941002 SRCNC Gravesite Expansion Bid Set - Plans 8 of 8.pdf
PDF 6 MB Posted
- Attached to
- Cemetery Expansion Improvements Construction Project - Snake River Canyon Natl Cemetery; Proj # 941-002
- Solicitation number
- 36C78625B0038
About this file
These are bid documents for the Snake River Canyon National Cemetery Gravesite Expansion project located in Buhl, Idaho. The project involves constructing a new storage building (Storage 101) and various site structures including columbarium walls, memorial walls, and a settling pond. The structural drawings detail concrete foundations, masonry walls, wood and steel trusses, and reinforcement specifications. Mechanical drawings cover HVAC equipment for the storage building, and electrical drawings outline power distribution, telecommunications infrastructure, and site electrical systems. The project is being managed by the Department of Veterans Affairs' Office of Construction and Facilities Management, with Four Front Design Inc. serving as the architect/engineer. The bid documents are dated 5/16/2025, with an addendum issued on 7/30/2025, indicating the project is in the pre-construction bidding phase.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUIRED SPECIAL INSPECTIONS AND TESTS OF MASONRY
LEVEL A QUALITY ASSURANCE REFERENCE TMS 402 TABLE 3.1.1
MINIMUM VERIFICATION
PRIOR TO CONSTRUCTION, VERIFY CERTIFICATES OF COMPLIANCE USED IN MASONRY CONSTRUCTION
REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION - REFERENCE 2024 IBC 1705.3
TYPE
PERIODIC
SPECIAL
INSPECTION
INSPECT REINFORCEMENT, INCLUDING TENDONS AND VERIFY PLACEMENT.
CONTINUOUS
SPECIAL
INSPECTION
X
REINFORCING BAR WELDING:
a. VERIFY WELDABILITY OF REINFORCING BARS OTHER THAN ASTM A706:
b. INSPECT SINGLE-PASS FILLET WELDS, MAXIMUM 5/16"; AND
c. INSPECT ALL OTHER WELDS.
X
X
INSPECT ANCHORS CAST IN CONCRETE. X
INSPECT ANCHORS POST-INSTALLED IN HARDENED CONCRETE MEMBERS.
a. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY INCLINED
ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS.
b. MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT DEFINED ABOVE. X
X
VERIFY USE OF REQUIRED DESIGN MIX. X
X
PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS FOR STRENGTH TESTS, PERFORM SLUMP
AND AIR TESTS AND DETERMINE THE TEMPERATURE OF THE CONCRETE.
-X
INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES. -X
VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES. X-
INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE CONCRETE MEMBER BEING
FORMED.
X-
POST-INSTALLED ANCHOR / REINFORCING STEEL SPECIAL INSPECTIONS (ICC-ES REPORT)
TYPE
EXPANSION ANCHORS, SLEEVE ANCHORS, SCREW ANCHORS INSTALLATION
PERIODIC
SPECIAL
INSPECTION
CONTINUOUS
SPECIAL
INSPECTION
-X
TORQUE TESTING OF EXPANSION ANCHORS, SLEEVE ANCHORS, SCREW ANCHORS -100%
ADHESIVE ANCHORS, REINFORCING STEEL INTO HARDENED CONCRETE INSTALLATION -X
TENSION TEST OF ADHESIVE ANCHORS FIRST 3 AND
1% OF
REMANING
POST-INSTALLED ANCHORS / REINFORCING STEEL SPECIAL INSPECTIONS
REFERENCE INDIVIDUAL ANCHOR - ICC-ES REPORT
TASKS PERIODIC CONTINUOUS
PRIOR TO START OF WORK REVIEW CONTRACTOR'S INSTALLATION PROCEDURE -
X
X
X
X
X
X
PRIOR TO INSTALLATION OF ANCHOR VERIFY TYPE, DIAMETER, LENGTH, FINISH AND BASE
MATERIAL. VERIFY SOLID GROUTED AREA AROUND ANCHORS IN GROUTED MASONRY. VERIFY
MAXIMUM IMPACT WRENCH TORQUE RATING FOR SCREW ANCHORS
DURING INSTALLATION OF ANCHOR VERIFY HOLE DIMENSIONS, HOLE CLEANING, ANCHOR
EMBEDMENT, EDGE DISTANCES AND SPACING
AFTER INSTALLATION OF ATTACHED ASSEMBLY VERIFY NUMBER, EDGE DISTANCES AND
ANCHOR FLUSH WITH AND PERPENDICULAR TO THE RECEIVING SURFACE
AFTER INSTALLED TORQUE TEST
PRIOR TO START OF WORK REVIEW CONTRACTOR'S INSTALLATION PROCEDURE
ADHESIVE ANCHORS, REINFORCING STEEL ANCHORED INTO HARDENED CONCRETE
PRIOR TO INSTALLATION OF ANCHOR VERIFY TYPE, DIAMETER, LENGTH, FINISH AND BASE
MATERIAL. VERIFY SOLID GROUTED AREA AROUND ANCHORS IN GROUTED MASONRY. VERIFY
MAXIMUM IMPACT WRENCH TORQUE RATING FOR SCREW ANCHORS
DURING INSTALLATION OF ANCHOR VERIFY HOLE DIMENSIONS, HOLE CLEANING, ANCHOR
EMBEDMENT, EDGE DISTANCES AND SPACING
AFTER INSTALLATION OF ATTACHED ASSEMBLY VERIFY NUMBER, EDGE DISTANCES AND
ANCHOR FLUSH WITH AND PERPENDICULAR TO THE RECEIVING SURFACE
CURE TIME
X
X
X
X
AFTER INSTALLED TENSION TEST PER ASTM E488 X -
REQUIRED SPECIAL INSPECTIONS AND TESTS OF SOILS - REFERENCE 2024 IBC 1705.6
TYPE
VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO ACHIEVE THE DESIGN
CAPACITY
PERIODIC
SPECIAL
INSPECTION
CONTINUOUS
SPECIAL
INSPECTION
X-
VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH AND HAVE REACHED PROPER
MATERIAL
X-
PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALS X-
DURING FILL PLACEMENT USE OF PROPER MATERIALS AND PROCEDURES IN ACCORDANCE WITH
THE PROVISIONS OF THE APPROVED GEOTECHNICAL REPORT. VERIFY DENSITIES AND LIFT
THICKNESSES DURING PLACEMENT AND COMPACTION OF COMPACTED FILL
-X
PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND VERIFY THAT SITE HAS
BEEN PREPARED PROPERLY
X-
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2024 IBC 1705.2
INSPECTION TASKS PRIOR TO WELDING - REFERENCE AISC 360-16 SPECIFICATION, TABLE N5.4-1
INSPECTION TASKS PRIOR TO WELDING QC QA
WELDER QUALIFICATION RECORDS AND CONTINUITY RECORDS PERFORM
PERFORM
PERFORM
OBSERVE
OBSERVE
OBSERVE
PERFORM
OBSERVE
OBSERVE
OBSERVE
OBSERVE
PERFORM
PERFORM
OBSERVE
OBSERVE
OBSERVE
OBSERVE
OBSERVE
OBSERVE
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2024 IBC 1705.2
INSPECTION TASKS DURING WELDING - REFERENCE AISC 360-16 SPECIFICATION, TABLE N5.4-2
INSPECTION TASKS DURING WELDING QC QA
OBSERVE
PERFORM
OBSERVE
PERFORM
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2024 IBC 1705.2
INSPECTION TASKS AFTER WELDING - REFERENCE AISC 360-16 SPECIFICATION, TABLE N5.4-3
INSPECTION TASKS AFTER WELDING QC QA
WELDS CLEANED OBSERVE
PERFORM
OBSERVE
OBSERVE
PERFORM
OBSERVE
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2024 IBC 1705.2
INSPECTION TASKS PRIOR TO BOLTING - REFERENCE AISC 360-16 SPECIFICATION, TABLE N5.6-1
INSPECTION TASKS PRIOR TO BOLTING QC QA
MANUFACTURER'S CERTIFICATIONS AVAILABLE FOR FASTENER MATERIALS OBSERVE
PERFORM
PERFORM
OBSERVE
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2024 IBC 1705.2
INSPECTION TASKS DURING BOLTING - REFERENCE AISC 360-16 SPECIFICATION, TABLE N5.6-2
INSPECTION TASKS DURING BOLTING QC QA
FASTENER ASSEMBLIES PLACED IN ALL HOLES AND WASHERS AND NUTS ARE POSITIONED AS
REQUIRED
OBSERVE
OBSERVE
OBSERVE
OBSERVE
OBSERVE
OBSERVE
OBSERVE
OBSERVE
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL - REFERENCE 2024 IBC 1705.2
INSPECTION TASKS AFTER BOLTING - REFERENCE AISC 360-16 SPECIFICATION, TABLE N5.6-3
INSPECTION TASKS AFTER BOLTING QC QA
DOCUMENT ACCEPTANCE OR REJECTION OF BOLTED CONNECTIONS PERFORM PERFORM
CHECK WELDING EQUIPMENT
WPS AVAILABLE
MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES AVAILABLE
MATERIAL IDENTIFICATION (TYPE / GRADE)
WELDER IDENTIFICATION SYSTEM
FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY)
FIT-UP OF CJP GROVE WELDS OF HSS T-, Y-, AND K-JOINTS WITHOUT BACKING (INCLUDING JOINT
GEOMETRY)
CONFIGURATION AND FINISH OF ACCESS HOLES
FIT-UP OF FILLET WELDS
CONTROL AND HANDLING OF WELDING CONSUMABLES
PLACEMENT AND INSTALLATION OF STEEL HEADED STUD ANCHORS
NO WELDING OVER CRACKED TACK WELDS
ENVIRONMENTAL CONDITIONS
WPS FOLLOWED
WELDING TECHNIQUES
ARC STRIKES
SIZE, LENGTH, AND LOCATION OF WELDS
WELDS MEET VISUAL ACCEPTANCE CRITERIA
NO PROHIBITED WELDS HAVE BEEN ADDED WITHOUT THE APPROVAL OF EOR
K-AREA
WELD ACCESS HOLES IN ROLLED HEAVY SHAPES AND BUILT-UP HEAVY SHAPES
BACKING REMOVED AND WELD TABS REMOVED (IF REQUIRED)
REPAIR ACTIVITIES
DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR MEMBER
FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS
PROTECTED STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS, AND OTHER FASTENER
COMPONENTS
CORRECT FASTENERS SELECTED FOR THE JOINT DETAIL
CORRECT BOLTING PROCEDURE SELECTED FOR JOINT DETAIL
CONNECTION ELEMENTS, INCLUDING THE APPROPRIATE FAYING SURFACE CONDITIONS AND
HOLE PREPARATION, IF SPECIFIED, MEET APPLICABLE REQUIREMENTS
PRE-INSTALLATION VERIFICATION TESTING
FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC SPECIFICATION,
PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID POINT TOWARDS THE FREE EDGES
JOINT BROUGHT TO THE SNUG-TIGHT CONDITION PRIOR TO THE PRE-TENSIONING OPERATION
FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTED FROM ROTATING
PERFORM PERFORM
PERFORM PERFORM
PERFORM PERFORM
PERFORM PERFORM
PERFORM PERFORM
PERFORM PERFORM
PERFORM PERFORM
OBSERVEOBSERVE
OBSERVE
OBSERVE
OBSERVE
OBSERVE
OBSERVE
OBSERVE
OBSERVE OBSERVE
OBSERVE OBSERVE
OBSERVE OBSERVE
OBSERVE OBSERVE
OBSERVE OBSERVE
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof4F Project Number: 23.2693.L01
RHAA
225 MILLER AVENUE
MILL VALLEY, CA 94941
AQUA ENGINEERING, INC.
