This is Amendment 0003 to a Request for Quotes (RFQ) for septic pumping and inspection services at Tahoma National Cemetery in Kent, Washington. The amendment extends the quote deadline from 04/02/2026 to 05/06/2026 at 12:00 p.m. America/Chicago time, publishes answers to vendor questions, and revises the performance statement.
The Statement of Work requires a one-year firm-fixed-price contract with a possible one-year option to provide septic tank pumping and inspection services for three existing septic tanks (1,750 gallons at Site A, 1,750 gallons at Site B, and 1,000 gallons at Site C). The contractor must pump the 1,750-gallon tanks at Sites A and B semi-annually (3-7 business days prior to Memorial Day and Veterans Day with 10 working days' notice), pump the 1,000-gallon tank at Site C every other month on the first Wednesday with 10 working days' written notice, and perform annual inspections during Memorial Day pumping services. Services include removal and disposal of all effluent and waste, cleanup of spilled materials, visual tank inspections documenting condition and accessibility, evidence of structural damage or leaks, inlet/outlet baffle conditions, and signs of improper operation. The contractor must measure and document volumes using calibrated equipment, prevent over-pumping beyond tank capacity, submit complete service documentation within five business days, test septic tank alarm systems during annual inspections, and provide disposal facility receipts. All work must comply with federal, state, and local regulations, OSHA standards including confined space entry procedures, and be performed during normal business hours Monday through Friday, 8:00 a.m. to 4:00 p.m., accompanied by the Contracting Officer Representative or designated cemetery personnel. The contractor must be properly licensed and certified with all required state and local septic hauler licenses and permits, valid commercial driver's licenses, and documented employee training in confined space hazards, spill prevention, and traffic control. The Quality Assurance Surveillance Plan establishes 100% acceptance quality levels for proper licensing, authorized personnel only, pumping limited to tank capacity, volume measurement and documentation, inspection performance, environmental protection, site restoration, disposal compliance, timely report submission, and invoice accuracy.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document Number: 36C78626Q50127 Page 1 of 19
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 19
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
04/29/2026
4. REQUISITION/PURCHASE REQ. NUMBER 5. PROJECT NUMBER (If applicable)
36C786CODE
NATIONAL CEMETERY ADMIN (786)
NATIONAL CEMETERY ADMINISTRATION
DEPT OF VETERANS AFFAIRS
18434 JOPLIN RD.
TRIANGLE, VA 22172
6. ISSUED BY CODE7. ADMINISTERED BY (If other than Item 6)
9A. AMENDMENT OF SOLICITATION NUMBER
36C78626Q50127
CODE FACILITY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)
X 9B. DATED (SEE ITEM 11)
04/02/2026
10A. MODIFICATION OF CONTRACT/ORDER
NUMBER
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Purpose of amendment 0003 is to publish answers to vendors' questions, revise the performance statement, and to extend the deadline for quotes to 05/06/2026.
CLOSING DATE/TIME:
05/06/2026 - 12:00 America/Chicago
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Ralph Crum
(Signature of person authorized to sign)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
By (Signature of Contracting Officer)
16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
NSN 7540-01-152-8070
Previous edition unusable
STANDARD FORM 30 (REV.
11/2016) Prescribed by GSA FAR (48 CFR) 53.243
Document Number: 36C78626Q50127 Page 2 of 19
Table of Contents
Section Description Page Number
1 SOW 04292026
3 Documents, Exhibits, or Attachments 3 Answers to Vendors Questions 0003
Document Number: 36C78626Q50127 Page 3 of 19
Document Number: 36C78626Q50127 Page 4 of 19
Statement of Work
Septic Pumping and Inspection Requirement
Tahoma National Cemetery
The National Cemetery Administration (NCA) honors veterans with a final resting place and
Lasting memorials that commemorate their service to our Nation. The standards of appearance and procedures performed by the Contractor at Tahoma National Cemetery shall reflect the nation’s concern for those buried here and exhibit absolute decorum, composure, and stability
The purpose of this Request is to retain septic pumping and inspection services for the Tahoma National Cemetery for 1 year.
1. Period of Performance
(Period of Performance is One (1) Year with a possible One (1) Option Year (If needed), due to the expansion of Tahoma National Cemetery and changes to the scope of Septic services that will be needed in Mid-2027 to 2028. A New Solicitation for Septic Services with a Five (5) Year Period of
Performance will be published before completion of the expansion.)
2. Place of Performance: The contractor shall provide materials, equipment, labor, and supervision necessary to perform septic pumping and inspection services at Tahoma National Cemetery, located at:
Tahoma National Cemetery
18600 SE 240th Street
Kent, WA 98042
3. Type of Contract:
The government will award a definitive quantity firm-fixed price contract.
