This is a pricing schedule for complete grounds maintenance services at Fort Mitchell National Cemetery in Fort Mitchell, Alabama. The contract uses a base year plus four option year structure, with pricing organized by Contract Line Item Numbers (CLINs) corresponding to specific maintenance tasks. The schedule covers two distinct periods: a full-year grounds maintenance contract (GMS) and a partial interim period (January through April) prior to award.

The full-year GMS section includes approximately 40 line items across Base Year and Option Years 1-4, with quantities that increase slightly year-over-year reflecting anticipated growth in burial activity. Key service categories include headstone services (preparation, installation, raising/realigning at 675-700 units annually), turf maintenance and mowing (weekly services across 56 acres), grounds repair and sod installation (25,000 square feet annually), irrigation maintenance and repairs (hourly rate labor at $30.00 per hour for as-needed work), chemical applications (fertilization, weed control, insecticide, fungicide treatments), cleaning and pressure washing services (performed bi-annually to quarterly), landscaping and tree maintenance, and burial support services. The interim period (January-April) pricing schedule covers a reduced set of seasonal services including headstone trimming, edging, headstone and pressure washing activities, with estimated weekly quantities of 18 total weeks across the four-month period. All cost cells in both sections currently display $0.00, indicating this is a template awaiting contractor pricing submissions. The contract references Service Contract Act WD #2015-4527 for most CLINs and Davis-Bacon Act WD #AL20260095 for highlighted CLINs.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GM WO $ Estimate (2)

Fort Mitchell National Cemetery Complete Grounds Maintenance Requirement
Base Year
CLINSOWDescriptionUnit of IssueCostQtyTotal1.5%2%
0001B.6.1Headstone preparation, and transportationEA$0.00675$0.00
0002B.6.4Fine Tune Alignment ("Bump and Run), based upon GAR resultsEA$0.0050$0.00
0003B.7.1Casket/Vault Gravesite Sod InstallationEA$0.00675$0.00
0004B.7.2Mowing Turf (Tiftuf Bermuda)WK$0.0043$0.00
0005B.7.3Mowing non-turf areas, to include wild grass along access road edges.WK$0.0023$0.00
0006B.7.4Edging of Walkways, Curbs and Other Horizontal SurfacesWK$0.0043$0.0011000lf
0007B.7.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0043$0.00
0008B.7.7Grounds and Turf Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment YearSQFT$0.0025000$0.00
0009B.7.8Top Dressing - up to 56 acres or as directed by the CORAcre$0.0056$0.001435600.5217805624393600.51,219,680.00svc non
0010B.7.9Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
0011B.7.10Sweeping/Blowing Off Roadways and Concrete Surfaces (Daily-billed monthly)MO$0.0012$0.006000lf
0012B.8.1Pump House Monitoring and MaintenanceMO$0.0012$0.00
0013B.8.2Irrigation- Yearly Startup/Shut Down, Start up includes Irrigation Audit IAW Irrigation Association standardsEA$0.002$0.00
0014B.8.2Irrigation- Monthly system check-Includes Sprinkler adjustments as needed (Growing Season)MO$0.0010$0.00
0015B.9.1Maintenance of Plant Beds, Shrubs, Hedges and Bushes to include application of herbicide and fertilizer to mitigate weed growthMO$0.0012$0.00
0016B.9.2Mulching - Removal ALL old mulch; Place new, fresh mulch in All mulch bedsJB$0.002$0.0050,000sqftWhat kind of mulch?
0017B.9.3Tree Maintenance-(tree trimming, pruning, new tree establishment, guying,) includes all treesMO$0.0012$0.00
0018B.9.3Tree Maintenance - woodline of cemetery grounds and access roadsYR$0.001$0.00
0019B.9.3Tree Removal - As needed and directed by COR/Cemetery LeadershipEA$0.001$0.00SVC NONsvc non
0020B.9.4Core Aerification (Aeration) - up to 56 acres - SeptemberJB$0.001$0.00svc non
0021B.9.4Dethatching - As necessary - Cemetery Discretion - Up to 56 acres of turfed groundsJB$0.001$0.00svc non
0022B.10.1Fertilization- Bermuda (Application IAW SED Agronomist Recommendation / SOW); Example: Mar 5, April 15, Jun 1, Aug. 15, Oct 1JB$0.005$0.00
0023B.10.2Weed Control: Pre-Emerge Herbicide Application (Spring (Jan through Mar) and Fall (Oct through Nov))JB$0.002$0.00
0024B.10.2Weed Control: Post Emerge Herbicide Treatment/Application-- includes spot treatments - All Turf areas - Approx 56 acres (as needed or directed by COR)JB$0.005$0.00
0025B.10Soil Test -JB$0.002$0.00
0026B.10.3Lime (Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil testJB$0.001$0.00
0027B.10.4Insecticide (i.e. Mole Cricket, Stunt Mite control, Army Worms, etc.), Treatment/Application (as needed or directed by COR)JB$0.005$0.00
0028B.10.5Fire Ant Control - Blanket Application - 56 acres or as directed by CORJB$0.002$0.00
0029B.10.5Fire Ant Control/Monitoring - Daily Treatment Invoiced MonthlyMO$0.0012$0.00
0030B.10.6Fungicide Treatment/Application (as needed or directed by COR)JB$0.005$0.00
0031B.12.1Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00
0032B.13Headstone, Monument, Niche Cover Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the CORJB$0.002$0.000.6612500825082504125
0033B.13Pressure/Power Washing: Entrance Ways, Walls (to include Columbarium), Caps, Brick Pylons Flag Assembly Area, Curbs, Sidewalks, and Composite Enclosures, and all surrounding concrete surfaces; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the CORJB$0.002$0.00
0034B.13Pressure/Power Washing: Buildings, Committal Shelters, Floral Vase/Trash receptacles, benches and Surrounding Concrete Surfaces; quarterly (4 times per year, Nov., Feb., April, July)QTR$0.004$0.00
0035B.14.1Weekend/Holiday Burial SupportEA$0.005$0.00
0036B.14.2Ceremony Event Support to include set-up and take-downEV$0.002$0.00
0037B.6.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.00675$0.00See guidance at bottom of page
0038B.6.3Headstone Raise and Realign, based upon GAR resultsEA$0.0050$0.00See guidance at bottom of page
0039B.7.6Sunken Grave Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment YearEA$0.0050$0.00See guidance at bottom of page
0040B.8.2Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government.EA$0.00266$0.00400.15266.6666666667svc nonSee guidance at bottom of page

