36C78621R0050_ Leavenworth Complex 08062021.docx
DOCX document 3 MB Posted
- Solicitation number
- 36C78621R0050
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78621R0050 0002.docx | DOCX document | |
| Amendment P00001 _ page 2.docx | DOCX document | |
| 36C78621R0050 0001.docx | DOCX document | |
| SCA 2015-5755 Ft Scott 08112021.docx | DOCX document | |
| 36C78621R0050_1.docx | DOCX document | |
| SCA 2015-5105 Leavenworth 08112021.docx | DOCX document | |
| Opp Description.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C78621R0050
PAGE 1 OF
1. REQUISITION NO.
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NO.
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
a. NAME
b. TELEPHONE NO. (No Collect Calls)
8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY
CODE
10. THIS ACQUISITION IS
UNRESTRICTED OR
SET ASIDE:
% FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
15. DELIVER TO
CODE
16. ADMINISTERED BY
CODE
17a. CONTRACTOR/OFFEROR
CODE
FACILITY CODE
18a. PAYMENT WILL BE MADE BY
CODE
TELEPHONE NO.
DUNS:
DUNS+4:
PHONE:
FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19.
20.
21.
22.
23.
24.
ITEM NO.
SCHEDULE OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
ARE
ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________
29. AWARD OF CONTRACT: REF. ___________________________________ OFFER
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
DATED ________________________________. YOUR OFFER ON SOLICITATION
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED
SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
(REV. 2/2012)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
36C78621R0050 Eleanor O'Bard 303-914-5718 09-30-2021 10:00
MDT
36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 X X 561730 $8 Million N/A X Leavenworth National Cemetery 150 Muncie Road Leavenworth KS 66048 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 http://www.tungsten-network.com/customer -campaigns/veterans-affairs/
1-877-752-0900 Leavenworth National Cemetery Complex Request for Proposal (RFP) to establish an IDIQ contract for grounds maintenance. The government intends to award on or about January 1, 2022, with work to begin on or about March 1, 2022.
This is a total SDVOSB set-aside.
Company
DUNS:_
COR POC- Michael.Bricker@va.gov POC Contract Specialist - Eleanor.OBard@va.gov $0.00 Barbara A. Eschels Contracting Officer Table of Contents
| SECTION A | 1 |
| A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS | 1 |
| SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS | 4 |
| B.1 PRICE/COST SCHEDULE | 4 |
| ITEM INFORMATION | 4 |
| SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK | 74 |
| SECTION D - PACKAGING AND MARKING | 75 |
| SECTION E - INSPECTION AND ACCEPTANCE | 76 |
| E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 76 |
| SECTION F - DELIVERIES OR PERFORMANCE | 77 |
| F.1 52.211-11 LIQUIDATED DAMAGES—SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEPT 2000) | 77 |
| SECTION G - CONTRACT ADMINISTRATION DATA | 78 |
| SECTION H - SPECIAL CONTRACT REQUIREMENTS | 79 |
| PART II - CONTRACT CLAUSES | 80 |
| SECTION I - CONTRACT CLAUSES | 80 |
| I.1 52.204-1 APPROVAL OF CONTRACT (DEC 1989) | 82 |
| I.2 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 82 |
| I.3 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018) | 82 |
| I.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 83 |
| I.5 52.216-18 ORDERING (AUG 2020) | 85 |
| I.6 52.216-19 ORDER LIMITATIONS (OCT 1995) | 85 |
| I.7 52.216-22 INDEFINITE QUANTITY (OCT 1995) | 86 |
| I.8 52.217-6 OPTION FOR INCREASED QUANTITY (MAR 1989) | 86 |
| I.9 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999) | 86 |
| I.10 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) | 87 |
| I.11 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020) | 87 |
| I.12 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020) | 90 |
| I.13 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020) | 90 |
| I.14 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 91 |
| I.15 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014) | 92 |
| I.16 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013) | 93 |
| I.17 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008) | 93 |
| I.18 52.232-12 ADVANCE PAYMENTS (MAY 2001) | 94 |
| I.19 52.232-35 DESIGNATION OF OFFICE FOR GOVERNMENT RECEIPT OF ELECTRONIC FUNDS TRANSFER INFORMATION (JUL 2013) | 100 |
| I.20 52.244-2 SUBCONTRACTS (JUN 2020) | 101 |
| I.21 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION) | 103 |
| I.22 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 105 |
| I.23 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 106 |
| I.24 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 107 |
| I.25 SUPPLEMENTAL INSURANCE REQUIREMENTS | 107 |
| I.26 MANDATORY WRITTEN DISCLOSURES | 108 |
| PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS | 109 |
| SECTION J - LIST OF ATTACHMENTS | 109 |
| PART IV - REPRESENTATIONS AND INSTRUCTIONS | 110 |
| SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS | 110 |
| K.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) (JUL 2020) (DEVIATION) | 110 |
| K.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020) | 114 |
| K.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 116 |
| K.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (FEB 2021) | 118 |
| K.5 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999) | 120 |
