Final_SCOPE_OF_WORK_501-330.doc
DOC document 28 KB Posted
- Solicitation number
- 36E77618B0087
About this file
Final_SCOPE_OF_WORK_501-330
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77618B0087-0003000.docx | DOCX document | |
| 36E77618B0087-0004000.docx | DOCX document | |
| 36E77618B0087-0002002.pdf | ||
| 36E77618B0087-0002001.pdf | ||
| 36E77618B0087-0002003.pdf | ||
| 36E77618B0087-0002000.docx | DOCX document | |
| 36E77618B0087-0001000.docx | DOCX document | |
| 36E77618B0087_1.docx | DOCX document | |
| Specifications_-_Bldg_41-4A_20_Bed_Unit_Project_Manual_-_Issued_For_Bid_-_Volume_2.pdf | ||
| Wage_Determination_-_Building_-_New_Mexico.txt | TXT text file | |
| Zip_File_100__Drawings_Albuq_NM_02.zip | ZIP file | |
| Specification_-_Bldg_41-4A_20_Bed_Unit_Project_Manual_-_Issued_For_Bid_-_Volume_1.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
RENOVATE BLDG. 41-4A 20 BED WARD – 501-330
The Scope of Work provided in this project contract requires the construction of a renovated 15,514 SF Space within Bldg. 41-4A located at The Raymond G. Murphy VA Medical Center, 1501 San Pedro SE, Albuquerque NM 8108. The project involves the construction of an existing office area that was previously an inpatient ward within clinic Building 41.
Work includes, but is not limited to the completely prepare project site for building operations, including demolition and removal of existing site elements, and furnish labor and materials and perform work for Project 501-330, Renovate Bldg. 41 20 Bed Ward as required by drawings and specifications.
Work includes general construction, alterations, mechanical and electrical work, necessary removal of existing structures and construction, and certain other items. This project will expand Building 41 by 2,000 GSF and modernize quadrant 4A to provide 19 private patient rooms and improved patient care space. This renovation includes completely renovating 15,514 GSF to construct private bedrooms and bathrooms with necessary ancillary and staff support space. The expansion of 2000 GSF at the 4th floor level will include structural work for new construction needing to be lifted and installed approximately 80 feet above ground level.
Provide Asbestos Abatement Scope of Work as identified in Specifications Section 02 82 11 Traditional Asbestos Abetment, Section 02 82 13.13 Glovebag Asbestos Abatement and drawings as part of this contract. Abatement shall be performed in the Mechanical Room by traditional method as required by specification section 08 82 11 and by glove bagging method within the interstitial spaces as required by specification section 02 82 13.13.
Construction of all work duration is 441 Calendar Days, in accordance to all work within the drawings and specifications. Please see the specifications and drawings for further detail.
Statement of Information Security: The Certification and Accreditation do not apply, and therefore a Security Accreditation Package is not required.
File details come from the government source that posted it.