Base Year Total Cost $0.00

Option Year 1
CLINSOWDescriptionUnit of IssueCostQtyTotal
10001B.6.1Headstone preparation, and transportationEA$0.00680$0.00$0.00
10002B.6.4Fine Tune Alignment ("Bump and Run), based upon GAR resultsEA$0.0050$0.00$0.00
10003B.7.1Casket/Vault Gravesite Sod InstallationEA$0.00680$0.00$0.00
10004B.7.2Mowing Turf (Tiftuf Bermuda)WK$0.0043$0.00$0.00
10005B.7.3Mowing non-turf areas, to include wild grass along access road edges.WK$0.0023$0.00$0.00
10006B.7.4Edging of Walkways, Curbs and Other Horizontal SurfacesWK$0.0043$0.00$0.0011000lf
10007B.7.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0043$0.00$0.00
10008B.7.7Grounds and Turf Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment YearSQFT$0.0025000$0.00$0.00
10009B.7.8Top Dressing - Burial Sections only, whole sectionAcre$0.0056$0.00$0.001435600.5217805624393600.51,219,680.00
10010B.7.9Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00$0.00
10011B.7.10Sweeping/Blowing Off Roadways and Concrete Surfaces (Daily-billed monthly)MO$0.0012$0.00$0.006000lf
10012B.8.1Pump House Monitoring and MaintenanceMO$0.0012$0.00$0.00
10013B.8.2Irrigation- Yearly Startup/Shut Down, Start up includes Irrigation Audit IAW Irrigation Association standardsEA$0.002$0.00$0.00
10014B.8.2Irrigation- Monthly system check-Includes Sprinkler adjustments as needed (Growing Season)MO$0.0010$0.00$0.00
10015B.9.1Maintenance of Plant Beds, Shrubs, Hedges and Bushes to include application of herbicide and fertilizer to mitigate weed growthMO$0.0012$0.00$0.00
10016B.9.1Mulching - Removal ALL old mulch, replace or install weed barrier, Place new fresh mulch in All existing mulch bedsJB$0.002$0.00$0.0050000sqftWhat kind of mulch?
10017B.9.3Tree Maintenance-(tree trimming, pruning, new tree establishment, guying,) includes all treesMO$0.0012$0.00$0.00
10018B.9.3Tree Maintenance - woodline of cemetery grounds and access roadsYR$0.001$0.00$0.00
10019B.9.3Tree Removal - As needed and directed by COR/Cemetery LeadershipEA$0.001$0.00$0.00
10020B.9.4Core Aerification (Aeration) - Approx 56 acres - SeptemberJB$0.001$0.00$0.00
10021B.9.4Dethatching - As necessary - Cemetery Discretion - Up to 56 acres of turfed groundsJB$0.001$0.00$0.00
10022B.10.1Fertilization- Bermuda (Application IAW SED Agronomist Recommendation / SOW); Example: Mar 5, April 15, Jun 1, Aug. 15, Oct 1JB$0.005$0.00$0.00
10023B.10.2Weed Control: Pre-Emerge Herbicide Application (Spring (Jan through Mar) and Fall (Oct through Nov))JB$0.002$0.00$0.00
10024B.10.2Weed Control: Post Emerge Herbicide Treatment/Application-- includes spot treatments - All Turf areas - Approx 56 acres (as needed or directed by COR)JB$0.005$0.00$0.00
10025B.10Soil Test -JB$0.002$0.00$0.00
10026B.10.3Lime (Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil testJB$0.001$0.00$0.00
10027B.10.4Insecticide (i.e. Mole Cricket, Stunt Mite control, Army Worms, etc.), Treatment/Application (as needed or directed by COR)JB$0.005$0.00$0.00
10028B.10.5Fire Ant Control - Blanket Application - 56 acres or as directed by CORJB$0.002$0.00$0.00
10029B.10.5Fire Ant Control/Monitoring - Daily Treatment Invoiced MonthlyMO$0.0012$0.00$0.00
10030B.10.6Fungicide Treatment/Application (as needed or directed by COR)JB$0.005$0.00$0.00
10031B.12.1Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00$0.00
10032B.13Headstone, Monument, Niche Cover Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the CORJB$0.002$0.00$0.000.6413150841684164208
10033B.13Pressure/Power Washing: Entrance Ways, Walls (to include Columbarium), Caps, Brick Pylons Flag Assembly Area, Curbs, Sidewalks, and Composite Enclosures, and all surrounding concrete surfaces; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the CORJB$0.002$0.00$0.00
10034B.13Pressure/Power Washing: Buildings, Committal Shelters, Floral Vase/Trash receptacles, benches and Surrounding Concrete Surfaces; quarterly (4 times per year, Nov., Feb., April, July)QTR$0.004$0.00$0.00
10035B.14.1Weekend/Holiday Burial SupportEA$0.005$0.00$0.00
10036B.14.2Ceremony Event Support to include set-up and take-down, includes tent and chair rentalEV$0.002$0.00$0.00
10037B.6.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.00680$0.00$0.00See guidance at bottom of page
10038B.6.3Headstone Raise and Realign, based upon GAR resultsEA$0.0050$0.00$0.00See guidance at bottom of page
10039B.7.6Sunken Grave Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment YearEA$0.0050$0.00ERROR:#REF!See guidance at bottom of page
10040B.8.2Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government.EA$0.00266$0.00$0.00400.15266.6666666667See guidance at bottom of page