300 BOARDWALK DRIVE, UNIT 4B
FORT COLLINS, CO 80525-3093
OCMI, INC.
8851 RESEARCH DRIVE
IRVINE, CA 92618
B&R GROUP
10152 ORCHID RIDGE LANE
ESTERO, FL 34135
RATIO ARCHITECTS, LLC
101 S. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46204
WWC ENGINEERING
1275 MAPLE STREET, SUITE F
HELENA, MT 59601
CENTRAL GEOTECHNICAL SERVICES
10240 SW NIMBUS AVENUE, SUITE L6
PORTLAND, OR 97223
CALIBRE ENGINEERING, INC.
8822 SOUTH RIDGELINE BLVD,
SUITE 301
HIGHLANDS RANCH, CO 80129
SCOUT ENVIRONMENTAL, INC.
169 SAXONY ROAD, SUITE 214
ENCINITAS, CA 92024
517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
/7
/2
:1
:3
A
M
Bid Documents
05/16/2025
QA NOTES & TABLES
S-002
SNAKE RIVER CANYON
NATIONAL CEMETERY
GRAVESITE EXPANSION
EMES
BUHL, IDAHO
941-002
QUALITY ASSURANCE PLAN AND STATEMENT OF SPECIAL INSPECTION NOTES
1. SPECIAL INSPECTIONS FOR THIS PROJECT ARE REQUIRED PER THE 2024 INTERNATIONAL BUILDING CODE CHAPTER 17, SECTION 1704 AND 1705. SEE PROJECT SPECIFICATIONS AND STATEMENT OF SPECIAL INSPECTIONS BELOW FOR SPECIFIED REQUIREMENTS.
2. THE OWNER SHALL ENGAGE A QUALIFIED INSPECTION AND TESTING AGENCY TO PERFORM SPECIAL INSPECTION SERVICES FOR ALL STRUCTURAL MEMBERS AND ASSEMBLIES. SPECIAL INSPECTORS’ INSPECTIONS ARE IN ADDITION TO ANY INSPECTION PERFORMED BY
THE AUTHORITY HAVING JURISDICTION.
3. THE SPECIAL INSPECTOR OR INSPECTION AGENCY RETAINED FOR CONDUCTING INSPECTIONS SHALL NOT BE EMPLOYED DIRECTLY OR INDIRECTLY BY THE CONTRACTOR, UNLESS APPROVED BY THE AUTHORITY HAVING JURISDICTION.
4. SPECIAL INSPECTION IS REQUIRED FOR THE FOLLOWING:
a. STEEL CONSTRUCTION (IBC 1705.2, AISC 360-16)
1. WELDING
2. HIGH STRENGTH BOLTS
b. CONCRETE CONSTRUCTION (IBC 1705.3, ACI 318)
c. SOILS (IBC 1705.6)
5. SEE INSPECTION TABLES AND REFERENCED DOCUMENTS FOR MORE IN-DEPTH INSPECTION REQUIREMENTS.
a. ‘O’ = OBSERVE, INSPECTOR SHALL OBSERVE THESE ITEMS ON A RANDOM BASIS
b. ‘P’ = PERFORM, INSPECTOR SHALL PERFORM TASKS FOR EACH MEMBER
6. FOR SHOP FABRICATED MEMBERS AND ASSEMBLIES, INSPECTIONS SHALL OCCUR UNLESS THE FABRICATOR IS REGISTERED AND APPROVED BY THE AUTHORITY HAVING JURISDICTION TO PERFORM SUCH WORK WITHOUT SPECIAL INSPECTION OR HAS A CURRENT ICC-
ES EVALUATION REPORT.
a. AT COMPLETION OF FABRICATION BY AN APPROVED FABRICATOR, THE FABRICATOR SHALL SUBMIT A CERTIFICATE OF
COMPLIANCE THAT THE WORK WAS COMPLETED IN COMPLIANCE WITH CONTRACT DOCUMENTS.
7. THE SPECIAL INSPECTOR FOR EACH MATERIAL SHALL SUBMIT SPECIAL INSPECTOR QUALIFICATIONS TO THE AUTHORITY HAVING
JURISDICTION PRIOR TO START OF WORK
8. A FINAL REPORT OF SPECIAL INSPECTIONS, DOCUMENTING COMPLETION OF ALL REQUIRED SPECIAL INSPECTIONS, INCLUDING TESTING
AND CORRECTION OF ANY DISCREPANCIES NOTED IN THE INSPECTIONS, SHALL BE SUBMITTED TO THE AUTHORITY HAVING JURISDICTION STATING THAT THE WORK WAS COMPLETED IN SUBSTANTIAL CONFORMANCE TO THE APPROVED PLANS, SPECIFICATIONS, AND THE APPLICABLE PROVISIONS OF THE CODE. ANY WORK NOT IN COMPLIANCE SHALL BE DESCRIBED IN THE REPORT.
9. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING AND COORDINATING THE WORK WITH THE INSPECTOR (WITH UPDATES AS NEEDED) TO FACILITATE PROPER INSPECTION PER THE CODE. CONTRACTOR SHALL KEEP WORK EXPOSED AND ACCESSIBLE UNTIL REQUIRED SPECIAL INSPECTIONS ARE COMPLETE. ANY COSTS TO RE-EXPOSE AREAS NOT INSPECTED SHALL BE BORNE BY THE
CONTRACTOR.
10. DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION. INSPECTOR SHALL SUBMIT
TIMELY REPORTS OF NON-CONFORMANCE TO SEOR.
11. STRUCTURAL OBSERVATION BY THE ENGINEER DOES NOT CONSTITUTE SPECIAL INSPECTIONS.
5/16/25
71 83
B
C
4" SOG
0'-0"
CJ
CJ CJC
J
C J
C
JCJ CJ
C J
2' - 0" TYP
S-302
S-302
TYP
T/FTG= -2' - 0"
20' - 0"
S-101 7
S-101
S-1015
S-101
S-302
TYP
4" 4"H
SS4X
4X 1/
H
SS4X
4X 1/
A
S-302
TYP
B
C
/4
/2
/2
/4
R
R
WOOD ROOF TRUSSES @ 2' OC
4" / 1'-0"4" / 1'-0"
S-600
TYP
S-600
TYP
S-101
S-101 7
S-101
S-1015
S-101
R1 R1
A
3' - 1 1/4" 20' - 0" 3' - 1 1/4"
S-600
S-600
2x6 @ 2' OC, MAX, TYP
S-600
TYP
HSS STEEL TRUSS
S-101
TYP
14' - 11 3/4"
T/ PLYWD
LEVEL 1
0' - 0"
LEVEL 2
10' - 0"
ML8
ML8
ML8
M J
M J
M J
M J
M J
M J
S-401
TYP
LEVEL 1
0' - 0"
LEVEL 2
10' - 0"
BC A
LEVEL 1
0' - 0"
LEVEL 2
10' - 0"
1 2
LEVEL 1
0' - 0"
LEVEL 2
10' - 0"
B CA
LEVEL 2
10' - 0"
1 2
32 PSF
23 PSF
8 PSF
4' - 0"
LEVEL 2
10' - 0"
4"5' - 0"5' - 0"5' - 0"5' - 0"4"
/2
S-600
TYP
/2
S-600
TYP
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof4F Project Number: 23.2693.L01
RHAA
225 MILLER AVENUE
MILL VALLEY, CA 94941
AQUA ENGINEERING, INC.
300 BOARDWALK DRIVE, UNIT 4B
FORT COLLINS, CO 80525-3093
OCMI, INC.
8851 RESEARCH DRIVE
IRVINE, CA 92618
B&R GROUP
10152 ORCHID RIDGE LANE
ESTERO, FL 34135
RATIO ARCHITECTS, LLC
101 S. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46204
WWC ENGINEERING
1275 MAPLE STREET, SUITE F
HELENA, MT 59601
CENTRAL GEOTECHNICAL SERVICES
10240 SW NIMBUS AVENUE, SUITE L6
PORTLAND, OR 97223
CALIBRE ENGINEERING, INC.
8822 SOUTH RIDGELINE BLVD,
SUITE 301
HIGHLANDS RANCH, CO 80129
SCOUT ENVIRONMENTAL, INC.
