specification Section?

Section 090600 has not been included.

31
9/14/18
9/19/18
Sheet EY104 depicts work for Nurse Call Systems. Will the VA issue the requisite Specification Section for this Nurse Call work?

Stand alone 120 v device no specification has been provided.

32
9/14/18
9/19/18
Sheet EY104 depicts work for Nurse Call Systems. Will the VA clarify if this Nurse Call System will be integrated into an existing system or whether it is “stand alone”? If the Nurse Call System is to be integrated into an existing system, will the VA specify what the existing system is, what company is currently maintaining this system, and whether the system is proprietary?

Stand alone.

33
9/18/18
9/19/18
Sheet ET104-INT 4th Floor Interstitial Telecom Plan Key Notes #2 states to terminate at room BB102A. The room BB102A cannot be located on the Drawings. Will the VA provide a site map depicting the location of Room BB102A?

See attached file. Contractor to assume 1300 ft run.

34
9/18/18
9/19/18
Sheet EY104 4th Floor Systems Plan states to connect to existing security panel (Hirsch Model 8). Key Notes #2 and #3 state to connect to existing Hirsch M8 Panel. A location for this panel is not found. Will the VA provide a location for this panel so that the length of this run can be determined?

Panel is approximately near column lines J.5 and 5. Contractor to verify exact location.

Additional Information:

ASBESTOS REPORTS

DETAIL FOR PATIENT LIFT THROUGH DOOR

MODIFIED DOOR SCHEDULE

LOCATION OF BB102A

SK-1.pdf

Drawing Number:Project Name:

Drawing Title:

Project Number:

Date:

Drawn By:

1/2' 1' 1 1/2'0 image3.emf

SK-2.pdf

Drawing Number:Project Name:

Drawing Title:

Project Number:

Date:

Drawn By:

image4.emf

LEVEL BB.pdf image5.emf image1.emf

VA San Diego 4th Floor West Wing Water Leak Draft ACM and Lead Survey Report & Work Plan- 02262018 - Combo.pdf

Hazardous Materials Assessment VA San Diego – 4th Floor West Wing 16043.2001

PRE-RENOVATION HAZARDOUS MATERIAL WORKPLAN &

HAZARDOUS MATERIALS SUPLEMENTAL SURVEY REPORT

Addendum to:

“ASBESTOS SURVEY REPORT VA SAN DIEGO HEALTHCARE SYSTEM – 4TH AND 3RD

FLOORS, WEST WING” & “ASBESTOS SURVEY REPORT VA SAN DIEGO HEALTHCARE

SYSTEM – 4TH AND 3RD FLOORS, WEST WING” Reports

Dated November 2017

FOR

VA SAN DIEGO HEALCARE SYSTEM

Medical Center – 4th Floor West Wing

3350 La Jolla Village Drive San Diego, CA 92161

PREPARED FOR

Dan Harper Paradigm Engineers and Constructors

Dublin, CA

PREPARED BY

Millennium Consulting Associates

2173 Salk Avenue, Suite 250 Carlsbad, CA 92008

February 23, 2018 http://www.mecaenviro.com/

SECTION 00002

DISCLAIMER NOTICE

Project Manual prepared by Millennium Consulting Associates (Millennium) under contract to:

Paradigm Engineers and Constructors Attention: Dan Harper Dublin, CA

No warranties, express or implied, are made by Millennium or its employees about the use of any information, apparatus, product, or process disclosed in this manual. Although reasonable efforts have been used to insure correctness, the Contractor should bring any discrepancies to the immediate attention of Millennium.

The specifications contained herein are developed for use on the U.S. Department of Veterans Affairs San Diego Medical Center.

The use of such information/or specification contained herein on other projects may result in serious legal liability and life safety consequences. Such is strictly prohibited without prior written permission from Millennium.

This project manual is provided for the sole purpose of bidding on the project work as outlined herein. Unauthorized use of this manual by bidders, or transfer of information/or specification contained herein to others by bidders shall be considered a violation of the bidder's license. The use of this document by unauthorized personnel for bidding of this project is strictly prohibited.

Millennium Consulting Associates, Inc.

