View the file

Other files

File Type Posted
36C78621R0050 0002.docx DOCX document
Amendment P00001 _ page 2.docx DOCX document
36C78621R0050 0001.docx DOCX document
SCA 2015-5755 Ft Scott 08112021.docx DOCX document
36C78621R0050_1.docx DOCX document
SCA 2015-5105 Leavenworth 08112021.docx DOCX document
Opp Description.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C78621R0050

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

DUNS:

DUNS+4:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. 2/2012)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

36C78621R0050 Eleanor O'Bard 303-914-5718 09-30-2021 10:00

MDT

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 X X 561730 $8 Million N/A X Leavenworth National Cemetery 150 Muncie Road Leavenworth KS 66048 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 http://www.tungsten-network.com/customer -campaigns/veterans-affairs/

1-877-752-0900 Leavenworth National Cemetery Complex Request for Proposal (RFP) to establish an IDIQ contract for grounds maintenance. The government intends to award on or about January 1, 2022, with work to begin on or about March 1, 2022.

This is a total SDVOSB set-aside.

Company

DUNS:_

COR POC- Michael.Bricker@va.gov POC Contract Specialist - Eleanor.OBard@va.gov $0.00 Barbara A. Eschels Contracting Officer Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS1
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS4
B.1 PRICE/COST SCHEDULE4
ITEM INFORMATION4
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK74
SECTION D - PACKAGING AND MARKING75
SECTION E - INSPECTION AND ACCEPTANCE76
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)76
SECTION F - DELIVERIES OR PERFORMANCE77
F.1 52.211-11 LIQUIDATED DAMAGES—SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEPT 2000)77
SECTION G - CONTRACT ADMINISTRATION DATA78
SECTION H - SPECIAL CONTRACT REQUIREMENTS79
PART II - CONTRACT CLAUSES80
SECTION I - CONTRACT CLAUSES80
I.1 52.204-1 APPROVAL OF CONTRACT (DEC 1989)82
I.2 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)82
I.3 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)82
I.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)83
I.5 52.216-18 ORDERING (AUG 2020)85
I.6 52.216-19 ORDER LIMITATIONS (OCT 1995)85
I.7 52.216-22 INDEFINITE QUANTITY (OCT 1995)86
I.8 52.217-6 OPTION FOR INCREASED QUANTITY (MAR 1989)86
I.9 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)86
I.10 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)87
I.11 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020)87
I.12 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)90
I.13 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)90
I.14 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)91
I.15 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)92
I.16 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)93
I.17 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008)93
I.18 52.232-12 ADVANCE PAYMENTS (MAY 2001)94
I.19 52.232-35 DESIGNATION OF OFFICE FOR GOVERNMENT RECEIPT OF ELECTRONIC FUNDS TRANSFER INFORMATION (JUL 2013)100
I.20 52.244-2 SUBCONTRACTS (JUN 2020)101
I.21 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)103
I.22 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)105
I.23 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)106
I.24 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008)107
I.25 SUPPLEMENTAL INSURANCE REQUIREMENTS107
I.26 MANDATORY WRITTEN DISCLOSURES108
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS109
SECTION J - LIST OF ATTACHMENTS109
PART IV - REPRESENTATIONS AND INSTRUCTIONS110
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS110
K.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) (JUL 2020) (DEVIATION)110
K.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)114
K.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)116
K.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (FEB 2021)118
K.5 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)120
K.6 52.222-25 AFFIRMATIVE ACTION COMPLIANCE (APR 1984)120
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS121
L.1 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008)121
L.2 52.215-5 FACSIMILE PROPOSALS (OCT 1997)122
L.3 52.216-1 TYPE OF CONTRACT (APR 1984)122
L.4 52.233-2 SERVICE OF PROTEST (SEP 2006)122
L.5 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)123
SECTION M - EVALUATION FACTORS FOR AWARD124

SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS

B.1 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
4,320.00
AC
__________________
__________________

Leavenworth National Cemetery:

Mow all turfgrass areas (108 Acres x 40 mowings) PRINCIPAL NAICS CODE: 561730 - Landscaping Services PRODUCT/SERVICE CODE: S208 - Housekeeping - Landscaping/Groundskeeping

2.00
AC
__________________
__________________

Mow Native Grass areas (2 Acres)

13,360.00
FT
__________________
__________________

Fence Line: Remove Vegetation

1,478,000.00
EA
__________________
__________________

String trim grass around upright headstones (36,950 headstones x 40 trimmings)

87,040.00
EA
__________________
__________________

Edge around flat grave markers at Leavenworth NC (2,176 markers x 40 edgings)