Option Year 1 Total Cost $0.00 $13,422.83 894855 $908,277.83

Option Year 2
CLINSOWDescriptionUnit of IssueCostQtyTotal
20001B.6.1Headstone preparation, and transportationEA$0.00685$0.00
20002B.6.4Fine Tune Alignment ("Bump and Run), based upon GAR resultsEA$0.0050$0.00
20003B.7.1Casket/Vault Gravesite Sod InstallationEA$0.00685$0.00
20004B.7.2Mowing Turf (Tiftuf Bermuda)WK$0.0043$0.00
20005B.7.3Mowing non-turf areas, to include wild grass along access road edges.WK$0.0023$0.00
20006B.7.4Edging of Walkways, Curbs and Other Horizontal SurfacesWK$0.0043$0.0011000lf
20007B.7.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0043$0.00
20008B.7.7Grounds and Turf Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment YearSQFT$0.0025000$0.00
20009B.7.8Top Dressing - up to 56 acres or as directed by the CORAcre$0.0056$0.001435600.5217805624393600.51,219,680.00
20010B.7.9Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
20011B.7.10Sweeping/Blowing Off Roadways and Concrete Surfaces (Daily-billed monthly)MO$0.0012$0.006000lf
20012B.8.1Pump House Monitoring and MaintenanceMO$0.0012$0.00
20013B.8.2Irrigation- Yearly Startup/Shut Down, Start up includes Irrigation Audit IAW Irrigation Association standardsEA$0.002$0.00
20014B.8.2Irrigation- Monthly system check-Includes Sprinkler adjustments as needed (Growing Season)MO$0.0010$0.00
20015B.9.1Maintenance of Plant Beds, Shrubs, Hedges and Bushes to include application of herbicide and fertilizer to mitigate weed growthMO$0.0012$0.00
20016B.9.2Mulching - Removal ALL old mulch, replace or install weed barrier, Place new fresh mulch in All existing mulch bedsJB$0.002$0.0050000sqftWhat kind of mulch?
20017B.9.3Tree Maintenance-(tree trimming, pruning, new tree establishment, guying,) includes all treesMO$0.0012$0.00
20018B.9.3Tree Maintenance - woodline of cemetery grounds and access roadsYR$0.001$0.00
20019B.9.3Tree Removal - As needed and directed by COR/Cemetery LeadershipEA$0.001$0.00
20020B.9.4Core Aerification (Aeration) - up to 56 acres - SeptemberJB$0.001$0.00
20021B.9.4Dethatching - As necessary - Cemetery Discretion - Up to 56 acres of turfed groundsJB$0.001$0.00
20022B.10.1Fertilization- Bermuda (Application IAW SED Agronomist Recommendation / SOW); Example: Mar 5, April 15, Jun 1, Aug. 15, Oct 1JB$0.005$0.00
20023B.10.2Weed Control: Pre-Emerge Herbicide Application (Spring (Jan through Mar) and Fall (Oct through Nov))JB$0.002$0.00
20024B.10.2Weed Control: Post Emerge Herbicide Treatment/Application-- includes spot treatments - All Turf areas - Approx 56 acres (as needed or directed by COR)JB$0.005$0.00
20025B.10Soil Test -JB$0.002$0.00
20026B.10.3Lime (Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil testJB$0.001$0.00
20027B.10.4Insecticide (i.e. Mole Cricket, Stunt Mite control, Army Worms, etc.), Treatment/Application (as needed or directed by COR)JB$0.005$0.00
20028B.10.5Fire Ant Control - Blanket Application - 56 acres or as directed by CORJB$0.002$0.00
20029B.10.5Fire Ant Control/Monitoring - Daily Treatment Invoiced MonthlyMO$0.0012$0.00
20030B.10.6Fungicide Treatment/Application (as needed or directed by COR)JB$0.005$0.00
20031B.12.1Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00
20032B.13Headstone, Monument, Niche Cover Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the CORJB$0.002$0.000.6213800855685564278
20033B.13Pressure/Power Washing: Entrance Ways, Walls (to include Columbarium), Caps, Brick Pylons Flag Assembly Area, Curbs, Sidewalks, and Composite Enclosures, and all surrounding concrete surfaces; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the CORJB$0.002$0.00
20034B.13Pressure/Power Washing: Buildings, Committal Shelters, Floral Vase/Trash receptacles, benches and Surrounding Concrete Surfaces; quarterly (4 times per year, Nov., Feb., April, July)QTR$0.004$0.00
20035B.14.1Weekend/Holiday Burial SupportEA$0.005$0.00
20036B.14.2Ceremony Event Support to include set-up and take-down, includes tent and chair rentalEV$0.002$0.00
20037B.6.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.00685$0.00See guidance at bottom of page
20038B.6.3Headstone Raise and Realign, based upon GAR resultsEA$0.0050$0.00See guidance at bottom of page
20039B.7.6Sunken Grave Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment YearEA$0.0050$0.00See guidance at bottom of page
20040B.8.2Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government.EA$0.00266$0.00400.15266.6666666667See guidance at bottom of page