DISCLAIMER NOTICE

00002 - 1

“Providing Premiere Environmental & Industrial Hygiene Services since 1986”

San Diego Office 2173Salk Ave, Ste. 250

Carlsbad, CA 92008 760.579.7300 www.mecaenviro.com

Project No. 16043.2001

TABLE OF CONTENTS

Cover Page………………………………………………

Disclaimer and Copyright Notice……………………………………………………...2

Table of Contents………………………………………………………………………

Traditional Asbestos Abatement…………………………………………………….…4

Lead-Based Paint Removal and Disposal…………………………………………59

ATTACHMENT 1

Hazardous Materials Supplemental Survey Report Dated February 23, 2018 Addendum to the “Asbestos Survey Report VA San Diego Healthcare System - 4th and 3rd Floors West Wing” & “Lead-Based Paint Survey Report VA San Diego Healthcare System - 4th and 3rd Floors West Wing” KMEA, Dated November 2015

LIST OF APPENDICES

APPENDIX A

APPENDIX B

Bulk Sample Analytical Laboratory Reports (Asbestos & Lead)

Sample Location Plan

Previous Asbestos & Lead-Based Paint Survey Reports - November 2017APPENDIX C

Fourth Floor West Wing Water Leak Damage Remediation VA San Diego

Pre-95% Submittal

02 82 11 - i

SECTION 02 82 11

TRADITIONAL ASBESTOS ABATEMENT

TABLE OF CONTENTS

PART 1 - GENERAL

1.1 SUMMARY OF THE WORK

1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS

1.1.2 EXTENT OF WORK

1.1.3 RELATED WORK

1.1.4 TASKS

1.1.5 CONTRACTORS USE OF PREMISES

1.2 VARIATIONS IN QUANTITY

1.3 STOP ASBESTOS REMOVAL

1.4 DEFINITIONS

1.4.1 GENERAL

1.4.2 GLOSSARY

1.4.3 REFERENCED STANDARDS ORGANIZATIONS

1.5 APPLICABLE CODES AND REGULATIONS

1.5.1 GENERAL APPLICABILITY OF CODES, REGULATIONS, AND STANDARDS

1.5.2 Asbestos Abatement CONTRACTOR RESPONSIBILITY

1.5.3 FEDERAL REQUIREMENTS

1.5.4 STATE REQUIREMENTS

1.5.5 LOCAL REQUIREMENTS

1.5.6 STANDARDS

1.5.7 EPA GUIDANCE DOCUMENTS

1.5.8 NOTICES

1.5.9 PERMITS/LICENSES

1.5.10 POSTING AND FILING OF REGULATIONS

1.5.11 VA RESPONSIBILITIES

1.5.12 EMERGENCY ACTION PLAN AND ARRANGEMENTS

1.5.13 PRE-CONSTRUCTION MEETING

1.6 PROJECT COORDINATION

1.6.1 PERSONNEL

1.7 RESPIRATORY PROTECTION

1.7.1 GENERAL - RESPIRATORY PROTECTION PROGRAM

1.7.2 RESPIRATORY PROTECTION PROGRAM COORDINATOR

1.7.3 SELECTION AND USE OF RESPIRATORS

02 82 11 - ii

1.7.4 MINIMUM RESPIRATORY PROTECTION

1.7.5 MEDICAL WRITTEN OPINION

1.7.6 RESPIRATOR FIT TEST

1.7.7 RESPIRATOR FIT CHECK

1.7.8 MAINTENANCE AND CARE OF RESPIRATORS

1.7.9 SUPPLIED AIR SYSTEMS

1.8 WORKER PROTECTION

1.8.1 TRAINING OF ABATEMENT PERSONNEL

1.8.2 MEDICAL EXAMINATIONS

1.8.3 REGULATED AREA ENTRY PROCEDURE

1.8.4 DECONTAMINATION PROCEDURE