4,320.00
AC
__________________
__________________

String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (108 acres x 40 trimmings)

864.00
AC
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (108 acres x 8 edgings)

25,000.00
SF
__________________
__________________

Supply and install sod

324.00
AC
__________________
__________________

Fertilizer: Provide and Apply (108 acres x 3 applications)

216.00
AC
__________________
__________________

Pre-emergence Herbicide: Provide and Apply (108 acres x 2 applications)

216.00
AC
__________________
__________________

Post -Emergence Broadleaf Herbicide: Provide and Apply (108 acres x 2 applications)

108.00
AC
__________________
__________________

Post-emergence yellow nutsedge herbicide: Provide and Apply

108.00
AC
__________________
__________________

Grub Insecticide: Provide and Apply (108 acres x 1 application)

108.00
AC
__________________
__________________

Core Aeration of Turfgrass

108.00
AC
__________________
__________________

Overseed Turfgrass

1.00
JB
__________________
__________________

Jet cleaning of Storm water Drainage

10.00
EA
__________________
__________________

Tree Removals or Pruning/Repair

648.00
AC
__________________
__________________

Fall Leaf Removal (108 acres x 6 removals)

100.00
EA
__________________
__________________

Sunken Grave Repair

58,000.00
EA
__________________
__________________

Headstone Cleaning

4,200.00
EA
__________________
__________________

Headstone Raise & Realign

1,100.00
EA
__________________
__________________

Headstone Setting

20,000.00
EA
__________________
__________________

Headstone Fine Tune Alignment

14.00
EA
__________________
__________________

Floral Pick-up

156.00
EA
__________________
__________________

Trash and Debris Removal

80.00
EA
__________________
__________________

Cleaning of storm water Basins

1.00
JB
__________________
__________________

Cleaning of French drains

4.00
EA
__________________
__________________

Cleaning Of Concrete Drainage area

4.00
EA
__________________
__________________

Columbaria Cleaning

2.00
EA
__________________
__________________

Power-wash Buildings

2.00
EA
__________________
__________________

Monument and Sign Cleaning at Union Confederate Monument (Kansas City, MO)

1,480.00
EA
__________________
__________________

Ft. Leavenworth:

Mow all turfgrass areas (37 Acres x 40 mowings)

791,600.00
EA
__________________
__________________

String trim grass around upright headstones (19790 headstones x 40 trimmings)

1,480.00
EA
__________________
__________________

String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (37 acres x 40 trimmings) Ft. Leavenworth

296.00
EA
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (37 acres x 8 edgings)

5,000.00
EA
__________________
__________________

Supply and install sod

111.00
EA
__________________
__________________

Fertilizer: Provide and Apply (37 acres x 3 applications)

74.00
EA
__________________
__________________

Pre-emergence Herbicide: Provide and Apply (37 acres x 2 applications)

74.00
EA
__________________
__________________

Post -Emergence Broadleaf Herbicide: Provide and Apply (37 acres x 2 applications)

37.00
EA
__________________
__________________

Post-emergence yellow nutsedge herbicide: Provide and Apply (37 acres x 1 application)

37.00
EA
__________________
__________________

Grub Insecticide: Provide and Apply (37 acres x 1 application)

37.00
EA
__________________
__________________

Core Aeration of Turfgrass

37.00
EA
__________________
__________________

Overseed Turfgrass

10.00
EA
__________________
__________________

Tree Removals or Pruning/Repair

222.00
EA
__________________
__________________

Fall Leaf Removal (37 acres x 6 removals)

100.00
EA
__________________
__________________

Sunken Grave Repair

58,000.00
EA
__________________
__________________

Headstone Cleaning

4,200.00
EA
__________________
__________________

Headstone Raise & Realign

75.00
EA
__________________
__________________

Headstone Setting

20,000.00
EA
__________________
__________________

Headstone Fine Tune Alignment

14.00
EA
__________________
__________________

Floral Pick-up

156.00
EA
__________________
__________________

Trash and Debris Removal

4,000.00
EA
__________________
__________________

Fort Scott: Supply and install turfgrass sod

54.00
EA
__________________
__________________

Fertilize Turfgrass (18 acres x 3 applications)

36.00
EA
__________________
__________________

Pre-Emergence Herbicide application (18 acres x 2 applications)

36.00
EA
__________________
__________________

Post-Emergence Herbicide Application (18 acres x 2 applications)

18.00
EA
__________________
__________________

Post-Emergence Herbicide for Yellow Nutsedge Control

18.00
EA
__________________
__________________

Grub Insecticide Application

720.00
EA
__________________
__________________

Mowing turfgrass (18 acres x 40 mowings)

236,000.00
EA
__________________
__________________

Trimming Turfgrass (5,900 headstones x 40 trimmings)

12,200.00
EA
__________________
__________________

Edge around flat grave markers (305 markers x 40 edgings)

40,000.00
EA
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (5,000 linear feet x 8 edgings)

96.00
EA
__________________
__________________

Mowing unimproved area (12 acres x 8 mowings)

18.00
EA
__________________
__________________

Core Aeration

18.00
EA
__________________
__________________

Overseeding

3.00
EA
__________________
__________________

Storm Damage Cleanup

2.00
EA
__________________
__________________

Tree Removal and Pruning

6,000.00
EA
__________________
__________________

Headstone Cleaning

2,000.00
EA
__________________
__________________

Headstone Raise/Realign

2,000.00
EA
__________________
__________________

Headstone Fine-Tune-Alignment

15.00
EA
__________________
__________________

Headstone Setting Ft. Scott

40.00
EA
__________________
__________________

Sunken Grave Repair

12.00
EA
__________________
__________________

Mound City Soldier Lot : Mow turf grass (0.3 acres x 40 mowings)

4,720.00
EA
__________________
__________________

Trimming Turfgrass (118 headstone/markers x 40 trimmings)

6.00
EA
__________________
__________________

Flag Raise and Lower

118.00
EA
__________________
__________________

Headstone Cleaning

4.00
EA
__________________
__________________

Headstone Raise/Realign

118.00
EA
__________________
__________________

Headstone Fine-Tune-Alignment

4.00
EA
__________________
__________________

Sunken Grave Repair

4,320.00
AC
__________________
__________________

Leavenworth National Cemetery:

2.00
AC
__________________
__________________

Mow Native Grass areas (2 Acres)

13,360.00
FT
__________________
__________________

Fence Line: Remove Vegetation

1,478,000.00
EA
__________________
__________________

String trim grass around upright headstones (36,950 headstones x 40 trimmings)

87,040.00
EA
__________________
__________________

Edge around flat grave markers at Leavenworth NC (2,176 markers x 40 edgings)

4,320.00
AC
__________________
__________________

String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (108 acres x 40 trimmings)

864.00
AC
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (108 acres x 8 edgings)

25,000.00
SF
__________________
__________________

Supply and install sod

324.00
AC
__________________
__________________

Fertilizer: Provide and Apply (108 acres x 3 applications)

216.00
AC
__________________
__________________

Pre-emergence Herbicide: Provide and Apply (108 acres x 2 applications)

216.00
AC
__________________
__________________

Post -Emergence Broadleaf Herbicide: Provide and Apply (108 acres x 2 applications)

108.00
AC
__________________
__________________

Post-emergence yellow nutsedge herbicide: Provide and Apply

108.00
AC
__________________
__________________

Grub Insecticide: Provide and Apply (108 acres x 1 application)

108.00
AC
__________________
__________________

Core Aeration of Turfgrass

108.00
AC
__________________
__________________

Overseed Turfgrass

1.00
JB
__________________
__________________

Jet cleaning of Storm water Drainage

10.00
EA
__________________
__________________

Tree Removals or Pruning/Repair

648.00
AC
__________________
__________________

Fall Leaf Removal (108 acres x 6 removals)

100.00
EA
__________________
__________________

Sunken Grave Repair

58,000.00
EA
__________________
__________________

Headstone Cleaning

4,200.00
EA
__________________
__________________

Headstone Raise & Realign

1,100.00
EA
__________________
__________________

Headstone Setting

20,000.00
EA
__________________
__________________

Headstone Fine Tune Alignment

14.00
EA
__________________
__________________

Floral Pick-up

156.00
EA
__________________
__________________

Trash and Debris Removal

80.00
EA
__________________
__________________

Cleaning of storm water Basins

1.00
JB
__________________
__________________

Cleaning of French drains

4.00
EA
__________________
__________________

Cleaning Of Concrete Drainage area

4.00
EA
__________________
__________________

Columbaria Cleaning

2.00
EA
__________________
__________________

Power-wash Buildings

2.00
EA
__________________
__________________

Monument and Sign Cleaning at Union Confederate Monument (Kansas City, MO)

1,480.00
EA
__________________
__________________

Ft. Leavenworth:

791,600.00
EA
__________________
__________________

String trim grass around upright headstones (19790 headstones x 40 trimmings)

1,480.00
EA
__________________
__________________

String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (37 acres x 40 trimmings)