Option Year 2 Total Cost $0.00

Option Year 3
CLINSOWDescriptionUnit of IssueCostQtyTotal
30001B.6.1Headstone preparation, and transportationEA$0.00690$0.00$0.00
30002B.6.4Fine Tune Alignment ("Bump and Run), based upon GAR resultsEA$0.0050$0.00$0.00
30003B.7.1Casket/Vault Gravesite Sod InstallationEA$0.00690$0.00$0.00
30004B.7.2Mowing Turf (Tiftuf Bermuda)WK$0.0043$0.00$0.00
30005B.7.3Mowing non-turf areas, to include wild grass along access road edges.WK$0.0023$0.00$0.00
30006B.7.4Edging of Walkways, Curbs and Other Horizontal SurfacesWK$0.0043$0.00$0.0011000lf
30007B.7.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0043$0.00$0.00
30008B.7.7Grounds and Turf Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment YearSQFT$0.0025000$0.00$0.00
30009B.7.8Top Dressing - Burial Sections only, whole sectionAcre$0.0056$0.00$0.001435600.5217805624393600.51,219,680.00
30010B.7.9Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00$0.00
30011B.7.10Sweeping/Blowing Off Roadways and Concrete Surfaces (Daily-billed monthly)MO$0.0012$0.00$0.006000lf
30012B.8.1Pump House Monitoring and MaintenanceMO$0.0012$0.00$0.00
30013B.8.2Irrigation- Yearly Startup/Shut Down, Start up includes Irrigation Audit IAW Irrigation Association standardsEA$0.002$0.00$0.00
30014B.8.2Irrigation- Monthly system check-Includes Sprinkler adjustments as needed (Growing Season)MO$0.0010$0.00$0.00
30015B.9.1Maintenance of Plant Beds, Shrubs, Hedges and Bushes to include application of herbicide and fertilizer to mitigate weed growthMO$0.0012$0.00$0.00
30016B.9.2Tree Maintenance-(tree trimming, pruning, new tree establishment, guying,) includes all treesMO$0.002$0.00$0.00
30017B.9.3Tree Maintenance - woodline of cemetery grounds and access roadsYR$0.0012$0.00$0.00
30018B.9.3Tree Removal - As needed and directed by COR/Cemetery LeadershipEA$0.001$0.00$0.00
30019B.9.3Mulching - Removal ALL old mulch, replace or install weed barrier, Place new fresh mulch in All existing mulch bedsJB$0.001$0.00$0.0050000sqftWhat kind of mulch?
30020B.9.4Core Aerification (Aeration) - Approx 56 acres - SeptemberJB$0.001$0.00$0.00
30021B.9.4Dethatching - As necessary - Cemetery Discretion - Up to 56 acres of turfed groundsJB$0.001$0.00$0.00
30022B.10.1Fertilization- Bermuda (Application IAW SED Agronomist Recommendation / SOW); Example: Mar 5, April 15, Jun 1, Aug. 15, Oct 1JB$0.005$0.00$0.00
30023B.10.2Weed Control: Pre-Emerge Herbicide Application (Spring (Jan through Mar) and Fall (Oct through Nov))JB$0.002$0.00$0.00
30024B.10.2Weed Control: Post Emerge Herbicide Treatment/Application-- includes spot treatments - All Turf areas - Approx 56 acres (as needed or directed by COR)JB$0.005$0.00$0.00
30025B.10Soil Test -JB$0.002$0.00$0.00
30026B.10.3Lime (Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil testJB$0.001$0.00$0.00
30027B.10.4Insecticide (i.e. Mole Cricket, Stunt Mite control, Army Worms, etc.), Treatment/Application (as needed or directed by COR)JB$0.005$0.00$0.00
30028B.10.5Fire Ant Control - Blanket Application - 56 acres or as directed by CORJB$0.002$0.00$0.00
30029B.10.5Fire Ant Control/Monitoring - Daily Treatment Invoiced MonthlyMO$0.0012$0.00$0.00
30030B.10.6Fungicide Treatment/Application (as needed or directed by COR)JB$0.005$0.00$0.00
30031B.12.1Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00$0.00
30032B.13Headstone, Monument, Niche Cover Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the CORJB$0.002$0.00$0.000.61144508814.58814.54407.25
30033B.13Pressure/Power Washing: Entrance Ways, Walls (to include Columbarium), Caps, Brick Pylons Flag Assembly Area, Curbs, Sidewalks, and Composite Enclosures, and all surrounding concrete surfaces; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the CORJB$0.002$0.00$0.00
30034B.13Pressure/Power Washing: Buildings, Committal Shelters, Floral Vase/Trash receptacles, benches and Surrounding Concrete Surfaces; quarterly (4 times per year, Nov., Feb., April, July)QTR$0.004$0.00$0.00
30035B.14.1Weekend/Holiday Burial SupportEA$0.005$0.00$0.00
30036B.14.2Ceremony Event Support to include set-up and take-down, includes tent and chair rentalEV$0.002$0.00$0.00
30037B.6.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.00690$0.00$0.00See guidance at bottom of page
30038B.6.3Headstone Raise and Realign, based upon GAR resultsEA$0.0050$0.00$0.00See guidance at bottom of page
30039B.7.6Sunken Grave Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment YearEA$0.0050$0.00$0.00See guidance at bottom of page
30040B.8.2Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government.EA$0.00266$0.00$0.00400.15266.6666666667See guidance at bottom of page

