Amended Bid Documents NCA Submittal Full Package with Amendments 002.1 - 7 of 8.pdf
PDF 5 MB Posted
- Solicitation number
- 36C78625B0003
About this file
This file contains architectural drawings and specifications detailing various improvements required at the Lebanon National Cemetery. The drawings include elevations, sections, and details for multiple buildings including a new maintenance building, administration building, committal shelter, and rostrum. Specific work includes installation of new gutters and downspouts, cleaning and resealing of exterior CMU walls, replacement of sealants on exterior windows, repainting of door frames, installation of new 12"x12" louvers for herbicide/pesticide storage, and construction of a new 10'x15' CMU building with shed roof.
The drawings provide detailed specifications for ADA-compliant ramps, handrails, door hardware, signage, ceiling systems, and room finishes. Room finish schedules indicate various floor, wall, and ceiling treatments required throughout the facilities. Window and door schedules specify sizes, types, and materials. The plans also include requirements for a temporary shelter (minimum 14'x14') with sound system to be used during construction activities that prevent services from being performed at the existing shelter. Detailed architectural renderings show 3D views of the administration building, old and new maintenance buildings, rostrum, and committal shelter.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
L1 0' - 0"
L2 12' - 0"
Roof Level 18' - 5 9/32"
F8 A-103
L1 0' - 0"
L2 12' - 0"
Roof Level 18' - 5 9/32"
7'
- 0
" 10
3/
"17
L1 0' - 0"
L2 12' - 0"
Roof Level 18' - 5 9/32"
14 14
F8 A-103
L1 0' - 0"
L2 12' - 0"
Roof Level 18' - 5 9/32"
7'
- 0
"10
3/
7/19/24
00404366CO
LO
RADO L ICENSED
A RC H I T ECT
SE
AN
M. F ITZPATRICK
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov
VA FORM 08 - 6231
A
BID PACKAGE
NA
National Cemetery Administration Design and
Construction Service U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
856CM3012
LEBANON, KY
504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433
VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering
07/19/2024 Sheet of 84
C :\U se rs
\d an ia .h ab bo ub \V
C I\V
A N
C A
Le ba no n
N C
F C
A Im pr ov em en ts
D oc um en ts \a
W or kF ile s\ 4_
Bi d_
D oc s\ 1_
Pl an s\ C
AD
\N ew M ai nt
B ui ld in g.
rv t 7/
/2
:4
3:
A M
A-201
New Maintenance Building New Work Elevations
1/4" = 1'-0" B2 North Elevation New Work
1/4" = 1'-0" C2 East Elevation New Work
1/4" = 1'-0" E2 South Elevation New Work
1/4" = 1'-0" F2 West Elevation New Work
ELEVATIONS NEW WORK KEYNOTESELEVATIONS NEW WORK KEYNOTES
Type Mark Keynote
14 REPAINT AND RESEAL ALL EXTERIOR DOOR FRAMES
15 REPLACE ALL SEALANTS ON ALL EXTERIOR WINDOWS
16 CLEAN OUT GUTTERS AND DOWNSPOUTS AND ADD
GUTTER SCREENS
17 NEW 10'X15' CMU BUILDING WITH A SHED ROOF
18 CLEAN AND RESEAL ALL EXTERIOR CMU WALLS
20 HAZARDOUS MATERIALS BUILDING IDENTIFICATION SIGN
31 INSTALL NEW 12"X12" LOUVERS FOR THE NEW
HERBICIDE AND PESTICIDE STORAGE
39 INSTALL NEW GUTTERS AND DOWNSPOUTS DISCHARGE
TO SPLASH BLOCK. SEE DETAIL F6/A-502
0' 2' 4' 8' 16'
1/4"=1'-0"
45Revisions: Date:
L1
0' - 0"
L2
12' - 0"
L1
0' - 0"
L2
12' - 0"
L1
0' - 0"
L2
12' - 0"
19A-202
B4
L1
0' - 0"
L2
12' - 0"
L1
0' - 0"
L2
12' - 0"
L1
0' - 0"
L2
12' - 0"
L1
0' - 0"
L2
12' - 0"
L1
0' - 0"
ARMY MARINE NAVY
AIR
FORCE
SPACE
FORCE
COAST
GUARD
18" 18" 18" 18" 18" 18"
1'
/8
4'
/4
EQ EQ EQ EQ EQ
B8
A-202
1/
2"
4" 6" 4"
1'
1/
8"
7/19/24
00404366C O
LO
RADO L ICENS
E
D
A
RC H I T EC
T
S
EA
N
M. F ITZPATR
IC
K
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov
VA FORM 08 - 6231
A
BID PACKAGE
NA
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E: Vali Cooper International
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
856CM3012
4101&LEB-NEW2
LEBANON, KY
504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433
VCI
Project Management
Construction Management
Engineering
02/12/2025 Sheet of 84
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
C U s e rs \D a n ia
H a b b o u b \V a li
C o o p e r In te rn a ti o n a l\ V
A N
C A
L e b a n o n
N C
F C
A I m p ro v e m e n ts
D o c u m e n ts
\a W o rk
F ile s \4
B id
D o c s \1
P la n s \C
A D
\C o m m it ta l S h e lt e r.
rv t
/1
/2
:1
:1
P
M
A-202
Committal shelter and Rostrum Elevations
1/4" = 1'-0" D1
South Elevation
1/4" = 1'-0" F1
West Elevation
1/4" = 1'-0" F4
East Elevation New Work
1/4" = 1'-0" B1
North Architectural Building Elevation
ELEVATION KEYNOTES
Type Mark Keynote
6 CLEAN GUTTERS AND DOWNSPOUTS AND
ADD GUTTER GUARDS
7 REPAINT ALL STRUCTURAL STEEL
8 DEMO 5 SEALS
9 INSTALL 6 SEALS. SEE DETAILS
D1&E1/A-502
10 ADD A STUD AND METAL BACKING PANEL
OVER THE STONE FOR MOUNTING THE
SEALS
11 NEW HANDRAILS. SEE DETAIL C6/A-106
12 REPLACE ALL STEEL GUARDRAILS WITH NEW
TO MATCH EXISTING
18 CLEAN ENTIRE CONCRETE STRUCTURE. FIX
ALL CRACKS AND DAMAGED AREAS.
RE-PARGE ENTIRE STRUCTURE TO MATCH
EXISTING FINISH
19 STRIP AND PAINT CASKET HOLDER
1/4" = 1'-0" D4
East Elevation Demo
1/4" = 1'-0" D8
East Elevation Demo
1/4" = 1'-0" E8
Rostrum North Elevation
1/2" = 1'-0" B4
Service Wall Elevation
1" = 1'-0"A-202
B8 Section 2
TEMPORARY SHELTER:
1. CONTRACTOR SHALL PROVIDE A TEMPORARY SHELTER
DURING ACTIVITES THAT PREVENT SERVICES FROM BEING
PERFORMED AT THE EXISTING SHELTER.
• SHELTER SHALL BE A MINIMUN OF 14'X14'.
• CONTRACTOR SHALL BE RESPONSIBLE FOR ADEQUATELY
SECURING SHELTER.
2. CONTRACTOR SHALL COORDINATE THE TEMPORARY SHELTER
LOCATION WITH CEMETERY STAFF.
3. CONTRACTOR SHALL PROVIDE A FUNCTIONING SOUND
SYSTEM FOR THE TEMPORARY SHELTER CONSISTING OF THE
FOLLOWING:
• 4-OHM WEATHER RESISTANT SPEAKERS (OWI TRP470 OR
APPROVED EQUAL).
• TAPS PLAYER (MACKENZIE LABORATORIES MINIMAC 2 OR
APPROVED EQUAL)
• POWER TO ALLOW OPERATION FOR AT LEAST TWO
HOURS.
2.1
2.1
Revisions: Date:
AMENDMENT 002.1 02/12/2025
7/ 19/ 24
4"
MIN
LE
SS
T H
AN
4" C
LE
AR
4" DISTANCE
TO CURB EDGE
4"
G U
AR
D R
AI
L
H
EI
G H T
3' -0 " A
FF
FIRST FLOOR
0' - 0"
SECOND FLOOR
10' - 8 1/2"
ROOF LEVEL
19' - 4 1/2"
FIRST FLOOR
0' - 0"
SECOND FLOOR
10' - 8 1/2"
ROOF LEVEL
19' - 4 1/2"
FIRST FLOOR
0' - 0"
A-301 D6
C6 A-301
C6 A-301
1' - 0"1' - 0"
1' 0"
1' 0"
3"3"
3"3"
3"3"
61 69
FIRST FLOOR
0' - 0"
F1 A-301
F1 A-301
M
IN
M
IN6"6"8 3/4"8 3/4"6"6"
6"6" 72
7/19/24
00404366CO
LO
RADO L ICENSED
A RC H I T ECT
SE
AN
M. F ITZPATRICK
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov
VA FORM 08 - 6231
A
BID PACKAGE
NA
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
856CM3012
LEBANON, KY
504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433
VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering
07/19/2024 Sheet of 84
C :\U se rs
\d an ia .h ab bo ub \V
C I\V
A N
C A
Le ba no n
N C
F C
A Im pr ov em en ts
D oc um en ts \a
W or kF ile s\ 4_
Bi d_
D oc s\ 1_
Pl an s\ C
AD
\A dm in b ui ld in g.
rv t 7/
/2
:4
2:
A M
A-301
Ramp& Stair Sections, Elevations and Details
1/4" = 1'-0" C1 Ramp East Elevation
1/4" = 1'-0" E1 Ramp South Elevation
RAMP VIEWS NEW WORK KEYNOTESRAMP VIEWS NEW WORK KEYNOTES
Type Mark Keynote
60 INSTALL 1:12 SLOPE CONCRETE RAMP, 3' WIDTH,
36" RISE WITH RAILING
61 CONCRETE SLAB TO ALIGN WITH ENTRANCE
LEVEL . POUR IN-PLACE CONCRETE OVER THE
EXISTING SLAB TO LEVEL WITH ENTRANCE. SEE
D6/A-301 FOR DOWELING AND REINFORCEMENT.