296.00
EA
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (37 acres x 8 edgings)

5,000.00
EA
__________________
__________________

Supply and install sod

111.00
EA
__________________
__________________

Fertilizer: Provide and Apply (37 acres x 3 applications)

74.00
EA
__________________
__________________

Pre-emergence Herbicide: Provide and Apply (37 acres x 2 applications)

74.00
EA
__________________
__________________

Post -Emergence Broadleaf Herbicide: Provide and Apply (37 acres x 2 applications)

37.00
EA
__________________
__________________

Post-emergence yellow nutsedge herbicide: Provide and Apply (37 acres x 1 application)

37.00
EA
__________________
__________________

Grub Insecticide: Provide and Apply (37 acres x 1 application)

37.00
EA
__________________
__________________

Core Aeration of Turfgrass

37.00
EA
__________________
__________________

Overseed Turfgrass

10.00
EA
__________________
__________________

Tree Removals or Pruning/Repair

222.00
EA
__________________
__________________

Fall Leaf Removal (37 acres x 6 removals)

100.00
EA
__________________
__________________

Sunken Grave Repair

58,000.00
EA
__________________
__________________

Headstone Cleaning

4,200.00
EA
__________________
__________________

Headstone Raise & Realign

75.00
EA
__________________
__________________

Headstone Setting

20,000.00
EA
__________________
__________________

Headstone Fine Tune Alignment

14.00
EA
__________________
__________________

Floral Pick-up

156.00
EA
__________________
__________________

Trash and Debris Removal

4,000.00
EA
__________________
__________________

Supply and install turfgrass sod

54.00
EA
__________________
__________________

Fertilize Turfgrass (18 acres x 3 applications)

36.00
EA
__________________
__________________

Pre-Emergence Herbicide application (18 acres x 2 applications)

36.00
EA
__________________
__________________

Post-Emergence Herbicide Application (18 acres x 2 applications)

18.00
EA
__________________
__________________

Post-Emergence Herbicide for Yellow Nutsedge Control

18.00
EA
__________________
__________________

Grub Insecticide Application

720.00
EA
__________________
__________________

Ft Scott:

Mowing turfgrass (18 acres x 40 mowings)

2,392,000.00
EA
__________________
__________________

Trimming Turfgrass (5,900 headstones x 40 trimmings)

12,200.00
EA
__________________
__________________

Edge around flat grave markers (305 markers x 40 edgings)

40,000.00
EA
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (5,000 linear feet x 8 edgings)

96.00
EA
__________________
__________________

Mowing unimproved area (12 acres x 8 mowings)

18.00
EA
__________________
__________________

Core Aeration

18.00
EA
__________________
__________________

Overseeding

3.00
EA
__________________
__________________

Storm Damage Cleanup

2.00
EA
__________________
__________________

Tree Removal and Pruning

6,000.00
EA
__________________
__________________

Headstone Cleaning

2,000.00
EA
__________________
__________________

Headstone Raise/Realign

2,000.00
EA
__________________
__________________

Headstone Fine-Tune-Alignment

15.00
EA
__________________
__________________

Headstone Setting

40.00
EA
__________________
__________________

Sunken Grave Repair

12.00
EA
__________________
__________________

Mound City Soldier Lot : Mow turf grass (0.3 acres x 40 mowings)

4,720.00
EA
__________________
__________________

Trimming Turfgrass (118 headstone/markers x 40 trimmings)

6.00
EA
__________________
__________________

Flag Raise and Lower

118.00
EA
__________________
__________________

Headstone Cleaning

4.00
EA
__________________
__________________

Headstone Raise/Realign

118.00
EA
__________________
__________________

Headstone Fine-Tune-Alignment

4.00
EA
__________________
__________________

Sunken Grave Repair

4,320.00
AC
__________________
__________________

Leavenworth National Cemetery:

2.00
AC
__________________
__________________

Mow Native Grass areas (2 Acres)

13,360.00
FT
__________________
__________________

Fence Line: Remove Vegetation

1,478,000.00
EA
__________________
__________________

String trim grass around upright headstones (36,950 headstones x 40 trimmings)

87,040.00
EA
__________________
__________________

Edge around flat grave markers at Leavenworth NC (2,176 markers x 40 edgings)

4,320.00
AC
__________________
__________________

String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (108 acres x 40 trimmings)

864.00
AC
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (108 acres x 8 edgings)

25,000.00
SF
__________________
__________________

Supply and install sod

324.00
AC
__________________
__________________

Fertilizer: Provide and Apply (108 acres x 3 applications)

216.00
AC
__________________
__________________

Pre-emergence Herbicide: Provide and Apply (108 acres x 2 applications)

