Attachment-B - Price Schedule - GMS - Ft. Mitchell National Cemetery.xlsx
XLSX spreadsheet 61 KB Posted
- Attached to
- S208- Complete Grounds Maintenance Services at Fort Mitchell National Cemetery, Fort Mitchell Alabama
- Solicitation number
- 36C78626Q50096
About this file
This is a pricing schedule for complete grounds maintenance services at Fort Mitchell National Cemetery in Fort Mitchell, Alabama. The contract uses a base year plus four option year structure, with pricing organized by Contract Line Item Numbers (CLINs) corresponding to specific maintenance tasks. The schedule covers two distinct periods: a full-year grounds maintenance contract (GMS) and a partial interim period (January through April) prior to award.
The full-year GMS section includes approximately 40 line items across Base Year and Option Years 1-4, with quantities that increase slightly year-over-year reflecting anticipated growth in burial activity. Key service categories include headstone services (preparation, installation, raising/realigning at 675-700 units annually), turf maintenance and mowing (weekly services across 56 acres), grounds repair and sod installation (25,000 square feet annually), irrigation maintenance and repairs (hourly rate labor at $30.00 per hour for as-needed work), chemical applications (fertilization, weed control, insecticide, fungicide treatments), cleaning and pressure washing services (performed bi-annually to quarterly), landscaping and tree maintenance, and burial support services. The interim period (January-April) pricing schedule covers a reduced set of seasonal services including headstone trimming, edging, headstone and pressure washing activities, with estimated weekly quantities of 18 total weeks across the four-month period. All cost cells in both sections currently display $0.00, indicating this is a template awaiting contractor pricing submissions. The contract references Service Contract Act WD #2015-4527 for most CLINs and Davis-Bacon Act WD #AL20260095 for highlighted CLINs.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GM WO $ Estimate (2)
| Fort Mitchell National Cemetery Complete Grounds Maintenance Requirement | ||||||||
| Base Year | ||||||||
| CLIN | SOW | Description | Unit of Issue | Cost | Qty | Total | 1.5% | 2% |
| 0001 | B.6.1 | Headstone preparation, and transportation | EA | $0.00 | 675 | $0.00 | ||||||||||||
| 0002 | B.6.4 | Fine Tune Alignment ("Bump and Run), based upon GAR results | EA | $0.00 | 50 | $0.00 | ||||||||||||
| 0003 | B.7.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 675 | $0.00 | ||||||||||||
| 0004 | B.7.2 | Mowing Turf (Tiftuf Bermuda) | WK | $0.00 | 43 | $0.00 | ||||||||||||
| 0005 | B.7.3 | Mowing non-turf areas, to include wild grass along access road edges. | WK | $0.00 | 23 | $0.00 | ||||||||||||
| 0006 | B.7.4 | Edging of Walkways, Curbs and Other Horizontal Surfaces | WK | $0.00 | 43 | $0.00 | 11000lf | |||||||||||
| 0007 | B.7.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 43 | $0.00 | ||||||||||||
| 0008 | B.7.7 | Grounds and Turf Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment Year | SQFT | $0.00 | 25000 | $0.00 | ||||||||||||
| 0009 | B.7.8 | Top Dressing - up to 56 acres or as directed by the COR | Acre | $0.00 | 56 | $0.00 | 1 | 43560 | 0.5 | 21780 | 56 | 2439360 | 0.5 | 1,219,680.00 | svc non | |||
| 0010 | B.7.9 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||||||||||||
| 0011 | B.7.10 | Sweeping/Blowing Off Roadways and Concrete Surfaces (Daily-billed monthly) | MO | $0.00 | 12 | $0.00 | 6000lf | |||||||||||
| 0012 | B.8.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | ||||||||||||
| 0013 | B.8.2 | Irrigation- Yearly Startup/Shut Down, Start up includes Irrigation Audit IAW Irrigation Association standards | EA | $0.00 | 2 | $0.00 | ||||||||||||
| 0014 | B.8.2 | Irrigation- Monthly system check-Includes Sprinkler adjustments as needed (Growing Season) | MO | $0.00 | 10 | $0.00 | ||||||||||||
| 0015 | B.9.1 | Maintenance of Plant Beds, Shrubs, Hedges and Bushes to include application of herbicide and fertilizer to mitigate weed growth | MO | $0.00 | 12 | $0.00 | ||||||||||||
| 0016 | B.9.2 | Mulching - Removal ALL old mulch; Place new, fresh mulch in All mulch beds | JB | $0.00 | 2 | $0.00 | 50,000sqft | What kind of mulch? | ||||||||||
| 0017 | B.9.3 | Tree Maintenance-(tree trimming, pruning, new tree establishment, guying,) includes all trees | MO | $0.00 | 12 | $0.00 | ||||||||||||
| 0018 | B.9.3 | Tree Maintenance - woodline of cemetery grounds and access roads | YR | $0.00 | 1 | $0.00 | ||||||||||||
| 0019 | B.9.3 | Tree Removal - As needed and directed by COR/Cemetery Leadership | EA | $0.00 | 1 | $0.00 | SVC NON | svc non | ||||||||||
| 0020 | B.9.4 | Core Aerification (Aeration) - up to 56 acres - September | JB | $0.00 | 1 | $0.00 | svc non | |||||||||||
| 0021 | B.9.4 | Dethatching - As necessary - Cemetery Discretion - Up to 56 acres of turfed grounds | JB | $0.00 | 1 | $0.00 | svc non | |||||||||||
| 0022 | B.10.1 | Fertilization- Bermuda (Application IAW SED Agronomist Recommendation / SOW); Example: Mar 5, April 15, Jun 1, Aug. 15, Oct 1 | JB | $0.00 | 5 | $0.00 | ||||||||||||
| 0023 | B.10.2 | Weed Control: Pre-Emerge Herbicide Application (Spring (Jan through Mar) and Fall (Oct through Nov)) | JB | $0.00 | 2 | $0.00 | ||||||||||||
| 0024 | B.10.2 | Weed Control: Post Emerge Herbicide Treatment/Application-- includes spot treatments - All Turf areas - Approx 56 acres (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||||||||||||
| 0025 | B.10 | Soil Test - | JB | $0.00 | 2 | $0.00 | ||||||||||||
| 0026 | B.10.3 | Lime (Gypsum) Calcuim Sulfate Application - | ||||||||||||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | ||||||||||||||
| 0027 | B.10.4 | Insecticide (i.e. Mole Cricket, Stunt Mite control, Army Worms, etc.), Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||||||||||||
| 0028 | B.10.5 | Fire Ant Control - Blanket Application - 56 acres or as directed by COR | JB | $0.00 | 2 | $0.00 | ||||||||||||
| 0029 | B.10.5 | Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly | MO | $0.00 | 12 | $0.00 | ||||||||||||
| 0030 | B.10.6 | Fungicide Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||||||||||||
| 0031 | B.12.1 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | ||||||||||||
| 0032 | B.13 | Headstone, Monument, Niche Cover Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR | JB | $0.00 | 2 | $0.00 | 0.66 | 12500 | 8250 | 8250 | 4125 | |||||||
| 0033 | B.13 | Pressure/Power Washing: Entrance Ways, Walls (to include Columbarium), Caps, Brick Pylons Flag Assembly Area, Curbs, Sidewalks, and Composite Enclosures, and all surrounding concrete surfaces; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||||||||||||
| 0034 | B.13 | Pressure/Power Washing: Buildings, Committal Shelters, Floral Vase/Trash receptacles, benches and Surrounding Concrete Surfaces; quarterly (4 times per year, Nov., Feb., April, July) | QTR | $0.00 | 4 | $0.00 | ||||||||||||
| 0035 | B.14.1 | Weekend/Holiday Burial Support | EA | $0.00 | 5 | $0.00 | ||||||||||||
| 0036 | B.14.2 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 2 | $0.00 | ||||||||||||
| 0037 | B.6.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 675 | $0.00 | See guidance at bottom of page | |||||||||||
| 0038 | B.6.3 | Headstone Raise and Realign, based upon GAR results | EA | $0.00 | 50 | $0.00 | See guidance at bottom of page | |||||||||||
| 0039 | B.7.6 | Sunken Grave Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment Year | EA | $0.00 | 50 | $0.00 | See guidance at bottom of page | |||||||||||
| 0040 | B.8.2 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA | $0.00 | 266 | $0.00 | 40 | 0.15 | 266.6666666667 | svc non | See guidance at bottom of page |
Base Year Total Cost $0.00
| Option Year 1 | ||||||
| CLIN | SOW | Description | Unit of Issue | Cost | Qty | Total |
| 10001 | B.6.1 | Headstone preparation, and transportation | EA | $0.00 | 680 | $0.00 | $0.00 | ||||||||||
| 10002 | B.6.4 | Fine Tune Alignment ("Bump and Run), based upon GAR results | EA | $0.00 | 50 | $0.00 | $0.00 | ||||||||||
| 10003 | B.7.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 680 | $0.00 | $0.00 | ||||||||||
| 10004 | B.7.2 | Mowing Turf (Tiftuf Bermuda) | WK | $0.00 | 43 | $0.00 | $0.00 | ||||||||||
| 10005 | B.7.3 | Mowing non-turf areas, to include wild grass along access road edges. | WK | $0.00 | 23 | $0.00 | $0.00 | ||||||||||
| 10006 | B.7.4 | Edging of Walkways, Curbs and Other Horizontal Surfaces | WK | $0.00 | 43 | $0.00 | $0.00 | 11000lf | |||||||||
| 10007 | B.7.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 43 | $0.00 | $0.00 | ||||||||||
| 10008 | B.7.7 | Grounds and Turf Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment Year | SQFT | $0.00 | 25000 | $0.00 | $0.00 | ||||||||||
| 10009 | B.7.8 | Top Dressing - Burial Sections only, whole section | Acre | $0.00 | 56 | $0.00 | $0.00 | 1 | 43560 | 0.5 | 21780 | 56 | 2439360 | 0.5 | 1,219,680.00 | ||
| 10010 | B.7.9 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 10011 | B.7.10 | Sweeping/Blowing Off Roadways and Concrete Surfaces (Daily-billed monthly) | MO | $0.00 | 12 | $0.00 | $0.00 | 6000lf | |||||||||
| 10012 | B.8.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 10013 | B.8.2 | Irrigation- Yearly Startup/Shut Down, Start up includes Irrigation Audit IAW Irrigation Association standards | EA | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 10014 | B.8.2 | Irrigation- Monthly system check-Includes Sprinkler adjustments as needed (Growing Season) | MO | $0.00 | 10 | $0.00 | $0.00 | ||||||||||
| 10015 | B.9.1 | Maintenance of Plant Beds, Shrubs, Hedges and Bushes to include application of herbicide and fertilizer to mitigate weed growth | MO | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 10016 | B.9.1 | Mulching - Removal ALL old mulch, replace or install weed barrier, Place new fresh mulch in All existing mulch beds | JB | $0.00 | 2 | $0.00 | $0.00 | 50000sqft | What kind of mulch? | ||||||||
| 10017 | B.9.3 | Tree Maintenance-(tree trimming, pruning, new tree establishment, guying,) includes all trees | MO | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 10018 | B.9.3 | Tree Maintenance - woodline of cemetery grounds and access roads | YR | $0.00 | 1 | $0.00 | $0.00 | ||||||||||
| 10019 | B.9.3 | Tree Removal - As needed and directed by COR/Cemetery Leadership | EA | $0.00 | 1 | $0.00 | $0.00 | ||||||||||
| 10020 | B.9.4 | Core Aerification (Aeration) - Approx 56 acres - September | JB | $0.00 | 1 | $0.00 | $0.00 | ||||||||||
| 10021 | B.9.4 | Dethatching - As necessary - Cemetery Discretion - Up to 56 acres of turfed grounds | JB | $0.00 | 1 | $0.00 | $0.00 | ||||||||||
| 10022 | B.10.1 | Fertilization- Bermuda (Application IAW SED Agronomist Recommendation / SOW); Example: Mar 5, April 15, Jun 1, Aug. 15, Oct 1 | JB | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 10023 | B.10.2 | Weed Control: Pre-Emerge Herbicide Application (Spring (Jan through Mar) and Fall (Oct through Nov)) | JB | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 10024 | B.10.2 | Weed Control: Post Emerge Herbicide Treatment/Application-- includes spot treatments - All Turf areas - Approx 56 acres (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 10025 | B.10 | Soil Test - | JB | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 10026 | B.10.3 | Lime (Gypsum) Calcuim Sulfate Application - | |||||||||||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | $0.00 | ||||||||||||
| 10027 | B.10.4 | Insecticide (i.e. Mole Cricket, Stunt Mite control, Army Worms, etc.), Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 10028 | B.10.5 | Fire Ant Control - Blanket Application - 56 acres or as directed by COR | JB | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 10029 | B.10.5 | Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly | MO | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 10030 | B.10.6 | Fungicide Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 10031 | B.12.1 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | $0.00 | ||||||||||
| 10032 | B.13 | Headstone, Monument, Niche Cover Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR | JB | $0.00 | 2 | $0.00 | $0.00 | 0.64 | 13150 | 8416 | 8416 | 4208 | |||||
| 10033 | B.13 | Pressure/Power Washing: Entrance Ways, Walls (to include Columbarium), Caps, Brick Pylons Flag Assembly Area, Curbs, Sidewalks, and Composite Enclosures, and all surrounding concrete surfaces; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR | JB | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 10034 | B.13 | Pressure/Power Washing: Buildings, Committal Shelters, Floral Vase/Trash receptacles, benches and Surrounding Concrete Surfaces; quarterly (4 times per year, Nov., Feb., April, July) | QTR | $0.00 | 4 | $0.00 | $0.00 | ||||||||||
| 10035 | B.14.1 | Weekend/Holiday Burial Support | EA | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 10036 | B.14.2 | Ceremony Event Support to include set-up and take-down, includes tent and chair rental | EV | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 10037 | B.6.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 680 | $0.00 | $0.00 | See guidance at bottom of page | |||||||||
| 10038 | B.6.3 | Headstone Raise and Realign, based upon GAR results | EA | $0.00 | 50 | $0.00 | $0.00 | See guidance at bottom of page | |||||||||
| 10039 | B.7.6 | Sunken Grave Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment Year | EA | $0.00 | 50 | $0.00 | ERROR:#REF! | See guidance at bottom of page | |||||||||
| 10040 | B.8.2 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA | $0.00 | 266 | $0.00 | $0.00 | 40 | 0.15 | 266.6666666667 | See guidance at bottom of page |
Option Year 1 Total Cost $0.00 $13,422.83 894855 $908,277.83
| Option Year 2 | ||||||
| CLIN | SOW | Description | Unit of Issue | Cost | Qty | Total |
| 20001 | B.6.1 | Headstone preparation, and transportation | EA | $0.00 | 685 | $0.00 | ||||||||||
| 20002 | B.6.4 | Fine Tune Alignment ("Bump and Run), based upon GAR results | EA | $0.00 | 50 | $0.00 | ||||||||||
| 20003 | B.7.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 685 | $0.00 | ||||||||||
| 20004 | B.7.2 | Mowing Turf (Tiftuf Bermuda) | WK | $0.00 | 43 | $0.00 | ||||||||||
| 20005 | B.7.3 | Mowing non-turf areas, to include wild grass along access road edges. | WK | $0.00 | 23 | $0.00 | ||||||||||
| 20006 | B.7.4 | Edging of Walkways, Curbs and Other Horizontal Surfaces | WK | $0.00 | 43 | $0.00 | 11000lf | |||||||||
| 20007 | B.7.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 43 | $0.00 | ||||||||||
| 20008 | B.7.7 | Grounds and Turf Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment Year | SQFT | $0.00 | 25000 | $0.00 | ||||||||||
| 20009 | B.7.8 | Top Dressing - up to 56 acres or as directed by the COR | Acre | $0.00 | 56 | $0.00 | 1 | 43560 | 0.5 | 21780 | 56 | 2439360 | 0.5 | 1,219,680.00 | ||
| 20010 | B.7.9 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||||||||||
| 20011 | B.7.10 | Sweeping/Blowing Off Roadways and Concrete Surfaces (Daily-billed monthly) | MO | $0.00 | 12 | $0.00 | 6000lf | |||||||||
| 20012 | B.8.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | ||||||||||
| 20013 | B.8.2 | Irrigation- Yearly Startup/Shut Down, Start up includes Irrigation Audit IAW Irrigation Association standards | EA | $0.00 | 2 | $0.00 | ||||||||||
| 20014 | B.8.2 | Irrigation- Monthly system check-Includes Sprinkler adjustments as needed (Growing Season) | MO | $0.00 | 10 | $0.00 | ||||||||||
| 20015 | B.9.1 | Maintenance of Plant Beds, Shrubs, Hedges and Bushes to include application of herbicide and fertilizer to mitigate weed growth | MO | $0.00 | 12 | $0.00 | ||||||||||
| 20016 | B.9.2 | Mulching - Removal ALL old mulch, replace or install weed barrier, Place new fresh mulch in All existing mulch beds | JB | $0.00 | 2 | $0.00 | 50000sqft | What kind of mulch? | ||||||||
| 20017 | B.9.3 | Tree Maintenance-(tree trimming, pruning, new tree establishment, guying,) includes all trees | MO | $0.00 | 12 | $0.00 | ||||||||||
| 20018 | B.9.3 | Tree Maintenance - woodline of cemetery grounds and access roads | YR | $0.00 | 1 | $0.00 | ||||||||||
| 20019 | B.9.3 | Tree Removal - As needed and directed by COR/Cemetery Leadership | EA | $0.00 | 1 | $0.00 | ||||||||||
| 20020 | B.9.4 | Core Aerification (Aeration) - up to 56 acres - September | JB | $0.00 | 1 | $0.00 | ||||||||||
| 20021 | B.9.4 | Dethatching - As necessary - Cemetery Discretion - Up to 56 acres of turfed grounds | JB | $0.00 | 1 | $0.00 | ||||||||||
| 20022 | B.10.1 | Fertilization- Bermuda (Application IAW SED Agronomist Recommendation / SOW); Example: Mar 5, April 15, Jun 1, Aug. 15, Oct 1 | JB | $0.00 | 5 | $0.00 | ||||||||||
| 20023 | B.10.2 | Weed Control: Pre-Emerge Herbicide Application (Spring (Jan through Mar) and Fall (Oct through Nov)) | JB | $0.00 | 2 | $0.00 | ||||||||||
| 20024 | B.10.2 | Weed Control: Post Emerge Herbicide Treatment/Application-- includes spot treatments - All Turf areas - Approx 56 acres (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||||||||||
| 20025 | B.10 | Soil Test - | JB | $0.00 | 2 | $0.00 | ||||||||||
| 20026 | B.10.3 | Lime (Gypsum) Calcuim Sulfate Application - | ||||||||||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | ||||||||||||
| 20027 | B.10.4 | Insecticide (i.e. Mole Cricket, Stunt Mite control, Army Worms, etc.), Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||||||||||
| 20028 | B.10.5 | Fire Ant Control - Blanket Application - 56 acres or as directed by COR | JB | $0.00 | 2 | $0.00 | ||||||||||
| 20029 | B.10.5 | Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly | MO | $0.00 | 12 | $0.00 | ||||||||||
| 20030 | B.10.6 | Fungicide Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||||||||||
| 20031 | B.12.1 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | ||||||||||