1.8.5 REGULATED AREA REQUIREMENTS

1.9 DECONTAMINATION FACILITIES

1.9.1 DESCRIPTION

1.9.2 GENERAL REQUIREMENTS

1.9.3 TEMPORARY FACILITIES TO THE PDF and W/EDF

1.9.4 PERSONNEL DECONTAMINATION FACILITY (PDF)

1.9.5 WASTE/EQUIPMENT DECONTAMINATION FACILITY (W/EDF)

1.9.6 WASTE/EQUIPMENT DECONTAMINATION PROCEDURES

PART 2 - PRODUCTS, MATERIALS AND EQUIPMENT

2.1 MATERIALS AND EQUIPMENT

2.1.1 GENERAL REQUIREMENTS

2.2 MONITORING, INSPECTION AND TESTING

2.2.1 GENERAL

2.2.2 SCOPE OF SERVICES OF THE VPIH/CIH CONSULTANT

2.2.3 MONITORING, INSPECTION AND TESTING BY CONTRACTOR CPIH/CIH

2.3 ASBESTOS hAZARD aBATEMENT pLAN

2.4 SUBMITTALS

2.4.1 PRE-START MEETING SUBMITTALS

2.4.2 SUBMITTALS DURING ABATEMENT

2.4.3 SUBMITTALS AT COMPLETION OF ABATEMENT

2.5 ENCAPSULANTS

2.5.1 TYPES OF ENCAPSULANTS

2.5.2 PERFORMANCE REQUIREMENTS

2.5.3 CERTIFICATES OF COMPLIANCE

PART 3 - EXECUTION

3.1 REGULATED AREA PREPARATIONS

02 82 11 - iii

3.1.3.1 ................................................................................................................................................. DE

SIGN AND LAYOUT

3.1.3.2 ................................................................................................................................................. NE

GATIVE AIR MACHINES (HEPA UNITS)

3.1.3.3 ................................................................................................................................................. PR

ESSURE DIFFERENTIAL

3.1.3.4 ................................................................................................................................................. MO

NITORING

3.1.3.5 ................................................................................................................................................. AU

XILIARY GENERATOR

3.1.3.6 ................................................................................................................................................... SU

PPLEMENTAL MAKE-UP AIR INLETS

3.1.3.7 ................................................................................................................................................. TE

STING THE SYSTEM

3.1.3.8 ................................................................................................................................................. DE MONSTRATION OF THE NEGATIVE PRESSURE Filtration SYSTEM

3.1.3.9 ................................................................................................................................................. US