216.00
AC
__________________
__________________

Post -Emergence Broadleaf Herbicide: Provide and Apply (108 acres x 2 applications)

108.00
AC
__________________
__________________

Post-emergence yellow nutsedge herbicide: Provide and Apply

108.00
AC
__________________
__________________

Grub Insecticide: Provide and Apply (108 acres x 1 application)

108.00
AC
__________________
__________________

Core Aeration of Turfgrass

108.00
AC
__________________
__________________

Overseed Turfgrass

1.00
JB
__________________
__________________

Jet cleaning of Storm water Drainage

10.00
EA
__________________
__________________

Tree Removals or Pruning/Repair

648.00
AC
__________________
__________________

Fall Leaf Removal (108 acres x 6 removals)

100.00
EA
__________________
__________________

Sunken Grave Repair

58,000.00
EA
__________________
__________________

Headstone Cleaning

4,200.00
EA
__________________
__________________

Headstone Raise & Realign

1,100.00
EA
__________________
__________________

Headstone Setting

20,000.00
EA
__________________
__________________

Headstone Fine Tune Alignment

14.00
EA
__________________
__________________

Floral Pick-up

156.00
EA
__________________
__________________

Trash and Debris Removal

80.00
EA
__________________
__________________

Cleaning of storm water Basins

1.00
JB
__________________
__________________

Cleaning of French drains

4.00
EA
__________________
__________________

Cleaning Of Concrete Drainage area

4.00
EA
__________________
__________________

Columbaria Cleaning

2.00
EA
__________________
__________________

Power-wash Buildings

2.00
EA
__________________
__________________

Monument and Sign Cleaning at Union Confederate Monument (Kansas City, MO)

1,480.00
EA
__________________
__________________

Ft. Leavenworth:

791,600.00
EA
__________________
__________________

String trim grass around upright headstones (19790 headstones x 40 trimmings)

1,480.00
EA
__________________
__________________

String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (37 acres x 40 trimmings)

296.00
EA
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (37 acres x 8 edgings)

5,000.00
EA
__________________
__________________

Supply and install sod

111.00
EA
__________________
__________________

Fertilizer: Provide and Apply (37 acres x 3 applications)

74.00
EA
__________________
__________________

Pre-emergence Herbicide: Provide and Apply (37 acres x 2 applications)

74.00
EA
__________________
__________________

Post -Emergence Broadleaf Herbicide: Provide and Apply (37 acres x 2 applications)

37.00
EA
__________________
__________________

Post-emergence yellow nutsedge herbicide: Provide and Apply (37 acres x 1 application)

37.00
EA
__________________
__________________

Grub Insecticide: Provide and Apply (37 acres x 1 application)

37.00
EA
__________________
__________________

Core Aeration of Turfgrass

37.00
EA
__________________
__________________

Overseed Turfgrass

10.00
EA
__________________
__________________

Tree Removals or Pruning/Repair

222.00
EA
__________________
__________________

Fall Leaf Removal (37 acres x 6 removals)

100.00
EA
__________________
__________________

Sunken Grave Repair

58,000.00
EA
__________________
__________________

Headstone Cleaning

4,200.00
EA
__________________
__________________

Headstone Raise & Realign

75.00
EA
__________________
__________________

Headstone Setting

20,000.00
EA
__________________
__________________

Headstone Fine Tune Alignment

14.00
EA
__________________
__________________

Floral Pick-up

156.00
EA
__________________
__________________

Trash and Debris Removal

4,000.00
EA
__________________
__________________

Supply and install turfgrass sod

54.00
EA
__________________
__________________

Fertilize Turfgrass (18 acres x 3 applications)

36.00
EA
__________________
__________________

Pre-Emergence Herbicide application (18 acres x 2 applications)

36.00
EA
__________________
__________________

Post-Emergence Herbicide Application (18 acres x 2 applications)

18.00
EA
__________________
__________________

Post-Emergence Herbicide for Yellow Nutsedge Control

18.00
EA
__________________
__________________

Grub Insecticide Application

720.00
EA
__________________
__________________

Ft Scott:

2,392,000.00
EA
__________________
__________________

Trimming Turfgrass (5,900 headstones x 40 trimmings)

12,200.00
EA
__________________
__________________

Edge around flat grave markers (305 markers x 40 edgings)

40,000.00
EA
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (5,000 linear feet x 8 edgings)

96.00
EA
__________________
__________________

Mowing unimproved area (12 acres x 8 mowings)