Document Number: 36C78626Q50127 Page 5 of 19
4. Scope of Work
The contractor shall provide septic tank pumping and inspection services for three (3) existing septic tanks located at Tahoma National Cemetery. Services shall be performed in accordance with all applicable federal, state, and local health and environmental regulations and shall be limited to the design capacity of each tank.
4.1 Tank Locations and Capacities
Public Information Center (PIC) – Site A - 1750-gallons.
Administration Building – Site B - 1750-gallons.
Temporary Honor Guard Trailer – Site C - 1000-gallons.
4.2 The Contractor shall remove and dispose of all effluent, sewage, liquid, semi-liquid, solid waste matter, debris, trash, and/or any material from the Septic tanks. The Contractor shall clean up all spilled, dropped, and/or leaked materials including but not limited to sewage, water, chemicals, and grease; because of pumping and related activities inside and/or surrounding the pumping access area for the Septic Tanks.
4.3 The septic tanks at site A, B and C all have two access covers, while sites A and B also have an additional cover for the pump chamber. Access to the covers for servicing the tanks should not require any digging, possibly will require some turf removal that occasionally grows over the top between service calls. (See attachments for pictures).
Document Number: 36C78626Q50127 Page 6 of 19
4.4 CLIN Structure
Contract Line-Item Number
Description Quantity Unit
Pumping of the 1750-gallon septic tank at Site A and B semi-annually – 3 to 7 business days prior to Memorial Day and Veterans Day. Services shall be scheduled with the COR at least 10 working days in advance of the proposed service date.
2 JB
Pumping of the 1000-gallon septic tank at Site C every other month on the first Wednesday. Services shall be confirmed with the COR in writing; at least 10 working days in advance of the service.
6 JB
Inspection of the septic systems at sites A, B and C on an annual basis, during the pumping services performed by the contractor for Memorial Day. During this service the contractor shall also test the septic tank alarm system on the pump tanks as part of this inspection.
Contractor shall report inspection findings to the COR within 3 business days.
1 JB
5. General Requirements
5.1 The contractor (including subcontractors if applicable), shall perform pumping and inspection services using properly licensed personnel and equipment, to include: all required state and local septic hauler licenses and permits for each jurisdiction in which services are performed. All drivers must hold valid commercial driver’s licenses (CDLs) appropriate for the vehicle weight and configuration operated. The Contractor shall comply with all applicable OSHA standards, including but not limited to confined space entry, trenching and excavation, lockout/tagout procedures, and personal protective equipment (PPE) requirements.
Additionally, the Contractor shall ensure that all employees performing work have documented training in confined space hazards associated with septic tanks and vaults, spill prevention and response procedures, traffic control practices when working near roadways or public access
Document Number: 36C78626Q50127 Page 7 of 19 areas, and safe equipment operation and fall protection as applicable. Documentation evidencing the above will be provided upon request by the cemetery.
5.2 The Contractor shall ensure pumping volumes do not exceed the designed tank capacity and shall prevent over-pumping or unnecessary service.
5.3 The Contractor shall be responsible for maintaining satisfactory standards of personnel conduct and work performance and shall administer disciplinary action as required. The
Contractor is expected to remove any staff for cause. Should the Contractor fail to act in this regard, or the reason for removal is immediately required to protect the interests of the
Government, the COR may request removal of contractor staff from the premises.
6. Pumping Requirements
6.1 Pumping shall be limited to removal of septic contents up to the design capacity of each tank.
6.2 The Contractor shall measure and document the volume removed from each tank at the site using calibrated equipment.
6.3 Pumping shall cease once the tank has been fully evacuated to normal operating levels.
6.4 Over-pumping beyond tank capacity or charging for volumes in excess of capacity is prohibited.
7. Inspection Requirements
At the time of pumping, the Contractor shall visually inspect each tank and note:
7.1 Tank condition and accessibility
7.2 Evidence of structural damage or leaks
7.3 Condition of inlet/outlet baffles (if visible)
7.4 Signs of improper operation or prior over-servicing
Findings shall be documented in a written inspection report
7.5 Measurement, Documentation and Verification
For each site, the Contractor shall provide:
• Date and time of service
• Tank location and capacity
Document Number: 36C78626Q50127 Page 8 of 19
• Volume pumped (in gallons)
• Mehtod of volume measurement
• Disposal facility name and disposal receipt
• Name and license number of personnel performing the work
• All documentation shall be provided to the COR at Tahoma National Cemetery electronically within five (5) business days of service.
8. Environmental and Site Protection
8.1 The Contractor shall prevent spills, leaks, or contamination of cemetery grounds
8.2 Any damage to Government property resulting from Contractor operations shall be repaired at no cost to the Government.
8.3 The site shall be restored to its original condition upon completion.
8.4 When onsite, the Contractor shall assume sole responsibility for the safety of all persons on, or about, the work site in accordance with applicable laws and codes.