E OF THE NEGATIVE PRESSURE FILTRATION SYSTEM DURING ABATEMENT

OPERATIONS

3.1.3.10 DISMANTLING THE SYSTEM

3.1.4 CONTAINMENT BARRIERS AND COVERINGS IN THE REGULATED AREA

3.1.4.1 GENERAL

3.1.4.2 PREPARATION PRIOR TO SEALING THE REGULATED AREA

3.1.4.3 CONTROLLING ACCESS TO THE REGULATED AREA

3.1.4.4 CRITICAL BARRIERS

3.1.4.5 PRIMARY BARRIERS

3.1.4.6 SECONDARY BARRIERS

3.1.4.7 EXTENSION OF THE REGULATED AREA

3.1.4.8 FIRESTOPPING

3.1.5 Sanitary facilities

3.1.6 PERSONAL PROTECTIVE EQUIPMENT

3.1.7 Pre-cleaning

3.1.8 PRE-ABATEMENT ACTIVITIES

3.1.8.1 PRE-ABATEMENT Meeting

3.1.8.2 PRE-ABATEMENT CONSTRUCTION AND OPERATIONS

3.1.8.3 PRE-ABATEMENT INSPECTIONS AND PREPARATIONS

3.2 REMOVAL OF ACM

3.2.1 WETTING acm

3.2.2 SECONDARY BARRIER AND WALKWAYS

3.2.3 WET REMOVAL OF ACM

3.2.4 WET REMOVAL OF AMOSITE

02 82 11 - iv

3.3 LOCKDOWN ENCAPSULATION

3.3.1 GENERAL

3.3.2 DELIVERY AND STORAGE

3.3.3 WORKER PROTECTION

3.3.4 ENCAPSULATION OF SCRATCH COAT PLASTER OR PIPING

3.3.5 SEALING EXPOSED EDGES

3.4 DISPOSAL OF ACM WASTE MATERIALS

3.4.1 GENERAL

3.4.2 PROCEDURES

3.5 PROJECT DECONTAMINATION

3.5.1 GENERAL

3.5.2 REGULATED AREA CLEARANCE

3.5.3 WORK DESCRIPTION

3.5.4 PRE-DECONTAMINATION CONDITIONS

3.5.5 FIRST CLEANING

3.5.6 PRE-CLEARANCE INSPECTION AND TESTING

3.5.7 LOCKDOWN ENCAPSULATION OF ABATED SURFACES

3.6 FINAL VISUAL INSPECTION AND AIR CLEARANCE TESTING

3.6.1 GENERAL

3.6.2 FINAL VISUAL INSPECTION

3.6.3 FINAL AIR CLEARANCE TESTING

3.6.4 FINAL AIR CLEARANCE PROCEDURES

3.6.5 CLEARANCE SAMPLING USING PCM – LESS THAN 260LF/160SF:

3.6.8 LABORATORY TESTING OF TEM SAMPLES

3.7 ABATEMENT CLOSEOUT AND CERTIFICATE OF COMPLIANCE

3.7.1 COMPLETION OF ABATEMENT WORK

3.7.2 CERTIFICATE OF COMPLETION BY CONTRACTOR

3.7.3 WORK SHIFTS

ATTACHMENT #1

ATTACHMENT #2

ATTACHMENT #4

02 82 11 - 1

SECTION 02 82 11

CLASS I NEGATIVE PRESSURE ENCLOSURE ASBESTOS ABATEMENT SPECIFICATIONS

PART 1 - GENERAL

1.1 SUMMARY OF THE WORK

1.1.1 CONTRACT DOCUMENTS AND RELATED REQUIREMENTS

Drawings, general provisions of the contract, including general and supplementary conditions and other Division 01 specifications, shall apply to the work of this section. The contract documents show the work to be done under the contract and related requirements and conditions impacting the project. Related requirements and conditions include applicable codes and regulations, notices and permits, existing site conditions and restrictions on use of the site, requirements for partial owner occupancy during the work, coordination with other work and the phasing of the work. In the event the Asbestos Abatement Contractor discovers a conflict in the contract documents and/or requirements or codes, the conflict must be brought to the immediate attention of the Contracting Officer for resolution. Whenever there is a conflict or overlap in the requirements, the most stringent shall apply. Any actions taken by the Contractor without obtaining guidance from the Contracting Officer shall become the sole risk and responsibility of the Asbestos Abatement Contractor. All costs incurred due to such action are also the responsibility of the Asbestos Abatement Contractor.

1.1.2 EXTENT OF WORK

A. Below is a brief description of the estimated quantities of asbestos containing materials to be abated. These quantities are for informational purposes only and are based on the best information available at the time of the specification preparation. The Contractor shall satisfy himself as the actual quantities to be abated. Nothing in this section may be interpreted as limiting the extent of work otherwise required by this contract and related documents.

B. Removal, clean-up and disposal of asbestos containing materials (ACM) and asbestos/waste contaminated elements in an appropriate regulated area for the following approximate quantities:

• 50 linear feet of <50 mm (2") diameter asbestos-containing pipe insulation (elbows & fittings only)

• 2,000 square feet of wallboard assembly systems

• 4,000 square feet of sprayed-on fireproofing (at select points of connection only – not full removal of all fireproofing in designated work areas

• 5,000 square feet fireproofing debris on non-asbestos containing acoustical ceiling panel, removal and decontamination

• 100 square feet of asbestos-containing duct sealant material

02 82 11 - 2

1.1.3 RELATED WORK

A. Section 02 41 00, DEMOLITION.

B. Division 22, PLUMBING.

C. Section 22 05 19, METERS AND GAGES FOR PLUMBING PIPING / Section 22 05

23, GENERAL-DUTY VALVES FOR PLUMBING PIPING / Section 22 05 33, HEAT

TRACING FOR PLUMBING PIPING

D. Section 23 31 00, HVAC DUCTS AND CASINGS / Section 23 37 00, AIR OUTLETS

AND INLETS.