18.00
EA
__________________
__________________

Core Aeration

18.00
EA
__________________
__________________

Overseeding

3.00
EA
__________________
__________________

Storm Damage Cleanup

2.00
EA
__________________
__________________

Tree Removal and Pruning

6,000.00
EA
__________________
__________________

Headstone Cleaning

2,000.00
EA
__________________
__________________

Headstone Raise/Realign

2,000.00
EA
__________________
__________________

Headstone Fine-Tune-Alignment

15.00
EA
__________________
__________________

Headstone Setting

40.00
EA
__________________
__________________

Sunken Grave Repair

12.00
EA
__________________
__________________

Mound City Soldier Lot : Mow turf grass (0.3 acres x 40 mowings)

4,720.00
EA
__________________
__________________

Trimming Turfgrass (118 headstone/markers x 40 trimmings)

6.00
EA
__________________
__________________

Flag Raise and Lower

118.00
EA
__________________
__________________

Headstone Cleaning

4.00
EA
__________________
__________________

Headstone Raise/Realign

118.00
EA
__________________
__________________

Headstone Fine-Tune-Alignment

4.00
EA
__________________
__________________

Sunken Grave Repair

4,320.00
AC
__________________
__________________

Leavenworth National Cemetery:

2.00
AC
__________________
__________________

Mow Native Grass areas (2 Acres)

13,360.00
FT
__________________
__________________

Fence Line: Remove Vegetation

1,478,000.00
EA
__________________
__________________

String trim grass around upright headstones (36,950 headstones x 40 trimmings)

87,040.00
EA
__________________
__________________

Edge around flat grave markers at Leavenworth NC (2,176 markers x 40 edgings)

4,320.00
AC
__________________
__________________

String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (108 acres x 40 trimmings)

864.00
AC
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (108 acres x 8 edgings)

25,000.00
SF
__________________
__________________

Supply and install sod

324.00
AC
__________________
__________________

Fertilizer: Provide and Apply (108 acres x 3 applications)

216.00
AC
__________________
__________________

Pre-emergence Herbicide: Provide and Apply (108 acres x 2 applications)

216.00
AC
__________________
__________________

Post -Emergence Broadleaf Herbicide: Provide and Apply (108 acres x 2 applications)

108.00
AC
__________________
__________________

Post-emergence yellow nutsedge herbicide: Provide and Apply

108.00
AC
__________________
__________________

Grub Insecticide: Provide and Apply (108 acres x 1 application)

108.00
AC
__________________
__________________

Core Aeration of Turfgrass

108.00
AC
__________________
__________________

Overseed Turfgrass

1.00
JB
__________________
__________________

Jet cleaning of Storm water Drainage

10.00
EA
__________________
__________________

Tree Removals or Pruning/Repair

648.00
AC
__________________
__________________

Fall Leaf Removal (108 acres x 6 removals)

100.00
EA
__________________
__________________

Sunken Grave Repair

58,000.00
EA
__________________
__________________

Headstone Cleaning

4,200.00
EA
__________________
__________________

Headstone Raise & Realign

1,100.00
EA
__________________
__________________

Headstone Setting

20,000.00
EA
__________________
__________________

Headstone Fine Tune Alignment

14.00
EA
__________________
__________________

Floral Pick-up

156.00
EA
__________________
__________________

Trash and Debris Removal

80.00
EA
__________________
__________________

Cleaning of storm water Basins

1.00
JB
__________________
__________________

Cleaning of French drains

4.00
EA
__________________
__________________

Cleaning Of Concrete Drainage area

4.00
EA
__________________
__________________

Columbaria Cleaning

2.00
EA
__________________
__________________

Power-wash Buildings

2.00
EA
__________________
__________________

Monument and Sign Cleaning at Union Confederate Monument (Kansas City, MO)

1,480.00
EA
__________________
__________________

Ft. Leavenworth:

791,600.00
EA
__________________
__________________

String trim grass around upright headstones (19790 headstones x 40 trimmings)

1,480.00
EA
__________________
__________________

String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (37 acres x 40 trimmings)

296.00
EA
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (37 acres x 8 edgings)

5,000.00
EA
__________________
__________________

Supply and install sod

111.00
EA
__________________
__________________

Fertilizer: Provide and Apply (37 acres x 3 applications)

74.00
EA
__________________
__________________

Pre-emergence Herbicide: Provide and Apply (37 acres x 2 applications)

74.00
EA
__________________
__________________

Post -Emergence Broadleaf Herbicide: Provide and Apply (37 acres x 2 applications)

37.00
EA
__________________
__________________

Post-emergence yellow nutsedge herbicide: Provide and Apply (37 acres x 1 application)

37.00
EA
__________________
__________________

Grub Insecticide: Provide and Apply (37 acres x 1 application)

37.00
EA
__________________
__________________

Core Aeration of Turfgrass

37.00
EA
__________________
__________________

Overseed Turfgrass

10.00
EA
__________________
__________________

Tree Removals or Pruning/Repair

222.00
EA
__________________
__________________

Fall Leaf Removal (37 acres x 6 removals)

100.00
EA
__________________
__________________

Sunken Grave Repair

58,000.00
EA
__________________
__________________

Headstone Cleaning

4,200.00
EA
__________________
__________________

Headstone Raise & Realign

75.00
EA
__________________
__________________

Headstone Setting

20,000.00
EA
__________________
__________________

Headstone Fine Tune Alignment

14.00
EA
__________________
__________________

Floral Pick-up

156.00
EA
__________________
__________________

Trash and Debris Removal

4,000.00
EA
__________________
__________________

Supply and install turfgrass sod

54.00
EA
__________________
__________________

Fertilize Turfgrass (18 acres x 3 applications)

36.00
EA
__________________
__________________

Pre-Emergence Herbicide application (18 acres x 2 applications)

36.00
EA
__________________
__________________

Post-Emergence Herbicide Application (18 acres x 2 applications)

18.00
EA
__________________
__________________

Post-Emergence Herbicide for Yellow Nutsedge Control

18.00
EA
__________________
__________________

Grub Insecticide Application

720.00
EA
__________________
__________________

Ft Scott:

2,392,000.00
EA
__________________
__________________

Trimming Turfgrass (5,900 headstones x 40 trimmings)

12,200.00
EA
__________________
__________________

Edge around flat grave markers (305 markers x 40 edgings)

40,000.00
EA
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (5,000 linear feet x 8 edgings)

96.00
EA
__________________
__________________

Mowing unimproved area (12 acres x 8 mowings)

18.00
EA
__________________
__________________

Core Aeration

18.00
EA
__________________
__________________

Overseeding

3.00
EA
__________________
__________________

Storm Damage Cleanup

2.00
EA
__________________
__________________

Tree Removal and Pruning

6,000.00
EA
__________________
__________________

Headstone Cleaning

2,000.00
EA
__________________
__________________

Headstone Raise/Realign

2,000.00
EA
__________________
__________________

Headstone Fine-Tune-Alignment

15.00
EA
__________________
__________________

Headstone Setting

40.00
EA
__________________
__________________

Sunken Grave Repair

12.00
EA
__________________
__________________

Mound City Soldier Lot : Mow turf grass (0.3 acres x 40 mowings)

4,720.00
EA
__________________
__________________

Trimming Turfgrass (118 headstone/markers x 40 trimmings)

6.00
EA
__________________
__________________

Flag Raise and Lower

118.00
EA
__________________
__________________

Headstone Cleaning

4.00
EA
__________________
__________________

Headstone Raise/Realign

118.00
EA
__________________
__________________

Headstone Fine-Tune-Alignment

4.00
EA
__________________
__________________

Sunken Grave Repair

4,320.00
AC
__________________
__________________

Leavenworth National Cemetery:

2.00
AC
__________________
__________________

Mow Native Grass areas (2 Acres)

13,360.00
FT
__________________
__________________

Fence Line: Remove Vegetation

1,478,000.00
EA
__________________
__________________

String trim grass around upright headstones (36,950 headstones x 40 trimmings)

87,040.00
EA
__________________
__________________

Edge around flat grave markers at Leavenworth NC (2,176 markers x 40 edgings)

4,320.00
AC
__________________
__________________

String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (108 acres x 40 trimmings)

864.00
AC
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (108 acres x 8 edgings)

25,000.00
SF
__________________
__________________

Supply and install sod

324.00
AC
__________________
__________________

Fertilizer: Provide and Apply (108 acres x 3 applications)

216.00
AC
__________________
__________________

Pre-emergence Herbicide: Provide and Apply (108 acres x 2 applications)

216.00
AC
__________________
__________________

Post -Emergence Broadleaf Herbicide: Provide and Apply (108 acres x 2 applications)

108.00
AC
__________________
__________________

Post-emergence yellow nutsedge herbicide: Provide and Apply

108.00
AC
__________________
__________________

Grub Insecticide: Provide and Apply (108 acres x 1 application)

108.00
AC
__________________
__________________

Core Aeration of Turfgrass

108.00
AC
__________________
__________________

Overseed Turfgrass

1.00
JB
__________________
__________________

Jet cleaning of Storm water Drainage

10.00
EA
__________________
__________________

Tree Removals or Pruning/Repair

648.00
AC
__________________
__________________

Fall Leaf Removal (108 acres x 6 removals)