8.5 Contractor shall also guard all hazards in accordance with the safety provisions of the latest manual of accident prevention published by the Associated General Contractors of America and
OSHA.
9. Government Oversight
The Government reserves the right to:
9.1 Observe pumping operations on site
9.2 Verify volume measurements
9.3 Reject services that exceed tank capacity or do not comply with this SOW.
10. Deliverables
Pumping and inspection report for each tank
Disposal Documentation
Volume Measurement Records
11. Hours of Operation
The Contractor shall perform all services during normal business hours of Monday through
Document Number: 36C78626Q50127 Page 9 of 19
Friday, 8:00am to 4:00pm (preferably early morning) and be accompanied by the Contracting Officer
Representative (COR) or designated cemetery personnel.
The Contractor shall ensure continuous operations of septic systems during service operations.
Services shall not interfere with other cemetery operations, such as burial services, grounds maintenance, construction, etc.
12. Quality Assurance Surveillance Plan (QASP)
SOW
Requirement
Performance
Standard
Surveillance
Method
Frequency Acceptable
Quality Level
(AQL)
Proper Licensing and certification
Contractor and personnel possess all required state and local licenses and certifications
Document review Prior to service and annually
100%
Authorized
Personnel Only
Work performed by approved contractor personnel; no unauthorized subcontracting
On-site observation
Each service 100%
Pumping limited to tank capacity
Pumped volume does not exceed capacity of each tank
On-Site verification and document review
Each service 100%
Volume measurement and documentation
Pumped volume measured using calibrated equipment and documented
Report Review Each service 100%
Document Number: 36C78626Q50127 Page 10 of 19
Inspection performance
Visual inspection conducted and findings documented
On-site observation
Each service 100%
Environmental
Protection
No spills, leaks or contamination of grounds
On-site observation
Each service 100%
Site Restoration Tanks access secured; site returned to pre-service condition
On-site observation
Each service 100%
Disposal
Compliance
Waste disposed at approved facility with receipt provided
Document review Each service 100%
Timely
Submission of reports
Complete service documentation submitted within required timeframe
Document review Each service 100%
Invoice accuracy Invoiced quantities and charges align with tank capacity and service performed
Invoice Review Each Invoice 100%
13. QUALITY CONTROL: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed
Document Number: 36C78626Q50127 Page 11 of 19 change to his QC system. Contractor shall submit quality control plan 10 days post award date to contracting officer and contracting officer representative.
14. QUALITY ASSURANCE: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
END OF STATEMENT OF WORK
LIST OF EXHIBITS
Exhibit Number of Pages
Exhibit A – Site Plan of Tahoma National Cemetery
Exhibit B – Site A
Exhibit C – Site B………
Exhibit D – Site C
Document Number: 36C78626Q50127 Page 12 of 19
Exhibit A:
Document Number: 36C78626Q50127 Page 13 of 19
Exhibit B:
Document Number: 36C78626Q50127 Page 14 of 19
Exhibit C:
Document Number: 36C78626Q50127 Page 15 of 19
Exhibit C:
Document Number: 36C78626Q50127 Page 16 of 19
Document Number: 36C78626Q50127 Page 17 of 19
Deliveries or Performance
Section 3 - Documents, Exhibits, or Attachments Title Dates Number of
Pages Statement of Work - DELETED 04/02/2026
Document Number: 36C78626Q50127 Page 18 of 19
36C78626Q50127 0003
1. Will water be provided by the government?
Answer: Cemetery does not supply water and there is no water hookups close to use.
2. Is there a historical disposal facility being used for this contract?
Answer: Unknown. The last contractor did not disclose a disposal facility.
3. Regarding the Tahoma National Cemetery septic contract (Notice ID 36C78626Q50127), I noticed that pre-approval is required before bringing on a subcontractor. Would it be possible to obtain that approval?
Answer: See the revised performance work statement, specifically subparagraph 5.1.
4. Could you confirm if the alarms to be tested are located on the pump tanks or the septic tanks?
Answer: Overflow alarms are located in the pump tanks at site A and B. As site C is just a holding tank, it’s located in the holding tank.
5. In the event an alarm is triggered or a pump failure is detected during inspection, what is the government's expected response protocol? Who is responsible for the actual repair or replacement of mechanical pump components?
Answer: This is a service contract. Repairs fall under construction. Therefore, any repairs or work that needs to be done will be done by the government, or on a separate contract that would go through the normal solicitation process. There by eliminating the chance of the servicing contractor trying to make work for itself.
6. Many systems of this type utilize baffle screens that require cleaning every six months to ensure proper flow. Does the current scope of work for the annual inspection or bi-monthly service include the cleaning and maintenance of these baffle screens?
Answer: no.
Document Number: 36C78626Q50127 Page 19 of 19