| K.6 52.222-25 AFFIRMATIVE ACTION COMPLIANCE (APR 1984) | 120 |
| SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS | 121 |
| L.1 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008) | 121 |
| L.2 52.215-5 FACSIMILE PROPOSALS (OCT 1997) | 122 |
| L.3 52.216-1 TYPE OF CONTRACT (APR 1984) | 122 |
| L.4 52.233-2 SERVICE OF PROTEST (SEP 2006) | 122 |
| L.5 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 123 |
| SECTION M - EVALUATION FACTORS FOR AWARD | 124 |
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4,320.00 |
| AC |
| __________________ |
| __________________ |
Leavenworth National Cemetery:
Mow all turfgrass areas (108 Acres x 40 mowings) PRINCIPAL NAICS CODE: 561730 - Landscaping Services PRODUCT/SERVICE CODE: S208 - Housekeeping - Landscaping/Groundskeeping
| 2.00 |
| AC |
| __________________ |
| __________________ |
Mow Native Grass areas (2 Acres)
| 13,360.00 |
| FT |
| __________________ |
| __________________ |
Fence Line: Remove Vegetation
| 1,478,000.00 |
| EA |
| __________________ |
| __________________ |
String trim grass around upright headstones (36,950 headstones x 40 trimmings)
| 87,040.00 |
| EA |
| __________________ |
| __________________ |
Edge around flat grave markers at Leavenworth NC (2,176 markers x 40 edgings)
| 4,320.00 |
| AC |
| __________________ |
| __________________ |
String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (108 acres x 40 trimmings)
| 864.00 |
| AC |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (108 acres x 8 edgings)
| 25,000.00 |
| SF |
| __________________ |
| __________________ |
Supply and install sod
| 324.00 |
| AC |
| __________________ |
| __________________ |
Fertilizer: Provide and Apply (108 acres x 3 applications)
| 216.00 |
| AC |
| __________________ |
| __________________ |
Pre-emergence Herbicide: Provide and Apply (108 acres x 2 applications)
| 216.00 |
| AC |
| __________________ |
| __________________ |
Post -Emergence Broadleaf Herbicide: Provide and Apply (108 acres x 2 applications)
| 108.00 |
| AC |
| __________________ |
| __________________ |
Post-emergence yellow nutsedge herbicide: Provide and Apply
| 108.00 |
| AC |
| __________________ |
| __________________ |
Grub Insecticide: Provide and Apply (108 acres x 1 application)
| 108.00 |
| AC |
| __________________ |
| __________________ |
Core Aeration of Turfgrass
| 108.00 |
| AC |
| __________________ |
| __________________ |
Overseed Turfgrass
| 1.00 |
| JB |
| __________________ |
| __________________ |
Jet cleaning of Storm water Drainage
| 10.00 |
| EA |
| __________________ |
| __________________ |
Tree Removals or Pruning/Repair
| 648.00 |
| AC |
| __________________ |
| __________________ |
Fall Leaf Removal (108 acres x 6 removals)
| 100.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 58,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4,200.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise & Realign
| 1,100.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 20,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine Tune Alignment
| 14.00 |
| EA |
| __________________ |
| __________________ |
Floral Pick-up
| 156.00 |
| EA |
| __________________ |
| __________________ |
Trash and Debris Removal
| 80.00 |
| EA |
| __________________ |
| __________________ |
Cleaning of storm water Basins
| 1.00 |
| JB |
| __________________ |
| __________________ |
Cleaning of French drains
| 4.00 |
| EA |
| __________________ |
| __________________ |
Cleaning Of Concrete Drainage area
| 4.00 |
| EA |
| __________________ |
| __________________ |
Columbaria Cleaning
| 2.00 |
| EA |
| __________________ |
| __________________ |
Power-wash Buildings
| 2.00 |
| EA |
| __________________ |
| __________________ |
Monument and Sign Cleaning at Union Confederate Monument (Kansas City, MO)
| 1,480.00 |
| EA |
| __________________ |
| __________________ |
Ft. Leavenworth:
Mow all turfgrass areas (37 Acres x 40 mowings)
| 791,600.00 |
| EA |
| __________________ |
| __________________ |
String trim grass around upright headstones (19790 headstones x 40 trimmings)
| 1,480.00 |
| EA |
| __________________ |
| __________________ |
String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (37 acres x 40 trimmings) Ft. Leavenworth
| 296.00 |
| EA |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (37 acres x 8 edgings)
| 5,000.00 |
| EA |
| __________________ |
| __________________ |
Supply and install sod
| 111.00 |
| EA |
| __________________ |
| __________________ |
Fertilizer: Provide and Apply (37 acres x 3 applications)
| 74.00 |
| EA |
| __________________ |
| __________________ |
Pre-emergence Herbicide: Provide and Apply (37 acres x 2 applications)
| 74.00 |
| EA |
| __________________ |
| __________________ |
Post -Emergence Broadleaf Herbicide: Provide and Apply (37 acres x 2 applications)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Post-emergence yellow nutsedge herbicide: Provide and Apply (37 acres x 1 application)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Grub Insecticide: Provide and Apply (37 acres x 1 application)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Core Aeration of Turfgrass
| 37.00 |
| EA |
| __________________ |
| __________________ |
Overseed Turfgrass
| 10.00 |
| EA |
| __________________ |
| __________________ |
Tree Removals or Pruning/Repair
| 222.00 |
| EA |
| __________________ |
| __________________ |
Fall Leaf Removal (37 acres x 6 removals)
