This document contains a federal contract opportunity notice and vendor questions with answers related to a road and drainage repair project at the Bay Pines National Cemetery. The Department of Veterans Affairs will issue a solicitation on or about June 1st, 2021 for construction services including roadway flooding and drainage upgrades, demolition and replacement of the committal services shelter, extension of the cortege lane, and potential dredging of an irrigation pond. The estimated period of performance is 365 calendar days with a bid opening on or about July 1st, 2021. The competition is set aside 100% for Service-Disabled Veteran-Owned Small Businesses. Interested vendors must register at Beta SAM.gov and submit any requests for information to the contracting officer electronically. The North American Industry Classification code is 237310 and the small business size standard is $39.5 million. The questions and answers document provides additional details on the project scope, staging areas, inspection requirements, and equipment specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VENDOR QUESTIONS WITH ANSWERS

Repair Roads & Drainage Issues 36C78621B0009

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

830CM3018

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 To all Offerors/Bidders

36C78621B0009

X

Offerors must acknowledge all amendments on Page 02 of their Bid Package

SEE CONTINUATION PAGES

Mark Graveline Contracting Officer

Q01: Period of Performance: Is the PoP 90 or 365 days? The Beta.SAM page states a PoP of 365 days and the solicitation states 90 days- please provide guidance as to which PoP is correct.

A01: 90 Calendar Days

Q02: Bay Pines NC/VA Value Proposition: During the site visit it was mentioned numerous times that high profile/VIP visits and services are the priority for Bay Pines NC, and that Night/Weekend construction would be preferred/less disruptive. This project can be completed outside of normal working hours for under the estimated $5M, but at a higher cost than if it is conducted during normal working hours (due to lights, overtime/non-standard hours, asphalt plant additional fees…etc.). Please provide guidance as to how we should plan/prioritize and provide pricing estimates.

A02: Roadwork to be performed after hours and on weekends.

Q03: Will the VA/Gov Engineer inspect/approve?

A03: Yes

Q04: Is the contractor responsible for scheduling/coordinating inspections with city/local/municipal inspectors (in addition to VA/Gov Engineer inspections)?

A04: Yes, as required. The Bay Pines National Cemetery is on Federal land and is exempt from most city/local/municipal/state inspectors. Compliance with the South West Florida Water Management District (SWFWMD) is required.

Q05: For evolutions conducted at night or on weekends, will Gov/VA engineers be available for inspecting work - or do all inspections need to be conducted or scheduled for normal working days/hours?

A05: Normally yes, but can be arranged on an “as needed basis”.

Q06: C101/Note 12 Reference: What is the height restriction referenced (for equipment under protected trees)?

A06: It varies, but the Director will provide clarification as needed.

Q07: Due to the high-water table we expect to conduct significant dewatering for the drainage work (to include well points)- can we plan to pump into the dry/wet ponds?

A07: Yes, however, in the event that the dry/wet become unusable, it is the contractors responsibility to come up with an acceptable alternative at no additional cost to the government.

Q08: During the site visit a staging area was pointed out (close to the parking lot and alternate entry point to the NC). Would it be possible for the area surrounding the furthest pond (with the liner/silt needing to be dredged) to be utilized for staging as well?

A08: Yes, there is a gravel road that leads to the back of the cemetery. Mid-size trucks can usually access the area via that road. The Cemetery Director must provide approval in advance.

Q09: What is the proposed volume of sludge to be removed, and are we removing material to clean the pond, or to prepare it for lining?

A09: Approximately between 4ft – 4.5ft.

Q10: What is the character of the material in the pond (loose silt or muck/thick silt)?

A10: Thick firm silt

Q11: What area(s) can be used for staging and dewatering?

A11: Back by the retention pond visited during the Pre-Bid, Walk-thru.

Q12: Can we make a visit to survey pond and collect samples to aid/assist in providing a more accurate price estimate?

A12: Yes

Q13: For “pruning” actions on the Oak Trees- the RFP docs state that COR/CO can approve pruning when/where necessary. Please provide guidance as to what contractors will be expected to provide in order to receive approval (arborist input? Simple written request/justification?...etc.).

A13. Approval will be provided by the Cemetery Director.

Q14: Road improvement design calls for limestone to be used as the sub-base. There is an opinion/”train of thought” that crushed concrete is preferred in locations with high water tables as it is more “durable” (deteriorates less when exposed to water) and cheaper than limestone. Is limestone the only sub-base to be considered, or would crushed concrete be a viable option/alternative?

A14: Crushed concrete can be submitted as alternative provided that the source of the crushed concrete is a clean source, is tested and report from testing firm certifies that the crushed concrete base course will be equivalent in strength to a limestone aggregate base course and complies with the plans and specifications.

The drawings indicate several options. Offerors shall incorporate the overall cost of all options into the Base Bid. Do not include pricing for Deductive Alternates, Additive Alternates, or Options, they will not be evaluated.

The Bay Pines National Cemetery has a need to add the following items to the Scope of Work for the 36C78621B0009 Repair Roads and project.

This request is for brand name or equal items. The items listed below are known to meet the requirements to satisfy the needs of the Bay Pines National Cemetery in St. Petersburgh, Florida. Offerors must include the exact equipment listed below. OR, if offering “equal”, the contractor is responsible for submitting enough supporting information/documentation to illustrate its capability to meet or exceed the following Salient Characteristics. VA has the right to reject “Equal” submissions after evaluation.

The contractor shall remove and replace eleven (11) sets of Trash and Flower Vase Receptacles. Six (6) sets will require concrete pads. Locations will be identified by Cemetery Director prior to installation.

The Victor Stanley SD-42 Ironsites Series, 36-Gallon, Side-Door Litter Receptacle, Dome Lid, Black Plastic Liner, Standard Top Band Decal, Bronze Powder Coat, meets the minimum specifications, technical requirements, and quality to fulfil the cemeteries need while maintaining uniformity and standardization.

The contractor shall Install 11 speed bumps within the Bay Pine National Cemetery road system. The specifications and appearance must match the existing speed bumps seen on the Bay Pines Veteran Administration Campus. Exact install locations will be identified by the Cemetery Director. Here are the approximate locations:

· Eight (8) speed bumps evenly spaced on both the inbound and outbound lanes (4 on each side)

· One (1) as you enter the Columbarium area (between Section A and T),

· Two (2) in the vicinity of Carillon

· One (1) on either side of the carillon halfway between the carillon tower

· One (1) on the inbound / outbound lanes

See attached document: Bay Pines Sign In Sheet.