1.1.4 TASKS

The work tasks are summarized briefly as follows:

A. Pre-abatement activities including pre-abatement meeting(s), inspection(s), notifications, permits, submittal approvals, regulated area preparations, emergency procedures arrangements, and standard operating procedures for asbestos abatement work.

B. Abatement activities including removal, encapsulation, clean-up and disposal of ACM waste, recordkeeping, security, monitoring, and inspections.

C. Cleaning and decontamination activities including final visual inspection, air monitoring and certification of decontamination.

1.1.5 CONTRACTORS USE OF PREMISES

A. The Contractor and Contractor's personnel shall cooperate fully with the VA representative/consultant to facilitate efficient use of buildings and areas within buildings. The Contractor shall perform the work in accordance with the VA specifications, drawings, phasing plan and in compliance with any/all applicable Federal, State and Local regulations and requirements.

B. The Contractor shall use the existing facilities in the building strictly within the limits indicated in contract documents as well as the approved VA Design and Construction Procedures. VA Design and Construction Procedures drawings of partially occupied buildings will show the limits of regulated areas; the placement of decontamination facilities; the temporary location of bagged waste ACM; the path of transport to outside the building; and the temporary waste storage area for each building/regulated area. Any variation from the arrangements shown on drawings shall be secured in writing from the VA representative through the pre-abatement plan of action. The following limitations of use shall apply to existing facilities shown on drawings:

• Contractor shall coordinate materials storage locations;

• Contractor shall coordinate waste load out – including waste manifest signatures - with Owner

1.2 VARIATIONS IN QUANTITY

The quantities and locations of ACM as indicated on the drawings and the extent of work included in this section are estimated which are limited by the physical constraints imposed by occupancy of the buildings and accessibility to ACM. Accordingly, minor variations (+/- 5%) in quantities of ACM within the regulated area are considered as having no impact on contract price and time requirements of this contract. Where additional work is required beyond the above variation, the contractor shall provide

02 82 11 - 3 unit prices for newly discovered ACM and those prices shall be used for additional work required under the contractor.

1.3 STOP ASBESTOS REMOVAL

If the Contracting Officer; their field representative; (the facility Safety Officer/Manager or their designee, or the VA Professional Industrial Hygienist/Certified Industrial Hygienist (VPIH/CIH) presents a verbal Stop Asbestos Removal Order, the Contractor/Personnel shall immediately stop all asbestos removal and maintain HEPA filtered negative pressure air flow in the containment and adequately wet any exposed ACM.

If a verbal Stop Asbestos Removal Order is issued, the VA shall follow-up with a written order to the Contractor as soon as it is practicable.

The Contractor shall not resume any asbestos removal activity until authorized to do so in writing by the VA Contracting Officer. A stop asbestos removal order may be issued at any time the VA Contracting Officer determines abatement conditions/activities are not within VA specification, regulatory requirements or that an imminent hazard exists to human health or the environment. Work stoppage will continue until conditions have been corrected to the satisfaction of the VA. Standby time and costs for corrective actions will be borne by the Contractor, including the VPIH/CIH time. The occurrence of any of the following events shall be reported immediately by the Contractor’s competent person to the VA Contracting Office or field representative using the most expeditious means (e.g., verbal or telephonic), followed up with written notification to the Contracting Officer as soon as practical. The Contractor shall immediately stop asbestos removal/disturbance activities and initiate fiber reduction activities:

A. Airborne PCM analysis results equal to or greater than 0.01 f/cc outside a regulated area or >0.05 f/cc inside a regulated area;

B. breach or break in regulated area containment barrier(s);

C. less than –0.02” WCG pressure in the regulated area;

D. serious injury/death at the site;

E. fire/safety emergency at the site;

F. respiratory protection system failure;

G. power failure or loss of wetting agent; or H. any visible emissions observed outside the regulated area.

1.4 DEFINITIONS

1.4.1 GENERAL

Definitions and explanations here are neither complete nor exclusive of all terms used in the contract documents, but are general for the work to the extent they are not stated more explicitly in another element of the contract documents. Drawings must be recognized as diagrammatic in nature and not completely descriptive of the requirements indicated therein.

1.4.2 GLOSSARY

Abatement - Procedures to control fiber release from asbestos-containing materials. Includes removal, encapsulation, enclosure, demolition, and renovation activities related to asbestos containing materials (ACM).