| 100.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 58,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4,200.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise & Realign
| 75.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 20,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine Tune Alignment
| 14.00 |
| EA |
| __________________ |
| __________________ |
Floral Pick-up
| 156.00 |
| EA |
| __________________ |
| __________________ |
Trash and Debris Removal
| 4,000.00 |
| EA |
| __________________ |
| __________________ |
Fort Scott: Supply and install turfgrass sod
| 54.00 |
| EA |
| __________________ |
| __________________ |
Fertilize Turfgrass (18 acres x 3 applications)
| 36.00 |
| EA |
| __________________ |
| __________________ |
Pre-Emergence Herbicide application (18 acres x 2 applications)
| 36.00 |
| EA |
| __________________ |
| __________________ |
Post-Emergence Herbicide Application (18 acres x 2 applications)
| 18.00 |
| EA |
| __________________ |
| __________________ |
Post-Emergence Herbicide for Yellow Nutsedge Control
| 18.00 |
| EA |
| __________________ |
| __________________ |
Grub Insecticide Application
| 720.00 |
| EA |
| __________________ |
| __________________ |
Mowing turfgrass (18 acres x 40 mowings)
| 236,000.00 |
| EA |
| __________________ |
| __________________ |
Trimming Turfgrass (5,900 headstones x 40 trimmings)
| 12,200.00 |
| EA |
| __________________ |
| __________________ |
Edge around flat grave markers (305 markers x 40 edgings)
| 40,000.00 |
| EA |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (5,000 linear feet x 8 edgings)
| 96.00 |
| EA |
| __________________ |
| __________________ |
Mowing unimproved area (12 acres x 8 mowings)
| 18.00 |
| EA |
| __________________ |
| __________________ |
Core Aeration
| 18.00 |
| EA |
| __________________ |
| __________________ |
Overseeding
| 3.00 |
| EA |
| __________________ |
| __________________ |
Storm Damage Cleanup
| 2.00 |
| EA |
| __________________ |
| __________________ |
Tree Removal and Pruning
| 6,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 2,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise/Realign
| 2,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine-Tune-Alignment
| 15.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting Ft. Scott
| 40.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 12.00 |
| EA |
| __________________ |
| __________________ |
Mound City Soldier Lot : Mow turf grass (0.3 acres x 40 mowings)
| 4,720.00 |
| EA |
| __________________ |
| __________________ |
Trimming Turfgrass (118 headstone/markers x 40 trimmings)
| 6.00 |
| EA |
| __________________ |
| __________________ |
Flag Raise and Lower
| 118.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise/Realign
| 118.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine-Tune-Alignment
| 4.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 4,320.00 |
| AC |
| __________________ |
| __________________ |
Leavenworth National Cemetery:
| 2.00 |
| AC |
| __________________ |
| __________________ |
Mow Native Grass areas (2 Acres)
| 13,360.00 |
| FT |
| __________________ |
| __________________ |
Fence Line: Remove Vegetation
| 1,478,000.00 |
| EA |
| __________________ |
| __________________ |
String trim grass around upright headstones (36,950 headstones x 40 trimmings)
| 87,040.00 |
| EA |
| __________________ |
| __________________ |
Edge around flat grave markers at Leavenworth NC (2,176 markers x 40 edgings)
| 4,320.00 |
| AC |
| __________________ |
| __________________ |
String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (108 acres x 40 trimmings)
| 864.00 |
| AC |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (108 acres x 8 edgings)
| 25,000.00 |
| SF |
| __________________ |
| __________________ |
Supply and install sod
| 324.00 |
| AC |
| __________________ |
| __________________ |
Fertilizer: Provide and Apply (108 acres x 3 applications)
| 216.00 |
| AC |
| __________________ |
| __________________ |
Pre-emergence Herbicide: Provide and Apply (108 acres x 2 applications)
| 216.00 |
| AC |
| __________________ |
| __________________ |
Post -Emergence Broadleaf Herbicide: Provide and Apply (108 acres x 2 applications)
| 108.00 |
| AC |
| __________________ |
| __________________ |
Post-emergence yellow nutsedge herbicide: Provide and Apply
| 108.00 |
| AC |
| __________________ |
| __________________ |
Grub Insecticide: Provide and Apply (108 acres x 1 application)
| 108.00 |
| AC |
| __________________ |
| __________________ |
Core Aeration of Turfgrass
| 108.00 |
| AC |
| __________________ |
| __________________ |
Overseed Turfgrass
| 1.00 |
| JB |
| __________________ |
| __________________ |
Jet cleaning of Storm water Drainage
| 10.00 |
| EA |
| __________________ |
| __________________ |
Tree Removals or Pruning/Repair
| 648.00 |
| AC |
| __________________ |
| __________________ |
Fall Leaf Removal (108 acres x 6 removals)
| 100.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 58,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4,200.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise & Realign
| 1,100.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 20,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine Tune Alignment
| 14.00 |
| EA |
| __________________ |
| __________________ |
Floral Pick-up
| 156.00 |
| EA |
| __________________ |
| __________________ |
Trash and Debris Removal
| 80.00 |
| EA |
| __________________ |
| __________________ |
