8 - Cost Estimate Worksheet.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C78624B0018
About this file
This document is a Cost Estimate Worksheet template for a federal contract opportunity. The template provides a structure for a contractor to submit a lump-sum cost breakdown across various construction divisions, including general conditions, mobilization, site investigation, and multiple building systems. The related federal contract opportunity is for the repair and upgrade of the existing Hunter Automated Irrigation System at the Memphis National Cemetery, covering approximately 44 acres. The Solicitation Number is 36C78624B0018. The contract is being procured by the Department of Veterans Affairs National Cemetery Administration. The worksheet template allows the contractor to provide unit costs and extended totals for each applicable division, as well as overhead, profit, insurance, and bonding costs to arrive at a grand total price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78624B0018_1.docx | DOCX document | |
| Memphis NC Original Irrigation Specs and Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contractor Cost Estimate Worksheet |
| Lump Sums are required for each Division that will be utilized in this project to total the Final Lump Sum number. |
If a Division is not being used put N/A in that field.
Additional lines/items can be added if needed or appropriate.
| Bidder shall use and edit to fit specified identified requirement. |
| Project Title: |
| Solicitation Number: |
| Division | Unit of Measure | # of Units | Unit Cost $ | Extended/Total Cost $ | Comments / Remarks |
| Division 0 - Special Sections | |||||
| General Conditions and Administration | JB | 1 | |||
| Division 01 - General Requirements | |||||
| Mobilization | JB | 1 |
| Division 02 - Existing Conditions | ||
| Site Investigation | JB | 1 |
| Division 03 - Concrete |
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastic, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings (Doors, Windows, etc...)
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12- Furnishings
Division 13 - Special Construction
Division 14 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heat, Ventilating, and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
| Mechanical, Electrical, Plumbing Subtotal | ||
| General Construction Subtotal | ||
| Total Base Construction Cost | ||
| Insurance (if applicable) | ||
| Bonding (if applicable) | ||
| Overhead | ________ % | $0.00 |
| Profit | ________ % | $0.00 |
| GRAND TOTALS | $ |
File details come from the government source that posted it. Updated .