Aerosol - Solid or liquid particulate suspended in air.

Adequately wet - Sufficiently mixed or penetrated with liquid to prevent the release of particulates. If visible emissions are observed coming from the ACM, then that material has not been adequately wetted.

02 82 11 - 4

Aggressive method - Removal or disturbance of building material by sanding, abrading, grinding, or other method that breaks, crumbles, or disintegrates intact ACM.

Aggressive sampling - EPA AHERA defined clearance sampling method using air moving equipment such as fans and leaf blowers to aggressively disturb and maintain in the air residual fibers after abatement.

AHERA - Asbestos Hazard Emergency Response Act. Asbestos regulations for schools issued in 1987.

Aircell - Pipe or duct insulation made of corrugated cardboard which contains asbestos.

Air monitoring - The process of measuring the fiber content of a known volume of air collected over a specified period of time. The NIOSH 7400 Method, Issue 2 is used to determine the fiber levels in air. For personal samples and clearance air testing using Phase Contrast Microscopy (PCM) analysis. NIOSH Method 7402 can be used when it is necessary to confirm fibers counted by PCM as being asbestos. The AHERA TEM analysis may be used for background, area samples and clearance samples when required by this specification, or at the discretion of the VPIH/CIH as appropriate.

Air sample filter - The filter used to collect fibers which are then counted. The filter is made of mixed cellulose ester membrane for PCM (Phase Contrast Microscopy) and polycarbonate for TEM (Transmission Electron Microscopy)

Amended water - Water to which a surfactant (wetting agent) has been added to increase the penetrating ability of the liquid.

Asbestos - Includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos, and any of these minerals that have been chemically treated or altered. Asbestos also includes PACM, as defined below.

Asbestos Hazard Abatement Plan (AHAP) - Asbestos work procedures required to be submitted by the contractor before work begins.

Asbestos-containing material (ACM) - Any material containing more than one percent of asbestos.

Asbestos-containing construction material (ACCM) - Any material containing more than one tenth of one percent of asbestos.

Asbestos contaminated elements (ACE) - Building elements such as ceilings, walls, lights, or ductwork that are contaminated with asbestos.

Asbestos-contaminated soil (ACS) – Soil found in the work area or in adjacent areas such as crawlspaces or pipe tunnels which is contaminated with asbestos-containing material debris and cannot be easily separated from the material.

Asbestos-containing waste (ACW) material - Asbestos-containing material or asbestos contaminated objects requiring disposal.

Asbestos Project Monitor – Some sates require that any person conducting asbestos abatement clearance inspections and clearance air sampling be licensed as an asbestos project monitor.

Asbestos waste decontamination facility - A system consisting of drum/bag washing facilities and a temporary storage area for cleaned containers of asbestos waste. Used as the exit for waste and equipment leaving the regulated area. In an emergency, it may be used to evacuate personnel.

Authorized person - Any person authorized by the VA, the Contractor, or government agency and required by work duties to be present in regulated areas.

Authorized visitor - Any person approved by the VA; the contractor; or any government agency representative having jurisdiction over the regulated area (e.g., OSHA, Federal and State EPA.

Barrier - Any surface the isolates the regulated area and inhibits fiber migration from the regulated area.

02 82 11 - 5

Containment Barrier - An airtight barrier consisting of walls, floors, and/or ceilings of sealed plastic sheeting which surrounds and seals the outer perimeter of the regulated area.

Critical Barrier - The barrier responsible for isolating the regulated area from adjacent spaces, typically constructed of plastic sheeting secured in place at openings such as doors, windows, or any other opening into the regulated area.

Primary Barrier – Plastic barriers placed over critical barriers and exposed directly to abatement work.

Secondary Barrier - Any additional plastic barriers used to isolate and provide protection from debris during abatement work.

Breathing zone - The hemisphere forward of the shoulders with a radius of about 150 - 225 mm (6 - 9 inches) from the worker's nose.

Bridging encapsulant - An encapsulant that forms a layer on the surface of the ACM.

Building/facility owner - The legal entity, including a lessee, which exercises control over management and recordkeeping functions relating to a building and/or facility in which asbestos activities take place.

Bulk testing - The collection and analysis of suspect asbestos containing materials.

Certified Industrial Hygienist (CIH) - A person certified in the comprehensive practice of industrial hygiene by the American Board of Industrial Hygiene.

Class I asbestos work - Activities involving the removal of Thermal System Insulation (TSI) and surfacing ACM and Presumed Asbestos Containing Material (PACM).

Class II asbestos work - Activities involving the removal of ACM which is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding shingles, and construction mastic.

Clean room/Changing room - An uncontaminated room having facilities for the storage of employee's street clothing and uncontaminated materials and equipment.

Clearance sample - The final air sample taken after all asbestos work has been done and visually inspected. Performed by the VA's professional industrial hygiene consultant/Certified Industrial Hygienist (VPIH/CIH).

Closely resemble - The major workplace conditions which have contributed to the levels of historic asbestos exposure, are no more protective than conditions of the current workplace.

Competent person - In addition to the definition in 29 CFR 1926.32(f), one who is capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, as specified in 29 CFR 1926.32(f); in addition, for Class I and II work who is specially trained in a training course which meets the criteria of EPA's Model Accreditation Plan (40 CFR 763) for supervisor.

Contractor's Professional Industrial Hygienist (CPIH/CIH) - The asbestos abatement contractor's industrial hygienist. The industrial hygienist must meet the qualification requirements of a PIH and may be a certified industrial hygienist (CIH).

Count - Refers to the fiber count or the average number of fibers greater than five microns in length with a length-to-width (aspect) ratio of at least 3 to 1, per cubic centimeter of air.

Crawlspace – An area which can be found either in or adjacent to the work area. This area has limited access and egress and may contain asbestos materials and/or asbestos contaminated soil.

02 82 11 - 6

Decontamination area/unit - An enclosed area adjacent to and connected to the regulated area and consisting of an equipment room, shower room, and clean room, which is used for the decontamination of workers, materials, and equipment that are contaminated with asbestos.

Demolition - The wrecking or taking out of any load-supporting structural member and any related razing, removing, or stripping of asbestos products.

VA Total – means a building or substantial part of the building is completely removed, torn or knocked down, bulldozed, flattened, or razed, including removal of building debris.

Disposal bag - Typically 6 mil thick sift-proof, dustproof, leak-tight container used to package and transport asbestos waste from regulated areas to the approved landfill. Each bag/container must be labeled/marked in accordance with EPA, OSHA and DOT requirements.

Disturbance - Activities that disrupt the matrix of ACM or PACM, crumble or pulverize ACM or PACM, or generate visible debris from ACM or PACM.

Disturbance includes cutting away small amounts of ACM or PACM, no greater than the amount that can be contained in one standard sized glove bag or waste bag in order to access a building component. In no event shall the amount of ACM or PACM so disturbed exceed that which can be contained in one glove bag or disposal bag which shall not exceed 60 inches in length or width.

Drum - A rigid, impermeable container made of cardboard fiber, plastic, or metal which can be sealed in order to be sift-proof, dustproof, and leak-tight.

Employee exposure - The exposure to airborne asbestos that would occur if the employee were not wearing respiratory protection equipment.

Encapsulant - A material that surrounds or embeds asbestos fibers in an adhesive matrix and prevents the release of fibers.

Encapsulation - Treating ACM with an encapsulant.

Enclosure - The construction of an air tight, impermeable, permanent barrier around ACM to control the release of asbestos fibers from the material and also eliminate access to the material.

Equipment room - A contaminated room located within the decontamination area that is supplied with impermeable bags or containers for the disposal of contaminated protective clothing and equipment.

Fiber - A particulate form of asbestos, 5 microns or longer, with a length to width (aspect) ratio of at least 3 to 1.

Fibers per cubic centimeter (f/cc) - Abbreviation for fibers per cubic centimeter, used to describe the level of asbestos fibers in air.

Filter - Media used in respirators, vacuums, or other machines to remove particulate from air.

Firestopping - Material used to close the open parts of a structure in order to prevent a fire from spreading.