Option Year 3 Total Cost $0.00

Option Year 4
CLINSOWDescriptionUnit of IssueCostQtyTotal
40001B.6.1Headstone preparation, and transportationEA$0.00700$0.00$0.00
40002B.6.4Fine Tune Alignment ("Bump and Run), based upon GAR resultsEA$0.0050$0.00$0.00
40003B.7.1Casket/Vault Gravesite Sod InstallationEA$0.00700$0.00$0.00
40004B.7.2Mowing Turf (Tiftuf Bermuda)WK$0.0043$0.00$0.00
40005B.7.3Mowing non-turf areas, to include wild grass along access road edges.WK$0.0023$0.00$0.00
40006B.7.4Edging of Walkways, Curbs and Other Horizontal SurfacesWK$0.0043$0.00$0.0011000lf
40007B.7.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0043$0.00$0.00
40008B.7.7Grounds and Turf Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment YearSQFT$0.0025000$0.00$0.00
40009B.7.8Top Dressing - Burial Sections only, whole sectionAcre$0.0056$0.00$0.001435600.5217805624393600.51,219,680.00
40010B.7.9Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00$0.00
40011B.7.10Sweeping/Blowing Off Roadways and Concrete Surfaces (Daily-billed monthly)MO$0.0012$0.00$0.006000lf
40012B.8.1Pump House Monitoring and MaintenanceMO$0.0012$0.00$0.00
40013B.8.2Irrigation- Yearly Startup/Shut Down, Start up includes Irrigation Audit IAW Irrigation Association standardsEA$0.002$0.00$0.00
40014B.8.2Irrigation- Monthly system check-Includes Sprinkler adjustments as needed (Growing Season)MO$0.0010$0.00$0.00
40015B.9.1Maintenance of Plant Beds, Shrubs, Hedges and Bushes to include application of herbicide and fertilizer to mitigate weed growthMO$0.0012$0.00$0.00
40016B.9.2Tree Maintenance-(tree trimming, pruning, new tree establishment, guying,) includes all treesMO$0.002$0.00$0.00
40017B.9.3Tree Maintenance - woodline of cemetery grounds and access roadsYR$0.0012$0.00$0.00
40018B.9.3Tree Removal - As needed and directed by COR/Cemetery LeadershipEA$0.001$0.00$0.00
40019B.9.3Mulching - Removal ALL old mulch, replace or install weed barrier, Place new fresh mulch in All existing mulch bedsJB$0.001$0.00$0.0050000sqftWhat kind of mulch?
40020B.9.4Core Aerification (Aeration) - Approx 56 acres - SeptemberJB$0.001$0.00$0.00
40021B.9.4Dethatching - As necessary - Cemetery Discretion - Up to 56 acres of turfed groundsJB$0.001$0.00$0.00
40022B.10.1Fertilization- Bermuda (Application IAW SED Agronomist Recommendation / SOW); Example: Mar 5, April 15, Jun 1, Aug. 15, Oct 1JB$0.005$0.00$0.00
40023B.10.2Weed Control: Pre-Emerge Herbicide Application (Spring (Jan through Mar) and Fall (Oct through Nov))JB$0.002$0.00$0.00
40024B.10.2Weed Control: Post Emerge Herbicide Treatment/Application-- includes spot treatments - All Turf areas - Approx 56 acres (as needed or directed by COR)JB$0.005$0.00$0.00
40025B.10Soil Test -JB$0.002$0.00$0.00
40026B.10.3Lime (Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil testJB$0.001$0.00$0.00
40027B.10.4Insecticide (i.e. Mole Cricket, Stunt Mite control, Army Worms, etc.), Treatment/Application (as needed or directed by COR)JB$0.005$0.00$0.00
40028B.10.5Fire Ant Control - Blanket Application - 56 acres or as directed by CORJB$0.002$0.00$0.00
40029B.10.5Fire Ant Control/Monitoring - Daily Treatment Invoiced MonthlyMO$0.0012$0.00$0.00
40030b.10.6Fungicide Treatment/Application (as needed or directed by COR)JB$0.005$0.00$0.00
40031B.12.1Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00$0.00
40032B.13Headstone, Monument, Niche Cover Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the CORJB$0.002$0.00$0.0000
40033B.13Pressure/Power Washing: Entrance Ways, Walls (to include Columbarium), Caps, Brick Pylons Flag Assembly Area, Curbs, Sidewalks, and Composite Enclosures, and all surrounding concrete surfaces; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the CORJB$0.002$0.00$0.00
40034B.13Pressure/Power Washing: Buildings, Committal Shelters, Floral Vase/Trash receptacles, benches and Surrounding Concrete Surfaces; quarterly (4 times per year, Nov., Feb., April, July)QTR$0.004$0.00$0.00
40035B.14.1Weekend/Holiday Burial SupportEA$0.005$0.00$0.00
40036B.14.2Ceremony Event Support to include set-up and take-down, includes tent and chair rentalEV$0.002$0.00$0.00
40037B.6.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.00700$0.00$0.00See guidance at bottom of page
40038B.6.3Headstone Raise and Realign, based upon GAR resultsEA$0.0050$0.00$0.00See guidance at bottom of page
40039B.7.6Sunken Grave Repair, to include sod (Tiftuf Bermuda) Installation - includes spot watering of repaired areas during establishment YearEA$0.0050$0.00$0.00See guidance at bottom of page
40040B.8.2Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government.EA$0.00266$0.00$0.00400.15266.6666666667See guidance at bottom of page

