36C78621Q0143 0007.docx
DOCX document 14 KB Posted
- Solicitation number
- 36C78621Q0143
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78621Q0143 0008.docx | DOCX document | |
| 36C78621Q0143 0006.docx | DOCX document | |
| 36C78621Q0143 0005.docx | DOCX document | |
| 36C78621Q0143 0004.docx | DOCX document | |
| 36C78621Q0143 0003.docx | DOCX document | |
| 36C78621Q0143 0002.docx | DOCX document | |
| ATTACHMENT B - 36C78621D0078 SOW.pdf | ||
| ATTACHMENT A - VA786-16-C-0021 SOW.pdf | ||
| 36C78621Q0143 0001.docx | DOCX document | |
| 36C78621Q0143_2.docx | DOCX document | |
| ATTACHMENT B - PERFORMANCE WORK STATEMENT.pdf | ||
| ATTACHMENT C - WAGE DETERMINATION.pdf | ||
| 36C78621Q0143.pdf | ||
| ATTACHMENT A - PRICE SCHEDULE.pdf | ||
| ATTACHMENT F - PAST PERFORMANCE QUESTIONNAIRE.pdf | ||
| ATTACHMENT E - LIST OF REFERENCES.pdf | ||
| ATTACHMENT D - CEMETERY MAPS.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Opportunity Amendment to a Previous Combined Solicitation
PRODUCT SERVICE CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE/TIME/ZONE
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Amendment to a Previous Combined Solicitation S208
FORT SAM HOUSTON GROUNDS MAINTENANCE
BASE PLUS 4, ONE-YEAR OPTION PERIODS
22172 36C78621Q0143 04-28-2021 4pm
EASTERN TIME, NEW YORK, USA
N
SDVOSBC
561730 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172
CONTRACTING OFFICER
KENNETH DOUGHERTY
KENNETH.DOUGHERTY@VA.GOV
703 630 9345
FORT SAM HOUSTON NATIONAL CEMETERY
1520 HARRY WURZBACH RD.
SAN ANTONIO
TX
78209
USA
https://www.va.gov////////// Department of Veterans Affairs, Nat Cemetery Administration
KENNETH.DOUGHERTY@VA.GOV
CO'S EMAIL
The purpose of this amendment to the solicitation is to address questions from prospective quoters.
Question 1: “The government stated, “…Cross cutting is required for each mowing service.”
Question 1.a.: “Will mowing (example) East to West along the face of the headstones in week one, and then mowing from West to East with a different mower/tread width/weight in week two meet the requirement of varying mow patterns, or will North to South mowing between headstones be required?”
Question 1.b.: “If North to South is required, will that be acceptable, or is diagonal mowing required?”
Answer 1.a.: Contractor is required to mow all improved turf. That is the turf on the rows on the face and back of the headstones. Crosscutting, or cutting between the headstone in a column is also required. The pattern of mowing should be changed up regardless of whether a contractor is mowing in the rows or along the columns.
Answer 1.b.: Mowing in the columns is all that is required. Diagonal mowing isn’t required. All improved turf is to be mowed.
Question 2: “The solicitation offers that contractors should change directions, wheel width, equipment weight, etc. between each mowing.”
Question 2.a.: “Is diagonal mowing, or mowing between the headstones required?”
Question 2.b.: “What is the contractor to do if a section in the cemetery does not allow the contractor to diagonally mow due to headstone layout?”
Answer 2.a.: Cross cutting mowing between the stones along the column is required. Diagonal mowing is not required.
Answer 2.b.: Diagonal mowing is not required.
Question 3: “Has cross cutting ever been performed at Ft. Sam Houston National Cemetery?
Answer 3: Yes, weekly.
Question 4: “When cross cutting is performed, how does the government require the grass that is left between the front and the back of the headstones to be cut?”
Question 4.a.: “The most feasible way to cut this area of uncut grass is to run a mower long ways down the headstone rows, however doing this would put traffic on the areas that we are trying to avoid, defeating the purpose. Hand trimming these areas would add substantial labor hours and additional cost to the contract.”
Question 4.b.: “A contractor could also cross cut a double diagonal at a cemetery, but this leads to double the amount of vehicle traffic on the same square footage of turf and defeats the purpose of maintaining the condition of the cemetery grounds as well.”
Answer 4.a.: All improved turf is to be cut each cycle. This includes turf in the columns between the stones (cross cutting) and in the rows along the face and back of the headstones. Varying patterns are to be used. The government does not dictate to the contractor the how of mowing, and the type of mowers used. The government’s concern is that the contract specifications are followed and no damage to the existing turf. Trimming of the headstones is required weekly per the Performance Work Statement.
Answer 4.b.: Diagonal cutting is not required. Mowing in the rows and cross cutting in the columns is required to ensure that all improved turf is mowed.
End of Document
File details come from the government source that posted it. Updated .