Friable asbestos containing material - Any material containing more than one (1) percent or asbestos as determined using the method specified in appendix A, Subpart F, 40 CFR 763, section 1, Polarized Light Microscopy, that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.

Glovebag - Not more than a 60 x 60 inch impervious plastic bag-like enclosure affixed around an asbestos-containing material, with glove-like appendages through which materials and tools may be handled.

High efficiency particulate air (HEPA) filter – An ASHRAE MERV 17 filter capable of trapping and retaining at least 99.97 percent of all mono-dispersed particles of 0.3 micrometers in diameter.

HEPA vacuum - Vacuum collection equipment equipped with a HEPA filter system capable of collecting and retaining asbestos fibers.

02 82 11 - 7

Homogeneous area - An area of surfacing, thermal system insulation or miscellaneous ACM that is uniform in color, texture and date of application.

HVAC - Heating, Ventilation and Air Conditioning Industrial hygienist (IH) - A professional qualified by education, training, and experience to anticipate, recognize, evaluate and develop controls for occupational health hazards. Meets definition requirements of the American Industrial Hygiene Association (AIHA).

Industrial hygienist technician (IH Technician) - A person working under the direction of an IH or CIH who has special training, experience, certifications and licenses required for the industrial hygiene work assigned. Some states require that an industrial hygienist technician conducting asbestos abatement clearance inspection and clearance air sampling be licensed as an asbestos project monitor.

Intact - The ACM has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix.

Lockdown - Applying encapsulant, after a final visual inspection, on all abated surfaces at the conclusion of ACM removal prior to removal of critical barriers.

National Emission Standards for Hazardous Air Pollutants (NESHAP) - EPA's rule to control emissions of asbestos to the environment (40 CFR part 61, Subpart M).

Negative initial exposure assessment - A demonstration by the employer which complies with the criteria in 29 CFR 1926.1101 (f)(2)(iii), that employee exposure during an operation is expected to be consistently below the PEL.

Negative pressure - Air pressure which is lower than the surrounding area, created by exhausting air from a sealed regulated area through HEPA equipped filtration units. OSHA requires maintaining -0.02" water column gauge inside the negative pressure enclosure.

Negative pressure respirator - A respirator in which the air pressure inside the facepiece is negative during inhalation relative to the air pressure outside the respirator facepiece.

Non-friable ACM - Material that contains more than 1 percent asbestos but cannot be crumbled, pulverized, or reduced to powder by hand pressure.

Organic vapor cartridge - The type of cartridge used on air purifying respirators to remove organic vapor hazardous air contaminants.

Outside air - The air outside buildings and structures, including, but not limited to, the air under a bridge or in an open ferry dock.

Owner/operator - Any person who owns, leases, operates, controls, or supervises the facility being demolished or renovated or any person who owns, leases, operates, controls, or supervises the demolition or renovation operation, or both.

Penetrating encapsulant - Encapsulant that is absorbed into the ACM matrix without leaving a surface layer.

Personal sampling/monitoring - Representative air samples obtained in the breathing zone for one or workers within the regulated area using a filter cassette and a calibrated air sampling pump to determine asbestos exposure.

Permissible exposure limit (PEL) - The level of exposure OSHA allows for an 8 hour time weighted average. For asbestos fibers, the eight (8) hour time weighted average PEL is 0.1 fibers per cubic centimeter (0.1 f/cc) of air and the 30-minute Excursion Limit is 1.0 fibers per cubic centimeter (1 f/cc).

02 82 11 - 8

Personal protective equipment (PPE) – equipment designed to protect user from injury and/or specific job hazard. Such equipment may include protective clothing, hard hats, safety glasses, and respirators.

Pipe tunnel – An area, typically located adjacent to mechanical spaces or boiler rooms in which the pipes servicing the heating system in the building are routed to allow the pipes to access heating elements. These areas may contain asbestos pipe insulation, asbestos fittings, or asbestos-contaminated soil.

Polarized light microscopy (PLM) - Light microscopy using dispersion staining techniques and refractive indices to identify and quantify the type(s) of asbestos present in a bulk sample.

Polyethylene sheeting - Strong plastic barrier material 4 to 6 mils thick, semi-transparent, flame…