Option Year 4 Total Cost $0.00

TOTAL COST
Base Year$0.00
Option Year 1$0.00
Option Year 2$0.00
Option Year 3$0.00
Option Year 4$0.00
Base Plus 4 Option Years Total$0.00
Note:
Service Contract Act WD # 2015-4527 will be applied for all other CLINS.
Davis-Bacon Act WD # AL20260095 will be applied for CLINS Highlighted

Partial til GMS AWD

Alabama National Cemetery Ground Maintenance RequirementPrior to Fork-in-the-Road, how many employees
Base Period
CLINSOWDescriptionNeeded through Jan - AprilUnit of issueEst. CostEst. QtyTotal
00015b.1.1Headstone receiving, preparation, and transportationEA$0.00850$0.00
00025b.1.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.00850$0.00
00035b.1.3Headstone Raise and RealignEA$0.00500$0.00
00045b.2.1Sunken Grave RepairEA$0.00150$0.00
Grounds Repairsqft
00055b.2.2Gravesite Floral/Decoration collection/removal (Weekly occurrence - Invoiced Monthly)MO$0.0012$0.00
00065b.2.3Mass Floral, Decorations, Trash and Debris Pick-up/RemovalEA$0.0020$0.00
00095b.4.1Pump House Monitoring and MaintenanceMO$0.0012$0.00
00105b.4.2Irrigation- Yearly Startup/Shut DownEA$0.002$0.00
Irrigation Monthly System check - includes sprinkler adjustments as needed (Growing Season)MO10
Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis - All Parts and Supplies Provided By Government.EA$30.00200$6,000.00$15.00
00175b.4.3Mowing Turf Area (Tifway 419 Bermuda), approx. 56 acres

tc={8ABAB512-6BE9-4C2A-855C-D04058D1CB93}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

Correct turf? Acrage?WK$0.0043$0.00
Turf EdgingStick Edging OnlyWK43
00185b.4.4Mowing non-turf areasWK$0.0043$0.00
00195b.4.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0025$0.00
00205b.4.6Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
00215b.4.7Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00
00225b.4.8Sweeping/Blowing Off Roadways and Concrete SurfacesMO$0.0012$0.00
00235b.4.9Maintenance of Benches, Concrete Pads, and Rocked AreasMO$0.0012$0.00
00245b.5.1Maintenance of Plant Beds, Shrubs, and BushesMO$0.006$0.00
00255b.5.2Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)JB$0.006$0.00
00265b.5.3Mulching - Removal, Replenish and/or Install All Areas
Cemetery definedJB$0.002$0.00
00275b.6.1Casket/Vault Gravesite Sod InstallationEA$0.00900$0.00
00285b.6.2Core Aerification (Aeration) - Approx 27 acres - SeptemberJB$0.001$0.00
00295b.6.3Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed groundsJB$0.001$0.00
00305b.6.4Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1JB$0.005$0.00
00315b.6.5Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov))JB$0.002$0.00
00325b.6.5Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR)JB$0.005$0.00
00335b.6.6Lime( Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil testJB$0.001$0.00
00345b.7.1Insecticide( Mole Cricket, Stunt Mite control), Treatment/Application (as needed or directed by COR)JB$0.005$0.00
00355b.7.2Fire Ant Control/Monitoring - Daily Treatment Invoiced MonthlyMO$0.0012$0.00
00365b.8.1Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the CORJB$0.002$0.00
00375b.8.2Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by CORJB$0.002$0.00
00385b.8.3Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the CORJB$0.002$0.00
00395b.8.4Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by CORJB$0.002$0.00
00405b.8.5Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the CORJB$0.002$0.00
00415b.8.6Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July)JB$0.004$0.00
00425b.8.7Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the CORJB$0.002$0.00
00435b.8.8Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July)JB$0.004$0.00
00445b.9.1Daily Committal Shelter Setup, Take Down, and CleaningEA$0.00375$0.00
00455b.9.2Weekend/Holiday Burial SupportEA$0.0011$0.00
00465b.9.3Ceremony Event Support to include set-up and take-downEV$0.003$0.00
00475b.1.3Fine Tune Alignment ("Bump and Run)EA$0.00500$0.00
00485b.7.1Fungicide Treatment/Application (as needed or directed by COR)JB$0.005$0.00

Base Year Total Estimate COST $15.00

Option 1 Period
CLINSOWDescriptionUnit of issueEst. CostEst. QtyTotal
100015b.1.1Headstone receiving, preparation, and transportationEA$0.00900$0.00
100025b.1.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.00900$0.00
100035b.1.3Headstone Raise and RealignEA$0.00500$0.00
100045b.2.1Sunken Grave and Grounds RepairEA$0.00150$0.00
100055b.2.2Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
100065b.2.3Mass Floral, Decorations, Trash and Debris Pick-up/RemovalEA$0.0020$0.00
100075b.3.1Pond Algae TreatmentMO$0.009$0.00
100085b.3.2Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.)JB$0.002$0.00
100095b.4.1Pump House Monitoring and MaintenanceMO$0.0012$0.00
100105b.4.2Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season)MO$0.0010$0.00
100115b.4.2Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" BreaksEA$0.005$0.00
100125b.4.2Irrigation- In-Valve Head Repair/ReplaceEA$0.005$0.00
100135b.4.2Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle presentEA$0.0015$0.00
100145b.4.2Irrigation- Electric & Gate valve Repair/ReplaceEA$0.005$0.00
100155b.4.2Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ PolyEA$0.005$0.00
100165b.4.2Irrigation- Controller Repair/ Replace/ Program to current Stand-alone (Hunter)EA$0.003$0.00
100175b.4.3Mowing and turf edging, (Tifway 419 Bermuda)WK$0.0043$0.00
100185b.4.4Mowing non-turf areasWK$0.0043$0.00
100195b.4.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0025$0.00
100205b.4.6Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
100215b.4.7Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00
100225b.4.8Sweeping/Blowing Off Roadways and Concrete SurfacesMO$0.0012$0.00
100235b.4.9Maintenance of Benches, Concrete Pads, and Rocked AreasMO$0.0012$0.00
100245b.5.1Maintenance of Plant Beds, Shrubs, and BushesMO$0.006$0.00
100255b.5.2Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)JB$0.006$0.00
100265b.5.3Mulching - Removal, Replenish and/or Install All Areas
Cemetery definedJB$0.002$0.00
100275b.6.1Casket/Vault Gravesite Sod InstallationEA$0.00950$0.00
100285b.6.2Core Aerification (Aeration) - Approx 27 acres - SeptemberJB$0.001$0.00
100295b.6.3Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed groundsJB$0.001$0.00
100305b.6.4Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1JB$0.005$0.00
100315b.6.5Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov))JB$0.002$0.00
100325b.6.5Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR)JB$0.005$0.00
100335b.6.6Lime( Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil testJB$0.001$0.00
100345b.7.1Insecticide( Mole Cricket, Stunt Mite control), Treatment/Application (as needed or directed by COR)JB$0.005$0.00
100355b.7.2Fire Ant Control/Monitoring - Daily Treatment Invoiced MonthlyMO$0.0012$0.00
100365b.8.1Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the CORJB$0.002$0.00
100375b.8.2Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by CORJB$0.002$0.00
100385b.8.3Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the CORJB$0.002$0.00
100395b.8.4Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by CORJB$0.002$0.00
100405b.8.5Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the CORJB$0.002$0.00
100415b.8.6Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July)JB$0.004$0.00
100425b.8.7Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the CORJB$0.002$0.00
100435b.8.8Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July)JB$0.004$0.00
100445b.9.1Daily Committal Shelter Setup, Take Down, and CleaningEA$0.00375$0.00
100455b.9.2Weekend/Holiday Burial SupportEA$0.0011$0.00
100465b.9.3Ceremony Event Support to include set-up and take-downEV$0.003$0.00
100475b.1.3Fine Tune Alignment ("Bump and Run)EA$0.00500$0.00
100485b.7.1Fungicide Treatment/Application (as needed or directed by COR)JB$0.002$0.00
Option Year 1 Total Estimate COST$0.00
Option 2 Period
CLINSOWDescriptionUnit of issueEst. CostEst. QtyTotal
200015b.1.1Headstone receiving, preparation, and transportationEA$0.00950$0.00
200025b.1.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.00950$0.00
200035b.1.3Headstone Raise and RealignEA$0.00500$0.00
200045b.2.1Sunken Grave and Grounds RepairEA$0.00150$0.00
200055b.2.2Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
200065b.2.3Mass Floral, Decorations, Trash and Debris Pick-up/RemovalEA$0.0020$0.00
200075b.3.1Pond Algae TreatmentMO$0.009$0.00
200085b.3.2Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.)JB$0.002$0.00
200095b.4.1Pump House Monitoring and MaintenanceMO$0.0012$0.00
200105b.4.2Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season)MO$0.0010$0.00
200115b.4.2Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" BreaksEA$0.005$0.00
200125b.4.2Irrigation- In-Valve Head Repair/ReplaceEA$0.005$0.00
200135b.4.2Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle presentEA$0.0015$0.00
200145b.4.2Irrigation- Electric & Gate valve Repair/ReplaceEA$0.005$0.00
200155b.4.2Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ PolyEA$0.005$0.00
200165b.4.2Irrigation- Controller Repair/ Replace/ Program to current Stand-alone (Hunter)EA$0.003$0.00
200175b.4.3Mowing and turf edging, (Tifway 419 Bermuda)WK$0.0043$0.00
200185b.4.4Mowing non-turf areasWK$0.0043$0.00
200195b.4.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0025$0.00
200205b.4.6Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
200215b.4.7Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00
200225b.4.8Sweeping/Blowing Off Roadways and Concrete SurfacesMO$0.0012$0.00
200235b.4.9Maintenance of Benches, Concrete Pads, and Rocked AreasMO$0.0012$0.00
200245b.5.1Maintenance of Plant Beds, Shrubs, and BushesMO$0.006$0.00