Cleaning of storm water Basins
| 1.00 |
| JB |
| __________________ |
| __________________ |
Cleaning of French drains
| 4.00 |
| EA |
| __________________ |
| __________________ |
Cleaning Of Concrete Drainage area
| 4.00 |
| EA |
| __________________ |
| __________________ |
Columbaria Cleaning
| 2.00 |
| EA |
| __________________ |
| __________________ |
Power-wash Buildings
| 2.00 |
| EA |
| __________________ |
| __________________ |
Monument and Sign Cleaning at Union Confederate Monument (Kansas City, MO)
| 1,480.00 |
| EA |
| __________________ |
| __________________ |
Ft. Leavenworth:
| 791,600.00 |
| EA |
| __________________ |
| __________________ |
String trim grass around upright headstones (19790 headstones x 40 trimmings)
| 1,480.00 |
| EA |
| __________________ |
| __________________ |
String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (37 acres x 40 trimmings)
| 296.00 |
| EA |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (37 acres x 8 edgings)
| 5,000.00 |
| EA |
| __________________ |
| __________________ |
Supply and install sod
| 111.00 |
| EA |
| __________________ |
| __________________ |
Fertilizer: Provide and Apply (37 acres x 3 applications)
| 74.00 |
| EA |
| __________________ |
| __________________ |
Pre-emergence Herbicide: Provide and Apply (37 acres x 2 applications)
| 74.00 |
| EA |
| __________________ |
| __________________ |
Post -Emergence Broadleaf Herbicide: Provide and Apply (37 acres x 2 applications)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Post-emergence yellow nutsedge herbicide: Provide and Apply (37 acres x 1 application)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Grub Insecticide: Provide and Apply (37 acres x 1 application)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Core Aeration of Turfgrass
| 37.00 |
| EA |
| __________________ |
| __________________ |
Overseed Turfgrass
| 10.00 |
| EA |
| __________________ |
| __________________ |
Tree Removals or Pruning/Repair
| 222.00 |
| EA |
| __________________ |
| __________________ |
Fall Leaf Removal (37 acres x 6 removals)
| 100.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 58,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4,200.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise & Realign
| 75.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 20,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine Tune Alignment
| 14.00 |
| EA |
| __________________ |
| __________________ |
Floral Pick-up
| 156.00 |
| EA |
| __________________ |
| __________________ |
Trash and Debris Removal
| 4,000.00 |
| EA |
| __________________ |
| __________________ |
Supply and install turfgrass sod
| 54.00 |
| EA |
| __________________ |
| __________________ |
Fertilize Turfgrass (18 acres x 3 applications)
| 36.00 |
| EA |
| __________________ |
| __________________ |
Pre-Emergence Herbicide application (18 acres x 2 applications)
| 36.00 |
| EA |
| __________________ |
| __________________ |
Post-Emergence Herbicide Application (18 acres x 2 applications)
| 18.00 |
| EA |
| __________________ |
| __________________ |
Post-Emergence Herbicide for Yellow Nutsedge Control
| 18.00 |
| EA |
| __________________ |
| __________________ |
Grub Insecticide Application
| 720.00 |
| EA |
| __________________ |
| __________________ |
Ft Scott:
Mowing turfgrass (18 acres x 40 mowings)
| 2,392,000.00 |
| EA |
| __________________ |
| __________________ |
Trimming Turfgrass (5,900 headstones x 40 trimmings)
| 12,200.00 |
| EA |
| __________________ |
| __________________ |
Edge around flat grave markers (305 markers x 40 edgings)
| 40,000.00 |
| EA |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (5,000 linear feet x 8 edgings)
| 96.00 |
| EA |
| __________________ |
| __________________ |
Mowing unimproved area (12 acres x 8 mowings)
| 18.00 |
| EA |
| __________________ |
| __________________ |
Core Aeration
| 18.00 |
| EA |
| __________________ |
| __________________ |
Overseeding
| 3.00 |
| EA |
| __________________ |
| __________________ |
Storm Damage Cleanup
| 2.00 |
| EA |
| __________________ |
| __________________ |
Tree Removal and Pruning
| 6,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 2,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise/Realign
| 2,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine-Tune-Alignment
| 15.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 40.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 12.00 |
| EA |
| __________________ |
| __________________ |
Mound City Soldier Lot : Mow turf grass (0.3 acres x 40 mowings)
| 4,720.00 |
| EA |
| __________________ |
| __________________ |
Trimming Turfgrass (118 headstone/markers x 40 trimmings)
| 6.00 |
| EA |
| __________________ |
| __________________ |
Flag Raise and Lower
| 118.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise/Realign
| 118.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine-Tune-Alignment
| 4.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 4,320.00 |
| AC |
| __________________ |
| __________________ |
Leavenworth National Cemetery:
| 2.00 |
| AC |
| __________________ |
| __________________ |
Mow Native Grass areas (2 Acres)
| 13,360.00 |
| FT |
| __________________ |
| __________________ |
Fence Line: Remove Vegetation
| 1,478,000.00 |
| EA |
| __________________ |
| __________________ |
String trim grass around upright headstones (36,950 headstones x 40 trimmings)
| 87,040.00 |
| EA |
| __________________ |