63 CONNECT RAMP TO EXISTING CONCRETE
SIDEWALK.
64 PROVIDE ABA COMPLIANT DOOR SILL
65 INSTALL DOOR OPENER SYSTEM.
66 #4 REBAR @ 1'-0" EW REBAR HORIZ BARS IN TO
ADJACENT WALL
67 INSTALL NEW CAST-IN-PLACE CONCRETE
STAIRS
68 #4 NOSING BAR, 1" CLEAR TYP.
69 INSTALL NEW STEEL RAILING. SEE DETAIL
F6/A-301
70 COMPACT EXCAVATED SOIL
71 8"D X 16"W CONT CONC FOOTING
72 MORTAR NET AND FLASHING WEEPS @ 36" O.C.
73 EXISTING CONCRETE SLAB
74 FACE BRICK TO MATCH ADMIN BUILDING
ELEVATIONS
75 ADJUSTABLE BRICK TIES-16" O.C. HORIZ& 24"
O.C.VERT.
76 PIPE 1.5" DIAMETER STANDARD HANDRAIL
77 1/2" DIAMETER STEEL PICKETS SPACED NO
LESS THAN 4" BETWEEN
78 WELD 3/16 (TYP.)
79 1 1/2" OD SCHED. 40 PIPE RAILS& POSTS (TYP.)
80 4-1/2"X4" EPOXY ANCHORS
81 4" SQUARE 1/2" THICK PLATE
82 #3 ADHESIVE DOWEL @18" O.C. W/2"
EMBEDMENT INTO SLAB
83 #4 CONT
84 WWF
85 #4 REBAR@ 12" O.C.
1/4" = 1'-0" F1 Section 3
1/2" = 1'-0" D6 Section 3 - Callout 1
1/2" = 1'-0" C6 Section 4
D8 3D View 7
F8 3D View 15
1" = 1'-0" F6 Steel Railing Details
Revisions: Date:
FIRST FLOOR
0' - 0"
2' /2
2' /2
2' 4"
2' 4"
1' 6"
1' 6"
FIRST FLOOR
0' - 0"
2' /2
2' /2
1' 4"
1' 4"
2' 6"
2' 6" 39
A5
A6
A7
19 2021
A2 A1
A4
40 4143
A3 A6
A7
SOLID
SURFACE TOP
CONT BASE
7"7" 5"5"
2' - 0"2' - 0" 1"1"
3"3"
FIXED PLAM PANEL
TO MATCH
DRAWERS
BASE PER
SCHEDULE
SINK PER SCHED.
SEE PLUMBING
DRAWING
OVERLAY DOOR
R
EF
IN
T
EL
EV
R
EF
IN
T
EL
EV
1/ 2"
1/ 2"
1/ 2"
1/ 2"
SOLID
SURFACE
BACKSPLASH
4"4" 4"4"
CLG SYSTEM PER SCHED
CABINET DOOR - FINISH
MATRL PER SCHED
CABINET BACK
BOT/SOFFIT @ 7'-0"
AFF (UNO)
FRT 1x CLEAT
VERIFYVERIFY 3/4"3/4"
1/ 2" M
AX
1/ 2" M
AX
SCRIBE TO SOFFIT
CONT 2 1/2x2 1/2"
CORNER REINF
GWB
2 1/2" MTL STUD SOFFIT
FRAMING @ 16" OR 24" OC
20GA STUD TRACK
FACE/PTN
SCRIBE
1"1"
4" U N O
4" U N O
SOLID SURFACING
CNTR TOP ON 3/4"
SUBSTRATE
FACE OF CAB DR
1"1"
PROVIDE DBL LAYER
SUBSTRATE TOP @
SPANS
3'-6" OR GREATER AND @
BRKT SUPPORTED TOPS
FACE OF
WALL
CNTR DEPTH 2'-1", UONCNTR DEPTH 2'-1", UON
1/ 2" 1/ 2"
3/8" RAD EDGE
TYP
FIN CLG - ELEV
VARIES
ADJUSTABLE
SHELF
OVERLAY
DOOR
BACK PANEL GLUED
TO RABBETTED END,
TOP, & BOT PANELS
SHELF CLIP HOLES
GWB @ PTN - USE
20 GA STUDS
WHERE WALL CABS
SCHEDULED
2"2" 2"2"
MTL BLKG @ CONT
CLEAT-TYP
2"2"
1' - 3"1' - 3"
R
EF
IN
T
EL
EV
R
EF
IN
T
EL
EV DRAWER PANEL
BASE PER
SCHEDULE
SUBTOP MTRL
VARIES W/ TOP
SPAN
CONT BASE
7"7" 5"5"
2' - 0"2' - 0" 1"1"
ADJ SHELF
1/ 2"
1/ 2"
1/ 2"
1/ 2"
GWB @ PTN -
USE
20 GA STUDS
WHERE WALL
CABS
SCHEDULED
PROVIDE FIXED
PANEL ON BOTH
SIDES
3"3"
R
EF
IN
T
EL
EV
R
EF
IN
T
EL
EV
4"4"
1/8":12" (1.04%) SLOPE TO DRAIN
MIRROR
FAUCET, SEE PLUMBING
SOLID SURFACE
COUNTERTOP WITH EASED
EDGE AND BACK SPLASH
PROVIDE INSULATION
AT EXPOSED PIPE
UNDERMOUNT SINK
3"X2 1/2"X1/4" "L" ANGLE
ATTACHED TO DOUBLE BOXED
STUD W/ 1/4" DIA. MACHINE BOLT
STANDARD NUT& WASHER
SEALANT ALL AROUND
AT BOTH ANGLE LEGS
1' -9 " T
YP
1' -9 " T
YP
2' -1 0" T
YP
2' -1 0" T
YP
7/19/24
00404366CO
LO
RADO L ICENSED
A RC H I T ECT
SE
AN
M. F ITZPATRICK
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov
VA FORM 08 - 6231
A
BID PACKAGE
NA
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
856CM3012
LEBANON, KY
504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433
VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering
07/19/2024 Sheet of 84
C :\U se rs
\d an ia .h ab bo ub \V
C I\V
A N
C A
Le ba no n
N C
F C
A Im pr ov em en ts
D oc um en ts \a
W or kF ile s\ 4_
Bi d_
D oc s\ 1_
Pl an s\ C
AD
\A dm in b ui ld in g.
rv t 7/
/2
:4
2:
A M
A-401
Administration Building Enlarged Views
1/2" = 1'-0" C1 Kitchen North Interior Demo Elevation
1/2" = 1'-0" C3 Kitchen West Interior Demo Elevation
1/2" = 1'-0" E1 Kitchen North Interior New Work Elevation
1/2" = 1'-0" E3 Kitchen West Interior New Work Elevation
DEMO KEYNOTES ENLARGED VIEWSDEMO KEYNOTES ENLARGED VIEWS
Type Mark Keynote
15 REMOVE AND DISPOSE OF PLUMBING FIXTURES
16 REMOVE AND DISPOSE OF CABINETS
17 REMOVE AND DISPOSE OF COUNTER TOP
18 REMOVE AND DISPOSE OF APPLIANCES
19 REMOVE AND DISPOSE OF PARTITION
20 REMOVE AND DISPOSE OF LIGHT FIXTURES
21 REMOVE AND DISPOSE OF MIRROR
25 REMOVE TOILET ACCESSORIES
NEW WORK KEYNOTES ENLARGED VIEWSNEW WORK KEYNOTES ENLARGED VIEWS
Type Mark Keynote
36 INSTALL NEW PLUMBING FIXTURES. SEE DETAIL
E9/A-401
37 INSTALL NEW PREMANUFACTURED WOOD CABINETS
38 INSTALL NEW APPLIANCES
39 INSTALL NEW SOLID SURFACE COUNTER TOP. SEE
F5/A-401
40 INSTALL NEW MIRROR. SEE DETAIL F9/A-501
41 INSTALL ABA COMPLIANT GRAB BARS
43 REPLACE LIGHT FIXTURES
54 INSTALL NEW TOILET ACCESSORIES
1/2" = 1'-0" C6 Restroom 102A Demo Elevation
1/2" = 1'-0" E6 Restroom 102A New Work Elevation
1/2" = 1'-0" C7 Bathroom 204 Interior Demo Elevation
1/2" = 1'-0" E7 Bathroom 204 Interior New Work Elevation
1" = 1'-0" F1 Cabinet Base with Sink
3" = 1'-0" F3 Cabinet GWB Soffit Detail
3" = 1'-0" F5 Cabinet Top Solid Surface
1" = 1'-0" F7 Cabinet Upper
RESTROOM ACCESSORIES SCHEDULERESTROOM ACCESSORIES SCHEDULE
Type Mark Description Manufacturer
A1 1-1/4" DIA. STAINLESS STEEL GRAB BARS,
42"
A2 1-1/4" DIA. STAINLESS STEEL GRAB BARS,
36"
A3 1-1/4 DIA. STAINLESS STEEL VERTICAL
GRAB BAR, 12
A4 24"X36" RECESSED MIRROR
A5 22 inch x 34 inch Oval Mirror
A6 WALL MOUNTED SOAP DISPENSER
A7 RECESSED HAND TOWEL ROLL DISPENSER
1" = 1'-0" F8 Base Cabinet- Open Shelf
12" = 1'-0" E9 Lavatory Detail
FIRE
EXTINGUISHER
9"
4' - 0"
ADA MAX
FEC SURFACE MOUNTED
FIRE
EXTINGUISHER
CABINET
5_
" TYPE X GWB
PLAN
ELEVATION SECTION
FIRE EQUIPMENT
SIGN
LOCK-PROVIDED
BY MANUF.
RECESSED PULL,
(OPTIONAL)
7' - 0"
BOTTOM OF SIGN
FIRE ALARM STROBE -
REFER TO ELEC.
4 1/4"
1"
7/ 8"
2'
- 0
1/ 4"
1'
- 1
/4
3'
- 9
/8
MAX
10 1/8"
4'-0" FIELD VERIFY
4"
1' - 6 3/8"
6 1/2" 2 1/4"
1' - 1 7/8"
4 1/4"
MAX
3'
- 1
2'-
7" F
IE
LD
V
ER
IF
Y
NEW WOOD NEWEL POST.
FINISHED AND BACK PRIMED
AND PAINTED REDWOOD.
GALVANIZED METAL POST BASE W/STAND OFF PLATE
ANCHORED TO NEW CONCRETE PAVEMENT.
EXISTING CONCRETE
STEPS TO REMAIN
GALVANIZED METAL
POST BASE W/STAND OFF
PLATE ANCHORED TO
EXISTING CONCRETE
2" 3"
1/
2"
1/ 2"
2"
6"
8'
- 0
/2
3'
- 1
/8
1'
- 0
GALVANIZED METAL
POST BASE W/STAND
OFF PLATE ANCHORED
TO EXISTING CONCRETE
NEW WOOD NEWEL POST.
FINISHED AND BACK PRIMED
AND PAINTED REDWOOD.
1/
2"
11 1/2" 7"
7"
NEW REDWOOD
NEWEL POST CAP.
5 3/4"
1/
4" 3/
4" 3/
4"
1"
2 3/4"
3/
4" 7/
8"
REDWOOD SINGLE
PIECE BOTTOM RAIL.
PREP, PRIME AND PAINT.
1-INCH SQUARE REDWOOD
PICKETS, AT 5" O.C. PREP,
PRIME AND PAINT.
REDWOOD
HANDRAIL. PREP,
PRIME AND PAINT.
1/8" DRIP EDGE.
4 1/2"
1/
2" 3/
4" 3/
4"
6 6 6
(3) 2X6 RIPPED TO
4 1/2" LENGTH
NEW BUILT-UP WOOD
COLUMN WITH BACK PRIMED
PAINTED CLEAR REDWOOD
1/
4" 3/
4" 1"
3/
8"
1/ 2"
1/
8"
5/ 8"
1/
2"
1/ 8"
3/ 8"
1/
2" 2"
3" 7/8"
NEW 4X8 WOOD PLASTERS WITH
WOOD TRIM, TO MATCH COLUMN
DETAILS. PREP, PRIME AND PAINT.
P02
4" STUD / GYP CMU / GYP
W12
8" CMU WALL, PAINTED
5/8" TYPE 'X' GYPSUM BOARD 5/8" TYPE 'X' GYPSUM BOARD
CEILING ON STEEL ROOF
TRUSSES, SEE STRUCTURAL
4" STEEL STUDS @ 16" O.C.,
SEE STRUCTURAL
5/8" TYPE 'X' GYPSUM BOARD
5"
SCHEDULED PARTITION
BACKING PLATE TYPE B
TYP TOP & BOT
MIRROR
CONTINUOUS HEAVY-DUTY
ALUM "J" CLIP, TYP TOP & BOT
SECURE "J" CLIP TO
BACKING WITH #10 SMS AT
12 " OC
REFER TO ELEVATIONS FOR
MOUNTING HEIGHTS
3/4"3/4" AS SCHEDAS SCHED
FACE OF WALL
C SYMM ABOUT AT BACK-TO-BACKL
STACKED LOCKERS
SEE SPECIFICATIONS
3/4" EXTERIOR PLYWOOD
BASE PER SCHEDULE
2X CROSS SUPPORT AT 24" OC
1X CONTINOUS SUPPORTS (FRT)
3/8" DIA EXPANSION BOLTS AT
24" OC
1/2"1/2"
SEALED CONC FLR
RESILIENT
FLOORING
EDGE STRIP -
CENTER UNDER DOOR
WHERE OCCURS
RESILIENT/CONCRETE
DOOR WHERE
OCCURS
EXTRUDED ALUM ADAPTOR
AT SHEET GOODS
SOLID VINYL ADAPTOR AT TILE
CL
NEW FLOORING
RUBBER BASE AS SCHEDULED.
EACH SIDE OF NEW WALL
TOP OF SLAB
TELECOM ROOM SIDEADJACENT SPACE
PARTITION AS SCHEDULED
INSTALL 3/4" PLYWOOD TO 8'AFF,
MOUNT BOTTOM OF PLYWOOD @
12" AFF
EXISTING FLOORING
7/19/24
00404366CO
LO
RADO L ICENSED
A RC H I T ECT
SE
AN
M. F ITZPATRICK
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov
VA FORM 08 - 6231
A
BID PACKAGE
NA
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
856CM3012
LEBANON, KY
504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433
VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering
07/19/2024 Sheet of 84
C :\U se rs
\d an ia .h ab bo ub \V
C I\V
A N
C A
Le ba no n
N C
F C
A Im pr ov em en ts
D oc um en ts \a
W or kF ile s\ 4_
Bi d_
D oc s\ 1_
Pl an s\ C
AD
\A dm in b ui ld in g.
rv t 7/
/2
:4
2:
A M
A-501
Architectural Details 1
1" = 1'-0" D2 Railing Detail
1" = 1'-0" D5 Railing Post Detail
3" = 1'-0" D7 Detail 3
3" = 1'-0" D9 Detail 4
3" = 1'-0" F1 Wall Sections
3" = 1'-0" F9 Mirror Detail
1 1/2" = 1'-0" F4 Locker Base Detail
3" = 1'-0" E4 Resilient-Concrete Floor Transition
12" = 1'-0" F7 Rubber Wall Base Detail
1 1/2" = 1'-0" D1 Fire Extinguisher Cabinet Detail
GENERAL NOTES
1 3/4"
SECTION THROUGH SEAL SHOWING
METHOD OF ATTACHMENT
MATERIAL:
BRONZE: FEDERAL SPECIFICATION QQ-C-535B, COMPOSITION 2.
WORKMANSHIP:
CASTINGS SHALL BE OF UNIFORM QUALITY AND CONDITION, FREE FROM INJURIOUS BLOWHOLES AND POROSITY, CRACKS AND OTHER DEFECTS AND NOT WARPED OR DISTORTED, WELL FINISHED, FREE FROM BURRS, SHARP EDGES, SCRATCHES AND DEFECTS THAT MAY AFFECT APPEARANCE OR SERVICEABILITY.
CASTINGS SHALL NOT BE REPAIRED, PLUGGED, WELDED, OR BURNED.
FINISH:
FINISH TO BE DETAILED, HAND CHASED FOR TRUE ALIGNMENT, FILED, BELT POLISHED SIDES GROUND SMOOTH, RAISED SURFACES AND BORDERS, SUCH AS ALL RAISED PORTIONS OF SEAL, EAGLE, SHIELD, LETTERING, ROPE BORDER ETC., TO BE POLISHED AND BUFFED TO A BRIGHT SATIN FINISH, BACKGROUND TEXTURES TO BE REVERSE MEDIUM PEBBLE BACKGROUND, FINE PEBBLE BACKGROUND, MOSS AS CAST, AS INDICATED.
COATING:
BRONZE: CHEMICALLY OXIDIZE TO A STATUARY MEDIUM COLOR AND FINISH WITH ONE COAT OF CLEAR
PROTECTIVE EXTERIOR METAL LACQUER.
FASTENERS:
BRONZE FASTENERS TO BE COMPATIBLE WITH MATERIAL OF CASTING.
SEALS REQUIRED:
NAVY -1, 18" DIA
ARMY -1, 18" DIA
AIR FORCE -1, 18" DIA
MARINE CROPS -1, 18" DIA
COAST GUARD -1, 18" DIA
SPACE FORCE -1, 18" DIA
SEALS ARE TO BE SUPPLIED AND INSTALLED BY CONTRACTOR
LOCATION OF
SOLID METAL
PORTION OF SEAL
SOLID METAL PORTION ON BACK OF SEAL, DRILL AND TAP FOR
STUDS-3 LOCATIONS AS INDICATED ON ELEVATIONS.
ROPE BORDER
CONTINUOUS
LOCATION OF
SOLID METAL
PORTION OF SEAL
PROFILE OF SEAL
LOCATION OF SOLID METAL
PORTION OF SEAL
DRILL IN CONCRETE OR SOLID MASONRY AND FILL WITH EPOXY IMMEDIATELY
PRIOR TO SETTING SEAL
FACE OF
WALL
SAME AS
ABOVE
FRONT
FACE OF
SEAL
MEDIUM PEBBLE
FINISH, ALL
BACKGROUND
AREAS.
3_
" BRONZE THREADED STUDS SCREWED INTO SOLID METAL PORTION ON
BACK OF SEAL. POSITION INTO DRILLED HOLES IN MASONRY FACE WHILE
EPOXY IS WET. PROVIDE BRONZE BOLTS FOR BRONZE SEAL.
DI
A M
ET
ER
F
A
D
I
ET
D ST
NU
E
TM
AP
R
E NT O
S
A
T SE FO
REM
ACI
N
VE RATE
A
FAI R
F
S
1 3/4"
1/4" MAX
4'-0" MAX. 8'-0" MAX.
8" MAX. OR 1/4 OF
8" MAX. OR 1/4 OF
LENGTH OF THE END
RUNNER,
WHICHEVER IS LESS 1'-0"
4'-0" MAX. 8'-0" MAX. 8'-0" MAX. 4'-0" MAX.
COMPRESSION STRUT:
7/8" FURRING CHANNELS
@ 2'-0" O.C. MAX.
1 1/2" X 1.12 #/FT. MIN.,
CHANNELS @ 4'- 0" O.C.
C6 10A-531
PERPENDICULAR
4 DIAGONAL BRACE WIRES
@ 8'x 12' GRID
MAX. 45° MAX. TYP. 45° MAX. TYP.
D8 10A-531
D6 10A-531
PARALLEL
B5
DIAGRAMATIC PLAN-GYP. BD. SUSPENSIONSYSTEM
1/8" = 1'-0"
RUNNER WHICHEVER IS LESS
8" OR 1/4 LENGTH OF THE END
PARTITION / STRUCTURAL
ELEMENT
EMBED @ CONC.
1 1/4" MIN.
MIN.
1/2"
2 1/4" X 7/8" X GA. GALV.
ANGLE W/ #8 SMS @ 16" O.C.
OR .145Ø SHOT PINS @ 16"
O.C. @ CONC. WALL 1-1/4"
MIN. EMBED
WIRE TIES
8 GA. HANGER WIRE
W/ 3 TURNS WITHIN
1-1/2" 8 GA. HANGER
WIRE W/ 3 TURN
WITHIN 1-1/2"
1 1/2" X 1.12 #/FT.
MIN. MAIN RUNNER
@ 4'-0" O.C. MAX.
LOOSE SCREW
GRID
1"
12 GA. HANGER WIRES @
PERIMETER
2" MAX. FROM BRACING
WIRES TO CROSS
RUNNERS
TYP. ACOUSTICAL CEILING BRACING
3/4" = 1'-0"
MAIN RUNNER
CROSS RUNNER
DIAGRAMATIC PLAN: ACOUSTICAL
CEILING SUSPENDED SYSTEM
1/8" = 1'-0"
ATTACH WIRE THRU
SUPPORT HOLES OR TO 16
GA. STEEL CLIP ATTACHED
TO LIGHT FIXTURE WITH (1) #
10 S.M.S.
12 GA WIRE
FIXED
END
12 GA. VERT HANGER
WIRES @ 4'-0" O.C MAX.
TYP.
1" Ø COMPRESSION STRUT. COMPRESSION
STRUT SHALL NOT REPLACE HANGER WIRE
LENGTH
4' rREQ
0.24IN
STRUT
350IU20
250IU20
158IU20
400IU20
RSUPP.
0.382 0.399 0.410
0.380
TYPICAL:
12 GAUGE BRACING WIRE W/
MIN. 4 TIGHT TURNS IN 1-1/2"
BOTH ENDS OF WIRE
TYPICAL:
12 GAUGE VERTICAL HANGER
WIRE @ 4'-0" EACH WAY W/
MIN. 3 TIGHT TURNS IN 1-1/2"
BOTH ENDS OF WIRE
LENGTH OF THE END
RUNNER, WHICHEVER
IS LESS 8" SLIP
END
8'-0" MAX. 4'-0" MAX.
C8 10A-531
ADDITIONAL
CROSS RUNNERS
WHERE 2'X2' GRID
OCCURS
CROSS RUNNERS
AT 2'-0" O.C.
D8 10A-531
FIXED END
10A-531
A8 4 DIAGONAL
BRACE WIRES
AT 8'X12' GRID
MAX.
12 GA. HANGER
WIRE AT
PERIMETER
MAIN RUNNERS AT
4'-0" O.C.
12 GA. VERTICAL
HANGER HANGER
WIRES AT 4'-0" O.C.
MAX. - TYP.
C8 10A-531
SLIP
END
LIGHT FIXTURE OR
MECHANICAL AIR DIFFUSER
WALL FINISH
GYP. BD.
(1) S-12 SMS @ EA. CHANNEL
ACOUSTICAL PANEL
ANGLE MOLDING
TAPE ALL JOINTS AND FINISH AS SPECIFIED
7/8" 26 GA. MIN. HAT CHANNEL PARTITION AS
SCHEDULED; SEE
PLAN FOR TYPE
ATTACH FIXTURE TO CEILING
GRID W/ SEISMIC RESTRAINT
CLIPS (TYP. AT FOUR
CORNERS)
CEILING SUSPENSION SYSTEM
NOTES:
FIXTURES WEIGHING LESS THAN 56 LBS. MAY BE SUPPORTED ON CEILING GRIDS RATED AS "HEAVY DUTY", PROVIDE TWO SLACK 12 GA. SAFETY WIRES ATTACHED TO FIXTURE AT DIAGONAL CORNERS AND TO STRUCTURE ABOVE SUPPORT FIXTERS OVER 56 LBS. WITH FOUR INDEPENDATN TAUT 12 GA. HANGER WIRES ATTACHED TO STRUCTURE. WIRES SHALL BE CAPBABLE OF SUPPORTING FOUR
TIMES THE WEIGHT OF THE FIXTURE
C5
GYP. BD. PERIMETER PERPENDICULARTO MAIN RUNNER
6" = 1'-0"
8" MAX. OR 1/4 OF LENGTH OF THE END
RUNNER WHICHEVER IS LESS
PARTITION / STRUCTURAL
ELEMENT
EMBED @ CONC.
1 1/4" MIN MIN.
1/2"
1 3/8" X 7/8" X GA. GALV.
ANGLE W/ ATTACHMENT TO
STRUCTURE NOT FINISH W/ (1)
#8 SMS @ 16"O.C. OR
SHOT .145 DIA PINS @ 16" O.C.
@ CONC. WALL 1 1/4" MIN.
EMBED.
8 GA. HANGER WIRE W/
3 TURNS WITHIN 1-1/2"
1 1/2" X 1.12 #/FT. MIN.,
MAIN RUNNER @ 4'- 0"
O.C. MAX.
(1) S-12 SMS @ EA. CHANNEL
7/8" 26 GA. MIN HAT
CHANNEL
ACOUSTICAL PANEL
ANGLE MOLDING
GYP. BD.
WALL FINISH
TAPE ALL JOINTS AND FINISH AS SPECIFIED
E5
GYP. BD PERIMETER PARALLELTO MAIN RUNNER
6" = 1'-0"
PARTITION AS
SCHEDULED; SEE PLAN
FOR TYPE
2'-0"
E7
SUSPENDED ACOUSTICAL CEILING
HORIZONTAL CEILING STRUT- FIXED END
6" = 1'-0"
EQ
2x4 CEILING
DIFFUSER OR GRILLE, OR 2 X
2 LIGHT FIXTURE
SPRINKLER HEAD,
DOWNLIGHT OR
CEILING MOUNTED
ITEMS
EQ
2'-0"
GRID
TIGHT SCREW
1"
SPRINKLER HEAD,
DOWNLIGHT OR
CEILING MOUNTED
ITEMS
C7 SLIP CONNECTION AT CEILING PERIMETER
6" = 1'-0"
FIXTURE SUSPENSION AT CEILING LAY IN PANEL
1'-0" 1'-0" 1'-0" 1'-0"
DIFFUSER OR GRILLE, OR 2 X
2 LIGHT FIXTURE
2 x 4 LIGHT FIXTURE
1'-0" 2'-0" 1'-0"
2 x 4 LIGHT FIXTURE
EQ EQ
2x2 OR 2x4 DIVIDED TILE
TYP. CEILING TILE LAYOUTS
1/2" = 1'-0"
4' -0
" M
AX
'-0 " M
AX
4' -0
" M
AX
8"
M
AX
1/ 2"
EQ
E
Q
EQ
E Q
EQ
E
Q
EQ
E Q
EQ
E
Q 4'
-0 " M
AX
'-0
" M
AX
4'
-0 " M
AX
8"
4'-0"
MAX.
4'-0" MAX.
C9
B9B7
F9
FIELD DRILLED HOLE TO MATCH
MOUNTING STUD, 3/4" DIA. HOLE
SECURED WITH EPOXY GROUT
THREADED MOUNTING
STUD AS RECOMMENDED
BY MANUFACTURER
MASONRY WALL
BRASS SEAL
STRAP AT 30" O.C.
ALUMINUM
FLASHING
FASTENER
BRACKET
32 OZ. ALUMINUM
GUTTER BRACE
ALUMINUM GUTTER
7/19/24
00404366CO
LO
RADO L ICENSED
A RC H I T ECT
SE
AN
M. F ITZPATRICK
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov
VA FORM 08 - 6231
A
BID PACKAGE
NA
National Cemetery Administration Design and
Construction Service U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
856CM3012
LEBANON, KY
504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433
VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering
07/19/2024 Sheet of 84
C :\U se rs
\d an ia .h ab bo ub \V
C I\V
A N
C A
Le ba no n
N C
F C
A Im pr ov em en ts
D oc um en ts \a
W or kF ile s\ 4_
Bi d_
D oc s\ 1_
Pl an s\ C
AD
\A dm in b ui ld in g.
rv t 7/
/2
:5
7:
A M
A-502
Architectural Details 2
3" = 1'-0" F1 Service Sign Detail
6" = 1'-0" F4 Service Sign Attachment Detail
1/8" = 1'-0" F6 Gutter Detail
CHANNEL LENGTHS VARY
BASED ON PANEL HEIGHT
SIGN PANEL LENGTHS VARY
BASED ON PANEL HEIGHT
2" 3"
1_2 "
4"
4'-0" M
IN
2" x 4" OR 4" x 4" TUBULAR
ALUMINUM POST
SIGN PANEL SHEET
POWDER COATED
ALUMINUM
POWDER COATED
ALUMINUM CHANNEL
POWDER COATED
ALUMINUM TAMPER-PROOF
SCREWS TO SECURE
SHEET ALUMINUM SIGN
PANEL TO ALUMINUM
CHANNEL
ENSURE CRISP CORNERS
AND BENDS
4" x 4" TUBULAR ALUMINUM
POST
1/8" ALUMINUM SIGN PANEL
POWDER COATED ALUMINUM
TAMPER-PROOF SCREWS,
COLOR TO MATCH SIGN PANEL
POWDER COATED ALUMINUM 1"∅
x 1/8" WASHER
11_2" x 1 1_ 4" X
1_
8" POWDER
COATED ALUMINUM
CHANNEL
2" x 4" TUBULAR ALUMINUM
POST
1/8" ALUMINUM SIGN PANEL
SIGNAGE:
1. PANELS TO BE 1/8" POWDER COATED ALUMINUM WITH DARK BRONZE BACKGROUND COLOR. PROVIDE COLOR
SAMPLES TO OWNER FOR APPROVAL.
2. PROVIDE A MINUMUM OF 2-3/4" CLEAR SPACE BETWEEN TEXT AND SIGN EDGE. OVERALL SIGN DIMENSIONS TO BE UNIFORM TO THE MAXIMUM EXTENT POSSIBLE. SUBMIT SIGN SHOP DRAWINGS SHOWING OVERALL SIGN DIMENSIONS
AND TEXT LAYOUT TO OWNER FOR APPROVAL.
3. SIGN PANELS TO BE BENT INTO AN UPSIDE DOWN "U" SHAPE. ENSURE NO SHARP CORNERS.
4. SIGN TEXT TYPEFACE TO BE HELVETICA BOLD, INITIAL CAPITAL AND LOWER CASE 2-1/2" HEIGHT MINIMUM UNLESS
NOTED OTHERWISE.
5. SIGN TEXT COLOR TO BE REFLECTIVE WHITE EQUAL TO PMS #454. PROVIDE COLOR SAMPLES TO OWNER FOR
APPROVAL.
POWDER COATED ALUMINUM 1"∅
x 1/8" WASHER
11_2" x 1 1_ 4" X
1_
8" POWDER
COATED ALUMINUM
CHANNEL
2"x4" POWDER COATED
TUBULAR ALUMINUM POST
POSITION AS PER SITE
PLAN DRAWINGS
EDGE OF ROAD
POWDER COATED
ALUMINUM POST CAP
A-503 E1
A-503 E7
3"
10" (TYP.)
2'-7"
1'-2"
2" CLR.
6" 1'-0" 2'-4" FOR SIGNS WITH 3'-0" WIDE PANELS
2'-8" FOR SIGNS WITH 3'-4" WIDE PANELS 1'-0" 6"
6'-0" FOR SIGNS WITH 3'-0" WIDE PANELS
6'-4" FOR SIGNS WITH 3'-4" WIDE PANELS
3" CLR.
2" CLR.
1"
1'-0" 81_2"81_2"
2'-9"
3" CLR.
2" CLR.
2"
3"
10" (TYP.)
2'-7"
1'-2"
2" 1"
11_2
2'-7"
1'-0"
3'-4" FOR SIGNS WITH 3'-0" WIDE PANELS
3'-8" FOR SIGNS WITH 3'-4" WIDE PANELS
2"2"
1"
3"
2" 2"
1'-0" 2'-0" FOR SIGNS WITH 3'-0" WIDE PANELS
2'-4" FOR SIGNS WITH 3'-4" WIDE PANELS
1'-0"
1'-0"
1'-0"43_4"
23_4"
35_8" 2" 4"
2" CLR.
2"
43_4"
2" 4"
2" CLR.
2"
45_8"23_4"
1'-0"
1'-0"
2" CLR.
2"
35_8" 2"
43_4"
43_4"
35_8" 2" 4"
2" CLR.
2"
43_4"
1'-0"
2" CLR.
2" CLR.
2" CLR.
1'-0"
1'-0"
1'-0"
1'-0"
FINISH GRADE
#4 TIE (TYP.)
#5 DOWEL (TYP.)
ROUGHEN CONCRETE
UNDISTURBED SOIL
#5 DOWEL (TYP.)
#4 TIE (TYP.)
2" x 4" TUBULAR POWDER
COATED ALUMINUM SIGN
POST, SIGN POST TO BEAR
ON TOP OF CONCRETE (TYPE)
#5 @ 12" O.C.
MAX T&B (TYP.)
CONCRETE COLLAR SLOPE
2% MIN.
#5 @ 12" O.C.
MAX T&B (TYP.)
#5 DOWEL (TYP.)
ROUGHEN
CONCRETE
COMPACTED
SUBGRADE
FINISH GRADE
4" x 4" TUBULAR POWDER
COATED ALUMINUM POST
CONCRETE FOOTING
- SQUARE PROVIDE
1/4" PER WASH ON
TOP
HSS 2 1_2"x1 1_ 2"x 1_
4" TUBE (TYP.)
(2) -A307 5_8"∅
BOLTS WITH NUTS
AND WASHERS
(TYP.)
HSS 2 1_2"x1 1_ 2"x 1_
4" TUBE
CENTERED IN PIER (TYP.)
2" x 4" TUBULAR POWDER
COATED ALUMINUM SIGN
POST, SIGN POST TO BEAR
ON TOP OF CONCRETE
(TYPE)
#4 TIE (TYP.)
HSS 2 1_2"x1 1_ 2"x 1_
4" TUBE
CENTERED IN PIER (TYP.)
3_
8" GAP BETWEEN METAL
POST AND PCC MOW
COLLAR
#4 TIE (TYP.)
1'-4" X 1'-4" PRECAST CONCRETE
MOW COLLAR (SEE F7/A-510)
#4 TIE (TYP.)
3_
8" GAP BETWEEN METAL
POST AND PCC MOW
COLLAR
4" x 4" TUBULAR POWDER
COATED ALUMINUM POST
UNDISTURBED SOIL
UNDISTURBED
NATIVE SOIL
7/19/24
00404366CO
LO
RA
DO L ICENSED
A RCH I T EC
T
SE
AN
M.
F ITZPATRICK
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov
VA FORM 08 - 6231
A
BID PACKAGE
NA
National Cemetery Administration Design and
Construction Service U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
856CM3012
LEBANON, KY
504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433
VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering
07/19/2024 Sheet of 84
C :\U se rs \d an ia .h ab bo ub \V C I\V A N C A Le ba no n N C F C A Im pr ov em en ts D oc um en ts \a W or kF ile s\ 4_ Bi d_ D oc s\ 1_ Pl an s\ C
AD
\A dm in b ui ld in g.
rv t
7/ /2 :5 6:
A M
A-503
Signage Details 1
C1 N.T.S
Two Post Foundation For 3'-0"& 3'-4" Wide Panel Signs Section N.T.S
Two Post Foundation Side Section
N.T.S
Typical 1'-0"x1'-0" Precast Concrete Mow Collar Plan View& Elevation
N.T.S
Typical 1'-0"x1'-0" Precast Concrete Mow Collar Plan View& Elevation
N.T.S
One Post Sign Elevation
N.T.S
Sign Post Distance From Road
N.T.S
Typical 1'-0"x1'-0" Precast Concrete Mow Collar Plan View
C5
E1
F1
F5
C7
D9
Do Not Enter
NOTE:
STOP SIGN TO MEET NCA STANDARD
REQUIREMENTS.
NOTE:
1. SIGN TYPE: NC-01.03A-M2 WITH "DO NOT ENTER" TEXT IN PLACE OF
"AUTHORIZED VEHICLES ONLY".
2. SEE NATIONAL CEMETERY SIGN MANUAL, PAGE 12-2-4 , FOR NCA
SPECIFIED PANEL COLORS.
3. PROVIDE ONE SIGN PANEL AND ONE BLANK PANEL ON BACK SIDE.
METAL POST
METAL POST
SIGN PANEL
POWDER COATED
ALUMINUM
CHANNEL
SUBGRADE
POWDER
COATED
ALUMINUM POST
CAP
METAL POST
METAL POST
SIGN PANEL
POWDER COATED
ALUMINUM
CHANNEL
SUBGRADE
POWDER
COATED
ALUMINUM POST
CAP
METAL POST
SIGN PANEL
METAL POST
POWDER COATED
ALUMINUM CHANNEL
SUBGRADE
POWDER COATED
ALUMINUM POST CAP
METAL POST
SIGN PANEL
METAL POST
POWDER COATED
ALUMINUM CHANNEL
SUBGRADE
POWDER COATED
ALUMINUM POST CAP
METAL POST
POWDER COATED
ALUMINUM
CHANNEL
SUBGRADE
POWDER COATED
ALUMINUM POST
CAP
SUBGRADE
METAL POST
SIGN PANEL
METAL POST
POWDER COATED
ALUMINUM CHANNEL
POWDER COATED
ALUMINUM POST CAP
2"
4" 3'-0"
1' -6
2"
3' -6
3'-0"
1"
1"
2"
4"
3'-0"
2' -0
2"
3' -6
3'-0"
1"
1"
2"
4"
1'-6"
1' -6
2"
3' -6
1'-6" 1"
2"
4"
3'-0"
1' -0
2"
3' -6
3'-0" 1"
6' -0
4' -0
3'-0"
3'-0"
2" 1"
2" 1"
4"
2"
4"
1'-6"
1' -6
2"
3' -6
1'-6" 1"
1' -6
1' -0
EQ
EQ
1'-6"
1'-0"EQ
EQ
EQ (B
1' -0
EQ (B
13 _ 4 13 _ 4 13 _ 4
1' -6
1'-6"
EQ(A) EQ(A)
EQ
(C)
EQ
(C)
C1 A-503C1
A-503
C3 A-503
C3 A-503
C1 A-503
C1 A-503
PLAN VIEW
ELEVATION
TEXT AS SHOWN ON DETAILS
& SIGNAGE SCHEDULE
2 SIGN PANELS BACK TO BACK
PLAN VIEW
ELEVATION
TEXT AS SHOWN ON DETAILS
& SIGNAGE SCHEDULE
2 SIGN PANELS BACK TO BACK
PLAN VIEW
ELEVATION
PLAN VIEW
ELEVATION
TEXT AS SHOWN ON
DETAILS & SIGNAGE
SCHEDULE
PLAN VIEW
TEXT AND IMAGE AS SHOWN ON
DETAILS & SIGNAGE SCHEDULE
ELEVATION
ELEVATION
PLAN VIEW
TEXT AS
SHOWN ON
DETAILS &
SIGNAGE
SCHEDULE
DO NOT
ENTER
TEXT AS
SHOWN ON
DETAILS &
SIGNAGE
SCHEDULE
MEN WOMEN
9"
9" 9"
9"
7/19/24
00404366CO
LO
RA
DO L ICENSED
A RCH I T EC
T
SE
AN
M.
F ITZPATRICK
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov
VA FORM 08 - 6231
A
BID PACKAGE
NA
National Cemetery Administration Design and
Construction Service U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
856CM3012
LEBANON, KY
504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433
VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering
07/19/2024 Sheet of 84
C :\U se rs \d an ia .h ab bo ub \V C I\V A N C A Le ba no n N C F C A Im pr ov em en ts D oc um en ts \a W or kF ile s\ 4_ Bi d_ D oc s\ 1_ Pl an s\ C
AD
\A dm in b ui ld in g.
rv t
7/ /2 :5 6:
A M
A-504
Signage Details 2
C1 N.T.S
Two Post, 1'-6"x3'-0" Panel Sign Elevation and Plan C3 N.T.S
Two Post, 2'-0"x3'-0" Panel Sign Elevation and Plan C5 N.T.S
Two Post, 4'-0"x3'-0" Panel Sign Elevation and Plan C8 N.T.S
Two Post, 1'-0"x3'-0" Panel Sign Elevation and Plan
E1 N.T.S
Two Post, 1'-6"x1'-6" Stop Sign Panel Elevation and Plan E3 N.T.S
Two Post, 1'-6"x1'-6" Panel Sign Elevation and Plan
NOTE: SEE CIVIL FOR SIGN LOCATIONS
3" = 1'-0" F1 Toilet Signs
Revisions: Date:
F3 N.T.S
Do Not Enter Sign Detail
ETR: EXISTING TO REMAIN
SIGN PANEL, SEE
SIGNAGE SCHEDULE
THIS SHEET
SIGN PANEL, SEE
SIGNAGE SCHEDULE
THIS SHEET
SIGN PANEL, SEE
SIGNAGE SCHEDULE
THIS SHEET
SIGN PANEL, SEE
SIGNAGE SCHEDULE
THIS SHEET
SIGN PANEL, SEE
SIGNAGE SCHEDULE
THIS SHEET
SIGN PANEL, SEE
SIGNAGE SCHEDULE
THIS SHEET
2AMENDMENT 002 11/01/2024
THROAT OPENING = PARTITION
WIDTH + 1/8" MIN
1/2" 1/2"
ADD RETURN ON
FRAME WHERE
DRYWALL FINISH
IS REQUIRED
1 15/16"VARIESVARIES
GAUGE AS
SPECIFIED
STANDARD DOOR FRAME
5/ 8"
2"
DOOR TYPE:
F-WD
F-HM
F-HMG
F
(FLUSH)
SCHEDSCHED
SC
H
ED
SC
H
ED
DOOR TYPES
FRAME TYPE:
1-HM
1-WD
1-AL
SINGLE
FRAME TYPES
SC
H
ED
SC
H
ED
2"2"
2"2" SCHEDSCHED 2"2"
FG
(FULL GLASS)
SCHEDSCHED
SC
H
ED
SC
H
ED
SG-1
SG-1
FG-HM
5"5"
5" 5"
HG
(HALF GLASS)
SCHEDSCHED
SC
H
ED
SC
H
ED
HG-WD
5"5"
5" 5"
2"2"
2 1/2"NOM2 1/2"NOM
2"2" 2"2"
5/ 8" 5/ 8"
GALV STL LINTELS, SIZE AND
CONFIGURATION PER STRUC
HM FRAME
THIS HEADER DETAIL FOR
MASONRY OPENINGS OVER
5'-4" WIDE
VARIESVARIES
CMU - SEE PLANS FOR SIZE
SCHEDULED
REVERSE FRAME
AS REQD TO
ACCOMMODATE
DOOR SWING
DOOR
2"2"
2 1/2"NOM2 1/2"NOM
2"2" 2"2"
5/ 8" 5/ 8"
HM FRAME
SEE FLOOR PLANS FOR SCHED
CMU PTN SIZES
VARIESVARIES
MASONRY ANCHOR
GROUT JAMB FULL AS WORK
PROGRESSES
2x6
GWB BOTH SIDES
WALL TYPEWALL TYPE
SCHEDULEDSCHEDULED
WOOD TRIM
WD DOOR
WOOD TRIM
GWB BOTH SIDES
W
AL
L
TY
PE
W
AL
L
TY
PE
SC
H
ED
U
LE
D
SC
H
ED
U
LE
D
WD DOOR
DOOR PER
SCHEDULE
DIM PT
FOR FRAMING INFORMATION
AND HEADER ATTACHMENT.
SEE SPECS
D O O R H
EI
G H T
SEE FLOOR PLANS FOR
PARTITION TYPE
SEALANT, TYP
2"@ DOOR2"@ DOOR
2"2"
3/ 4" M
IN
3/ 4" M
IN
PROVIDE FRAME ANCHOR AT
OPENINGS OVER 6'-4" WIDE
HM DBL RABBET FRAME
REVERSE FRAME WHERE
REQD TO ACHIEVE DOOR
SWING
VARIESVARIES
1/2"NOM1/2"NOM
A NON-RATED OR 1 HOUR RATED
MIN (3) ANCHORS PER JAMB
WELDED TO DR FRAME - FASTEN
ANCHORS TO STUDS W/ MIN
(2) #10 SMS PER ANCHOR - FLR
ANCHOR WELDED TO FRAME
AND FASTENED TO SLAB W/ (2)
0.14" POWDER DRIVEN FASTENERS
JAMB STUDS FULL HT TO
STRUC ABOVE - FOR FRAMING
INFORMATION SEE B2/0AI505
SEE FLOOR PLANS FOR
PARTITION TYPE
SEALANT
VA
R
IE
S
VA
R
IE
S
4"4"
ADJACENT WALL
LOCATION, UNO
NOM DR SIZE 2"2"
2" D O O R
2" D O O R
5/8"5/8"
1/ 2" N O M
1/ 2" N O M
PER SCHEDULEPER SCHEDULE
WALL WIDTHWALL WIDTH
3" BOARD
INSULATION
MASONRY VENEER
ANCHOR W/ SEISMIC
CLIP& ROD WITHIN 8"
OF OPENINGS
SEALANT
EACH SIDE
HARDWARE CLOTH
16" OC
DOOR FRAME
ANCHOR
PRECAST
CONCRETE
HM FRAME
FACING BRICK
VENEER
PER SCHEDULEPER SCHEDULE
WALL WIDTHWALL WIDTH
CAVITY VENT
AT LINTEL
3" BOARD
INSULATION
MASONRY FLASHING
FACING BRICK
VENEER
STEEL LINTEL
3/8" X4" STEEL BAR WELD
FLUSH TO LINTEL GRIND
WELD SMOOTH AND FLUSH
PRECAST
CONCRETE
BOND BEAM LINTEL
PT BLOCKING
BACKER ROD AND SEALANT AT
SHIM SPACE, BOTH SIDES
HM FRAME
GWB BOTH SIDES
W
AL
L
TY
PE
W
AL
L
TY
PE
SC
H
ED
U
LE
D
SC
H
ED
U
LE
D
WD DOOR
2x6
GWB BOTH SIDES
WALL TYPEWALL TYPE
SCHEDULEDSCHEDULED
WD DOOR
DOOR FLASHING TAPE.
CLEAN FLOOR AREA AND
APPLY OVER ROUGH
OPENING FLOOR SURFACE
EXTENDING 6" UP EACH
JAMB& OVERLAP ONTO
THRU-WALL FLASHING.
ANCHOR DOOR SILL TO
FLOOR CONSTRUCTION
PER MANUFACTURE'S
INSTALLATION
INSTRUCTIONS.
SEAL DOOR TO FLOOR
CONSTRUCTION PER
MANUFACTURER'S
INSTALLATION
INSTRUCTIONS.
METAL SILL FLASHING.
HARDWOOD ABA COMPLIANT
THRESHOLD, MATCH EXISTING
WOOD FLOOR FINISH.
EXISTING WOOD FLOOR.
NEW CERAMIC TILE
CEMENT BACKER BOARD
DRY SET MORTAR
EXISTING SUBFLOOR, VIF
ENTRY SLAB
EXPANSION JOINT
STOP STRIP
ALUMINIUM ABA
COMPLIANT THRESHOLD
EXISTING BRICK
WALL
DOOR
BACKER ROD AND
SEALANT, MATCH
DOOR COLOR
DOOR
BRICK WALL
7/19/24
00404366CO
LO
RADO L ICENSED
A RC H I T ECT
SE
AN
M. F ITZPATRICK
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov
VA FORM 08 - 6231
A
BID PACKAGE
NA
National Cemetery Administration Design and
Construction Service U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
856CM3012
LEBANON, KY
504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433
VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering
07/19/2024 Sheet of 84
C :\U se rs
\d an ia .h ab bo ub \V
C I\V
A N
C A
Le ba no n
N C
F C
A Im pr ov em en ts
D oc um en ts \a
W or kF ile s\ 4_
Bi d_
D oc s\ 1_
Pl an s\ C
AD
\A dm in b ui ld in g.
rv t 7/
/2
:5
5:
A M
A-601
Door Schedule and Details
Door Schedule
Building Name Room Name
Door Frame Hard ware
CommentsMark Size
Material Finish Type Material Type Finish Head Jamb Sill Set No.Width Height Thickness
Administration Building
REAR SPACE 001 2' - 8" 6' - 8" 0' - 1 3/4" WD PAINT HG WD 1 PAINT E9/A-601 F9/A-601 S-1 HW-1
Administration Building
STAIR 001a 2' - 8" 6' - 8" 0' - 1 3/4" HM PAINT FG WD 1 PAINT E9/A-601 F9/A-601 S-1 HW-1
Administration Building
TR 002 2' - 10" 6' - 8" 0' - 1 3/8" WD PAINT F WD 1 PAINT E9/A-601 F9/A-601 - HW-5 ELECTRIFIED LOCK TO BE CONNECTED TO
PACS SYSTEM. ADD TO EXCEPTION MEMO
DOOR HEIGHT UNDER 8'.
Administration Building
101 3' - 0" 7' - 0" 0' - 1 3/4" EXT EXT EXT EXT EXT EXT - - - HW-2
Administration Building
WORKROOM 101A 3' - 0" 7' - 0" 0' - 1 3/8" EXT EXT EXT EXT EXT EXT - - - HW-6
Administration Building
102A 3' - 0" 7' - 0" 0' - 1 3/8" WD PAINT F WD 1 PAINT E4/A-601 F4/A-601 S-2 HW-7
Administration Building
103 3' - 0" 7' - 0" 0' - 1 3/4" EXT EXT EXT EXT EXT EXT - - - HW-1
Administration Building
WORKROOM 103A 3' - 0" 7' - 0" 0' - 1 3/8" EXT EXT EXT EXT EXT EXT - - - HW-6
Administration Building
104 3' - 0" 7' - 0" 0' - 1 3/8" EXT EXT EXT EXT EXT EXT - - - HW-2A
Administration Building
BEDROOM 1 202 2' - 10" 7' - 0" 0' - 1 3/8" WD PAINT F WD 1 PAINT E4/A-601 F4/A-601 - HW-6
Administration Building
BEDROOM 2 203 2' - 10" 7' - 0" 0' - 1 3/8" WD PAINT F WD 1 PAINT E4/A-601 F4/A-601 - HW-6
Administration Building
CLOSET 203A 2' - 6" 6' - 8" 0' - 1 3/4" WD PAINT F WD 1 PAINT E4/A-601 F4/A-601 - HW-8
Administration Building
BATHROOM 204 2' - 10" 7' - 0" 0' - 1 3/8" WD PAINT F WD 1 PAINT E4/A-601 F4/A-601 S-2 HW-7
Administration Building
BEDROOM 3 205 2' - 10" 7' - 0" 0' - 1 3/8" WD PAINT F WD 1 PAINT E4/A-601 F4/A-601 - HW-6
Administration Building
CLOSET 205A 1' - 10" 6' - 8" 0' - 1 3/8" WD PAINT F WD 1 PAINT E3/A-601 F3/A-601 - HW-8
3" = 1'-0" E1 Door Header@ CMU W/GYP BD Furring
3" = 1'-0" F1 Door Jamb@ CMU W/GYP BD Furring
3" = 1'-0" E3 Wooden Door Header@ Dry Wall
3" = 1'-0" F3 Wooden Door Jamb@ Dry Wall
3" = 1'-0" E5 HM Frame Header@ Dry Wall
3" = 1'-0" F6 HM Frame Jamb@ Dry Wall
3" = 1'-0" F9 HM Frame Jamb@ Masonry Wall
3" = 1'-0" E9 HM Frame Header@ Masonry Wall
New Maintenance Building
011 3' - 0" 6' - 8" 0' - 1 3/4" HM HM E1/A-601 F1/A-601F 1
Old Maintenance Building
001 3' - 0" 7' - 0" 0' - 1 3/4" WD F WD 1
Old Maintenance Building
004 2' - 6" 6' - 8" 0' - 1 3/4" WD F WD 1
Old Maintenance Building
005 2' - 6" 6' - 8" 0' - 1 3/4" WD F WD 1
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
PAINT
3" = 1'-0" F4 Wooden Door Jamb No Trim@ Dry Wall
3" = 1'-0" E4 Wooden Door Header No Trim@ Dry Wall
3" = 1'-0" D1 Door Sill/ S-1
3" = 1'-0" D3 Door Sill/S-2
RESTROOM
3" = 1'-0" D5 Door Sill/S-3
S-3STORAGE
S-4
S-3
S-3
SERVICE BAY1
MEN'S
RESTROOM
WOMEN'S
RESTROOM
3" = 1'-0" D7 Door Sill/S-4
SMARTFLASH ONE RESIN
SMARTFLASH ONE REINFORCEMENT
SET IN WET RESIN
SMARTFLASH ONE RESIN SATURATE/COVER
REINFORCEMENT, ALLOW TO DRY
SMARTFLASH ONE RESIN SECOND COAT, APPLY
AFTER FIRST COAT IS DRY. OPTIONAL
BROADCAST GRANULES INTO WET RESIN
IF VERTICAL HEIGHT OF DOOR SILL IS LESS THAN
6" MIN., REINSTALL SILL PLACE WITH ADHESIVE
APPROPRIATE FOR SIL/PLATE SURFACES
E7/A-601
E7/A-601
E7/A-601 F7/A-601
F7/A-601
F7/A-601
3" = 1'-0" E7 Steel Door Header@Brick Wall
3" = 1'-0" F7 Steel Door Jamb@Brick Wall
New Maintenance Building
007 EXTGRAVE
LOCATOR
EXT EXT EXT EXT EXT EXT EXT EXT EXT EXT EXT
HW-4
HW-5
HW-2
HW-3
HW-3
FRONT PORCH
DIRECTOR
OFFICE
KITCHEN
Revisions: Date:
ELECTRIFIED LOCK TO BE CONNECTED
TO PACS SYSTEM.
Old Maintenance Building
11 B 3' - 4" 3' - 8" WD PAINT 6' - 8"
Old Maintenance Building
12 B 3' - 4" 3' - 8" WD PAINT 6' - 8"
Old Maintenance Building
13 B 3' - 4" 3' - 8" WD PAINT 6' - 8"
Old Maintenance Building
14 B 3' - 4" 3' - 8" WD PAINT 6' - 8"
Old Maintenance Building
15 C 2' - 6" 3' - 10" WD PAINT 6' - 10"
Old Maintenance Building
16 C 2' - 6" 3' - 10" WD PAINT 6' - 10"
Old Maintenance Building
17 C 2' - 6" 3' - 10" WD PAINT 6' - 10"
Old Maintenance Building
18 D 2' - 5" 5' - 5" WD PAINT 14' - 3 31/32"
E6/A-602
E6/A-602
E6/A-602
E6/A-602
E6/A-602
E6/A-602
E6/A-602
E6/A-602
E3/A-602
E3/A-602
E3/A-602
E3/A-602
E3/A-602
E3/A-602
E3/A-602
E3/A-602
F6/A-602
F6/A-602
F6/A-602
F6/A-602
F6/A-602
F6/A-602
F6/A-602
F6/A-602
SUBSILL BY WINDOW
MANUFACTURER
WINDOW & DOOR
FLASHING TAPE. APPLY
OVER ROUGH OPENING
SILL EXTENDING 6" UP
EACH JAMB & OVERLAP
ONTO FACE OF ICE /
WATER BARRIER .EIFS COATING.
ICE / WATER BARRIER . FOLD
IN @ OPENING SILL & EXTEND
18" MIN. OUTSIDE R.O..
LEVEL OPENING SILL PRIOR TO
UNIT INSTALLATION. PROVIDE
IMPERVIOUS SHIMS PER
WINDOW MANUFACTURER'S
RECOMMENDATIONS.
EIFS COATING
INTERIOR
INSULATION & AIR
SEAL PER
WINDOW
MANUFACTURER.
MASONRY ATTACHMENT
CLIP. USE WINDOW
MANUFACTURER'S
RECOMMENDED FASTENERS
SUITABLE TO BUCK TYPE.
ICE/WATER BARRIER. LAP
OVER WINDOW FLASHING
TAPE, EXTEND 18" MIN. ABOVE
R.O. FLASH & SEAL INTO FORM.
CS CLEAR SEALER
EX EXISTING TO REMAIN
GB GYPSUM BOARD
C/PT COAT & PAINT
PL PLASTER, RESTORE ORIGINAL
PARGE NEW CEMENTITIOUS COATING
PT PAINT
POLY CLEAR POLYURETHANE
RS RESILIENT SHEET FLOORING
SDT STATIC DISSIPATIVE TILE
RB RUBBER BASE
EXP EXPOSED TO STRUCTURE
WD WOOD
WD-A OAK T&G WOOD
WD1 EXISTING WOOD BASE REMOVED AND REINSTALLED,
PROVIDE NEW MILLED WOOD BASE TO MATCH EXISTING
WD2 NEW 1X8 WOOD BASE AND TOE MOLD
WD3 EXISTING WOOD BASE AND NEW TOE MOLD
ROOM FINISH ABBREVIATIONS
MASONRY TIES
FACE BRICK
SEALANT APPLIED TO TOP OF
TERMINATION BAR AFTER
INSTALLATION
FLUID-APPLIED WATER
BARRIER
PRECAST CONCRETE
BACKUP WALL
THRU WALL FLASHING W/
DRIP EDGE, WEEP TABS,
PREASSEMBLED,
TERMINATION BAR, AND
MORTAR COLLECTION
STRUCTURAL ANGLE
RIGID INSULATION
RIGID INSULATION
EXTERIOR WINDOW SILL
PRECAST CONCRETE
BACKUP WALL
THRU WALL FLASHING W/
DRIP EDGE, WEEP TABS,
PREASSEMBLED,
TERMINATION BAR, AND
MORTAR COLLECTION
INTERIOR WINDOW SILL
GL
2"2" 2"2"
TYPE A
F.V.F.V.
3' - 4"3' - 4"
F.
V.
F.
V.
2' 1/ 2"
2' 1/ 2"
F.
V.
F.
V.
1' 1/ 4"
1' 1/ 4"
BASEMENT STORM
1 LITE WOOD FRAME
RAD USED TOP
SG1
TYPE B
WOOD FRAME
SINGLE HUNG
SG1
F.V.F.V.
3' - 4"3' - 4"
F.
V.
F.
V.
3' 8"
3' 8"
SG1
TYPE C
WOOD FRAME
SINGLE HUNG
SG1
F.V.F.V.
2' - 6"2' - 6"
F.
V.
F.
V.
3'
3'
F.V.F.V.
2' - 5"2' - 5"
F.
V.
F.
V.
5' 5"
5' 5"
TYPE D
WOOD FRAME
FIXED
TREATED BLOCKING
OR COMPRESSIBLE
FILLER
SHIM& PLUMB UNIT AS
REQUIRED TO KEEP
JAMBS STRAIGHT
MASONRY ATTACHMENT
CLIP. USE WINDOW
MANUFACTURER'S
RECOMMENDED
FASTENERS SUITABLE
TO BUCK TYPE
INTERIOR INSULATION&
AIR SEAL PER WINDOW
MANUFACTURER.
ICE/WATER BARRIER
INTERIOR INSULATION& AIR SEAL
PER WINDOW MANUFACTURER.
MASONRY ATTACHMENT CLIP.
USE WINDOW MANUFACTURER'S
RECOMMENDED FASTENERS
SUITABLE TO BUCK TYPE.
1' - 0"1' - 0"
1' 0"
1' 0"
TYPE A
7/19/24
00404366CO
LO
RA
DO L ICENSED
A RCH I T EC
T
SE
AN
M.
F ITZPATRICK
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov
VA FORM 08 - 6231
A
BID PACKAGE
NA
National Cemetery Administration Design and
Construction Service U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
856CM3012
LEBANON, KY
504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433
VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering
07/19/2024 Sheet of 84
C :\U se rs \d an ia .h ab bo ub \V C I\V A N C A Le ba no n N C F C A Im pr ov em en ts D oc um en ts \a W or kF ile s\ 4_ Bi d_ D oc s\ 1_ Pl an s\ C
AD
\A dm in b ui ld in g.
rv t
7/ /2 :5 5:
A M
A-602
Window& Room Finish Schedule
Room Finish Schedule
Building Name Room Number Room Name Floor Finish Base Finish Wall Finish Ceiling Finish Comments
Administration Building 001 REAR SPACE EXP NO WORK PARGED C/PT REPAINT WALLS& CEILING AND RESEAL
FLOOR
Administration Building 002 TR SDT RB PT EXP Administration Building 003 SIDE SPACE EXP NO WORK PARGED C/PT REPAINT WALLS& CEILING AND RESEAL
FLOOR
Administration Building 004 CRAWL SPACE NO WORK NO WORK NO WORK NO WORK Administration Building 101 RECEPTION NO WORK WD1/PT GB/PL/PT GB/PT REPAINT WALLS AND CEILING Administration Building 102 WORKROOM NO WORK WD2/PT GB/PL/PT GB/PT REPAINT WALLS AND CEILING Administration Building 102A RESTROOM RS WD3/PT EX/PT EX/PT REPAINT WALLS AND CEILING Administration Building 103 DIRECTOR'S OFFICE NO WORK No work GB/PL/PT GB/PT REPAINT WALLS AND CEILING Administration Building 104 KITCHEN WD-A WD2/PT PL/PT GB/PT REPAINT WALLS AND CEILING Administration Building 201 CORRIDOR NO WORK PT PT PT REPAINT WALLS AND CEILING Administration Building 202 BEDROOM 1 NO WORK PT PT PT REPAINT WALLS AND CEILING Administration Building 202A CLOSET NO WORK PT PT PT REPAINT WALLS AND CEILING Administration Building 203 BEDROOM 2 NO WORK PT PT PT REPAINT WALLS AND CEILING Administration Building 203A CLOSET NO WORK PT PT PT REPAINT WALLS AND CEILING Administration Building 204 BATHROOM RS PT PT PT REPAINT WALLS AND CEILING Administration Building 205 BEDROOM 3 NO WORK PT PT PT REPAINT WALLS AND CEILING Administration Building 205A CLOSET NO WORK PT PT PT REPAINT WALLS AND CEILING Administration Building ST1 STAIR NO WORK EX/PT PL/PT GB/PT REPAINT WALLS AND CEILING Administration Building ST2 STAIR NO WORK PT PT PT REPAINT WALLS AND CEILING Administration Building ST3 STAIR NO WORK PT PT PT
Window Schedule Building Name Mark Type Mark
Size Material Finish
Detail Glazing Head Height CommentsWidth Height Head Jamb Sill Thickness Type
Administration Building
01 A 3' - 4" 2' - 1" WD PAINT E1/A-602 F3/A-602 F1/A-602 7' - 9 1/2"
Administration Building
02 A 3' - 4" 2' - 1" WD PAINT E1/A-602 F3/A-602 F1/A-602 7' - 9 1/2"
Administration Building
03 A 3' - 4" 2' - 1" WD PAINT E1/A-602 F3/A-602 F1/A-602 7' - 9 1/2"
Administration Building
04 A 3' - 4" 2' - 1" WD PAINT E1/A-602 F3/A-602 F1/A-602 7' - 9 1/2"
Administration Building
05 A 3' - 4" 2' - 1" WD PAINT E1/A-602 F3/A-602 F1/A-602 7' - 9 1/2"
Administration Building
06 A 3' - 4" 2' - 1" WD PAINT E1/A-602 F3/A-602 F1/A-602 7' - 9 1/2"
3" = 1'-0" E1 Window Head Detail
3" = 1'-0" F1 Window Sill Detail
1/4" = 1'-0" A5 Window Frame Types
New Maintenance New Maintenance New Maintenance New Maintenance New Maintenance New Maintenance New Maintenance New Maintenance
New Maintenance 009 New Maintenance 010 New Maintenance 011
SERVICE BAYS
BREAK ROOM
CORRIDOR
RESTROOM
LOCKER ROOM
CLOSET
GRAVE LOCATOR
MECH/ELEC ROOM
WOMEN'S RESTROOM
MEN'S RESTROOM
STORAGE
NO WORK
EXP
EXP
EXP
EXP
EXP
NO WORK
NO WORK
EXP
EXP
EXP
NO WORK
PT
PT
PT
PT
PT
NO WORK
NO WORK
PT
NO WORK
NO WORK
NO WORK
PT
PT
PT
PT
PT
NO WORK
NO WORK
GYP/PT
NO WORK
NO WORK
NO WORK
ACT
NO WORK
NO WORK
GYP/PT
NO WORK
NO WORK
ACT
ACT
GYP/PT
GYP/PT
Old Maintenance 001
SERVICE BAY 1
MEN'S RESTROOM
EXP
EXP
EXP
EXP
NO WORK
Old Maintenance Old Maintenance Old Maintenance Old Maintenance
SERVICE BAY 2
SERVICE BAY 3
WOMEN'S RESTROOM
EXP
NO WORK
NO WORK
NO WORK
NO WORK NO WORK
NO WORK
EXP
PT
PT
NO WORK
NO WORK
NO WORK
NO WORK
NO WORK
3" = 1'-0" F3 Window Jamb Detail
3" = 1'-0" F6 Wood Window@Brick Sill Detail
3" = 1'-0" E6 Wood Window@Brick Head Detail
3" = 1'-0" E3 Wood Window@Brick Jamb Detail
1/4" = 1'-0" B5 Louver Detail
011B A
Louver Schedule Building Name
New Maintenance
Mark Type Mark
New Maintenance
011A A
Width Height
Size
1'- 0"
1'- 0"
1'- 0"
1'- 0"
Material
AL
AL
Finish
PAINT
PAINT
Sill Height
6'- 8"
1'- 0"
RESEAL CONCRETE FLOOR
RESEAL CONCRETE FLOOR
CLEAN AND RESEAL GROUT
CLEAN AND RESEAL GROUT
CLEAN AND RESEAL GROUT
CLEAN AND RESEAL GROUT
CLEAN AND RESEAL GROUT
RESEAL CONCRETE FLOOR
RESEAL CONCRETE FLOOR
RESEAL CONCRETE FLOOR
RESEAL CONCRETE FLOOR
RESEAL CONCRETE FLOOR
7/19/24
00404366CO
LO
RADO L ICENSED
A RC H I T ECT
SE
AN
M. F ITZPATRICK
623 26TH AVENUE
QUAD CITIES, IL
61201
PH: 309.788.0673
FAX: 309.786.5967
www.imegcorp.com
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Manager/ COR Bobbie Griffin Department of Veteran Affairs, NCA
Phone: 470-998-1497 Email: Bobbie.Griffin@va.gov
VA FORM 08 - 6231
A
BID PACKAGE
NA
National Cemetery Administration
Design and Construction Service
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E: Vali Cooper International
STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT CEMETERY FACILITY
CONDITION ASSESSMENT (FCA)
DEFICIENCIES
856CM3012
LEBANON, KY
504.684.4408; Sean Fitzpatrick 56 Louis Prima Drive, Suite B, Covington LA 70433
VCI Project ManagementProject Management Construction ManagementConstruction Management EngineeringEngineering
07/19/2024 Sheet of 84
C :\U se rs
\d an ia .h ab bo ub \V
C I\V
A N
C A
Le ba no n
N C
F C
A Im pr ov em en ts
D oc um en ts \a
W or kF ile s\ 4_
Bi d_
D oc s\ 1_
Pl an s\ C
AD
\A dm in b ui ld in g.
rv t 7/
/2
:4
2:
A M
A-901
Architectural Renderings
Administration Building 3D View
N.T.S
New Maintenance Building 3D View
N.T.S
Committal Shelter 3D View
N.T.S
Old Maintenance Building 3D View
N.T.S
Rostrum 3D View
N.T.S
C2
F2 F6
C6
D8
55Revisions: Date:
| Sheets and Views |
| G-001 COVERSHEET |
| G-101 CONSTRUCTION ACCESS, STAGING & FENCING PLAN |
| V-101 TOPOGRAPHICAL SURVEY |
| V-401 ENLARGED - TOPOGRAPHICAL SURVEY |
| V-402 ENLARGED - TOPOGRAPHICAL SURVEY |
| V-403 ENLARGED - TOPOGRAPHICAL SURVEY |
| V-404 ENLARGED - TOPOGRAPHICAL SURVEY |
| V-405 ENLARGED - TOPOGRAPHICAL SURVEY |
| V-406 ENLARGED - TOPOGRAPHICAL SURVEY |
| V-407 ENLARGED - TOPOGRAPHICAL SURVEY |
| V-408 ENLARGED - TOPOGRAPHICAL SURVEY |
| V-409 ENLARGED - TOPOGRAPHICAL SURVEY |
| V-410 ENLARGED - TOPOGRAPHICAL SURVEY |
| V-411 ENLARGED - TOPOGRAPHICAL SURVEY |
| GC-101 EROSION & SEDIMENTATION CONTROL PLAN |
| CD101 DEMOLITION PLAN |
| CD401 ENLARGED - DEMOLITION PLAN |
| C-101 SITE PLAN |
| C-401 ENLAGRED SITE PLAN - STONE WALL REPAIR & ADA PARKING |
| C-402 ENLARGED SITE PLAN - MAINTENANCE YARD PAVING |
| C-403 ENLARGED SITE PLAN - CONDUIT ROUTING |
| C-404 ENLARGED GRADING PLAN & PROFILES - MAINTENANCE YARD PAVING |
| C-405 ENLARGED SITE PLAN, GRADING PLAN & PROFILE - SPOILS ROAD PAVING |
| C-501 DETAILS - SITE |
| C-502 DETAILS - FLOWER WATER STATION |
| C-503 DETAILS - FLOWER WATER STATION |
| HD101 HAZARDOUS MATERIALS & MOLD ABATEMENT |
| HD401 HAZARDOUS MATERIALS ABATEMENT - ADMINISTRATION BUILDING |
| HD402 HAZARDOUS MATERIALS ABATEMENT - OLD MAINTENANCE BUILDING |
File details come from the government source that posted it. Updated .