169 SAXONY ROAD, SUITE 214
ENCINITAS, CA 92024
517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
/7
/2
:1
:3
A
M
Bid Documents
05/16/2025
FRAMING PLANS, SNOW LOAD PLAN, &
WALL ELEVATIONS
S-101
SNAKE RIVER CANYON
NATIONAL CEMETERY
GRAVESITE EXPANSION
EMES
BUHL, IDAHO
941-002
1/4" = 1'-0"
FIRST FLOOR PLAN
1/4" = 1'-0"
ROOF FRAMING PLAN
FIRST FLOOR PLAN NOTES:
1. SEE GENERAL NOTES, SPECIFICATIONS, AND DETAILS FOR ADDITIONAL INFORMATION.
2. TOP OF SLAB = 0’-0” WHICH IS 3795.37’ IN CIVIL ELEVATION. SEE CIVIL AND ARCHITECTURAL DRAWINGS FOR LAYOUT IN SPACE.
3. SEE ARCHITECTURAL DRAWINGS FOR SLAB ON GRADE SLOPES, STEPS, AND DEPRESSIONS NOT SHOWN ON STRUCTURAL.
4. SEE ARCH DRAWINGS FOR VAPOR RETARDER LOCATIONS. INSTALL VAPOR RETARDER DIRECTLY UNDER SLAB PER RECOMMENDATIONS OF PCA
AND ACI 302.1R-04. TAKE PRECAUTIONS TO MINIMIZE SLAB CURLING. GRIND SLAB TO ACHIEVE SPECIFIED FLOOR FLATNESS AND LEVELNESS
VALUES.
5. SEE ELEVATIONS AND DETAILS FOR MASONRY WALL INFORMATION.
6. SEE ARCHITECTURAL DRAWINGS FOR DIMENSIONS OF OPENINGS
ROOF PLAN NOTES:
1. SEE GENERAL NOTES, SPECIFICATIONS, AND DETAILS FOR ADDITIONAL INFORMATION.
2. DECK NOTATED AS R1 IS 15/32" WITH A MIN SPAN RATING OF 32/16, APA RATED SHEATHING, EXPOSURE 1, NOMINAL 4'x8', UNO. SHEATHING
FASTENED TO SUPPORTS AS FOLLOWS:
A. EDGE: 8d @ 6" OC B. FIELD: 8d @ 6" OC
3. CONTRACTOR TO PROVIDE ALL REQUIRED TEMPORARY AND PERMANENT TRUSS BRACING. COORDINATE WITH TRUSS ENGINEER.
1/8" = 1'-0"
NORTH ELEV
1/8" = 1'-0"
EAST ELEV
1/8" = 1'-0"
SOUTH ELEV
1/8" = 1'-0"
WEST ELEV
WALL ELEVATION NOTES:
1. ALL WALLS ARE 8” CMU WITH #4 @ 48” OC.
2. SEE ELEVATIONS AND DETAILS FOR ADDITIONAL REINF AT JAMBS, LINTELS,
AND BOND BEAMS.
3. PROVIDE (1) #5 BOND BEAM AT TOPS OF ALL WALLS AND AT ROOF DECK
ELEVATION.
1/4" = 1'-0"
WOOD TRUSS DESIGN LOADS
TRUSS NOTES:
1. DESIGN TRUSS FOR WIND AND SEISMIC LOADS FROM DESIGN CRITERIA.
2. DESIGN TOP CHORD DEAD LOAD = 10 PSF
3. DESIGN BOT CHORD DEAD LOAD = 10 PSF
4. DESIGN TOP CHORD LIVE LOAD = 20 PSF
5. SNOW LOAD ABOVE CAN OCCUR ON EITHER SIDE OF CENTERLINE
6. WEB LAYOUT TO BE DETERMINED BY TRUSS SUPPLIER
1/4" = 1'-0"
STEEL TRUSS ELEV
STEEL TRUSS NOTES:
1. ALL TRUSS MEMBERS ARE HSS4x4x1/4
2. HSS CENTERLINES INTERSECT AT PANEL POINTS
72 83
B
A
B
A
A
A
KEYNOTES:
1. TRENCH EXCAVATION, SEE GENERAL
NOTES AND SOILS REPORT FOR BACKFILL
REQUIREMENTS, TYP
2. FINISH GRADE
3. FOOTING, MAY VARY SEE PLAN
4. BOTTOM OF TRENCH SHALL NOT EXTEND
BELOW THIS LINE
5. PIPE SLEEVE - 2" LARGER THAN PIPE
PASSING THROUGH FOOTING STEM
(GROUT ANNULAR SPACE AROUND PIPE)
6. NO PIPE TO PASS THROUGH THIS PORTION
OF FOOTING
7. PIPE, SEE PLAN TYP
NOTES:
1. THE CONTRACTOR SHALL COORDINATE ALL
EXCAVATION OPERATIONS WITH BUILDING
FOUNDATION REQUIREMENTS
2. SEE DETAILS AND FOR ADDITIONAL
INFORMATION FOR UTILITIES PASSING BELOW
FOUNDATION
1' - 6"
10' - 0"
PARALLEL TO FOUNDATION
PERPENDICULAR TO FOUNDATION
3/S-3012/S-301
M
IN
1' - 6"
KEYNOTES:
1. STEM WALL, AS OCCURS
2. CONCRETE FOOTING OR FOUNDATION
3. 1'-6" MAX WHERE TRENCH EXCEEDS 1'-6"
NOTIFY STRUCTURAL ENGINEER PRIOR TO
PLACEMENT OF FOOTING
4. BACKFILL AND RECOMPACT TRENCH PER
SOILS REPORT AND SPECIFICATIONS
5. BOTTOM OF TRENCH
6. SEE DETAIL FOR DEPTHS 3'-0" AND
LESS
2/S-301
0"
M
IN
KEYNOTES:
1. STEM WALL, AS OCCURS
2. CONCRETE FOOTING OR FOUNDATION
3. PIPE SLEEVE, PROVIDE 1/2" MIN
CLEARANCE AROUND PIPE
4. PIPE
5. CONCRETE FILL TO BE PLACE BEFORE
FOOTING IS POURED AND POUR FULL
WIDTH OF PIPE TRENCH
6. 8" MIN, 3'-0" MAX WHERE DEPTH IS
GREATER THAN 3'-0" SEE DETAIL
NOTES:
1. PIPES SHALL NOT PASS THRU FOOTINGS NOR BE LOCATED BELOW
ISOLATED COLUMN FOOTINGS.
3/S-301 d
STANDARD BENDS
D1
#3-#8 6d
#9-#11 8d
90° HOOK
180° HOOK
STIRRUP / TIE BENDS
D2
#3-#5 4d
#6-#8 6d
90° HOOK (#3-#5)
d d
D1
D1
2 1/2" MIN
4d d
3" MIN
6d
90° HOOK (#6-#8)
D2 d
D2
12d
180° HOOK (#3-#8)
D2 d
2 1/2" MIN
4d
135° HOOK (#3-#8)
d
D2
3" M
IN
6d
MAX OFFSET BEND
NOTES:
1. ALL BENDS SHALL BE MADE COLD.
2. #14 & #18 BARS SHALL BE BEND TESTED
AND LAB APPROVED PRIOR TO BENDING
GENERAL NOTES:
1. LENGTHS SPECIFIALLY DETAILED ON DRAWINGS SHALL GOVERN IN LIEU OF LAP LENGTHS SCHEDULED
2. ABBREVIATIONS:
a. 'LDH'= HOOK DEVELOPMENT LENGTH
b. 'LTE'= TENSION EMBEDMENT LENGTH
c. 'LTS'= TENSION LAP SLICE LENGTH
3. 'TOP BARS' BARS ARE HORIZONTAL BARS PLACED SUCH THAT MORE THAN 12" OF FRESH CONCRETE IS CAST BELOW THE BAR
4. CLEAR COVER IS DEFINED FROM THE NEAREST FACE OF CONCRETE TO THE BAR BEING DEVELOPED OR SPLICED
5. UNLESS NOTED OTHERWISE, ALL HOOK BARS SHALL EXTEND TO THE FAR FACE LESS 2" COVER
6. IF A NOTE OR DETAIL CALLS FOR A BAR TO BE EMBEDDED Ld (DEVELOPMENT LENGTH) INTO CONCRETE, THIS SHALL CORRESPOND TO A 'LTE' LENGTH
7. IF A NOTE OR DETAIL REQUIRES A BAR TO HAVE A DEVELOPMENT OR LAP LENGTH BUT INSUFFICIENT DIMENSION IS AVAILABLE FOR THE LENGTH
SCHEDULED, EXTEND BAR TO FAR FACE OF CONCRETE LESS 2" COVER AND HOOK
ADJUSTMENTS TO GIVEN LENGTHS:
1. IF REINFORCING IS SPECIED AS EXPOXY COATED, INCREASE SCHEDULED LENGTHS BY 50%
2. IF LIGHTWEIGHT AGGREGATE IS SPECIFIED, INCREASE SCHEDULED LAP BY LENGTHS 30%
3. SCHEDULED LENGTHS ASSUME:
A. CLEAR COVER IS AS INDICATED IN SCHEDULE
B. CLEAR SPACING BETWEEN BARS IS GREATER THAN 2xCLEAR COVER C. IF EITHER CONDITION A OR B IS NOT MET FOR A GIVEN BAR, INCREASE LENGTHS BY 50% D. LENGTHS NOTED BASED ON Fy=60,000 PSI.
A. FOR OTHER YIELD STRENGTHS, MULTIPLY LENGTHS NOTED BY Fy/60,000
LAP SPLICE NOTES:
1. ALLSPLICES SHALL BE WIRED IN CONTACT
2. ALL SPLICES ARE 'LTS' UNLESS NOTED OTHERWISE
3. SMALLER BAR LAP LENGTH SHALL BE USED WHEN SPLICING DIFFERENT SIZED BARS
A. COMPRESSION LAP LENGTH SHALL NOT BE LESS THAN 'LCE' OF THE LARGER BAR
B. TENSION LAP LENGTH SHALL NOT BE LESS THAN 'LTE' OF THE LARGER BAR
4. BUNDLED BAR SPLICES:
A. INDIVIDUAL BAR SPLICES WITHIN THE BUNDLE SHALL BE STAGGERED
B. INCREASE LAP LENGTH 20% FOR A 3 BAR BUNDLE
C. INCREASE LAP LENGTH 33% FOR A 4 BAR BUNDLE
5. TOP AND BOTTOM BEAM SPLICES SHALL BE STACKED VERTICALLY
HOOK EMBEDMENT NOTES:
1. SCHEDULED HOOK EMBEDMENT LENGTHS ASSUME:
A. SIDE COVER IS 2 1/2 INCHES OR GREATER
B. COVER BEYOND IS 2 INCHES OR GREATER
C. IF REINFORCING IS SPECIED AS EPOXY COATED, INCREASE SCHEDULED LENGTHS BY 20%
D. IF LIGHTWEIGHT AGGREAGATE IS SPECIFIED, INCREASE SCHEDULED LENGTHS BY 30%
E. IF SIDE COVER IS LESS THAN 2 1/2 INCHES, INCREASE LENGTHS BY 40%
BAR
SIZE
#3
#4
#5
#6
#7
#8
#9
#10
#11
LAP SPLICE & DEVELOPMENT LENGTHS (INCHES) F'c=4,000 PSI, Fy=60,000 PSI
LDH
CLEAR COVER
LTE
0.75"
12 12
12 12
17 15
24 18
38 25
48 29
58 36
71 44
83 53
1" >2"
LTE TOP & LTS
0.75"
12 12
15 15
23 29
31 23
50 33
62 37
76 46
92 57
108 68
1" >2"
BAR
SIZE
#3
#4
#5
#6
#7
#8
#9
#10
#11
LAP SPLICE & DEVELOPMENT LENGTHS (INCHES) F'c=3,000 PSI, Fy=60,000 PSI
LDH
CLEAR COVER
LTE
0.75"
12 12
14 14
20 17
27 20
44 29
55 33
67 41
82 51
96 61
1" >2"
LTE TOP & LTS
0.75"
13 13
18 18
26 22
35 26
57 38
72 43
87 54
106 66
125 79
1" >2"
TYPICAL REINFORCING BENDS
LTS TOP
0.75"
17 17
23 23
34 28
46 34
74 49
93 56
113 69
137 85
162 103
1" >2"
LTS TOP
0.75" 1" >2"
15 15
20 20
29 25
40 29
65 43
81 49
98 60
119 74
141 89
BAR
SIZE
#3
#4
#5
#6
#7
#8
#9
#10
#11
LAP SPLICE & DEVELOPMENT LENGTHS (INCHES) F'c=3,500 PSI, Fy=60,000 PSI
LDH
CLEAR COVER
LTE
0.75"
12 12
13 13
19 16
25 19
41 27
51 31
62 38
76 47
89 56
1" >2"
LTE TOP & LTS
0.75"
12 12
16 16
24 20
33 24
53 35
66 40
81 50
98 61
116 73
1" >2"
LTS TOP
0.75"
16 16
21 21
31 26
43 31
69 45
86 52
105 64
127 79
150 95
1" >2"
ADDITIONAL #6x7'-0" @ 12" OC MAX
(2 MIN), CENTER ON
CONSTRUCTION JOINTS
NOTES:
1. REINFORCING SHOWN IS IN ADDITIONAL TO
TYPICAL WALL/ GRADE BEAM REINFORCING
2. WALL/GRADE BEAM REINFORCING IS NOT
SHOWN
3. WALL/GRADE BEAM SHALL BE CONTINUOUS
THROUGH CONSTRUCTION JOINT
3' - 6" 3' - 6"
1ST POUR 2ND POUR
E Q
E Q
E Q
CHAMFER VERTICAL EDGES AS
SHOWN AT CONTRACTOR'S OPTION,
DO NOT CHAMFER TOP & BOTTOM
EDGES
NOTES:
1. WALL/GRADE BEAM REINFORCING IS NOT
SHOWN
2. WALL/GRADE BEAM REINFORCING SHALL
BE CONTINUOUS THROUGH
CONSTRUCTION JOINT
3. CLEAN SURFACES AND REMOVE
LAITANCE
4. WET SURFACE AND REMOVE STANDING
WATER PRIOR TO PLACING CONCRETE
NOTES:
1. SUBMIT LOCATIONS OF CONSTRUCTION JOINTS FOR REVIEW PRIOR TO CONSTRUCTION
2. PLACE A MAXIMUM OF 80 FEET OF CONCRETE IN A STRAIGHT LENGTH OF WALL IN A SINGLE POUR
1 1/2"
2x KEY, TYP
OPTION 2 - ADDITIONAL REINFORCING
WALL ELEVATION
W
W
PLAN SECTION
M A
X
E Q
T Y
P
T Y
P
M
A X
M
IN
OPTION 1 - SHEAR KEYS
WALL ELEVATION
1ST POUR 2ND POUR
TYP
2' - 0"
STANDARD HOOK, TYP
CROSS WALL
T Y
P
2'-0"x2'-0" CORNER
BAR TO MATCH
TYPICAL WALL REINF
OR CONTINUOUS BAR
CONTINUOUS BAR OR
SPLICE BAR TO MATCH
TYPICAL WALL HORIZONTAL
REINFORCING SIZE
AND SPACING
INSIDE
FACES
HORIZONTAL REINF
CORNER BAR SIZE & SPACING
TO MATCH HORIZONTAL REINF
OUTSIDE FACE (SOIL SIDE)
CORNER BAR SIZE & SPACING
TO MATCH HORIZONTAL REINF
INDICATES ADDITIONAL VERTICAL
BARS, SIZE TO MATCH TYPICAL WALL
VERT REINF NOTES:
1. TYPICAL VERTICAL REINFORCING NOT SHOWN
2. SEE WALL DETAILS FOR BAR LAYERING
3. DETAIL IS SIMILAR WHERE SOIL OCCURS ON BOTH SIDES OF WALL
LTE LTE MATCH SIZE AND NUMBER OF FOOTING
BOTTOM BARS IF NO TOP BARS
PRESENT
1ST POUR 2ND POUR
ELEVATION VIEW
T Y
PBAR SPLICES
LTS AT ALL
PLAN AT FOOTING
INTERSECTIONS
CONSTRUCTION
JOINT
C O
N S
T J
O
IN
T
L T
S O
R C
O N
T P
A S
TTHROUGH FOOTING
LTE OR CONTINUOUS
W
TOP REINFORCING IF NOTED
IN SCHEDULE
C L R
T
TRANSVERSE
REINFORCING STRIP FOOTING SECTION
LONGITUDINAL
REINFORCING
NOTES:
1. SEE FOR POUR LENGTH LIMITS AND CONSTRUCTION JOINT DETAILS
T/FTG=
SEE PLAN
6/S-301
NOTES:
1. WALL HORIZONTAL & VERTICAL MAT REINFORCING NOT SHOWN
TO BE CONTINUOUS THROUGH STEP
EXCAVATE STEP AS
STEEPLY AS SOIL
ALLOWS
M A
X
3' - 0"
4" MAX
LTE
LOWEST STEM WALL HORIZ BAR TO EXTEND
LTE MIN PAST FOOTING STEP
4" MAX
3"3"
WALL
DOWELS
STEP T/FOOTING, SEE
PLAN
SEE PLAN
T/FTG=
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof4F Project Number: 23.2693.L01
RHAA
225 MILLER AVENUE
MILL VALLEY, CA 94941
AQUA ENGINEERING, INC.
300 BOARDWALK DRIVE, UNIT 4B
FORT COLLINS, CO 80525-3093
OCMI, INC.
8851 RESEARCH DRIVE
IRVINE, CA 92618
B&R GROUP
10152 ORCHID RIDGE LANE
ESTERO, FL 34135
RATIO ARCHITECTS, LLC
101 S. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46204
WWC ENGINEERING
1275 MAPLE STREET, SUITE F
HELENA, MT 59601
CENTRAL GEOTECHNICAL SERVICES
10240 SW NIMBUS AVENUE, SUITE L6
PORTLAND, OR 97223
CALIBRE ENGINEERING, INC.
8822 SOUTH RIDGELINE BLVD,
SUITE 301
HIGHLANDS RANCH, CO 80129
SCOUT ENVIRONMENTAL, INC.
169 SAXONY ROAD, SUITE 214
ENCINITAS, CA 92024
517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
/7
/2
:1
:3
A
M
Bid Documents
05/16/2025
CONCRETE DETAILS
S-301
SNAKE RIVER CANYON
NATIONAL CEMETERY
GRAVESITE EXPANSION
EMES
BUHL, IDAHO
941-002
NTS
TYP TRENCH DETAIL
NTS
PIPE PASSING BELOW CONT FOOTING - DEEP
NTS
PIPE PASSING BELOW CONT FOOTING - SHALLOW
3/4" = 1'-0"
REINFORCING DEVELOPMENT, PLACEMENT, AND BEND INFO
3/4" = 1'-0"
CONSTRUCTION JOINT IN WALL ON FOOTINGS
1/2" = 1'-0"
TYP STEM WALL REINFORCING AT CORNERS / INTERSECTIONS
3/4" = 1'-0"
TYP STRIP FOOTING
NTS
STRIP FOOTING w/ CIP STEM WALL STEP, 3'-0" AND LESS
73 83
1/8"
NOTES:
1. PROVIDE TOOLED OR SAW CUT JOINT AS SOON AS
CONCRETE HAS HARDENED, BUT NO MORE THAN 12
HOURS AFTER CASTING
2. FILL JOINT FULL DEPTH WITH SEMI-RIGID JOINT FILLERS
TOOLED OR SAW CUT JOINT
TYPICAL CONTRACTION JOINT
COMPACTED GRADE. SEE
GEOTECH REPORT
1/4" PREFORMED JOINT FILLER
FULL DEPTH OF SLAB
SEMI-RIGID JOINT FILLER
TYPICAL
WALL ELEVATION
LAP BARS TO MATCH
TOP REINFORCING
U N
O
TOP REINFORCING
LTS+16"
2"
8"
U N
O
#4x @ 12" TOP, A 706 FIELD BENT AT
CONTRACTOR'S
OPTION
" 3'-0"
#4x5'-0" @ 12", EPOXY COATED, CTRD ON WALL
NOTES:
1. SEE ARCHITECT FOR SIZE, THICKNESS, AND LOCATIONS
2. WWR TO MATCH THAT OF SLAB OR 6x6-W2.9xW2.9 WHERE SLAB WWR NOT IDENTIFIED
AT LOW EQUIPMENT PAD
2" CLR
M A
X
C L R
N E
E D
N O
T E
X C
E E
D
#4 AT PERIMETER
WWR 6x6- W2.9xW2.9
#4 @ 16" OC, CIP DRILL AND
EPOXY AT CONTRACTOR'S
OPTION
T
W H
IC
H
E V
E R
I S
S M
A L
L E
R M
A X
D
.3
T O
R
D
CLR
3D (12" MIN)
TYP EACH WAY
2" CLR TO REINFORCING
12" MAX
N O
T E
E D
G E
S T
Y P
F
R O
M A
L L
NOTE 1D
NOTE 2
ALIGN PENETRATIONS
VERTICALLY AND
HORIZONTALLY
EDGE OF WALL
(BOT, OPENING, ETC)
REINFORCING, TYP
H
M A
X
T Y
P
L T
S
H
W, 3'-0" MAXLTS+W 3" TYP
ADD 1/2 NUMBER OF BARS
INTERRUPTED BY OPENING
PLUS 1, SPACE AT 3" OC
DETAIL SIMILAR FOR
CIRCULAR
OPENINGS
AT PIPING OR CONDUIT
(WALL SECTION)
AT OPENINGS 12" OR LESS
(WALL ELEVATION)
TYPICAL OPENING
(WALL ELEVATION)
NOTES:
1. WHERE CLEAR DISTANCE BETWEEN PIPING/CONDUIT CAN NOT BE ACHIEVED
AS SHOWN, STRUCTURAL ENGINEER OF RECORD SHALL BE NOTIFIED FOR
REVIEW
2. IN WALL PIPING/CONDUITS GREATER THAN 0.3T SHALL BE SUBMITTED FOR
REVIEW
3. LOCATE PIPING./CONDUITS WITHIN MIDDLE THIRD (T/3) OF WALL
NOTES:
1. GREATER OF 2xD AND 12", WHERE CLEAR DISTANCE IS NOT ACHIEVABLE, TREAT AREA AS SINGLE OPENING REINFORCED PER "TYPICAL OPENING"
DETAIL
2. DO NOT CORE OPENINGS, SLEEVE OPENINGS PRIOR TO PLACING CONCRETE
3. DO NOT CUT REBAR AT PENETRATION LOCATIONS. REBAR MAY BE MOVED 8"
MAX TO ACCOMMODATE PENETRATIONS
4. SCHEDULE 40 STEEL SLEEVES SHALL BE USED IN CRITICAL AREAS OF THE
WALL AND SLABS AS DETERMINED BY STRUCTURAL ENGINEER OF RECORD
NOTES:
1. DETAIL APPLIES UNLESS REINFORCING IS SPECIFICALLY DETAILED ON THE
DRAWINGS
2. HOOK BARS WITH STANDARD HOOK WHERE LTS CANNOT BE ACHIEVED
1' - 2"
2' - 0"
#4 HORIZ @ 12", EF
#4 VERT @ 18", EF
(3) #4xCONT
#4 @ 12"
S-302
T/FTG=
SEE PLAN
M
IN
M L S
MASONRY DOWELS
TO MATCH MASONRY
WALL REINFORCING
SIZE, SPACING AND
LOCATION
L T
E
ANCHOR RODS BY
EQUIPMENT
MANUFACTURER
C L R
C L R
#4@12", EACH WAY, TOP &
BOTTOM
MIN
6"
3" CLR
-1'-6"
(4)#5 EW BOT
4' - 0" x 4' - 0"
ISOLATION JOINT SEE
COLUMN BLOCKOUT SEE 3/S-302
2/S-302
S-302
FOR ADDITIONAL
INFO
PLAN AT COLUMN
CONTROL JOINT OR
CONSTRUCTION JOINT
ISOLATION JOINT, TYP
TOOLED JOINT, TYP
CONSTRUCTION JOINT
COLUMN, SEE
PLAN FOR
SHAPE
DIAMOND OR
ROUND
BLOCKOUT
SEE PLAN FOR SUPPORTED
COLUMN TYPE AND SIZE
3/4"Ø ANCHOR RODS, UNO
PL WASHER 1/2x2x2 W/
STANDARD HOLES
1 5/16"Ø HOLES IN BASE
PLATE UNO
OPTIONAL LEVELING NUTS
DOUBLE NUT OR HEADED
ANCHOR ROD TYPICAL
TYP
1 1/2"
10"
HSS COLUMN
T Y
P
/2
1/4
HSS
G R
O U
T
/2
N O
N -S
H R
IN
K
/2
M A
X A
B O
V E
N U
T
M
IN
P R
O J E
C T
IO
N
3/4" PL
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof4F Project Number: 23.2693.L01
RHAA
225 MILLER AVENUE
MILL VALLEY, CA 94941
AQUA ENGINEERING, INC.
300 BOARDWALK DRIVE, UNIT 4B
FORT COLLINS, CO 80525-3093
OCMI, INC.
8851 RESEARCH DRIVE
IRVINE, CA 92618
B&R GROUP
10152 ORCHID RIDGE LANE
ESTERO, FL 34135
RATIO ARCHITECTS, LLC
101 S. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46204
WWC ENGINEERING
1275 MAPLE STREET, SUITE F
HELENA, MT 59601
CENTRAL GEOTECHNICAL SERVICES
10240 SW NIMBUS AVENUE, SUITE L6
PORTLAND, OR 97223
CALIBRE ENGINEERING, INC.
8822 SOUTH RIDGELINE BLVD,
SUITE 301
HIGHLANDS RANCH, CO 80129
SCOUT ENVIRONMENTAL, INC.
169 SAXONY ROAD, SUITE 214
ENCINITAS, CA 92024
517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
/1
/2
:5
:0
P M
ADDENDUM 1, REISSUED FOR BID
07/30/2025
TYP CONCRETE DETAILS
S-302
SNAKE RIVER CANYON
NATIONAL CEMETERY
GRAVESITE EXPANSION
EMES
BUHL, IDAHO
941-002
1 1/2" = 1'-0"
TYP 4" SLAB JOINTS
1 1/2" = 1'-0"
TYP SOG ISOLATION JOINT
NTS
TYP SOG EXT THRESHOLD
3/4" = 1'-0"
TYP SOG EQUIPMENT PAD
NTS
CAST IN PLACE WALL PENETRATIONS
3/4" = 1'-0"
TYP STEM WALL AND FOOTING
3/4" = 1'-0"
TYP EXTERIOR EQUIPMENT PAD
1" = 1'-0"
TYP EXTERIOR COLUMN BASE
NTS
SOG BLOCKOUT AT COLUMN/PILASTER
1 1/2" = 1'-0"
TYP GRAVITY COLUMN BASE PLATE
1 ADDENDUM 1, REISSUED FOR BID 07/30/25
5/16/25 brett.hanson Text Box brett.hanson Text Box
VARIES
SEE LANDSCAPE
DWGS
VENEER, SEE ARCH
FINISH GRADE
SEE CIVIL
S-302
VARIES
7' - 6"
6"
#5@12"
(8)#5
6"
#4@18" VERT, EF
#4@12" HORIZ, EF
M
IN
#4 TIES @ 8"OC
(14)#6 BARS EVENLY
SPACED PER 2/S-321
M A
X
M
IN
SEE LANDSCAPE
DWGS
COLUMBARIUM NICHES,
SEE LANDSCAPE
FINISH GRADE
SEE CIVIL
4' - 2"6" 6"
7' - 6"
VENEER, SEE LANDSCAPE
STAINLESS STEEL COLUMBARIUM
ANCHOR BOLTS BY
CONTRACTOR, TYP
#5@12"
(8)#5
#4@18" VERT, EF
#4@12" HORIZ, EF
M A
X
M
IN
M
IN
SEE LANDSCAPE
DWGS
SEE LANDSCAPE
DWGS
VENEER, SEE
LANDSCAPE
FINISH GRADE
SEE CIVIL
S-302
VARIES
VARIES
#4@12", EF HORIZ
#4@18", EF VERT
#4 TIES @ 8"OC
(10)#6 BARS EVENLY
SPACED PER 2/S-321
6" TYP 6" TYP
M A
X
M
IN
#5@12"
(8)#5
7' - 6"
SEE LANDSCAPE
DWGS
MEMORIAL WALL
VENEER, SEE
LANDSCAPE
FINISH GRADE
SEE CIVIL
3' - 2" 5 1/4" 5 1/4"
VENEER, SEE LANDSCAPE
#5@12" VERT, EF
#5@8" HORIZ, EF
#4@18" VERT, EF
#4@12" HORIZ, EF
2' - 3 1/2"
M A
X
M
IN
M
IN
#5@12"
(8)#5
7' - 6"
SEE LANDSCAPE
DWGS
COLUMBARIUM
MEMORIAL WALL
S-321
S-321
S-321
S-321
VENEER, SEE ARCH
VENEER, SEE
LANDSCAPE
FOOTING BELOW
PER SECTIONS
FOOTING BELOW
PER SECTIONS
1' - 0"
CONC PILASTER
1' - 0"
CONC PILASTER
NOTES:
1. SEE LANDSCAPE DRAWINGS FOR DIMENSIONS OF END
OF WALL PILASTER
8"
M
IN
M A
X
3' - 0" 4' - 0"
#4@12"OC
EW, T&B
#6 @ 12"OC, VERT
#4 @ 12"OC, HORIZ
SETTLING PONDIRRIGATION POND
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof4F Project Number: 23.2693.L01
RHAA
225 MILLER AVENUE
MILL VALLEY, CA 94941
AQUA ENGINEERING, INC.
300 BOARDWALK DRIVE, UNIT 4B
FORT COLLINS, CO 80525-3093
OCMI, INC.
8851 RESEARCH DRIVE
IRVINE, CA 92618
B&R GROUP
10152 ORCHID RIDGE LANE
ESTERO, FL 34135
RATIO ARCHITECTS, LLC
101 S. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46204
WWC ENGINEERING
1275 MAPLE STREET, SUITE F
HELENA, MT 59601
CENTRAL GEOTECHNICAL SERVICES
10240 SW NIMBUS AVENUE, SUITE L6
PORTLAND, OR 97223
CALIBRE ENGINEERING, INC.
8822 SOUTH RIDGELINE BLVD,
SUITE 301
HIGHLANDS RANCH, CO 80129
SCOUT ENVIRONMENTAL, INC.
169 SAXONY ROAD, SUITE 214
ENCINITAS, CA 92024
517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
/7
/2
:1
:4
A
M
Bid Documents
05/16/2025
SITE STRUCTURE DETAILS
S-321
SNAKE RIVER CANYON
NATIONAL CEMETERY
GRAVESITE EXPANSION
EMES
BUHL, IDAHO
941-002
3/4" = 1'-0"
COLUMBARIUM SECTION AT PILASTER
3/4" = 1'-0"
COLUMBARIUM SECTION AT NICHE
3/4" = 1'-0"
MEMORIAL WALL SECTION AT PILASTER
3/4" = 1'-0"
MEMORIAL WALL SECTION AT MARKER
3/4" = 1'-0"
WALL ENDS PARTIAL PLANS
3/4" = 1'-0"
SETTLING POND CONCRETE WEIR
75 83
MASONRY LAP SPLICE SCHEDULE
BAR SIZE
ENGLISH METRIC
R E
IN
F
C E
N T
E R
E D
M A
S
R E
IN
F
C E
N T
E R
E D
M A
S
R E
IN
F
A T
F A
C E
A N
D
T
B O
N D
B E
A M
S f'm = 2000 PSI
#3 #10 15 15
#4 #13 20 22
#5 #16 25 35
#6 #19 38 (NOTE 8) 54 (NOTE 8)
#7 #22 52 (NOTE 8) 63 (NOTE 8)
#8 #25 72 (NOTE 9) 72 (NOTE 9)
#9 #29 81 (NOTE 9) 81 (NOTE 9)
NOTES:
1. SMALLER BAR LAP LENGTH SHALL BE USED WHEN SPLICING DIFFERENT
SIZED BARS.
2. LAP LENGTHS SPECIFICALLY DETAILED ON DRAWINGS SHALL GOVERN
INSTEAD OF SCHEDULED LAP LENGTHS.
3. IF REINFORCING IS SPECIFIED AS EPOXY COATED, INCREASE LENGTHS BY
50%.
4. MECHANICAL COUPLERS MAY BE USED IN LIEU OF ANY LAP LENGTH
SHOWN.
5. WHEN LOW LIFT GROUTING IS USED, AND THE LAP LENGTH EXCEEDS THE
GROUT LIFT HEIGHT (NOTED BY *), A MECHANICAL COUPLER IS REQUIRED
IN LIEU OF LAPPED REINF.
6. VERTICAL REINF IN PILASTERS WITH AT LEAST 3 1/2" CLEAR SHALL BE
SPLICED PER THE "REINF CENTERED" COLUMN.
7. HORIZONTAL BOND BEAM REINF SHALL BE SPLICED PER THE "REINF AT
FACE" COLUMN.
8. REINF IN THESE SIZES SHALL NOT BE USED IN 6" MASONRY.
9. REINF IN THESE SIZES SHALL NOT BE USED IN 6", 8" OR 10" MASONRY.
2" CLEAR
MLS MLS
T Y
P
MAX (2) BARS PER COURSE,
PLACE ADDITIONAL ROWS
OF REINFORCEMENT
IN COURSE ABOVE
GROUT LINTEL SOLID FOR DEPTH
SHOWN ON ELEVATIONS
VERTICAL REINFORCEMENT,
SEE WALL SCHEDULE
NOTE:
1. SEE ELEVATION FOR LINTEL
LOCATIONS AND TYPE
2. EXTEND LINTEL REINFORCING 16"
PAST OPENING OR TO CONTROL JOINT
A P
P L
IC
A B
L E
T Y
P W
H E
R E
TOP BARS IN LINTEL WHERE
SHOWN ON ELEVATIONS
D E
P T
H I N
S C
H E
D U
L E
SEE ELEVATION
JAMB WIDTH CLEAR SPAN
SEE ELEVATION
JAMB WIDTH
GROUTED CELL WITHOUT
REINFORCING WHERE NEEDED
FOR MECHANICAL / ELECTRICAL
PLACE SCHEDULED
BARS AT EACH JAMB,
FULL HEIGHT
ON HEAD JOINT AT CONTROL JOINT
CONTROL JOINT: HEAD JOINTS OF UNITS
ALIGN AT CONTROL JOINT, NO MORTAR
(2) VERTICAL REINF IN
CELL EACH SIDE OF JOINT
DO NOT CONTINUE JOINT REINF
THRU CONTROL JOINT
PROVIDE CONTROL JOINTS IN
STRUCTURAL MASONRY
ONLY WHERE SHOWN ON THE
STRUCTURAL OR
ARCHITECTURAL PLAN
ONLY CONTINUE BOND BEAM
THRU CONTROL JOINT AT
FLOORS AND ROOF
VENEER TIES
VERTICAL LEG OF
ANGLE TIGHT TO
BACK OF VENEER
L5x3-1/2x5/16, BEAR
EACH END 8" MIN. HOT
DIP GALVANIZE
2" MAX.
5"
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof4F Project Number: 23.2693.L01
RHAA
225 MILLER AVENUE
MILL VALLEY, CA 94941
AQUA ENGINEERING, INC.
300 BOARDWALK DRIVE, UNIT 4B
FORT COLLINS, CO 80525-3093
OCMI, INC.
8851 RESEARCH DRIVE
IRVINE, CA 92618
B&R GROUP
10152 ORCHID RIDGE LANE
ESTERO, FL 34135
RATIO ARCHITECTS, LLC
101 S. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46204
WWC ENGINEERING
1275 MAPLE STREET, SUITE F
HELENA, MT 59601
CENTRAL GEOTECHNICAL SERVICES
10240 SW NIMBUS AVENUE, SUITE L6
PORTLAND, OR 97223
CALIBRE ENGINEERING, INC.
8822 SOUTH RIDGELINE BLVD,
SUITE 301
HIGHLANDS RANCH, CO 80129
SCOUT ENVIRONMENTAL, INC.
169 SAXONY ROAD, SUITE 214
ENCINITAS, CA 92024
517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
/7
/2
:1
:4
A
M
Bid Documents
05/16/2025
MASONRY DETAILS
S-401
SNAKE RIVER CANYON
NATIONAL CEMETERY
GRAVESITE EXPANSION
EMES
BUHL, IDAHO
941-002
NTS
TYP MASONRY LAP SPLICE SCHEDULE
3/4" = 1'-0"
TYP CMU LINTEL
1" = 1'-0"
TYP CMU JAMB
1 1/2" = 1'-0"
TYP MASONRY WALL CONTROL JOINT
MASONRY LINTEL SCHEDULE
MARK DEPTH REINF NOTES
ML8 8 (1) #4 -
MASONRY JAMB SCHEDULE
MARK DEPTH REINF NOTES
MJ8 8" (1) #4 -
1 1/2" = 1'-0"
TYP VENEER LOOSE LINTEL
76 83
BEVELED
SOLID 2x OR
LVL BLOCKING
SEE PLAN
10'-0" AFF
PRESSURE TREATED
2x6 W/ 3/4" ANCHOR
BOLT @ 24"OC,
CENTERED IN CMU
16d TOE NAIL @
4" OC
(1)#4xCONT
BOND BEAM
BOUNDARY MEMBER NAIL.
SEE ROOF PLAN NOTES
BEVELED SOLID 2x
BLOCKING W/ (2)
16d TOE NAILS TO
TRUSS
SIMPSON H3 TIE EA TRUSS
W/ (8) SD#9x1-1/2"
SCREWS
2x6 SILL
TRUSS
2x6 OUTRIGGER
PRESSURE TREATED
2x6 W/ 3/4" ANCHOR
BOLT @ 24"OC,
CENTERED IN CMU
SIMPSON
LU26 W/ (10)
SD#10x1-1/2"
SCREWS
SIMPSON H3 TIE EA
TRUSS W/ (8)
SD#9x1-1/2" SCREWS
(2) 16d EA
OUTRIGGER
CONT 2x FASCIA, SEE PLANS
/2
T Y
P
2x6 SILL
BN 16d TOE NAIL @ 4" OC
TRUSS
2x6 OUTRIGGER
PRESSURE TREATED
2x6 W/ 3/4" ANCHOR
BOLT @ 24"OC,
CENTERED IN CMU
(3/16)
(3/16) SEAL WELD,
TYP
3/16
3/16 SEAL WELD,
TYP
HSS4x4x1/4, TYP
SIMPSON H3 TIE
EA TRUSS W/ (8)
SD#9x1-1/2"
SCREWS
1/2"Øx3" THREADED
ROD @ 2' OC MAX
or SIMPSON
PDPAWL-150 @ 2'
OC MAX
SIMPSON H3 TIE EA
TRUSS W/ (8)
SD#9x1-1/2" SCREWS
(2) 16d EA
OUTRIGGER
CONT 2x FASCIA, SEE PLANS
/2
T Y
P
3/16
2x4 SILL, TYP
WOOD ROOF TRUSSES
WALL BELOW
CONT 2x FASCIA
2x6 WOOD
OUTRIGGER.
FASCIA WITHIN 6'-0" MIN FROM WALL CORNER
DO NOT SPLICE 2x
CONT 2x FASCIA
S-600
2' - 0" 2' - 0"
S-600
1' - 5 1/4"
S-600
(2) 16d EA
OUTRIGGER,
TYP
ROOF
SHEATHING,
SEE PLANS
2x OUTRIGGER, SEE PLANS
CONT 2x FASCIA, SEE PLANS
WOOD TRUSS,
SEE PLANS1
/2
T
Y P
EN
SIMPSON LU26 W/
(10) SD#10x1-1/2"
SCREWS 1
(3/16)
(3/16)SEAL WELD,
TYP
1/8
SEAL WELD
CAP PL1/4
3/16
3/16
SEAL WELD
(3/16)
(3/16)SEAL WELD,
TYP
2' - 9 1/4"
/4
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER:CONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof4F Project Number: 23.2693.L01
RHAA
225 MILLER AVENUE
MILL VALLEY, CA 94941
AQUA ENGINEERING, INC.
300 BOARDWALK DRIVE, UNIT 4B
FORT COLLINS, CO 80525-3093
OCMI, INC.
8851 RESEARCH DRIVE
IRVINE, CA 92618
B&R GROUP
10152 ORCHID RIDGE LANE
ESTERO, FL 34135
RATIO ARCHITECTS, LLC
101 S. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46204
WWC ENGINEERING
1275 MAPLE STREET, SUITE F
HELENA, MT 59601
CENTRAL GEOTECHNICAL SERVICES
10240 SW NIMBUS AVENUE, SUITE L6
PORTLAND, OR 97223
CALIBRE ENGINEERING, INC.
8822 SOUTH RIDGELINE BLVD,
SUITE 301
HIGHLANDS RANCH, CO 80129
SCOUT ENVIRONMENTAL, INC.