200255b.5.2Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)JB$0.006$0.00
200265b.5.3Mulching - Removal, Replenish and/or Install All Areas
Cemetery definedJB$0.002$0.00
200275b.6.1Casket/Vault Gravesite Sod InstallationEA$0.001000$0.00
200285b.6.2Core Aerification (Aeration) - Approx 27 acres - SeptemberJB$0.001$0.00
200295b.6.3Dethatching - As necessary - Cemetery Discretion - Up to 27 acres of turfed groundsJB$0.001$0.00
200305b.6.4Fertilization- Bermuda (20-0-06 at 5lb N per 1000); Mar 5, April 15, Jun 1, Aug. 15, Oct 1JB$0.005$0.00
200315b.6.5Weed Control: Pre-Emerge Herbicide Application (Spring (Jan/Mar) and Fall (Oct/Nov))JB$0.002$0.00
200325b.6.5Weed Control: Post Emerge Herbicide Treatment/Application-- All Turf areas - Approx 27 acres (as needed or directed by COR)JB$0.005$0.00
200335b.6.6Lime( Gypsum) Calcuim Sulfate Application -
All Turf Areas-Early Spring Yearly - as indicated by soil testJB$0.001$0.00
200345b.7.1Insecticide( Mole Cricket, Stunt Mite control), Treatment/Application (as needed or directed by COR)JB$0.005$0.00
200355b.7.2Fire Ant Control/Monitoring - Daily Treatment Invoiced MonthlyMO$0.0012$0.00
200365b.8.1Headstone Cleaning; 2 times (Bi-annually) a year. Cleaning shall be completed two weeks prior to Memorial Day and one week prior to Veterans Day, or as scheduled by the CORJB$0.002$0.00
200375b.8.2Pressure/Power Washing: Curbs, Sidewalks, and Composite Enclosures; 2 times a year; once between April 1st through May 15th, and again between November 1st through December 1st, or as directed by CORJB$0.002$0.00
200385b.8.3Pressure/Power Washing: Entrance Ways, Walls, Caps, Brick Pylons, Areas (concrete pads/bases) under signs and Trash/Floral Receptacles; 2 times a year; once between April 15th and May 15th, and again between November 1st through December 1st, or as directed by the CORJB$0.002$0.00
200395b.8.4Pressure/Power Washing: Flag Assembly Area; 2 times a year; once between March 1st and May 15, and again between September 1st and November 15th, or as directed by CORJB$0.002$0.00
200405b.8.5Pressure/Power Washing: Columbarium, Memorial Walls, Concrete Surfaces and Marble Niche Covers/Memorial Wall Markers; washed two (2) times a year, two weeks prior to Memorial Day and one week prior to Veterans Day, or as directed by the CORJB$0.002$0.00
200415b.8.6Pressure/Power Washing: Committal Shelters; quarterly (4 times per year, Nov., Feb., April, July)JB$0.004$0.00
200425b.8.7Pressure/Power Washing: Buildings and Surrounding Concrete Surfaces; two (2) times a year, once between March 1st and May 15, and again between September 1st and November 15th or as directed by the CORJB$0.002$0.00
200435b.8.8Pressure/Power Washing: Floral Vase/Trash Receptacle Cleaning; (quarterly (4 times per year), Nov., Feb., April, July)JB$0.004$0.00
200445b.9.1Daily Committal Shelter Setup, Take Down, and CleaningEA$0.00375$0.00
200455b.9.2Weekend/Holiday Burial SupportEA$0.0011$0.00
200465b.9.3Ceremony Event Support to include set-up and take-downEV$0.003$0.00
200475b.1.3Fine Tune Alignment ("Bump and Run)EA$0.00500$0.00
200485b.7.1Fungicide Treatment/Application (as needed or directed by COR)JB$0.002$0.00
Option Year 2 Total Estimate COST$0.00
Option 3 Period
CLINSOWDescriptionUnit of issueEst. CostEst. QtyTotal
30015b.1.1Headstone receiving, preparation, and transportationEA$0.001000$0.00
30025b.1.2Headstone Installation and Setting, All First, Subequent (R2) Interment and All Replacement HeadstonesEA$0.001000$0.00
30035b.1.3Headstone Raise and RealignEA$0.00500$0.00
30045b.2.1Sunken Grave and Grounds RepairEA$0.00150$0.00
30055b.2.2Gravesite Floral/Decoration collection/removal (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
30065b.2.3Mass Floral, Decorations, Trash and Debris Pick-up/RemovalEA$0.0020$0.00
30075b.3.1Pond Algae TreatmentMO$0.009$0.00
30085b.3.2Pond Equipment Maintenance (Timers, Fountains, Aerators, Cables, etc.)JB$0.002$0.00
30095b.4.1Pump House Monitoring and MaintenanceMO$0.0012$0.00
30105b.4.2Irrigation- Yearly Startup/Shut Down, & Monthly system check-Includes Sprinkler adjustments as needed (Growing Season)MO$0.0010$0.00
30115b.4.2Irrigation- Main Line/ Lateral PVC/Poly Repair/Replace 2" to 6" BreaksEA$0.005$0.00
30125b.4.2Irrigation- In-Valve Head Repair/ReplaceEA$0.005$0.00
30135b.4.2Irrigation-Popup Rotor,Mister Head and Electric Valve Solenoid Repair/Replace (Includes rotor/mister adjustment with OEM nozzle presentEA$0.0015$0.00
30145b.4.2Irrigation- Electric & Gate valve Repair/ReplaceEA$0.005$0.00
30155b.4.2Irrigation- Lateral Line Repair/Replace 3/4"-1" PVC/ PolyEA$0.005$0.00
30165b.4.2Irrigation- Controller Repair/ Replace/ Program to current Stand-alone (Hunter)EA$0.003$0.00
30175b.4.3Mowing and turf edging, (Tifway 419 Bermuda)WK$0.0043$0.00
30185b.4.4Mowing non-turf areasWK$0.0043$0.00
30195b.4.5Headstone, Marker, Monument and Other Vertical Surface TrimmingWK$0.0025$0.00
30205b.4.6Leaf, Trash and Debris Collection and Removal; (Daily occurrence - Invoiced Monthly)MO$0.0012$0.00
30215b.4.7Extreme Weather Storm Damage and Debris Clean-upEV$0.003$0.00
30225b.4.8Sweeping/Blowing Off Roadways and Concrete SurfacesMO$0.0012$0.00
30235b.4.9Maintenance of Benches, Concrete Pads, and Rocked AreasMO$0.0012$0.00
30245b.5.1Maintenance of Plant Beds, Shrubs, and BushesMO$0.006$0.00
30255b.5.2Tree Maintenance-(tree trimming, canopy raise, new tree establishment, guying)JB$0.006$0.00
30265b.5.3Mulching - Removal, Replenish and/or Install All Areas
Cemetery definedJB$0.002$0.00
30275b.6.1Casket/Vault Gravesite Sod InstallationEA$0.001050$0.00

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .