This is a revised IFB Cost Estimate Worksheet for a construction project at Wood National Cemetery in Milwaukee, Wisconsin. The worksheet is a template designed for contractors to submit lump sum pricing for Division-based construction work organized into five Contract Line Items (CLINs 001-005). Contractors must provide cost estimates for applicable divisions, which include General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood/Plastic/Composites, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Integrated Automation, Electrical, Communications, Electronic Safety and Security, Earthwork, Exterior Improvements, and Utilities. The worksheet also requires line items for Bonds, Overhead, and Profit, with a grand total field for the complete project cost.
The solicitation (36C78626B0006) is issued by the Department of Veterans Affairs National Cemetery Administration for Project 823CM3024, Renovate Roads and FCA Corrections at Wood National Cemetery, located at 5000 West National Avenue, Building 1301, Milwaukee, Wisconsin 53295-0001. This cost estimate worksheet represents a revised amendment that adds CLIN 0005 to the original statement of work. Contractors responding to this Invitation for Bid must complete the worksheet with estimated costs for each applicable division, marking "N/A" for divisions not being utilized, and may add additional line items as deemed appropriate for the project scope.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| IFB Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| Solicitation Number | 36C78626B0006 |
| Project Nunber | 823CM3024 |
| Project Name | Renovate Roads and FCA Corrections at Wood NC |
| Division | Unit | CLIN 001 | CLIN 002 | CLIN 003 | CLIN 004 | CLIN 005 | Total |
| Division 0 | |||||||
| Special Sections | |||||||
| Division 01 | |||||||
| General Requirements | |||||||
| Division 02 | |||||||
| Existing Conditions | |||||||
| Division 03 | |||||||
| Concrete | |||||||
| Division 04 | |||||||
| Masonry | |||||||
| Division 05 | |||||||
| Metals | |||||||
| Division 06 | |||||||
| Wood, Plastic, and Composites | |||||||
| Division 07 | |||||||
| Thermal and Moisture Protection | |||||||
| Division 08 | |||||||
| Openings (Doors, Windows, etc...) | |||||||
| Division 09 | |||||||
| Finishes | |||||||
| Division 10 | |||||||
| Specialties | |||||||
| Division 11 | |||||||
| Equipment | |||||||
| Division 12 | |||||||
| Furnishings | |||||||
| Division 13 | |||||||
| Special Construction | |||||||
| Division 14 | |||||||
| Fire Suppression | |||||||
| Division 22 | |||||||
| Plumbing | |||||||
| Division 23 | |||||||
| Heat, Ventilating, and Air Conditioning | |||||||
| Division 25 | |||||||
| Integrated Automation | |||||||
| Division 26 | |||||||
| Electrical | |||||||
| Division 27 | |||||||
| Communications | |||||||
| Division 28 | |||||||
| Electronic Safety and Security | |||||||
| Division 31 | |||||||
| Earthwork | |||||||
| Division 32 | |||||||
| Exterior Improvements | |||||||
| Division 33 | |||||||
| Utilities | |||||||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $