About this file

This statement of work outlines requirements for a federal construction contract to provide restoration improvements to the administration building and demolition of a pole barn at the Danville National Cemetery in Danville, Illinois. The scope of work includes replacing the simulated slate roof on the administration building with the same product and color; demolishing the pole barn and its concrete foundation; replacing exterior electrical outlets; installing new sod and topsoil; and other minor repairs. The contractor must follow all standards for dignity, conduct, and safety when working at the national cemetery. The performance period is 135 calendar days with a 10-day submission window for required documentation after the notice to proceed.

View the file

Other files

File Type Posted
36C78622B0005 0002.docx DOCX document
36C78622B0005 0001.docx DOCX document
DOL Wage Determination _ Vermilion County.pdf PDF
G-1 _ Architectural Drawings Cover Sheet.pdf PDF
DOL Davis Bacon Wage Determination _ Vermilion County.pdf PDF
36C78622B0005_1.docx DOCX document
Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

G-1 _ Cover Sheet

A-1 _ Floor Plans
A-2 _ Elevations
A-10 _ Roof Wall Details
A-11 _ Details
A-12 _ Misc Details

File details come from the government source that posted it. Updated .