| 20032 | B.13 | Headstone, Monument, Niche Cover Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR | JB | $0.00 | 2 | $0.00 | 0.62 | 13800 | 8556 | 8556 | 4278 | |||||
| 20033 | B.13 | Pressure/Power Washing: Entrance Ways, Walls (to include Columbarium), Caps, Brick Pylons Flag Assembly Area, Curbs, Sidewalks, and Composite Enclosures, and all surrounding concrete surfaces; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||||||||||
| 20034 | B.13 | Pressure/Power Washing: Buildings, Committal Shelters, Floral Vase/Trash receptacles, benches and Surrounding Concrete Surfaces; quarterly (4 times per year, Nov., Feb., April, July) | QTR | $0.00 | 4 | $0.00 | ||||||||||
| 20035 | B.14.1 | Weekend/Holiday Burial Support | EA | $0.00 | 5 | $0.00 | ||||||||||
| 20036 | B.14.2 | Ceremony Event Support to include set-up and take-down, includes tent and chair rental | EV | $0.00 | 2 | $0.00 | ||||||||||
| 20037 | B.6.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 685 | $0.00 | See guidance at bottom of page | |||||||||
| 20038 | B.6.3 | Headstone Raise and Realign, based upon GAR results | EA | $0.00 | 50 | $0.00 | See guidance at bottom of page | |||||||||
| 20039 | B.7.6 | Sunken Grave Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment Year | EA | $0.00 | 50 | $0.00 | See guidance at bottom of page | |||||||||
| 20040 | B.8.2 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA | $0.00 | 266 | $0.00 | 40 | 0.15 | 266.6666666667 | See guidance at bottom of page |
Option Year 2 Total Cost $0.00
| Option Year 3 | ||||||
| CLIN | SOW | Description | Unit of Issue | Cost | Qty | Total |
| 30001 | B.6.1 | Headstone preparation, and transportation | EA | $0.00 | 690 | $0.00 | $0.00 | ||||||||||
| 30002 | B.6.4 | Fine Tune Alignment ("Bump and Run), based upon GAR results | EA | $0.00 | 50 | $0.00 | $0.00 | ||||||||||
| 30003 | B.7.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 690 | $0.00 | $0.00 | ||||||||||
| 30004 | B.7.2 | Mowing Turf (Tiftuf Bermuda) | WK | $0.00 | 43 | $0.00 | $0.00 | ||||||||||
| 30005 | B.7.3 | Mowing non-turf areas, to include wild grass along access road edges. | WK | $0.00 | 23 | $0.00 | $0.00 | ||||||||||
| 30006 | B.7.4 | Edging of Walkways, Curbs and Other Horizontal Surfaces | WK | $0.00 | 43 | $0.00 | $0.00 | 11000lf | |||||||||
| 30007 | B.7.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 43 | $0.00 | $0.00 | ||||||||||
| 30008 | B.7.7 | Grounds and Turf Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment Year | SQFT | $0.00 | 25000 | $0.00 | $0.00 | ||||||||||
| 30009 | B.7.8 | Top Dressing - Burial Sections only, whole section | Acre | $0.00 | 56 | $0.00 | $0.00 | 1 | 43560 | 0.5 | 21780 | 56 | 2439360 | 0.5 | 1,219,680.00 | ||
| 30010 | B.7.9 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 30011 | B.7.10 | Sweeping/Blowing Off Roadways and Concrete Surfaces (Daily-billed monthly) | MO | $0.00 | 12 | $0.00 | $0.00 | 6000lf | |||||||||
| 30012 | B.8.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 30013 | B.8.2 | Irrigation- Yearly Startup/Shut Down, Start up includes Irrigation Audit IAW Irrigation Association standards | EA | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 30014 | B.8.2 | Irrigation- Monthly system check-Includes Sprinkler adjustments as needed (Growing Season) | MO | $0.00 | 10 | $0.00 | $0.00 | ||||||||||
| 30015 | B.9.1 | Maintenance of Plant Beds, Shrubs, Hedges and Bushes to include application of herbicide and fertilizer to mitigate weed growth | MO | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 30016 | B.9.2 | Tree Maintenance-(tree trimming, pruning, new tree establishment, guying,) includes all trees | MO | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 30017 | B.9.3 | Tree Maintenance - woodline of cemetery grounds and access roads | YR | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 30018 | B.9.3 | Tree Removal - As needed and directed by COR/Cemetery Leadership | EA | $0.00 | 1 | $0.00 | $0.00 | ||||||||||
| 30019 | B.9.3 | Mulching - Removal ALL old mulch, replace or install weed barrier, Place new fresh mulch in All existing mulch beds | JB | $0.00 | 1 | $0.00 | $0.00 | 50000sqft | What kind of mulch? | ||||||||
| 30020 | B.9.4 | Core Aerification (Aeration) - Approx 56 acres - September | JB | $0.00 | 1 | $0.00 | $0.00 | ||||||||||
| 30021 | B.9.4 | Dethatching - As necessary - Cemetery Discretion - Up to 56 acres of turfed grounds | JB | $0.00 | 1 | $0.00 | $0.00 | ||||||||||
| 30022 | B.10.1 | Fertilization- Bermuda (Application IAW SED Agronomist Recommendation / SOW); Example: Mar 5, April 15, Jun 1, Aug. 15, Oct 1 | JB | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 30023 | B.10.2 | Weed Control: Pre-Emerge Herbicide Application (Spring (Jan through Mar) and Fall (Oct through Nov)) | JB | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 30024 | B.10.2 | Weed Control: Post Emerge Herbicide Treatment/Application-- includes spot treatments - All Turf areas - Approx 56 acres (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 30025 | B.10 | Soil Test - | JB | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 30026 | B.10.3 | Lime (Gypsum) Calcuim Sulfate Application - | |||||||||||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | $0.00 | ||||||||||||
| 30027 | B.10.4 | Insecticide (i.e. Mole Cricket, Stunt Mite control, Army Worms, etc.), Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 30028 | B.10.5 | Fire Ant Control - Blanket Application - 56 acres or as directed by COR | JB | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 30029 | B.10.5 | Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly | MO | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 30030 | B.10.6 | Fungicide Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 30031 | B.12.1 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | $0.00 | ||||||||||
| 30032 | B.13 | Headstone, Monument, Niche Cover Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR | JB | $0.00 | 2 | $0.00 | $0.00 | 0.61 | 14450 | 8814.5 | 8814.5 | 4407.25 | |||||
| 30033 | B.13 | Pressure/Power Washing: Entrance Ways, Walls (to include Columbarium), Caps, Brick Pylons Flag Assembly Area, Curbs, Sidewalks, and Composite Enclosures, and all surrounding concrete surfaces; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR | JB | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 30034 | B.13 | Pressure/Power Washing: Buildings, Committal Shelters, Floral Vase/Trash receptacles, benches and Surrounding Concrete Surfaces; quarterly (4 times per year, Nov., Feb., April, July) | QTR | $0.00 | 4 | $0.00 | $0.00 | ||||||||||
| 30035 | B.14.1 | Weekend/Holiday Burial Support | EA | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 30036 | B.14.2 | Ceremony Event Support to include set-up and take-down, includes tent and chair rental | EV | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 30037 | B.6.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 690 | $0.00 | $0.00 | See guidance at bottom of page | |||||||||
| 30038 | B.6.3 | Headstone Raise and Realign, based upon GAR results | EA | $0.00 | 50 | $0.00 | $0.00 | See guidance at bottom of page | |||||||||
| 30039 | B.7.6 | Sunken Grave Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment Year | EA | $0.00 | 50 | $0.00 | $0.00 | See guidance at bottom of page | |||||||||
| 30040 | B.8.2 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA | $0.00 | 266 | $0.00 | $0.00 | 40 | 0.15 | 266.6666666667 | See guidance at bottom of page |
Option Year 3 Total Cost $0.00
| Option Year 4 | ||||||
| CLIN | SOW | Description | Unit of Issue | Cost | Qty | Total |
| 40001 | B.6.1 | Headstone preparation, and transportation | EA | $0.00 | 700 | $0.00 | $0.00 | ||||||||||
| 40002 | B.6.4 | Fine Tune Alignment ("Bump and Run), based upon GAR results | EA | $0.00 | 50 | $0.00 | $0.00 | ||||||||||
| 40003 | B.7.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 700 | $0.00 | $0.00 | ||||||||||
| 40004 | B.7.2 | Mowing Turf (Tiftuf Bermuda) | WK | $0.00 | 43 | $0.00 | $0.00 | ||||||||||
| 40005 | B.7.3 | Mowing non-turf areas, to include wild grass along access road edges. | WK | $0.00 | 23 | $0.00 | $0.00 | ||||||||||
| 40006 | B.7.4 | Edging of Walkways, Curbs and Other Horizontal Surfaces | WK | $0.00 | 43 | $0.00 | $0.00 | 11000lf | |||||||||
| 40007 | B.7.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 43 | $0.00 | $0.00 | ||||||||||
| 40008 | B.7.7 | Grounds and Turf Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment Year | SQFT | $0.00 | 25000 | $0.00 | $0.00 | ||||||||||
| 40009 | B.7.8 | Top Dressing - Burial Sections only, whole section | Acre | $0.00 | 56 | $0.00 | $0.00 | 1 | 43560 | 0.5 | 21780 | 56 | 2439360 | 0.5 | 1,219,680.00 | ||
| 40010 | B.7.9 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 40011 | B.7.10 | Sweeping/Blowing Off Roadways and Concrete Surfaces (Daily-billed monthly) | MO | $0.00 | 12 | $0.00 | $0.00 | 6000lf | |||||||||
| 40012 | B.8.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 40013 | B.8.2 | Irrigation- Yearly Startup/Shut Down, Start up includes Irrigation Audit IAW Irrigation Association standards | EA | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 40014 | B.8.2 | Irrigation- Monthly system check-Includes Sprinkler adjustments as needed (Growing Season) | MO | $0.00 | 10 | $0.00 | $0.00 | ||||||||||
| 40015 | B.9.1 | Maintenance of Plant Beds, Shrubs, Hedges and Bushes to include application of herbicide and fertilizer to mitigate weed growth | MO | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 40016 | B.9.2 | Tree Maintenance-(tree trimming, pruning, new tree establishment, guying,) includes all trees | MO | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 40017 | B.9.3 | Tree Maintenance - woodline of cemetery grounds and access roads | YR | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 40018 | B.9.3 | Tree Removal - As needed and directed by COR/Cemetery Leadership | EA | $0.00 | 1 | $0.00 | $0.00 | ||||||||||
| 40019 | B.9.3 | Mulching - Removal ALL old mulch, replace or install weed barrier, Place new fresh mulch in All existing mulch beds | JB | $0.00 | 1 | $0.00 | $0.00 | 50000sqft | What kind of mulch? | ||||||||
| 40020 | B.9.4 | Core Aerification (Aeration) - Approx 56 acres - September | JB | $0.00 | 1 | $0.00 | $0.00 | ||||||||||
| 40021 | B.9.4 | Dethatching - As necessary - Cemetery Discretion - Up to 56 acres of turfed grounds | JB | $0.00 | 1 | $0.00 | $0.00 | ||||||||||
| 40022 | B.10.1 | Fertilization- Bermuda (Application IAW SED Agronomist Recommendation / SOW); Example: Mar 5, April 15, Jun 1, Aug. 15, Oct 1 | JB | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 40023 | B.10.2 | Weed Control: Pre-Emerge Herbicide Application (Spring (Jan through Mar) and Fall (Oct through Nov)) | JB | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 40024 | B.10.2 | Weed Control: Post Emerge Herbicide Treatment/Application-- includes spot treatments - All Turf areas - Approx 56 acres (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 40025 | B.10 | Soil Test - | JB | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 40026 | B.10.3 | Lime (Gypsum) Calcuim Sulfate Application - | |||||||||||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | $0.00 | ||||||||||||
| 40027 | B.10.4 | Insecticide (i.e. Mole Cricket, Stunt Mite control, Army Worms, etc.), Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 40028 | B.10.5 | Fire Ant Control - Blanket Application - 56 acres or as directed by COR | JB | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 40029 | B.10.5 | Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly | MO | $0.00 | 12 | $0.00 | $0.00 | ||||||||||
| 40030 | b.10.6 | Fungicide Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 40031 | B.12.1 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | $0.00 | ||||||||||
| 40032 | B.13 | Headstone, Monument, Niche Cover Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR | JB | $0.00 | 2 | $0.00 | $0.00 | 0 | 0 | ||||||||
| 40033 | B.13 | Pressure/Power Washing: Entrance Ways, Walls (to include Columbarium), Caps, Brick Pylons Flag Assembly Area, Curbs, Sidewalks, and Composite Enclosures, and all surrounding concrete surfaces; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR | JB | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 40034 | B.13 | Pressure/Power Washing: Buildings, Committal Shelters, Floral Vase/Trash receptacles, benches and Surrounding Concrete Surfaces; quarterly (4 times per year, Nov., Feb., April, July) | QTR | $0.00 | 4 | $0.00 | $0.00 | ||||||||||
| 40035 | B.14.1 | Weekend/Holiday Burial Support | EA | $0.00 | 5 | $0.00 | $0.00 | ||||||||||
| 40036 | B.14.2 | Ceremony Event Support to include set-up and take-down, includes tent and chair rental | EV | $0.00 | 2 | $0.00 | $0.00 | ||||||||||
| 40037 | B.6.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 700 | $0.00 | $0.00 | See guidance at bottom of page | |||||||||
| 40038 | B.6.3 | Headstone Raise and Realign, based upon GAR results | EA | $0.00 | 50 | $0.00 | $0.00 | See guidance at bottom of page | |||||||||
| 40039 | B.7.6 | Sunken Grave Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment Year | EA | $0.00 | 50 | $0.00 | $0.00 | See guidance at bottom of page | |||||||||
| 40040 | B.8.2 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA | $0.00 | 266 | $0.00 | $0.00 | 40 | 0.15 | 266.6666666667 | See guidance at bottom of page |
Option Year 4 Total Cost $0.00
| TOTAL COST | |
| Base Year | $0.00 |
| Option Year 1 | $0.00 |
| Option Year 2 | $0.00 |
| Option Year 3 | $0.00 |
| Option Year 4 | $0.00 |
| Base Plus 4 Option Years Total | $0.00 |
| Note: |
| Service Contract Act WD # 2015-4527 will be applied for all other CLINS. |
| Davis-Bacon Act WD # AL20260095 will be applied for CLINS Highlighted |
Partial til GMS AWD
| Alabama National Cemetery Ground Maintenance Requirement | Prior to Fork-in-the-Road, how many employees | |||||||
| Base Period | ||||||||
| CLIN | SOW | Description | Needed through Jan - April | Unit of issue | Est. Cost | Est. Qty | Total | |
| 0001 | 5b.1.1 | Headstone receiving, preparation, and transportation | EA | $0.00 | 850 | $0.00 | ||
| 0002 | 5b.1.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 850 | $0.00 | ||
| 0003 | 5b.1.3 | Headstone Raise and Realign | EA | $0.00 | 500 | $0.00 | ||
| 0004 | 5b.2.1 | Sunken Grave Repair | EA | $0.00 | 150 | $0.00 | ||
| Grounds Repair | sqft | |||||||
| 0005 | 5b.2.2 | Gravesite Floral/Decoration collection/removal (Weekly occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 0006 | 5b.2.3 | Mass Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 20 | $0.00 | ||
| 0009 | 5b.4.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | ||
| 0010 | 5b.4.2 | Irrigation- Yearly Startup/Shut Down | EA | $0.00 | 2 | $0.00 | ||
| Irrigation Monthly System check - includes sprinkler adjustments as needed (Growing Season) | MO | 10 | ||||||
| Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government. | EA | $30.00 | 200 | $6,000.00 | $15.00 | |||
| 0017 | 5b.4.3 | Mowing Turf Area (Tifway 419 Bermuda), approx. 56 acres |
tc={8ABAB512-6BE9-4C2A-855C-D04058D1CB93}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Correct turf? Acrage? | WK | $0.00 | 43 | $0.00 | ||||
| Turf Edging | Stick Edging Only | WK | 43 | |||||
| 0018 | 5b.4.4 | Mowing non-turf areas | WK | $0.00 | 43 | $0.00 | ||
| 0019 | 5b.4.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 25 | $0.00 | ||
| 0020 | 5b.4.6 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 0021 | 5b.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | ||
| 0022 | 5b.4.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | ||
| 0023 | 5b.4.9 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | ||
| 0024 | 5b.5.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | $0.00 | 6 | $0.00 | ||
| 0025 | 5b.5.2 | Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 6 | $0.00 | ||
| 0026 | 5b.5.3 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | ||||
| 0027 | 5b.6.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 900 | $0.00 | ||
| 0028 | 5b.6.2 | Core Aerification (Aeration) - Approx 27 acres - September | JB | $0.00 | 1 | $0.00 | ||
| 0029 | 5b.6.3 | Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed grounds | JB | $0.00 | 1 | $0.00 | ||
| 0030 | 5b.6.4 | Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1 | JB | $0.00 | 5 | $0.00 | ||
| 0031 | 5b.6.5 | Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov)) | JB | $0.00 | 2 | $0.00 | ||
| 0032 | 5b.6.5 | Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 0033 | 5b.6.6 | Lime( Gypsum) Calcuim Sulfate Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | ||||
| 0034 | 5b.7.1 | Insecticide( Mole Cricket, Stunt Mite control), Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 0035 | 5b.7.2 | Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly | MO | $0.00 | 12 | $0.00 | ||
| 0036 | 5b.8.1 | Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR | JB | $0.00 | 2 | $0.00 | ||
| 0037 | 5b.8.2 | Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 0038 | 5b.8.3 | Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 0039 | 5b.8.4 | Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 0040 | 5b.8.5 | Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 0041 | 5b.8.6 | Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 0042 | 5b.8.7 | Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 0043 | 5b.8.8 | Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 0044 | 5b.9.1 | Daily Committal Shelter Setup, Take Down, and Cleaning | EA | $0.00 | 375 | $0.00 | ||
| 0045 | 5b.9.2 | Weekend/Holiday Burial Support | EA | $0.00 | 11 | $0.00 | ||
| 0046 | 5b.9.3 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 3 | $0.00 | ||
| 0047 | 5b.1.3 | Fine Tune Alignment ("Bump and Run) | EA | $0.00 | 500 | $0.00 | ||
| 0048 | 5b.7.1 | Fungicide Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 |
Base Year Total Estimate COST $15.00
| Option 1 Period | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | ||
| 10001 | 5b.1.1 | Headstone receiving, preparation, and transportation | EA | $0.00 | 900 | $0.00 | ||
| 10002 | 5b.1.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 900 | $0.00 | ||
| 10003 | 5b.1.3 | Headstone Raise and Realign | EA | $0.00 | 500 | $0.00 | ||
| 10004 | 5b.2.1 | Sunken Grave and Grounds Repair | EA | $0.00 | 150 | $0.00 | ||
| 10005 | 5b.2.2 | Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 10006 | 5b.2.3 | Mass Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 20 | $0.00 | ||
| 10007 | 5b.3.1 | Pond Algae Treatment | MO | $0.00 | 9 | $0.00 | ||
| 10008 | 5b.3.2 | Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.) | JB | $0.00 | 2 | $0.00 | ||
| 10009 | 5b.4.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | ||
| 10010 | 5b.4.2 | Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season) | MO | $0.00 | 10 | $0.00 | ||
| 10011 | 5b.4.2 | Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" Breaks | EA | $0.00 | 5 | $0.00 | ||
| 10012 | 5b.4.2 | Irrigation- In-Valve Head Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 10013 | 5b.4.2 | Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle present | EA | $0.00 | 15 | $0.00 | ||
| 10014 | 5b.4.2 | Irrigation- Electric & Gate valve Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 10015 | 5b.4.2 | Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ Poly | EA | $0.00 | 5 | $0.00 | ||
| 10016 | 5b.4.2 | Irrigation- Controller Repair/ Replace/ Program to current Stand-alone (Hunter) | EA | $0.00 | 3 | $0.00 | ||
| 10017 | 5b.4.3 | Mowing and turf edging, (Tifway 419 Bermuda) | WK | $0.00 | 43 | $0.00 | ||
| 10018 | 5b.4.4 | Mowing non-turf areas | WK | $0.00 | 43 | $0.00 | ||
| 10019 | 5b.4.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 25 | $0.00 | ||
| 10020 | 5b.4.6 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 10021 | 5b.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | ||
| 10022 | 5b.4.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | ||
| 10023 | 5b.4.9 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | ||
| 10024 | 5b.5.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | $0.00 | 6 | $0.00 | ||
| 10025 | 5b.5.2 | Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 6 | $0.00 | ||
| 10026 | 5b.5.3 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | ||||
| 10027 | 5b.6.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 950 | $0.00 | ||
| 10028 | 5b.6.2 | Core Aerification (Aeration) - Approx 27 acres - September | JB | $0.00 | 1 | $0.00 | ||
| 10029 | 5b.6.3 | Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed grounds | JB | $0.00 | 1 | $0.00 | ||
| 10030 | 5b.6.4 | Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1 | JB | $0.00 | 5 | $0.00 | ||
| 10031 | 5b.6.5 | Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov)) | JB | $0.00 | 2 | $0.00 | ||
| 10032 | 5b.6.5 | Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 10033 | 5b.6.6 | Lime( Gypsum) Calcuim Sulfate Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | ||||
| 10034 | 5b.7.1 | Insecticide( Mole Cricket, Stunt Mite control), Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 10035 | 5b.7.2 | Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly | MO | $0.00 | 12 | $0.00 | ||
| 10036 | 5b.8.1 | Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR | JB | $0.00 | 2 | $0.00 | ||
| 10037 | 5b.8.2 | Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 10038 | 5b.8.3 | Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 10039 | 5b.8.4 | Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 10040 | 5b.8.5 | Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 10041 | 5b.8.6 | Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 10042 | 5b.8.7 | Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 10043 | 5b.8.8 | Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 10044 | 5b.9.1 | Daily Committal Shelter Setup, Take Down, and Cleaning | EA | $0.00 | 375 | $0.00 | ||
| 10045 | 5b.9.2 | Weekend/Holiday Burial Support | EA | $0.00 | 11 | $0.00 | ||
| 10046 | 5b.9.3 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 3 | $0.00 | ||
| 10047 | 5b.1.3 | Fine Tune Alignment ("Bump and Run) | EA | $0.00 | 500 | $0.00 | ||
| 10048 | 5b.7.1 | Fungicide Treatment/Application (as needed or directed by COR) | JB | $0.00 | 2 | $0.00 | ||
| Option Year 1 Total Estimate COST | $0.00 |
| Option 2 Period | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | ||
| 20001 | 5b.1.1 | Headstone receiving, preparation, and transportation | EA | $0.00 | 950 | $0.00 | ||
| 20002 | 5b.1.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 950 | $0.00 | ||
| 20003 | 5b.1.3 | Headstone Raise and Realign | EA | $0.00 | 500 | $0.00 | ||
| 20004 | 5b.2.1 | Sunken Grave and Grounds Repair | EA | $0.00 | 150 | $0.00 | ||
| 20005 | 5b.2.2 | Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 20006 | 5b.2.3 | Mass Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 20 | $0.00 | ||
| 20007 | 5b.3.1 | Pond Algae Treatment | MO | $0.00 | 9 | $0.00 | ||
| 20008 | 5b.3.2 | Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.) | JB | $0.00 | 2 | $0.00 | ||
| 20009 | 5b.4.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | ||
| 20010 | 5b.4.2 | Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season) | MO | $0.00 | 10 | $0.00 | ||
| 20011 | 5b.4.2 | Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" Breaks | EA | $0.00 | 5 | $0.00 | ||
| 20012 | 5b.4.2 | Irrigation- In-Valve Head Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 20013 | 5b.4.2 | Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle present | EA | $0.00 | 15 | $0.00 | ||
| 20014 | 5b.4.2 | Irrigation- Electric & Gate valve Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 20015 | 5b.4.2 | Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ Poly | EA | $0.00 | 5 | $0.00 | ||
| 20016 | 5b.4.2 | Irrigation- Controller Repair/ Replace/ Program to current Stand-alone (Hunter) | EA | $0.00 | 3 | $0.00 | ||
| 20017 | 5b.4.3 | Mowing and turf edging, (Tifway 419 Bermuda) | WK | $0.00 | 43 | $0.00 | ||
| 20018 | 5b.4.4 | Mowing non-turf areas | WK | $0.00 | 43 | $0.00 | ||
| 20019 | 5b.4.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 25 | $0.00 | ||
| 20020 | 5b.4.6 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 20021 | 5b.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | ||
| 20022 | 5b.4.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | ||
| 20023 | 5b.4.9 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | ||
| 20024 | 5b.5.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | $0.00 | 6 | $0.00 | ||
| 20025 | 5b.5.2 | Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 6 | $0.00 | ||
| 20026 | 5b.5.3 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | ||||
| 20027 | 5b.6.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 1000 | $0.00 | ||
| 20028 | 5b.6.2 | Core Aerification (Aeration) - Approx 27 acres - September | JB | $0.00 | 1 | $0.00 | ||
| 20029 | 5b.6.3 | Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed grounds | JB | $0.00 | 1 | $0.00 | ||
| 20030 | 5b.6.4 | Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1 | JB | $0.00 | 5 | $0.00 | ||
| 20031 | 5b.6.5 | Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov)) | JB | $0.00 | 2 | $0.00 | ||
| 20032 | 5b.6.5 | Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 20033 | 5b.6.6 | Lime( Gypsum) Calcuim Sulfate Application - | ||||||
| All Turf Areas-Early Spring Yearly - as indicated by soil test | JB | $0.00 | 1 | $0.00 | ||||
| 20034 | 5b.7.1 | Insecticide( Mole Cricket, Stunt Mite control), Treatment/Application (as needed or directed by COR) | JB | $0.00 | 5 | $0.00 | ||
| 20035 | 5b.7.2 | Fire Ant Control/Monitoring - Daily Treatment Invoiced Monthly | MO | $0.00 | 12 | $0.00 | ||
| 20036 | 5b.8.1 | Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the COR | JB | $0.00 | 2 | $0.00 | ||
| 20037 | 5b.8.2 | Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 20038 | 5b.8.3 | Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 20039 | 5b.8.4 | Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by COR | JB | $0.00 | 2 | $0.00 | ||
| 20040 | 5b.8.5 | Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 20041 | 5b.8.6 | Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 20042 | 5b.8.7 | Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the COR | JB | $0.00 | 2 | $0.00 | ||
| 20043 | 5b.8.8 | Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July) | JB | $0.00 | 4 | $0.00 | ||
| 20044 | 5b.9.1 | Daily Committal Shelter Setup, Take Down, and Cleaning | EA | $0.00 | 375 | $0.00 | ||
| 20045 | 5b.9.2 | Weekend/Holiday Burial Support | EA | $0.00 | 11 | $0.00 | ||
| 20046 | 5b.9.3 | Ceremony Event Support to include set-up and take-down | EV | $0.00 | 3 | $0.00 | ||
| 20047 | 5b.1.3 | Fine Tune Alignment ("Bump and Run) | EA | $0.00 | 500 | $0.00 | ||
| 20048 | 5b.7.1 | Fungicide Treatment/Application (as needed or directed by COR) | JB | $0.00 | 2 | $0.00 | ||
| Option Year 2 Total Estimate COST | $0.00 |
| Option 3 Period | ||||||||
| CLIN | SOW | Description | Unit of issue | Est. Cost | Est. Qty | Total | ||
| 3001 | 5b.1.1 | Headstone receiving, preparation, and transportation | EA | $0.00 | 1000 | $0.00 | ||
| 3002 | 5b.1.2 | Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement Headstones | EA | $0.00 | 1000 | $0.00 | ||
| 3003 | 5b.1.3 | Headstone Raise and Realign | EA | $0.00 | 500 | $0.00 | ||
| 3004 | 5b.2.1 | Sunken Grave and Grounds Repair | EA | $0.00 | 150 | $0.00 | ||
| 3005 | 5b.2.2 | Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 3006 | 5b.2.3 | Mass Floral, Decorations, Trash and Debris Pick-up/Removal | EA | $0.00 | 20 | $0.00 | ||
| 3007 | 5b.3.1 | Pond Algae Treatment | MO | $0.00 | 9 | $0.00 | ||
| 3008 | 5b.3.2 | Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.) | JB | $0.00 | 2 | $0.00 | ||
| 3009 | 5b.4.1 | Pump House Monitoring and Maintenance | MO | $0.00 | 12 | $0.00 | ||
| 3010 | 5b.4.2 | Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season) | MO | $0.00 | 10 | $0.00 | ||
| 3011 | 5b.4.2 | Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" Breaks | EA | $0.00 | 5 | $0.00 | ||
| 3012 | 5b.4.2 | Irrigation- In-Valve Head Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 3013 | 5b.4.2 | Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle present | EA | $0.00 | 15 | $0.00 | ||
| 3014 | 5b.4.2 | Irrigation- Electric & Gate valve Repair/Replace | EA | $0.00 | 5 | $0.00 | ||
| 3015 | 5b.4.2 | Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ Poly | EA | $0.00 | 5 | $0.00 | ||
| 3016 | 5b.4.2 | Irrigation- Controller Repair/ Replace/ Program to current Stand-alone (Hunter) | EA | $0.00 | 3 | $0.00 | ||
| 3017 | 5b.4.3 | Mowing and turf edging, (Tifway 419 Bermuda) | WK | $0.00 | 43 | $0.00 | ||
| 3018 | 5b.4.4 | Mowing non-turf areas | WK | $0.00 | 43 | $0.00 | ||
| 3019 | 5b.4.5 | Headstone, Marker, Monument and Other Vertical Surface Trimming | WK | $0.00 | 25 | $0.00 | ||
| 3020 | 5b.4.6 | Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly) | MO | $0.00 | 12 | $0.00 | ||
| 3021 | 5b.4.7 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 3 | $0.00 | ||
| 3022 | 5b.4.8 | Sweeping/Blowing Off Roadways and Concrete Surfaces | MO | $0.00 | 12 | $0.00 | ||
| 3023 | 5b.4.9 | Maintenance of Benches, Concrete Pads, and Rocked Areas | MO | $0.00 | 12 | $0.00 | ||
| 3024 | 5b.5.1 | Maintenance of Plant Beds, Shrubs, and Bushes | MO | $0.00 | 6 | $0.00 | ||
| 3025 | 5b.5.2 | Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying) | JB | $0.00 | 6 | $0.00 | ||
| 3026 | 5b.5.3 | Mulching - Removal, Replenish and/or Install All Areas | ||||||
| Cemetery defined | JB | $0.00 | 2 | $0.00 | ||||
| 3027 | 5b.6.1 | Casket/Vault Gravesite Sod Installation | EA | $0.00 | 1050 | $0.00 |
This is the start of the file's text. The full file is on GovTribe.