169 SAXONY ROAD, SUITE 214
ENCINITAS, CA 92024
517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
/1
/2
:5
:0
P M
ADDENDUM 1, REISSUED FOR BID
07/30/2025
WOOD DETAILS & TYP STRUCT
DETAILS
S-600
SNAKE RIVER CANYON
NATIONAL CEMETERY
GRAVESITE EXPANSION
EMES
BUHL, IDAHO
941-002
1 1/2" = 1'-0"
TYP TRUSS TO WALL CONN.
1 1/2" = 1'-0"
TYP END WALL SEC AT TRUSS
1 1/2" = 1'-0"
TYP END WALL SEC AT STEEL TRUSS
1/2" = 1'-0"
TYP ROOF CORNER
1 1/2" = 1'-0"
ROOF CORNER SECT
3/4" = 1'-0"
STEEL TRUSS TO COL CONN
1 ADDENDUM 1, REISSUED FOR BID 07/30/25
5/16/25 brett.hanson Text Box brett.hanson Text Box
MECHANICAL ABBREVIATIONS:
P
AHU-6 2
H
MECHANICAL SYMBOLS
MECHANICAL EQUIPMENT TAG WITH
NUMBER DESIGNATION
THERMOSTAT
MECHANICAL PLAN NOTE
POINT OF CONNECTION
POINT OF DISCONNECTION
TO BE DEMOLISHED
CHILLED WATER SUPPLY
CHILLED WATER RETURN
PRESSURE SENSOR
PIPE DOWN
PIPE UP
PIPE TEE DOWN
LOW PRESSURE STEAM
MEDIUM PRESSURE STEAM
CONDENSATE RETURN
HIGH PRESSSURE STEAM
CONDENSATE RETURN
PUMPED STEAM CONDENSATE RETURN
PIPE ELBOW
STRAINER
STEAM BUCKET TRAP
GATE VALVE
UNION
CHECK VALVE
CONCENTRIC PIPE REDUCER
PIE TEE
HUMIDITY SENSOR
HOT WATER SUPPLY
HOT WATER RETURN
REHEAT HOT WATER SUPPLY
REHEAT HOT WATER RETURN
BALL VALVE
HEAT EXCHANGER
PRESSURE GAUGE
STEAM CONDENSATE PUMP
STEAM FLASH TANK
TEMPERATURE GAUGE
FLOAT & THERMOSTATIC TRAP
STEAM THERMOSTATIC TRAP
GLOBE VALVE
ECCENTRIC PIPE REDUCER
MODULATING CONTROL VALVE
PRESSURE REDUCING VALVE
LIQUID FLOW DIRECTION
MANUAL BALANCING / SHUT-OFF VALVE
MEDIUM PRESSURE STEAM
HIGH PRESSURE STEAM
LOW PRESSURE STEAM
CONDENSATE RETURN
SA SUPPLY AIR DUCT FROM AHU
REFRIGERANT - LIQUID
REFRIGERANT - SUCTION
N.O. N.C.
S DIFFERENTIAL PRESSURE SENSORP
TS TEMPERATURE SENSOR
EXPANSION TANK
PERIMETER HEATING WATER SUPPLY
PERIMETER HEATING WATER RETURN
TWO HOUR FIRE BARRIER
ONE HOUR FIRE BARRIER
DIRECTION OF AIR FLOW
S/A SUPPLY AIR DUCT FROM VAV
F/A FRESH AIR DUCT FROM ERV
O/A OUTSIDE AIR DUCT TO AHU OR ERV
EA EXHAUST AIR DUCT TO AHU
E/A EXHAUST AIR DUCT TO EXTERIOR
VANED ELBOW (PROVIDE ALL SQUARE
OR RECTANGULAR ELBOWS WITH
VANES EVEN IF SYMBOL IS MISSING)
VANED RADIUS ELBOW (SHORT RADIUS)
RADIUS ELBOW (SHORT RADIUS)
10X8 RECTANGULAR DUCT (INSIDE
DIMENSIONS: WIDTH / DEPTH)
10/8 OVAL DUCT (INSIDE DIMENSIONS:
WIDTH / DEPTH)
10"⌀ ROUND DUCT (INSIDE DIMENSIONS:
WIDTH / DEPTH)
10X8 SUPPLY DUCT UP
10X8 SUPPLY DUCT DOWN
10X8 RETURN DUCT UP
10X8 RETURN DUCT DOWN
10X8 EXHAUST DUCT UP
10X8 EXHAUST DUCT DOWN
M
MOTORIZED DAMPER
W/ ACCESS DOOR
FD
FIRE DAMPER
W/ ACCESS DOOR
FSD
FIRE AND SMOKE DAMPER
W/ ACCESS DOOR
BD
BACKDRAFT DAMPER
W/ ACCESS DOOR
MANUAL VOLUME DAMPER
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
SD
SMOKE DAMPER
W/ ACCESS DOOR
575 CFM
S-1 GRILLE / REGISTER / DIFFUSER
TAG W/ CFM
FLEX DUCT
DUCT FLEX CONNECTOR
VARIABLE AIR VOLUME BOX (VAV) /
TERMINAL UNIT (TU)
WALL MOUNTED EXHAUST FAN
DUCT HOT WATER REHEAT COIL
PIPE TEE UP
OR
SMOKE BARRIERS S
GENERAL MECHANICAL NOTES:
THIS IS A FEDERAL PROJECT, AS SUCH ALL NCA DESIGN GUIDES AND CODE
REQUIREMENTS ARE REQUIRED.
ALL WORK SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE FOLLOWING:
· INTERNATIONAL BUILDING CODE (IBC 2018)
· INTERNATIONAL MECHANICAL CODE (IMC 2018)
· INTERNATIONAL ENERGY CONSERVATION CODE (IECC 2018)
· NCA HVAC DESIGN MANUAL SPECIFICATIONS AND GUIDELINES
· ANY AUTHORITY HAVING JURISDICTION (AHJ)
CONTRACTOR IS TO VERIFY ALL DRAWING INFORMATION PRIOR TO STARTING WORK.
MINOR CHANGES IN ROUTING IS EXPECTED. WHERE WORK VARIES GREATLY FROM
THE PLANS CONTRACTOR SHALL CONTACT THE AE IMMEDIATELY BEFORE STARTING
WORK.
EXCEPT WHERE INDICATED, ALL EQUIPMENT, MATERIALS, AND ARTICLES
INCORPORATED IN THE WORK SHALL BE NEW AND OF COMPARABLE QUALITY AS
SPECIFIED. ALL WORKMANSHIP SHALL BE FIRST-CLASS AND SHALL BE PERFORMED BY
PERSONNEL SKILLED AND REGULARLY EMPLOYED IN THEIR RESPECTIVE TRADES.
ITEMS REUSED AND/OR RELOCATED SHALL BE BROUGHT TO LIKE NEW CONDITION
PRIOR TO BEING PLACED INTO SERVICE.
ALL WORK SHALL BE COORDINATED WITH ALL AFFECTED DISCIPLINES AND TRADES
PRIOR TO STARTING WORK. REWORK REQUIRED DUE TO COORDINATION ISSUES
SHALL BE DONE BY THE INSTALLATION CONTRACTOR WITHOUT INCREASED COST TO
THE OWNER.
SYSTEMS DESIGNATED TO BE PROVIDED AND INSTALLED WITHIN THESE CONTRACT
DOCUMENTS ARE INTENDED TO BE COMPLETE AND OPERATIONAL. PROVIDE
EVERYTHING ESSENTIAL FOR THE COMPLETION OF THE WORK TO MAKE THE SYSTEM
READY FOR NORMAL AND PROPER OPERATION. THIS INCLUDES ALL WORK OR
MATERIALS NOT DIRECTLY SHOWN ON THE DRAWINGS OR IN THE SPECIFICATIONS,
BUT NECESSARY FOR THE PROPER OPERATION OF THE SYSTEM.
MECHANICAL CONTRACTOR IS RESPONSIBLE FOR ENSURING PROPER MAINTENANCE
CLEARANCES ARE MAINTAINED. CLOSE COORDINATION WILL BE REQUIRED WITH THE
FIRE PROTECTION, PLUMBING, AND ELECTRICAL SYSTEMS.
IN GENERAL IT IS THE INTENT OF THESE DRAWINGS:
ITEMS INSTALLED WHERE THE STRUCTURE IS EXPOSED - INSTALLED AS HIGH AS
POSSIBLE. ALL VALVES AND CONTROL DEVICES SHOULD BE INSTALLED AS LOW AS
POSSIBLE OR WHERE IT WILL BE MAINTAINABLE FROM A LADDER OR LIFT. CLOSE
COORDINATION WILL BE REQUIRED IN ORDER TO AVOID ALL CONFLICTS.
ALL DUCT TO BE GALVANIZED STEEL. EXPOSED DUCT SHALL BE OF SPIRAL
CONSTRUCTION.
ALL SQUARE THROAT DUCT ELBOWS WITH ANY DIMENSIONS LARGER THAN 6" SHALL
HAVE TURNING VANES, WHETHER SHOWN ON THE PLANS OR NOT.
MANUFACTURERS/MODEL NUMBERS INDICATED ON DRAWINGS ARE BASIS OF DESIGN.
OTHER MANUFACTURERS/MODEL NUMBERS WILL BE ACCEPTED PROVIDING THEY
MEET SPECIFICATIONS AND PERFORMANCE REQUIREMENTS OF THE BASIS OF DESIGN.
CONTRACTORS SHALL COMMUNICATE WITH PRODUCT VENDORS ON LEAD TIMES, AND
SHALL SELECT UNITS THAT MOST CLOSELY COMPLY WITH THE PROJECT SCHEDULE
REQUIREMENTS.
SNAKE RIVER CANYON NCA
HVAC SHEET INDEX
M-000 HVAC COVER SHEET
M-100 STORAGE BUILDING 101 HVAC PLAN
HWS
HWR
RHWS
RHWR
CHWS
CHWR
STM-LP
STM-MP
STM-HP
CDR-L
CDR-M
CDR-H
PC
RL
RS
PHWS
PHWR
AC ALTERNATING CURRENT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
BHP BRAKE HORSEPOWER
BMS BUILDING MANAGEMENT SYSTEM
CALC CALCULATED
CC CHILLED WATER COOLING COIL - AHU
CDR STEAM CONDENSATE RETURN
CFM CUBIC FEET PER MINUTE
CHWR CHILLED (HYDRONIC) WATER RETURN
CHWS CHILLED (HYDRONIC) WATER SUPPLY
C/L CENTERLINE
CO CLEANOUT
COEF COEFFICIENT
COMLINK COMMUNICATION LINK
COMB COMBUSTION AIR
COND CONDENSATE DRAIN
CONFIG CONFIGURED
COR CONTRACTING OFFICER'S REPRESENTATIVE
CTRL CONTROL
CP CONDENSATE PUMP
CPVC CHLORINATED POLYVINYL CHLORIDE
CPCI CONTRACTOR-PROVIDED CONTRACTOR-INSTALLED
CPOI CONTRACTOR-PROVIDED OWNER-INSTALLED
CV CONTROL VALVE
CV FLOW COEFFICIENT
CWR CONDENSER (HYDRONIC) WATER RETURN
CWS CONDENSER (HYDRONIC) WATER SUPPLY
DAMP DAMPER
DAT DISCHARGE AIR TEMPERATURE
DB DRY BULB
DC DIRECT CURRENT
DCW DOMESTIC (POTABLE) COLD WATER
DEG DEGREES
DHW DOMESTIC (POTABLE) HOT WATER
DHW-R DOMESTIC (POTABLE) HOT WATER RETURN
DIFF DIFFERENTIAL
DIST DISTRIBUTION
DS DOWNSPOUT
DSP DEHUMIDIFICATION SET POINT
DWV DRAIN, WASTE AND VENT
E EXISTING
E/A EXHAUST AIR
EC ELECTRICAL CONTRACTOR
ECC ENERGY CONTROL CENTER
ELEC ELECTRICAL
ELEV ELEVATION
ENT ENTERING
ERC ENERGY RECOVERY COIL - AHU
ES END SWITCH
EWC ELECTRIC WATER COOLER
F FAHRENHEIT
FD FLOOR DRAIN
FILT FILTER
FLUE FLUE EXHAUST
FPM FEET PER MINUTE
FP-W FIRE PROTECTION - WET
FT FEET
GAL GALLONS
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GT GLYCOL TANK
H HEIGHT
H HUMIDIFIER - AHU
HC HVAC CONTRACTOR
HP HORSEPOWER
HPS HIGH PRESSURE STEAM
HR HOUR
HRCR HEAT RECOVERY RETURN
HRCS HEAT RECOVERY SUPPLY
HRP HEAT RECOVERY PUMP
HRV HEAT RECOVERY VENTILATOR
HSP HUMIDIFICATION SET POINT
HVAC HEATING, VENTILATION, AND AIR CONDITIONING
HWR HOT (HYDRONIC) WATER RETURN
HWS HOT (HYDRONIC) WATER SUPPLY
HX HEAT EXCHANGER
Hz HERTZ
IBC INTERNATIONAL BUILDING CODE
IECC INTERNATIONAL ENERGY CONSERVATION CODE
IFB INTEGRAL FACE AND BYPASS
IJS IN JOIST SPACE
IMC INTERNATIONAL MECHANICAL CODE
I/O INPUT/OUTPUT
IPC INTERNATIONAL PLUMBING CODE
KO COMMANDING OFFICER
L LENGTH
LBS POUNDS
LEED LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN
LP PROPANE GAS
LPS LOW PRESSURE STEAM
LWA SOUND POWER LEVEL
M/A MIXED AIR
MAX MAXIMUM
MBH THOUSAND BRITISH THERMAL UNITS PER HOUR
MC MECHANICAL CONTRACTOR
MD MOTORIZED DAMPER
MECH MECHANICAL
MFG MANUFACTURER
MIN MINIMUM
MIN MINUTE
mm MILLIMETER
MPS MEDIUM PRESSURE STEAM
MT MOISTURE (HUMIDITY) TRANSMITTER
MV MANUAL VENT
N.C. NORMALLY CLOSED
NC NOISE CRITERIA LEVEL
NCA NATIONAL CEMETERY ADMINISTRATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NG NATURAL GAS
N.O. NORMALLY OPEN
NPT NATIONAL PIPE THREAD
O/A OUTSIDE AIR
OAT OUTSIDE AIR TEMPERATURE
OPCI OWNER-PROVIDED CONTRACTOR-INSTALLED
OPOI OWNER-PROVIDED OWNER-INSTALLED
ORD OVERFLOW ROOF DRAIN
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
Pa PASCAL
PC PUMPED CONDENSATE
PC PREHEAT STEAM COIL - AHU
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
PDS PRESSURE DIFFERENTIAL SENSOR
PH PHASE
PI PROPORTIONAL INTEGRAL
PID PROPORTIONAL INTEGRAL DERIVATIVE
PRESS PRESSURE
PSH HIGH PRESSURE SWITCH
PSIG POUNDS PER SQUARE INCH - GAUGE
PSL LOW PRESSURE SWITCH
QUANT QUANTITY
R RADIUS
R RETURN
R/A RETURN AIR
RE/A RELIEF AIR
RC REHEAT STEAM COIL - AHU
RD ROOF DRAIN
RE RESIDENT ENGINEER
RECT RECTANGULAR
REQ'D REQUIRED
RH RELATIVE HUMIDITY
RL REFRIGERANT LIQUID (SUPPLY)
RS REFRIGERANT SUCTION (RETURN)
RPM REVOLUTIONS PER MINUTE
S SUPPLY
S/A SUPPLY AIR
SAN SANITARY SEWER
S-DCW SOFT DOMESTIC (POTABLE) COLD WATER
SD SMOKE DAMPER
SF FAN SECTION - AHU
SF SQUARE FEET
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS ASSOCIATION
SP STATIC PRESSURE
SPEC SPECIFICATION
SS STAINLESS STEEL
SST START/STOP
SUH STEAM UNIT HEATER
SV STEAM VALVE
SV STEAM VENT
T THERMOSTAT
TEMP TEMPERATURE
TSP TOTAL STATIC PRESSURE
TT TEMPERATURE SENSOR/TRANSMITTER
TYP TYPICAL
UH UNIT HEATER
V SANITARY VENT
V VOLTS
VA VETERANS' AFFAIRS
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
VSMC VARIABLE SPEED MOTOR CONTROLLER
VTR VENT THROUGH ROOF
W WIDTH
W/ WITH
WB WET BULB
WG INCHES OF WATER
ZAT ZONE AIR TEMPERATURE
ZC ZONE VALVE OR DAMPER CONTROLLER
SITE PLAN
PROJECT
LOCATION
N
Bid Documents
5/16/2025
SNAKE RIVER CANYON
NATIONAL CEMETERY
GRAVESITE EXPANSION
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECT/ENGINEER:CONSULTANTS:
DateRevisions:
8A (OR/ ��§����
o n e e iI J tJ in c J o n e
Ho o t o n e
S u C Tt e T in c J o n e
Ho o t tJ Te e e iI J tJ s in c J o n e
Ho o t o n e
J C
NH
in c J o n e
Ho o t tJ Te e
S u C Tt e Ts in c J o n e
Ho o t o n e in c J o n e
Ho o t o n e
C n d o n e
J C
NH
in c J e s o n e
Ho o t tJ Te e in c J e s o n e
Ho o t
E
D
C
B
A
E
D
C
B
A
BUHL, IDAHO
of
941-002
4F Project Number: 23.2693.L01
CALIBRE ENGINEERING, INC.
8822 SOUTH RIDGELINE BLVD, SUITE
301 HIGHLANDS RANCH, CO 80129
Department of Veterans Affairs
WWC ENGINEERING
1275 MAPLE STREET, SUITE F
HELENA, MT 59601
B&R GROUP
10152 ORCHID RIDGE LANE
ESTERO, FL 34135
AQUA ENGINEERING, INC.
300 BOARDWALK DRIVE, UNIT 4B
FORT COLLINS, CO 80525-3093
RHAA
225 MILLER AVENUE
MILL VALLEY, CA 94941
OCMI, INC.
8851 RESEARCH DRIVE
IRVINE, CA 92618
RATIO ARCHITECTS, LLC
101 S. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46204
CENTRAL GEOTECHNICAL SERVICES
10240 SW NIMBUS AVENUE, SUITE L6
PORTLAND, OR 97223
SCOUT ENVIRONMENTAL, INC.
169 SAXONY ROAD, SUITE 214
ENCINITAS, CA 92024 517 7TH STREET
RAPID CITY, SD 57701
PH: (605) 342-9470
P-23254P R
O
FE
SSIONAL ENGINEER
ALEX R. ZIMMERMAN
ST A TE OF IDAHO
LICENSED
05/16/2025
M-000
HVAC COVER SHEET
AZDF 83
OUTDOOR HEAT PUMP CONDENSING UNIT SCHEDULE
REFRIG. CONN.
V.-PH.-CY.
ELECTRICAL
MFGR OR EQUAL NOTES
LIQUID VAPOR MCA MOCP
MITSUBISHICU-1 1
4" 208-1-60 28 1,2,3,4,5,6,7
CU
2"
TAG
NOTES:
1. PROVIDE WITH LOW AMBIENT PACKAGE CONFIGURATION FOR LOW TEMPERATURE HEATING CAPABILITY.
2. SIZE AND INSTALL REFRIGERANT LINESET PER MANUFACTURER RECOMMENDATIONS.
3. PROVIDE WITH FACTORY SIZED THERMOSTATIC EXPANSION VALVE.
4. CONDENSER MUST HAVE DC HYBRID INVERTER-DRIVEN COMPRESSOR.
5. PROVIDE MANUFACTURER'S RECOMMENDED CONTROL WIRE AND POWER CONDUCTOR TO INTERCONNECT OUTDOOR AND INDOOR UNITS.
6. PROVIDE WITH 3" CONCRETE HOUSEKEEPING PAD.
7. SHOWN AS BASIS OF DESIGN, APPROVED EQUAL ALLOWED.
MODEL
PUZ-A12NKA7
SERVICE
HEAT/COOL
LOCATION
COOLING
SEER
12000 21.3
NOMINAL
BTUH
OUTSIDE STORAGE 2 93
UNIT WEIGHT
(LB)
HEATING
COP
18000 3.9
NOMINAL
BTUH
MITSUBISHICU-2 1
4" 208-1-60 28 1,2,3,4,5,6,71
2"PUZ-A12NKA7 HEAT/COOL 12000 21.3 9318000…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .