36E77618B0087-0004000.docx
DOCX document 18 KB Posted
- Solicitation number
- 36E77618B0087
About this file
36E77618B0087 0004 36E77618B0087 0004.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77618B0087-0003000.docx | DOCX document | |
| 36E77618B0087-0002002.pdf | ||
| 36E77618B0087-0002001.pdf | ||
| 36E77618B0087-0002003.pdf | ||
| 36E77618B0087-0002000.docx | DOCX document | |
| 36E77618B0087-0001000.docx | DOCX document | |
| 36E77618B0087_1.docx | DOCX document | |
| Final_SCOPE_OF_WORK_501-330.doc | DOC document | |
| Specifications_-_Bldg_41-4A_20_Bed_Unit_Project_Manual_-_Issued_For_Bid_-_Volume_2.pdf | ||
| Wage_Determination_-_Building_-_New_Mexico.txt | TXT text file | |
| Zip_File_100__Drawings_Albuq_NM_02.zip | ZIP file | |
| Specification_-_Bldg_41-4A_20_Bed_Unit_Project_Manual_-_Issued_For_Bid_-_Volume_1.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI 4-6 for Solicitation No. 36E77618B0087 Renovate B-41, 4A, 20 Bed Ward
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 09-06-2018 501-330
PCAC
Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence
OH
44131
PCAC
Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence
OH
44131 To all Offerors/Bidders
36E77618B0087 09-06-2018
X X X X 1 (one) Please see attached page for Technical Questions responses
Carlton Moreland Contracting Officer
Question:
They have requested IRC (In Rail Charging), but with the traverse rail switches, etc… we cannot do IRC, we must have a wall-charging unit.
Answer:
Provide wall charging unit and associated power required to charger. Provide receptacle at 60” O.F.F. and tie into existing junction box above ceiling Sheet EJ140A (keynote 7), sheet EJ140A a receptacle, but circuiting is already there.
Question:
They are listing gaps in the rails for the bathroom doors, and we need to confirm that the door gaps are smaller than 40 mm (about 1.5 inches) Answer:
See Spec Section 08-13-70 INTERIOR SLIDING ALUMINUM-FRAMED DOORS 2.2 Manufacture and 2.3Interior Sliding Aluminum Door. “AIR” 1500 Symmetrical Stile/Profile Depth: 42 mm (1-5/8 inches). Also see attached Sliding Door System AIR Product List for additional information. If this door is not adequate for
Question:
Using document SF-501 Patient Lift Supports Drawing as a reference – there are questions about pendant install (Section F6). It is unclear the spacing and engineering of how the pendants will be secured and if the roof/attachment material has been rated to hold the 1100 lbs. request they have made. Are there more drawings or has engineering already been completed, or if we need to provide engineering?
Answer:
There are not any more drawings The intent of the Structural drawings was to show a point and method of connection to the existing Structure only. Provide engineering to ensure proper rating for installation of patient lift system as required for the engineering of the supports by the supplier. Also reference Specification 11 70 00, 1.3 Submittals, 2.5 Seismic Requirements.
File details come from the government source that posted it.