100.00
EA
__________________
__________________

Sunken Grave Repair

58,000.00
EA
__________________
__________________

Headstone Cleaning

4,200.00
EA
__________________
__________________

Headstone Raise & Realign

1,100.00
EA
__________________
__________________

Headstone Setting

20,000.00
EA
__________________
__________________

Headstone Fine Tune Alignment

14.00
EA
__________________
__________________

Floral Pick-up

156.00
EA
__________________
__________________

Trash and Debris Removal

80.00
EA
__________________
__________________

Cleaning of storm water Basins

1.00
JB
__________________
__________________

Cleaning of French drains

4.00
EA
__________________
__________________

Cleaning Of Concrete Drainage area

4.00
EA
__________________
__________________

Columbaria Cleaning

2.00
EA
__________________
__________________

Power-wash Buildings

2.00
EA
__________________
__________________

Monument and Sign Cleaning at Union Confederate Monument (Kansas City, MO)

1,480.00
EA
__________________
__________________

Ft. Leavenworth:

791,600.00
EA
__________________
__________________

String trim grass around upright headstones (19790 headstones x 40 trimmings)

1,480.00
EA
__________________
__________________

String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (37 acres x 40 trimmings)

296.00
EA
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (37 acres x 8 edgings)

5,000.00
EA
__________________
__________________

Supply and install sod

111.00
EA
__________________
__________________

Fertilizer: Provide and Apply (37 acres x 3 applications)

74.00
EA
__________________
__________________

Pre-emergence Herbicide: Provide and Apply (37 acres x 2 applications)

74.00
EA
__________________
__________________

Post -Emergence Broadleaf Herbicide: Provide and Apply (37 acres x 2 applications)

37.00
EA
__________________
__________________

Post-emergence yellow nutsedge herbicide: Provide and Apply (37 acres x 1 application)

37.00
EA
__________________
__________________

Grub Insecticide: Provide and Apply (37 acres x 1 application)

37.00
EA
__________________
__________________

Core Aeration of Turfgrass

37.00
EA
__________________
__________________

Overseed Turfgrass

10.00
EA
__________________
__________________

Tree Removals or Pruning/Repair

222.00
EA
__________________
__________________

Fall Leaf Removal (37 acres x 6 removals)

100.00
EA
__________________
__________________

Sunken Grave Repair

58,000.00
EA
__________________
__________________

Headstone Cleaning

4,200.00
EA
__________________
__________________

Headstone Raise & Realign

75.00
EA
__________________
__________________

Headstone Setting

20,000.00
EA
__________________
__________________

Headstone Fine Tune Alignment

14.00
EA
__________________
__________________

Floral Pick-up

156.00
EA
__________________
__________________

Trash and Debris Removal

4,000.00
EA
__________________
__________________

Supply and install turfgrass sod

54.00
EA
__________________
__________________

Fertilize Turfgrass (18 acres x 3 applications)

36.00
EA
__________________
__________________

Pre-Emergence Herbicide application (18 acres x 2 applications)

36.00
EA
__________________
__________________

Post-Emergence Herbicide Application (18 acres x 2 applications)

18.00
EA
__________________
__________________

Post-Emergence Herbicide for Yellow Nutsedge Control

18.00
EA
__________________
__________________

Grub Insecticide Application

720.00
EA
__________________
__________________

Ft Scott:

2,392,000.00
EA
__________________
__________________

Trimming Turfgrass (5,900 headstones x 40 trimmings)

12,200.00
EA
__________________
__________________

Edge around flat grave markers (305 markers x 40 edgings)

40,000.00
EA
__________________
__________________

Edge along sidewalks, curbs, and other flat hard surfaces (5,000 linear feet x 8 edgings)

96.00
EA
__________________
__________________

Mowing unimproved area (12 acres x 8 mowings)

18.00
EA
__________________
__________________

Core Aeration

18.00
EA
__________________
__________________

Overseeding

3.00
EA
__________________
__________________

Storm Damage Cleanup

2.00
EA
__________________
__________________

Tree Removal and Pruning

6,000.00
EA
__________________
__________________

Headstone Cleaning

2,000.00
EA
__________________
__________________

Headstone Raise/Realign

2,000.00
EA
__________________
__________________

Headstone Fine-Tune-Alignment

15.00
EA
__________________
__________________

Headstone Setting

40.00
EA
__________________
__________________

Sunken Grave Repair

This is the start of the file's text. The full file is on GovTribe.