| __________________ |
Edge around flat grave markers at Leavenworth NC (2,176 markers x 40 edgings)
| 4,320.00 |
| AC |
| __________________ |
| __________________ |
String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (108 acres x 40 trimmings)
| 864.00 |
| AC |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (108 acres x 8 edgings)
| 25,000.00 |
| SF |
| __________________ |
| __________________ |
Supply and install sod
| 324.00 |
| AC |
| __________________ |
| __________________ |
Fertilizer: Provide and Apply (108 acres x 3 applications)
| 216.00 |
| AC |
| __________________ |
| __________________ |
Pre-emergence Herbicide: Provide and Apply (108 acres x 2 applications)
| 216.00 |
| AC |
| __________________ |
| __________________ |
Post -Emergence Broadleaf Herbicide: Provide and Apply (108 acres x 2 applications)
| 108.00 |
| AC |
| __________________ |
| __________________ |
Post-emergence yellow nutsedge herbicide: Provide and Apply
| 108.00 |
| AC |
| __________________ |
| __________________ |
Grub Insecticide: Provide and Apply (108 acres x 1 application)
| 108.00 |
| AC |
| __________________ |
| __________________ |
Core Aeration of Turfgrass
| 108.00 |
| AC |
| __________________ |
| __________________ |
Overseed Turfgrass
| 1.00 |
| JB |
| __________________ |
| __________________ |
Jet cleaning of Storm water Drainage
| 10.00 |
| EA |
| __________________ |
| __________________ |
Tree Removals or Pruning/Repair
| 648.00 |
| AC |
| __________________ |
| __________________ |
Fall Leaf Removal (108 acres x 6 removals)
| 100.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 58,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4,200.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise & Realign
| 1,100.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 20,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine Tune Alignment
| 14.00 |
| EA |
| __________________ |
| __________________ |
Floral Pick-up
| 156.00 |
| EA |
| __________________ |
| __________________ |
Trash and Debris Removal
| 80.00 |
| EA |
| __________________ |
| __________________ |
Cleaning of storm water Basins
| 1.00 |
| JB |
| __________________ |
| __________________ |
Cleaning of French drains
| 4.00 |
| EA |
| __________________ |
| __________________ |
Cleaning Of Concrete Drainage area
| 4.00 |
| EA |
| __________________ |
| __________________ |
Columbaria Cleaning
| 2.00 |
| EA |
| __________________ |
| __________________ |
Power-wash Buildings
| 2.00 |
| EA |
| __________________ |
| __________________ |
Monument and Sign Cleaning at Union Confederate Monument (Kansas City, MO)
| 1,480.00 |
| EA |
| __________________ |
| __________________ |
Ft. Leavenworth:
| 791,600.00 |
| EA |
| __________________ |
| __________________ |
String trim grass around upright headstones (19790 headstones x 40 trimmings)
| 1,480.00 |
| EA |
| __________________ |
| __________________ |
String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (37 acres x 40 trimmings)
| 296.00 |
| EA |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (37 acres x 8 edgings)
| 5,000.00 |
| EA |
| __________________ |
| __________________ |
Supply and install sod
| 111.00 |
| EA |
| __________________ |
| __________________ |
Fertilizer: Provide and Apply (37 acres x 3 applications)
| 74.00 |
| EA |
| __________________ |
| __________________ |
Pre-emergence Herbicide: Provide and Apply (37 acres x 2 applications)
| 74.00 |
| EA |
| __________________ |
| __________________ |
Post -Emergence Broadleaf Herbicide: Provide and Apply (37 acres x 2 applications)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Post-emergence yellow nutsedge herbicide: Provide and Apply (37 acres x 1 application)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Grub Insecticide: Provide and Apply (37 acres x 1 application)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Core Aeration of Turfgrass
| 37.00 |
| EA |
| __________________ |
| __________________ |
Overseed Turfgrass
| 10.00 |
| EA |
| __________________ |
| __________________ |
Tree Removals or Pruning/Repair
| 222.00 |
| EA |
| __________________ |
| __________________ |
Fall Leaf Removal (37 acres x 6 removals)
| 100.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 58,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4,200.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise & Realign
| 75.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 20,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine Tune Alignment
| 14.00 |
| EA |
| __________________ |
| __________________ |
Floral Pick-up
| 156.00 |
| EA |
| __________________ |
| __________________ |
Trash and Debris Removal
| 4,000.00 |
| EA |
| __________________ |
| __________________ |
Supply and install turfgrass sod
| 54.00 |
| EA |
| __________________ |
| __________________ |
Fertilize Turfgrass (18 acres x 3 applications)
| 36.00 |
| EA |
| __________________ |
| __________________ |
Pre-Emergence Herbicide application (18 acres x 2 applications)
| 36.00 |
| EA |
| __________________ |
| __________________ |
Post-Emergence Herbicide Application (18 acres x 2 applications)
| 18.00 |
| EA |
| __________________ |
| __________________ |
Post-Emergence Herbicide for Yellow Nutsedge Control
| 18.00 |
| EA |
| __________________ |
| __________________ |
Grub Insecticide Application
| 720.00 |
| EA |
| __________________ |
| __________________ |
Ft Scott:
| 2,392,000.00 |
| EA |
| __________________ |
| __________________ |
Trimming Turfgrass (5,900 headstones x 40 trimmings)
| 12,200.00 |
| EA |
| __________________ |
| __________________ |
Edge around flat grave markers (305 markers x 40 edgings)
| 40,000.00 |
| EA |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (5,000 linear feet x 8 edgings)
| 96.00 |
| EA |
| __________________ |
| __________________ |
Mowing unimproved area (12 acres x 8 mowings)
| 18.00 |
| EA |
| __________________ |
| __________________ |
Core Aeration
| 18.00 |
| EA |
| __________________ |
| __________________ |
Overseeding
| 3.00 |
| EA |
| __________________ |
| __________________ |
Storm Damage Cleanup
| 2.00 |
| EA |
| __________________ |
| __________________ |
Tree Removal and Pruning
| 6,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 2,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise/Realign
| 2,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine-Tune-Alignment
| 15.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 40.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 12.00 |
| EA |
| __________________ |
| __________________ |
Mound City Soldier Lot : Mow turf grass (0.3 acres x 40 mowings)
| 4,720.00 |
| EA |
| __________________ |
| __________________ |
Trimming Turfgrass (118 headstone/markers x 40 trimmings)
| 6.00 |
| EA |
| __________________ |
| __________________ |
Flag Raise and Lower
| 118.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise/Realign
| 118.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine-Tune-Alignment
| 4.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 4,320.00 |
| AC |
| __________________ |
| __________________ |
Leavenworth National Cemetery:
| 2.00 |
| AC |
| __________________ |
| __________________ |
Mow Native Grass areas (2 Acres)
| 13,360.00 |
| FT |
| __________________ |
| __________________ |
Fence Line: Remove Vegetation
| 1,478,000.00 |
| EA |
| __________________ |
| __________________ |
String trim grass around upright headstones (36,950 headstones x 40 trimmings)
| 87,040.00 |
| EA |
| __________________ |
| __________________ |
Edge around flat grave markers at Leavenworth NC (2,176 markers x 40 edgings)
| 4,320.00 |
| AC |
| __________________ |
| __________________ |
String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (108 acres x 40 trimmings)
| 864.00 |
| AC |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (108 acres x 8 edgings)
| 25,000.00 |
| SF |
| __________________ |
| __________________ |
Supply and install sod
| 324.00 |
| AC |
| __________________ |
| __________________ |
Fertilizer: Provide and Apply (108 acres x 3 applications)
| 216.00 |
| AC |
| __________________ |
| __________________ |
Pre-emergence Herbicide: Provide and Apply (108 acres x 2 applications)
| 216.00 |
| AC |
| __________________ |
| __________________ |
Post -Emergence Broadleaf Herbicide: Provide and Apply (108 acres x 2 applications)
| 108.00 |
| AC |
| __________________ |
| __________________ |
Post-emergence yellow nutsedge herbicide: Provide and Apply
| 108.00 |
| AC |
| __________________ |
| __________________ |
Grub Insecticide: Provide and Apply (108 acres x 1 application)
| 108.00 |
| AC |
| __________________ |
| __________________ |
Core Aeration of Turfgrass
| 108.00 |
| AC |
| __________________ |
| __________________ |
Overseed Turfgrass
| 1.00 |
| JB |
| __________________ |
| __________________ |
Jet cleaning of Storm water Drainage
| 10.00 |
| EA |
| __________________ |
| __________________ |
Tree Removals or Pruning/Repair
| 648.00 |
| AC |
| __________________ |
| __________________ |
Fall Leaf Removal (108 acres x 6 removals)
| 100.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 58,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4,200.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise & Realign
| 1,100.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 20,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine Tune Alignment
| 14.00 |
| EA |
| __________________ |
| __________________ |
Floral Pick-up
| 156.00 |
| EA |
| __________________ |
| __________________ |
Trash and Debris Removal
| 80.00 |
| EA |
| __________________ |
| __________________ |
Cleaning of storm water Basins
| 1.00 |
| JB |
| __________________ |
| __________________ |
Cleaning of French drains
| 4.00 |
| EA |
| __________________ |
| __________________ |
Cleaning Of Concrete Drainage area
| 4.00 |
| EA |
| __________________ |
| __________________ |
Columbaria Cleaning
| 2.00 |
| EA |
| __________________ |
| __________________ |
Power-wash Buildings
| 2.00 |
| EA |
| __________________ |
| __________________ |
Monument and Sign Cleaning at Union Confederate Monument (Kansas City, MO)
| 1,480.00 |
| EA |
| __________________ |
| __________________ |
Ft. Leavenworth:
| 791,600.00 |
| EA |
| __________________ |
| __________________ |
String trim grass around upright headstones (19790 headstones x 40 trimmings)
| 1,480.00 |
| EA |
| __________________ |
| __________________ |
String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (37 acres x 40 trimmings)
| 296.00 |
| EA |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (37 acres x 8 edgings)
| 5,000.00 |
| EA |
| __________________ |
| __________________ |
Supply and install sod
| 111.00 |
| EA |
| __________________ |
| __________________ |
Fertilizer: Provide and Apply (37 acres x 3 applications)
| 74.00 |
| EA |
| __________________ |
| __________________ |
Pre-emergence Herbicide: Provide and Apply (37 acres x 2 applications)
| 74.00 |
| EA |
| __________________ |
| __________________ |
Post -Emergence Broadleaf Herbicide: Provide and Apply (37 acres x 2 applications)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Post-emergence yellow nutsedge herbicide: Provide and Apply (37 acres x 1 application)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Grub Insecticide: Provide and Apply (37 acres x 1 application)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Core Aeration of Turfgrass
| 37.00 |
| EA |
| __________________ |
| __________________ |
Overseed Turfgrass
| 10.00 |
| EA |
| __________________ |
| __________________ |
Tree Removals or Pruning/Repair
| 222.00 |
| EA |
| __________________ |
| __________________ |
Fall Leaf Removal (37 acres x 6 removals)
| 100.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 58,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4,200.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise & Realign
| 75.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 20,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine Tune Alignment
| 14.00 |
| EA |
| __________________ |
| __________________ |
Floral Pick-up
| 156.00 |
| EA |
| __________________ |
| __________________ |
Trash and Debris Removal
| 4,000.00 |
| EA |
| __________________ |
| __________________ |
Supply and install turfgrass sod
| 54.00 |
| EA |
| __________________ |
| __________________ |
Fertilize Turfgrass (18 acres x 3 applications)
| 36.00 |
| EA |
| __________________ |
| __________________ |
Pre-Emergence Herbicide application (18 acres x 2 applications)
| 36.00 |
| EA |
| __________________ |
| __________________ |
Post-Emergence Herbicide Application (18 acres x 2 applications)
| 18.00 |
| EA |
| __________________ |
| __________________ |
Post-Emergence Herbicide for Yellow Nutsedge Control
| 18.00 |
| EA |
| __________________ |
| __________________ |
Grub Insecticide Application
| 720.00 |
| EA |
| __________________ |
| __________________ |
Ft Scott:
| 2,392,000.00 |
| EA |
| __________________ |
| __________________ |
Trimming Turfgrass (5,900 headstones x 40 trimmings)
| 12,200.00 |
| EA |
| __________________ |
| __________________ |
Edge around flat grave markers (305 markers x 40 edgings)
| 40,000.00 |
| EA |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (5,000 linear feet x 8 edgings)
| 96.00 |
| EA |
| __________________ |
| __________________ |
Mowing unimproved area (12 acres x 8 mowings)
| 18.00 |
| EA |
| __________________ |
| __________________ |
Core Aeration
| 18.00 |
| EA |
| __________________ |
| __________________ |
Overseeding
| 3.00 |
| EA |
| __________________ |
| __________________ |
Storm Damage Cleanup
| 2.00 |
| EA |
| __________________ |
| __________________ |
Tree Removal and Pruning
| 6,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 2,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise/Realign
| 2,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine-Tune-Alignment
| 15.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 40.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 12.00 |
| EA |
| __________________ |
| __________________ |
Mound City Soldier Lot : Mow turf grass (0.3 acres x 40 mowings)
| 4,720.00 |
| EA |
| __________________ |
| __________________ |
Trimming Turfgrass (118 headstone/markers x 40 trimmings)
| 6.00 |
| EA |
| __________________ |
| __________________ |
Flag Raise and Lower
| 118.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise/Realign
| 118.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine-Tune-Alignment
| 4.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 4,320.00 |
| AC |
| __________________ |
| __________________ |
Leavenworth National Cemetery:
| 2.00 |
| AC |
| __________________ |
| __________________ |
Mow Native Grass areas (2 Acres)
| 13,360.00 |
| FT |
| __________________ |
| __________________ |
Fence Line: Remove Vegetation
| 1,478,000.00 |
| EA |
| __________________ |
| __________________ |
String trim grass around upright headstones (36,950 headstones x 40 trimmings)
| 87,040.00 |
| EA |
| __________________ |
| __________________ |
Edge around flat grave markers at Leavenworth NC (2,176 markers x 40 edgings)
| 4,320.00 |
| AC |
| __________________ |
| __________________ |
String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (108 acres x 40 trimmings)
| 864.00 |
| AC |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (108 acres x 8 edgings)
| 25,000.00 |
| SF |
| __________________ |
| __________________ |
Supply and install sod
| 324.00 |
| AC |
| __________________ |
| __________________ |
Fertilizer: Provide and Apply (108 acres x 3 applications)
| 216.00 |
| AC |
| __________________ |
| __________________ |
Pre-emergence Herbicide: Provide and Apply (108 acres x 2 applications)
| 216.00 |
| AC |
| __________________ |
| __________________ |
Post -Emergence Broadleaf Herbicide: Provide and Apply (108 acres x 2 applications)
| 108.00 |
| AC |
| __________________ |
| __________________ |
Post-emergence yellow nutsedge herbicide: Provide and Apply
| 108.00 |
| AC |
| __________________ |
| __________________ |
Grub Insecticide: Provide and Apply (108 acres x 1 application)
| 108.00 |
| AC |
| __________________ |
| __________________ |
Core Aeration of Turfgrass
| 108.00 |
| AC |
| __________________ |
| __________________ |
Overseed Turfgrass
| 1.00 |
| JB |
| __________________ |
| __________________ |
Jet cleaning of Storm water Drainage
| 10.00 |
| EA |
| __________________ |
| __________________ |
Tree Removals or Pruning/Repair
| 648.00 |
| AC |
| __________________ |
| __________________ |
Fall Leaf Removal (108 acres x 6 removals)
| 100.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 58,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4,200.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise & Realign
| 1,100.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 20,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine Tune Alignment
| 14.00 |
| EA |
| __________________ |
| __________________ |
Floral Pick-up
| 156.00 |
| EA |
| __________________ |
| __________________ |
Trash and Debris Removal
| 80.00 |
| EA |
| __________________ |
| __________________ |
Cleaning of storm water Basins
| 1.00 |
| JB |
| __________________ |
| __________________ |
Cleaning of French drains
| 4.00 |
| EA |
| __________________ |
| __________________ |
Cleaning Of Concrete Drainage area
| 4.00 |
| EA |
| __________________ |
| __________________ |
Columbaria Cleaning
| 2.00 |
| EA |
| __________________ |
| __________________ |
Power-wash Buildings
| 2.00 |
| EA |
| __________________ |
| __________________ |
Monument and Sign Cleaning at Union Confederate Monument (Kansas City, MO)
| 1,480.00 |
| EA |
| __________________ |
| __________________ |
Ft. Leavenworth:
| 791,600.00 |
| EA |
| __________________ |
| __________________ |
String trim grass around upright headstones (19790 headstones x 40 trimmings)
| 1,480.00 |
| EA |
| __________________ |
| __________________ |
String Trim grass at other areas and along upright surfaces and borders where mowers don’t cut (37 acres x 40 trimmings)
| 296.00 |
| EA |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (37 acres x 8 edgings)
| 5,000.00 |
| EA |
| __________________ |
| __________________ |
Supply and install sod
| 111.00 |
| EA |
| __________________ |
| __________________ |
Fertilizer: Provide and Apply (37 acres x 3 applications)
| 74.00 |
| EA |
| __________________ |
| __________________ |
Pre-emergence Herbicide: Provide and Apply (37 acres x 2 applications)
| 74.00 |
| EA |
| __________________ |
| __________________ |
Post -Emergence Broadleaf Herbicide: Provide and Apply (37 acres x 2 applications)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Post-emergence yellow nutsedge herbicide: Provide and Apply (37 acres x 1 application)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Grub Insecticide: Provide and Apply (37 acres x 1 application)
| 37.00 |
| EA |
| __________________ |
| __________________ |
Core Aeration of Turfgrass
| 37.00 |
| EA |
| __________________ |
| __________________ |
Overseed Turfgrass
| 10.00 |
| EA |
| __________________ |
| __________________ |
Tree Removals or Pruning/Repair
| 222.00 |
| EA |
| __________________ |
| __________________ |
Fall Leaf Removal (37 acres x 6 removals)
| 100.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
| 58,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 4,200.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise & Realign
| 75.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 20,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine Tune Alignment
| 14.00 |
| EA |
| __________________ |
| __________________ |
Floral Pick-up
| 156.00 |
| EA |
| __________________ |
| __________________ |
Trash and Debris Removal
| 4,000.00 |
| EA |
| __________________ |
| __________________ |
Supply and install turfgrass sod
| 54.00 |
| EA |
| __________________ |
| __________________ |
Fertilize Turfgrass (18 acres x 3 applications)
| 36.00 |
| EA |
| __________________ |
| __________________ |
Pre-Emergence Herbicide application (18 acres x 2 applications)
| 36.00 |
| EA |
| __________________ |
| __________________ |
Post-Emergence Herbicide Application (18 acres x 2 applications)
| 18.00 |
| EA |
| __________________ |
| __________________ |
Post-Emergence Herbicide for Yellow Nutsedge Control
| 18.00 |
| EA |
| __________________ |
| __________________ |
Grub Insecticide Application
| 720.00 |
| EA |
| __________________ |
| __________________ |
Ft Scott:
| 2,392,000.00 |
| EA |
| __________________ |
| __________________ |
Trimming Turfgrass (5,900 headstones x 40 trimmings)
| 12,200.00 |
| EA |
| __________________ |
| __________________ |
Edge around flat grave markers (305 markers x 40 edgings)
| 40,000.00 |
| EA |
| __________________ |
| __________________ |
Edge along sidewalks, curbs, and other flat hard surfaces (5,000 linear feet x 8 edgings)
| 96.00 |
| EA |
| __________________ |
| __________________ |
Mowing unimproved area (12 acres x 8 mowings)
| 18.00 |
| EA |
| __________________ |
| __________________ |
Core Aeration
| 18.00 |
| EA |
| __________________ |
| __________________ |
Overseeding
| 3.00 |
| EA |
| __________________ |
| __________________ |
Storm Damage Cleanup
| 2.00 |
| EA |
| __________________ |
| __________________ |
Tree Removal and Pruning
| 6,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Cleaning
| 2,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Raise/Realign
| 2,000.00 |
| EA |
| __________________ |
| __________________ |
Headstone Fine-Tune-Alignment
| 15.00 |
| EA |
| __________________ |
| __________________ |
Headstone Setting
| 40.00 |
| EA |
| __________________ |
| __________________ |
Sunken Grave Repair
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .