IFB Cost Estimate Worksheet.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Y1PZ--917CM3006 In Ground Cremains, Memorial Walk, Improvements and Repairs Saratoga National Cemetery.
Solicitation number
36C78624B0033
Issued by

About this file

This document is an IFB (Invitation for Bid) Cost Estimate Worksheet for Solicitation Number 36C78624B0033, Project Number 917CM3006, "In Ground Cremains, Memorial Walk, Improvements and Repairs at Saratoga National Cemetery". The worksheet provides a template for contractors to submit lump sum pricing for various divisions of work, including general requirements, concrete, masonry, finishes, and utilities. The project is being procured by the Department of Veterans Affairs National Cemetery Administration. The solicitation requires contractors to provide total lump sum pricing, including bonds, overhead, and profit. No other details about the required products, services, or timeline are provided in this specific document.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IFB Contractor Cost Estimate Worksheet
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.

If a Division is not being used put N/A in that field.

You can Add additional items you feel are appropriate.

Solicitation Number36C78624B0033
Project Nunber917CM3006
Project NameIn Ground Cremains, Memorial Walk, Improvements and Repairs at Saratoga National Cemetery
DivisionUnitCLIN 001CLIN 002CLIN 003CLIN 004Total
Division 0
Special Sections
Division 01
General Requirements
Division 02
Existing Conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood, Plastic, and Composites
Division 07
Thermal and Moisture Protection
Division 08
Openings (Doors, Windows, etc...)
Division 09
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 14
Fire Suppression
Division 22
Plumbing
Division 23
Heat, Ventilating, and Air Conditioning
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 31
Earthwork
Division 32
Exterior Improvements
Division 33
Utilities
Bonds

Overhead

Profit

GRAND TOTALS $ $ $ $ $