36C78620R0003-002.pdf
PDF 3 MB Posted
- Attached to
- FY20 Pacific District - Fort Rosecrans Natl Cemetery - Grounds Maintenance Services TIERED EVALUATIONS
- Solicitation number
- 36C78620R0003
About this file
36C78620R0003 Attachment 2 - PWS -Price Schedule.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78620R0003-0003000.docx | DOCX document | |
| 36C78620R0003-0001000.docx | DOCX document | |
| 36C78620R0003-003.pdf | ||
| 36C78620R0003-001.pdf | ||
| 36C78620R0003-000.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I. PART I - THE SCHEDULE
II. SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
PRICE SCHEDULE: The contractor shall provide all labor, materials, equipment, tools, and supplies to perform headstone setting and full grounds and facility maintenance services at Fort Rosecrans National Cemetery, Cabrillo Memorial Drive, San Diego CA, 92122.
All work shall be performed in accordance the Description/Specifications/Statement of Work, contained in this contract; National Cemetery Administration National Shrine Commitment Operational Standards and Measures (Version 5.1 July 2014 or the most current version); Handbook 3120: Interment Area Layout; Handbook 3410:
Integrated Pest Management Procedures for VA National Cemeteries; Handbook 3420: Turfgrass Maintenance in VA National Cemeteries; the most current Organizational Analysis and Improvement Guide (OAI); and in accordance with the NCA Environmental Management System (EMS). Copies of these documents may be obtained from the cemetery director, Rex Kern (Tel.: 858-658-7366).
The base contract performance period is from October 1, 2019 (or Date of Award), through September 30, 2020 with four (4) one-year options beginning on October 1 through September 30, if exercised.
BASE YEAR: October 1, 2019 (or Date of Award) through September 30, 2020
CLIN ITEM EST.
QTY
UNIT
UNIT PRICE TOTAL PRICE
0001 Headstone Setting and Alignment
0001a Setting New or Replacement Upright Headstones/ Upright Memorial Markers
100 EA $ $
0001b Setting New or Replacement Flat Markers 260 EA $ $
0001c Headstone Removal, Break-up and Disposal 260 EA $ $
0001d Upright Headstone “Bump & Run” 125 EA $ $
TOTAL 0001 $
0002 Headstone Cleaning and Maintenance
0002a Upright Headstone Cleaning 5,000 EA $ $
0002b Flat Marker Cleaning 1,000 EA $ $
0002c Minor Headstone Cleaning 2,000 EA $ $
TOTAL 0002 $
0003 Headstone Raise, Lower, Re-align & Reset
0003a Raise and Re-align Upright Headstones/Memorial Markers
50 EA $ $
0003b Raise and Re-align Flat Markers 250 EA $ $
TOTAL 0003 $
0004 Gravesite Maintenance
0004a Sunken Grave Repair– Full Casket Gravesite 300 EA $ $
0004b Sunken Grave Repair – Cremain Gravesite 50 EA $ $
TOTAL 0004 $
0005 Columbaria and Memorial Wall Maintenance
0005a Clean Columbaria and Memorial Walls 12 MO $ $
0005b Niche Cover and Memorial Marker Cleaning 2 JB $ $
0005c Maintain Pea Gravel Flower Strips 12 MO $ $
TOTAL 0005 $
0006 Cemetery Grounds Management Plan
0006a Daily, weekly, monthly Grounds Maintenance Schedule showing frequency of all activities for the contract year, including monthly updates.
12 MO $ $
TOTAL 0006
0007 Artificial Turf Maintenance
0007a Inspect, Clean and Groom Turf Fibers 1 JB $ $
0007b Remove Weeds and Litter 12 MO $ $
0007c Replenish Infill 1 JB $ $
0007d Artificial Turf Rejuvenation 1 JB $ $
0007e TOTAL 0007
0008 Turf Renovation
0008a Vegetation Removal 20,000 SF $ $
0008b Soil Preparation for Sod 20,000 SF $ $
0008c Turf Renovation by Sod 17,000 SF $ $
0008d Turf Renovation by Seed 3,000 SF $ $
TOTAL 0008 $
0009 Turf Maintenance – Fertilization
0009a Soil Testing and Recommendations 1 JB $ $
0009b Fertilizer Formulated with Pre-Emergent Application 1 JB $ $
0009c Fertilizer Applications 2 JB $ $
0009d Soil Conditioner 1: (Gypsum) 65 Acres @ 650#/A 2 JB $ $
TOTAL 0009 $
0010 Turf Maintenance – Pest Control
0010a Weed Control – Post Emergent Herbicide 12 MO $ $
0010b Weed Control – Pre-Emergent Herbicide (Second Application)
1 JB $ $
0010c Kikuyugrass/Bermudagrass Control 5 JB $ $
0010d Invertebrate Pest Control 12 MO $ $
0010e Vertebrate Pest Control 12 MO $ $
0010f Repair of Landscape Damaged by Vertebrate Pests 12 MO $ $
0010g Repair and Protection of Irrigation Valve Boxes filled with Soil by Vertebrate Pests
25 EA $ $
TOTAL 0010 $
0011 Turf Maintenance – Mowing, Trimming & Edging
0011a Cleaning Mowers to remove all Vegetation 12 MO $ $
0011b Mowing – Irrigated Turf 52 JB $ $
0011c Trimming Upright Headstones/Memorial Markers 52 JB $ $
0011d Edging Flat Markers & Clipping Removal 52 JB $ $
0011e Edging Curbs/Sidewalks/Landscape Borders 26 JB $ $
TOTAL 0011 $
0012 Turf Maintenance – Aerification
0012a Aerification by Core Aerator – All Turf 2 JB $ $
0012b Drill and Fill 1 JB $ $
TOTAL 0012 $
0013 Turf Maintenance – Dethatching
0013a Dethatching (1/13 cemetery turf) 5 acres $ $
TOTAL 0013 $
0014 Tree, Shrub, Planting Bed Maintenance
0014a Shrub and Ground Cover Pruning/Trimming 12 MO $ $
0014b Tree Pruning/Trimming 12 MO $ $
0014c Tree Branch/Limb Disposal 12 MO $ $
0014d Pest Control 2 JB $ $
0014e Planting Bed Tilling 1 JB $ $
0014f Planting Bed Weed Control - Pre-Emergent 1 JB $ $
0014g Planting Bed Weed Control - Post-Emergent / Manual Removal
12 MO $ $
0014h Organic Mulch – Planting Beds, Tree Rings, and Open Ground Areas
1 JB $ $
0014i Inorganic Mulch – Planting Beds, Tree Rings, and Open Ground Areas
1 JB
0014j Planting Bed Edger Maintenance 1 JB $ $
0014k Tree Staking and Maintenance 1 JB $ $
0014l Plant Fertilizing 1 JB $ $
0014m Palm Tree Fertilization 1 JB $ $
0014n Perimeter Landscape Buffer Area Maintenance 12 MO $ $
TOTAL 0014 $
0015 Tree, Shrub & Groundcover Planting
0015a Tree Planting (15 gallon) 4 EA $ $
0015b Shrub Planting (5 gallon) 2 EA $ $
0015c Ground Cover Planting (1 gallon) 10 EA $ $
0015d Annual Color Planting (4” pots) 32 EA $ $
TOTAL 0015 $
0016 Irrigation System Management
0016a Manage and Maintain Irrigation System including Scheduling and Sprinkler Adjustments
12 MO $ $
0016b Irrigation Audit 1 JB $ $
0016c Turf Rotor Pressure Testing 1 JB $ $
0016d Irrigation Schedule 1 EA $ $
TOTAL 0016 $
0017 Irrigation System Scheduled Maintenance
0017a Irrigation Pump Station Maintenance (quarterly) 4 JB $ $
0017b Irrigation Pump Filter Maintenance (quarterly) 4 JB $ $
0017c Weather Station Maintenance 1 JB $ $
0017d Backflow Preventer Testing and Certification 1 EA $ $
0017e Master Valve (Hydrometer) Testing & Calibration 1 JB $ $
0017f Pressure-Regulating Valve Testing 1 JB $ $
0017g Combination (Air & Vacuum Release) Valve Testing 1 JB $ $
0017h Isolation Valve Testing 1 JB $ $
0017i Leak Detection 2 JB $ $
0017j Control System Maintenance 1 JB $ $
0017k Turf Rotor Head Maintenance 1 JB $ $
0017l Spray/MSR/Bubbler Head Maintenance 1 JB $ $
0017m Drip Irrigation System Maintenance 4 JB $ $
TOTAL 0017 $
0018 Irrigation System Maintenance & Repair
0018a Turf Rotor Head Replacement 100 EA $ $
0018b Spray/Multi-Stream Rotary Head Repair 50 EA $ $
0018c Spray/Multi-Stream Rotary Replacement 50 EA $ $
0018d Drip Irrigation Line Repair 10 EA $ $
0018e Drip Filter Repair 2 EA $ $
0018f Electric Valve Repair 25 EA $ $
0018g Electric Valve Replacement 10 EA $ $
0018h Quick Coupling Valve Replacement 10 EA $ $
0018i Decoder Replacement 5 EA $ $
0018j Control Wire Fault Location and Repair 10 EA $ $
0018k Lateral Line Repair 25 EA $ $
0018l Mainline Repair 10 EA $ $
0018m Replace Broken Valve Box and Cover 25 EA $ $
0018n Replace Broken Cover on Valve Box 25 EA $ $
0018o Emergency Irrigation Parts /Repair 1 YR $3,600 $3,600
TOTAL 0018 $
0019 Drainage System Maintenance
0019a Remove debris from Drainage Structures 1 JB $ $
0019b Clean Terrace Drains and Concrete Channels 6 JB $ $
TOTAL 0019
0020 Trash & Debris Removal (Waste Management)
0020a Plant Litter Collection and Removal 12 MO $ $
0020b Trash and Debris Collection and Removal 12 MO $ $
0020c Commercial Waste Collection and Disposal 12 MO $ $
TOTAL 0020 $
0021 Pavement Sweeping and Cleaning
0021a Power sweeping of pavements including walkways, assembly area, columbaria courts, roadways, parking lots, driveways, curb lines and gutters.
12 MO $ $
0021b Power washing of pavements including walkways, assembly area, columbaria courts, curb lines and gutters.
2 JB $ $
TOTAL 0021 $
0022 Structure Maintenance
0022a Clean Columbaria Structure 1 JB $ $
0022b Clean Main Entry Walls and Gates 1 JB $ $
0022c Clean Perimeter Walls, Fences, and Guardrails and columbarium walls
JB $ $
0022d Maintain Gate Hinges and Automation 1 JB $ $
0022e Clean Rostrum Structure 1 JB $ $
0022f Clean Signage and Service Seals 1 JB $ $
0022g Clean and Maintain Flag Poles 1 JB $ $
0022h Maintain Exterior and Interior Lighting 12 MO $ $
0022i Clean Buildings Exteriors and Roofs 1 JB $ $
0022j Sand Joints in Unit Pavers at Committal Shelter 1 JB $ $
0022k Provide and Maintain Fire Extinguishers 1 JB $ $
TOTAL 0022 $
0023 Ceremonies
0023a Ceremonies Assist w/ Set-up/Break-down (Memorial Day, and Wreaths Across America)
TOTAL 0023
Total Estimated Cost for Base Year: $
OPTION YEAR 1: October 1, 2020 through September 30, 2021
QTY
UNIT UNIT PRICE TOTAL PRICE
1001 Headstone Setting and Alignment
1001a Setting New or Replacement Upright Headstones/ Upright Memorial Markers
100 EA $ $
1001b Setting New or Replacement Flat Markers 260 EA $ $
1001c Headstone Removal, Break-up and Disposal 260 EA $ $
1001d Upright Headstone “Bump & Run” 125 EA $ $
TOTAL 1001 $
1002 Headstone Cleaning and Maintenance
1002a Upright Headstone Cleaning 5,000 EA $ $
1002b Flat Marker Cleaning 1,000 EA $ $
1002c Minor Headstone Cleaning 2,000 EA $ $
TOTAL 1002 $
1003 Headstone Raise, Lower, Re-align & Reset
1003a Raise and Re-align Upright Headstones/Memorial Markers
50 EA $ $
1003b Raise and Re-align Flat Markers 250 EA $ $
TOTAL 1003 $
1004 Gravesite Maintenance
1004a Sunken Grave Repair– Full Casket Gravesite 300 EA $ $
1004b Sunken Grave Repair – Cremain Gravesite 50 EA $ $
TOTAL 1004 $
1005 Columbaria & Memorial Wall Maintenance
1005a Clean Columbaria & Memorial Wall 12 MO $ $
1005b Niche Cover & Memorial Marker Cleaning 2 JB $ $
1005c Maintain Pea Gravel Flower Strips 12 MO $ $
TOTAL 1005 $
1006 Cemetery Grounds Management Plan
1006a Daily, weekly, monthly Grounds Maintenance Schedule showing frequency of all activities for the contract year, including monthly updates.
TOTAL 1006 $
1007 Artificial Turf Maintenance
1007a Inspect, Clean and Groom Turf Fibers 1 JB $ $
1007b Remove Weeds and Litter 12 MO $ $
1007c Replenish Infill 1 JB $ $
1007d Artificial Turf Rejuvenation 1 JB $ $
TOTAL 1007 $
1008 Turf Renovation
1008a Vegetation Removal 20,000 SF $ $
1008b Soil Preparation for Sod 20,000 SF $ $
1008c Turf Renovation by Sod 17,000 SF $ $
1008d Turf Renovation by Seed 3,000 SF $ $
TOTAL 1008 $
1009 Turf Maintenance – Fertilization
1009a Soil Testing and Recommendations 0 EA $ $
1009b Fertilizer Formulated with Pre-Emergent Application 1 JB $ $
1009c Fertilizer Applications 2 JB $ $
1009d Soil Conditioner 1: (Gypsum) 65 Acres @ 1000#/A 2 JB $ $
TOTAL 1009 $
1010 Turf Maintenance – Pest Control
1010a Weed Control – Post Emergent Herbicide 12 MO $ $
1010b Weed Control – Pre-Emergent Herbicide (Second Application)
1 JB $ $
1010c Kikuyugrass/Bermudagrass Control 5 JB $ $
1010d Invertebrate Pest Control 12 MO $ $
1010e Vertebrate Pest Control 12 MO $ $
1010f Repair of Landscape Damaged by Vertebrate Pests 12 MO $ $
1010g Repair and Protection of Irrigation Valve Boxes filled with Soil by Vertebrate Pests
TOTAL 1010 $
1011 Turf Maintenance – Mowing, Trimming & Edging
1011a Cleaning Mowers to remove all Vegetation 12 MO $ $
1011b Mowing – Irrigated Turf 52 JB $ $
1011c Trimming Upright Headstones/Memorial Markers 52 JB $ $
1011d Edging Flat Markers & Clipping Removal 52 JB $ $
1011e Edging Curbs/Sidewalks/Landscape Borders 26 JB $ $
TOTAL 1011 $
1012 Turf Maintenance – Aerification
1012a Aerification by Core Aerator – All Turf 2 JB $ $
1012b Drill and Fill 1 JB $ $
TOTAL 1012 $
1013 Turf Maintenance – Dethatching
1013a Dethatching (1/13 cemetery turf) 5 acres $ $
TOTAL 1013 $
1014 Tree, Shrub, Planting Bed Maintenance
1014a Shrub and Ground Cover Pruning/Trimming 12 MO $ $
1014b Tree Pruning/Trimming 12 MO $ $
1014c Tree Branch/Limb Disposal 12 MO $ $
1014d Pest Control 2 JB $ $
1014e Planting Bed Tilling 1 JB $ $
1014f Planting Bed Weed Control - Pre-Emergent 1 JB $ $
1014g Planting Bed Weed Control - Post-Emergent / Manual Removal
12 MO $ $
1014h Organic Mulch – Planting Beds, Tree Rings, and Open Ground Areas
1 JB $ $
1014i Inorganic Mulch – Planting Beds, Tree Rings, and Open Ground Areas
1 JB $ $
1014j Planting Bed Edger Maintenance 1 JB $ $
1014k Tree Staking and Maintenance 1 JB $ $
1014l Plant Fertilizing 1 JB $ $
1014m Palm Tree Fertilization 1 JB $ $
1014n Perimeter Landscape Buffer Area Maintenance 12 MO $ $
TOTAL 1014 $
1015 Tree, Shrub & Groundcover Planting
1015a Tree Planting (15 gallon) 4 EA $ $
1015b Shrub Planting (5 gallon) 2 EA $ $
1015c Ground Cover Planting (1 gallon) 10 EA $ $
1015d Annual Color Planting (4” pots) 32 EA $ $
TOTAL 1015 $
1016 Irrigation System Management
1016a Manage and Maintain Irrigation System including Scheduling and Sprinkler Adjustments
12 MO $ $
1016b Irrigation Audit 1 JB $ $
1016c Turf Rotor Pressure Testing 1 JB $ $
1016d Irrigation Schedule 1 EA $ $
TOTAL 1016 $
1017 Irrigation System Scheduled Maintenance
1017a Irrigation Pump Station Maintenance (quarterly) 4 JB $ $
1017b Irrigation Pump Filter Maintenance (quarterly) 4 JB $ $
1017c Weather Station Maintenance 1 JB $ $
1017d Backflow Preventer Testing and Certification 1 EA $ $
1017e Master Valve (Hydrometer) Testing & Calibration 1 JB $ $
1017f Pressure-Regulating Valve Testing 1 JB $ $
1017g Combination (Air & Vacuum Release) Valve Testing 1 JB $ $
1017h Isolation Valve Testing 1 JB $ $
1017i Leak Detection 2 JB $ $
1017j Control System Maintenance 1 JB $ $
1017k Turf Rotor Head Maintenance 1 JB $ $
1017l Spray/MSR/Bubbler Head Maintenance 1 JB $ $
1017m Drip Irrigation System Maintenance 4 JB $ $
TOTAL 1017 $
1018 Irrigation System Maintenance & Repair
1018a Turf Rotor Head Replacement 100 EA $ $
1018b Spray/Multi-Stream Rotary Head Repair 50 EA $ $
1018c Spray/Multi-Stream Rotary Replacement 50 EA $ $
1018d Drip Irrigation Line Repair 10 EA $ $
1018e Drip Filter Repair 2 EA $ $
1018f Electric Valve Repair 25 EA $ $
1018g Electric Valve Replacement 10 EA $ $
1018h Quick Coupling Valve Replacement 10 EA $ $
1018i Decoder Replacement 5 EA $ $
1018j Control Wire Fault Location and Repair 10 EA $ $
1018k Lateral Line Repair 25 EA $ $
1018l Mainline Repair 10 EA $ $
1018m Replace Broken Valve Box and Cover 25 EA $ $
1018n Replace Broken Cover on Valve Box 25 EA $ $
1018o Emergency Irrigation Parts /Repair 1 YR $3,600 $3,600
TOTAL 1018 $
1019 Drainage System Maintenance
1019a Remove debris from Drainage Structures 1 JB $ $
1019b Clean Terrace Drains and Concrete Channels 6 JB $ $
TOTAL 1019 $
1020 Trash & Debris Removal (Waste Management)
1020a Plant Litter Collection and Removal 12 MO $ $
1020b Trash and Debris Collection and Removal 12 MO $ $
1020c Commercial Waste Collection and Disposal 12 MO $ $
TOTAL 1020 $
1021 Pavement Sweeping and Cleaning
1021a Power sweeping of pavements including walkways, assembly area, columbaria courts, roadways, parking lots, driveways, curb lines and gutters.
12 MO $ $
1021b Power washing of pavements including walkways, assembly area, columbaria courts, curb lines and gutters.
TOTAL 1021 $
1022 Structure Maintenance
1022a Clean Columbaria Structures 1 JB $ $
1022b Clean Main Entry Walls and Gates 1 JB $ $
1022c Clean Perimeter Walls, Fences, and Guardrails 1 JB $ $
1022d Maintain Gate Hinges and Automation 1 JB $ $
1022e Clean Rostrum Structure 1 JB $ $
1022f Clean Signage and Service Seals 1 JB $ $
1022g Clean and Maintain Flag Poles 1 JB $ $
1022h Maintain Exterior and Interior Lighting 12 MO $ $
1022i Clean Buildings Exteriors and Roofs 1 JB $ $
1022j Sand Joints in Unit Pavers at Committal Shelter 1 JB $ $
1022k Provide and Maintain Fire Extinguishers 1 JB $ $
TOTAL 1022 $
1023 Ceremonies
1023a Ceremonies Assist w/ Set-up/Break-down (Memorial Day and Wreaths Across America)
TOTAL 1023
Total Estimated Cost for Option Year 1: $
OPTION YEAR 2: October 1, 2021 through September 30, 2022
QTY
UNIT UNIT PRICE TOTAL PRICE
2001 Headstone Setting and Alignment
2001a Setting New or Replacement Upright Headstones/ Upright Memorial Markers
100 EA $ $
2001b Setting New or Replacement Flat Markers 260 EA $ $
2001c Headstone Removal, Break-up and Disposal 260 EA $ $
2001d Upright Headstone “Bump & Run” 125 EA $ $
TOTAL 2001 $
2002 Headstone Cleaning and Maintenance
2002a Upright Headstone Cleaning 5,000 EA $ $
2002b Flat Marker Cleaning 1,000 EA $ $
2002c Minor Headstone Cleaning 2,000 EA $ $
TOTAL 2002 $
2003 Headstone Raise, Lower, Re-align & Reset
2003a Raise and Re-align Upright Headstones/Memorial Markers
50 EA $ $
2003b Raise and Re-align Flat Markers 250 EA $ $
TOTAL 2003 $
2004 Gravesite Maintenance
2004a Sunken Grave Repair– Full Casket Gravesite 300 EA $ $
2004b Sunken Grave Repair – Cremain Gravesite 50 EA $ $
TOTAL 2004 $
2005 Columbaria & Memorial Wall Maintenance
2005a Clean Columbaria & Memorial Wall 12 MO $ $
2005b Niche Cover & Memorial Marker Cleaning 2 JB $ $
2005c Maintain Pea Gravel Flower Strips 12 MO $ $
TOTAL 2005 $
2006 Cemetery Grounds Management Plan
2006a Daily, weekly, monthly Grounds Maintenance Schedule showing frequency of all activities for the contract year, including monthly updates.
TOTAL 2006 $
2007 Artificial Turf Maintenance
2007a Inspect, Clean and Groom Turf Fibers 1 JB $ $
2007b Remove Weeds and Litter 12 MO $ $
2007c Replenish Infill 1 JB $ $
2007d Artificial Turf Rejuvenation 1 JB $ $
TOTAL 2007 $
2008 Turf Renovation
2008a Vegetation Removal 20,000 SF $ $
2008b Soil Preparation for Sod 20,000 SF $ $
2008c Turf Renovation by Sod 17,000 SF $ $
2008d Turf Renovation by Seed 3,000 SF $ $
TOTAL 2008 $
2009 Turf Maintenance – Fertilization
2009a Soil Testing and Recommendations 1 EA $ $
2009b Fertilizer Formulated with Pre-Emergent Application 1 JB $ $
2009c Fertilizer Applications 2 JB $ $
2009d Soil Conditioner 1: (Gypsum) 65 Acres @ 1000#/A 2 JB $ $
TOTAL 2009 $
2010 Turf Maintenance – Pest Control
2010a Weed Control – Post Emergent Herbicide 12 MO $ $
2010b Weed Control – Pre-Emergent Herbicide (Second Application)
1 JB $ $
2010c Kikuyugrass/Bermudagrass Control 5 JB $ $
2010d Invertebrate Pest Control 12 MO $ $
2010e Vertebrate Pest Control 12 MO $ $
2010f Repair of Landscape Damaged by Vertebrate Pests 12 MO $ $
2010g Repair and Protection of Irrigation Valve Boxes filled with Soil by Vertebrate Pests
TOTAL 2010 $
2011 Turf Maintenance – Mowing, Trimming & Edging
2011a Cleaning Mowers to remove all Vegetation 12 MO $ $
2011b Mowing – Irrigated Turf 52 JB $ $
2011c Trimming Upright Headstones/Memorial Markers 52 JB $ $
2011d Edging Flat Markers & Clipping Removal 52 JB $ $
2011e Edging Curbs/Sidewalks/Landscape Borders 26 JB $ $
TOTAL 2011 $
2012 Turf Maintenance – Aerification
2012a Aerification by Core Aerator – All Turf 2 JB $ $
2012b Drill and Fill 1 JB $ $
TOTAL 2012 $
2013 Turf Maintenance – Dethatching
2013a Dethatching (1/13 cemetery turf) 5 acres $ $
TOTAL 2013 $
2014 Tree, Shrub, Planting Bed Maintenance
2014a Shrub and Ground Cover Pruning/Trimming 12 MO $ $
2014b Tree Pruning/Trimming 12 MO $ $
2014c Tree Branch/Limb Disposal 12 MO $ $
2014d Pest Control 2 JB $ $
2014e Planting Bed Tilling 1 JB $ $
2014f Planting Bed Weed Control - Pre-Emergent 1 JB $ $
2014g Planting Bed Weed Control - Post-Emergent / Manual Removal
12 MO $ $
2014h Organic Mulch – Planting Beds, Tree Rings, and Open Ground Areas
1 JB $ $
2014i Inorganic Mulch – Planting Beds, Tree Rings, and Open Ground Areas
1 JB $ $
2014j Planting Bed Edger Maintenance 1 JB $ $
2014k Tree Staking and Maintenance 1 JB $ $
2014l Plant Fertilizing 1 JB $ $
2014m Palm Tree Fertilization 1 JB $ $
2014n Perimeter Landscape Buffer Area Maintenance 12 MO $ $
TOTAL 2014 $
2015 Tree, Shrub & Groundcover Planting
2015a Tree Planting (15 gallon) 4 EA $ $
2015b Shrub Planting (5 gallon) 2 EA $ $
2015c Ground Cover Planting (1 gallon) 10 EA $ $
2015d Annual Color Planting (4” pots) 32 EA $ $
TOTAL 2015 $
2016 Irrigation System Management
2016a Manage and Maintain Irrigation System including Scheduling and Sprinkler Adjustments
12 MO $ $
2016b Irrigation Audit 1 JB $ $
2016c Turf Rotor Pressure Testing 1 JB $ $
2016d Irrigation Schedule 1 EA $ $
TOTAL 2016 $
2017 Irrigation System Scheduled Maintenance
2017a Irrigation Pump Station Maintenance (quarterly) 4 JB $ $
2017b Irrigation Pump Filter Maintenance (quarterly) 4 JB $ $
2017c Weather Station Maintenance 1 JB $ $
2017d Backflow Preventer Testing and Certification 1 EA $ $
2017e Master Valve (Hydrometer) Testing & Calibration 1 JB $ $
2017f Pressure-Regulating Valve Testing 1 JB $ $
2017g Combination (Air & Vacuum Release) Valve Testing 1 JB $ $
2017h Isolation Valve Testing 1 JB $ $
2017i Leak Detection 2 JB $ $
2017j Control System Maintenance 1 JB $ $
2017k Turf Rotor Head Maintenance 1 JB $ $
2017l Spray/MSR/Bubbler Head Maintenance 1 JB $ $
2017m Drip Irrigation System Maintenance 4 JB $ $
TOTAL 2017 $
2018 Irrigation System Maintenance & Repair
2018a Turf Rotor Head Replacement 100 EA $ $
2018b Spray/Multi-Stream Rotary Head Repair 50 EA $ $
2018c Spray/Multi-Stream Rotary Replacement 50 EA $ $
2018d Drip Irrigation Line Repair 10 EA $ $
2018e Drip Filter Repair 2 EA $ $
2018f Electric Valve Repair 25 EA $ $
2018g Electric Valve Replacement 10 EA $ $
2018h Quick Coupling Valve Replacement 10 EA $ $
2018i Decoder Replacement 5 EA $ $
2018j Control Wire Fault Location and Repair 10 EA $ $
2018k Lateral Line Repair 25 EA $ $
2018l Mainline Repair 10 EA $ $
2018m Replace Broken Valve Box and Cover 25 EA $ $
2018n Replace Broken Cover on Valve Box 25 EA $ $
2018o Emergency Irrigation Parts /Repair 1 YR $3,600 $3,600
TOTAL 2018 $
2019 Drainage System Maintenance
2019a Remove debris from Drainage Structures 1 JB $ $
2019b Clean Terrace Drains and Concrete Channels 6 JB $ $
TOTAL 2019 $
2020 Trash & Debris Removal (Waste Management)
2020a Plant Litter Collection and Removal 12 MO $ $
2020b Trash and Debris Collection and Removal 12 MO $ $
2020c Commercial Waste Collection and Disposal 12 MO $ $
TOTAL 2020 $
2021 Pavement Sweeping and Cleaning
2021a Power sweeping of pavements including walkways, assembly area, columbaria courts, roadways, parking lots, driveways, curb lines and gutters.
12 MO $ $
2021b Power washing of pavements including walkways, assembly area, columbaria courts, curb lines and gutters.
TOTAL 2021 $
2022 Structure Maintenance
2022a Clean Columbaria Structures 1 JB $ $
2022b Clean Main Entry Walls and Gates 1 JB $ $
2022c Clean Perimeter Walls, Fences, and Guardrails 1 JB $ $
2022d Maintain Gate Hinges and Automation 1 JB $ $
2022e Clean Rostrum Structure 1 JB $ $
2022f Clean Signage and Service Seals 1 JB $ $
2022g Clean and Maintain Flag Poles 1 JB $ $
2022h Maintain Exterior and Interior Lighting 12 MO $ $
2022i Clean Buildings Exteriors and Roofs 1 JB $ $
2022j Sand Joints in Unit Pavers at Committal Shelter 1 JB $ $
2022k Provide and Maintain Fire Extinguishers 1 JB $ $
TOTAL 2022 $
2023 Ceremonies
2023a Ceremonies Assist w/ Set-up/Break-down (Memorial Day and Wreaths Across America)
TOTAL 2023
Total Estimated Cost for Option Year 2: $
OPTION YEAR 3: October 1, 2022 through September 30, 2023
QTY
UNIT UNIT PRICE TOTAL PRICE
3001 Headstone Setting and Alignment
3001a Setting New or Replacement Upright Headstones/ Upright Memorial Markers
100 EA $ $
3001b Setting New or Replacement Flat Markers 260 EA $ $
3001c Headstone Removal, Break-up and Disposal 260 EA $ $
3001d Upright Headstone “Bump & Run” 125 EA $ $
TOTAL 3001 $
3002 Headstone Cleaning and Maintenance
3002a Upright Headstone Cleaning 5,000 EA $ $
3002b Flat Marker Cleaning 1,000 EA $ $
3002c Minor Headstone Cleaning 2,000 EA $ $
TOTAL 3002 $
3003 Headstone Raise, Lower, Re-align & Reset
3003a Raise and Re-align Upright Headstones/Memorial Markers
50 EA $ $
3003b Raise and Re-align Flat Markers 250 EA $ $
TOTAL 3003 $
3004 Gravesite Maintenance
3004a Sunken Grave Repair– Full Casket Gravesite 300 EA $ $
3004b Sunken Grave Repair – Cremain Gravesite 50 EA $ $
TOTAL 3004 $
3005 Columbaria and Memorial Wall Maintenance
3005a Clean Columbaria and Memorial Wall 12 MO $ $
3005b Niche Cover & Memorial Marker Cleaning 2 JB $ $
3005c Maintain Pea Gravel Flower Strips 12 MO $ $
TOTAL 3005 $
3006 Cemetery Grounds Management Plan
3006a Daily, weekly, monthly Grounds Maintenance Schedule showing frequency of all activities for the contract year, including monthly updates.
TOTAL 3006 $
3007 Artificial Turf Maintenance
3007a Inspect, Clean and Groom Turf Fibers 1 JB $ $
3007b Remove Weeds and Litter 12 MO $ $
3007c Replenish Infill 1 JB $ $
3007d Artificial Turf Rejuvenation 1 JB $ $
TOTAL 3007 $
3008 Turf Renovation
3008a Vegetation Removal 20,000 SF $ $
3008b Soil Preparation for Sod 20,000 SF $ $
3008c Turf Renovation by Sod 17,000 SF $ $
3008d Turf Renovation by Seed 3,000 SF $ $
TOTAL 3008 $
3009 Turf Maintenance – Fertilization
3009a Soil Testing and Recommendations 0 EA $ $
3009b Fertilizer Formulated with Pre-Emergent Application 1 JB $ $
3009c Fertilizer Applications 2 JB $ $
3009d Soil Conditioner 1: (Gypsum) 65 Acres @ 1000#/A 2 JB $ $
TOTAL 3009 $
3010 Turf Maintenance – Pest Control
3010a Weed Control – Post Emergent Herbicide 12 MO $ $
3010b Weed Control – Pre-Emergent Herbicide (Second Application)
1 JB $ $
3010c Kikuyugrass/Bermudagrass Control 5 JB $ $
3010d Invertebrate Pest Control 12 MO $ $
3010e Vertebrate Pest Control 12 MO $ $
3010f Repair of Landscape Damaged by Vertebrate Pests 12 MO $ $
3010g Repair and Protection of Irrigation Valve Boxes filled with Soil by Vertebrate Pests
TOTAL 3010 $
3011 Turf Maintenance – Mowing, Trimming & Edging
3011a Cleaning Mowers to remove all Vegetation 12 MO $ $
3011b Mowing – Irrigated Turf 52 JB $ $
3011c Trimming Upright Headstones/Memorial Markers 52 JB $ $
3011d Edging Flat Markers & Clipping Removal 52 JB $ $
3011e Edging Curbs/Sidewalks/Landscape Borders 26 JB $ $
TOTAL 3011 $
3012 Turf Maintenance – Aerification
3012a Aerification by Core Aerator – All Turf 2 JB $ $
3012b Drill and Fill 1 JB $ $
TOTAL 3012 $
3013 Turf Maintenance – Dethatching
3013a Dethatching (1/13 cemetery turf) 5 acres $ $
TOTAL 3013 $
3014 Tree, Shrub, Planting Bed Maintenance
3014a Shrub and Ground Cover Pruning/Trimming 12 MO $ $
3014b
3014c Tree Pruning/Trimming 12 MO $ $
3014d Tree Branch/Limb Disposal 12 MO $ $
3014e Pest Control 2 JB $ $
3014f Planting Bed Tilling 1 JB $ $
3014g Planting Bed Weed Control - Pre-Emergent 1 JB $ $
3014h Planting Bed Weed Control - Post-Emergent / Manual Removal
12 MO $ $
3014i Organic Mulch – Planting Beds, Tree Rings, and Open Ground Areas
1 JB $ $
3014j Inorganic Mulch – Planting Beds, Tree Rings, and Open Ground Areas
1 JB $ $
3014k Planting Bed Edger Maintenance 1 JB $ $
3014l Tree Staking and Maintenance 1 JB $ $
3014m Plant Fertilizing 1 JB $ $
3014n Palm Tree Fertilization 1 JB $ $
3014o Perimeter Landscape Buffer Area Maintenance 12 MO $ $
TOTAL 3014 $
3015 Tree, Shrub & Groundcover Planting
3015a Tree Planting (15 gallon) 4 EA $ $
3015b Shrub Planting (5 gallon) 2 EA $ $
3015c Ground Cover Planting (1 gallon) 10 EA $ $
3015d Annual Color Planting (4” pots) 32 EA $ $
TOTAL 3015 $
3016 Irrigation System Management
3016a Manage and Maintain Irrigation System including Scheduling and Sprinkler Adjustments
12 MO $ $
3016b Irrigation Audit 1 JB $ $
3016c Turf Rotor Pressure Testing 1 JB $ $
3016d Irrigation Schedule 1 EA $ $
TOTAL 3016 $
3017 Irrigation System Scheduled Maintenance
3017a Irrigation Pump Station Maintenance (quarterly) 4 JB $ $
3017b Irrigation Pump Filter Maintenance (quarterly) 4 JB $ $
3017c Weather Station Maintenance 1 JB $ $
3017d Backflow Preventer Testing and Certification 1 EA $ $
3017e Master Valve (Hydrometer) Testing & Calibration 1 JB $ $
3017f Pressure-Regulating Valve Testing 1 JB $ $
3017g Combination (Air & Vacuum Release) Valve Testing 1 JB $ $
3017h Isolation Valve Testing 1 JB $ $
3017i Leak Detection 2 JB $ $
3017j Control System Maintenance 1 JB $ $
3017k Turf Rotor Head Maintenance 1 JB $ $
3017l Spray/MSR/Bubbler Head Maintenance 1 JB $ $
3017m Drip Irrigation System Maintenance 4 JB $ $
TOTAL 3017 $
3018 Irrigation System Maintenance & Repair
3018a Turf Rotor Head Replacement 100 EA $ $
3018b Spray/Multi-Stream Rotary Head Repair 50 EA $ $
3018c Spray/Multi-Stream Rotary Replacement 50 EA $ $
3018d Drip Irrigation Line Repair 10 EA $ $
3018e Drip Filter Repair 2 EA $ $
3018f Electric Valve Repair 25 EA $ $
3018g Electric Valve Replacement 10 EA $ $
3018h Quick Coupling Valve Replacement 10 EA $ $
3018i Decoder Replacement 5 EA $ $
3018j Control Wire Fault Location and Repair 10 EA $ $
3018k Lateral Line Repair 25 EA $ $
3018l Mainline Repair 10 EA $ $
3018m Replace Broken Valve Box and Cover 25 EA $ $
3018n Replace Broken Cover on Valve Box 25 EA $ $
3018o Emergency Irrigation Parts /Repair 1 YR $3,600 $3,600
TOTAL 3018 $
3019 Drainage System Maintenance
3019a Remove debris from Drainage Structures 1 JB $ $
3019b Clean Terrace Drains and Concrete Channels 6 JB $ $
TOTAL 3019 $
3020 Trash & Debris Removal (Waste Management)
3020a Plant Litter Collection and Removal 12 MO $ $
3020b Trash and Debris Collection and Removal 12 MO $ $
3020c Commercial Waste Collection and Disposal 12 MO $ $
TOTAL 3020 $
3021 Pavement Sweeping and Cleaning
3021a Power sweeping of pavements including walkways, assembly area, columbaria courts, roadways, parking lots, driveways, curb lines and gutters.
12 MO $ $
3021b Power washing of pavements including walkways, assembly area, columbaria courts, curb lines and gutters.
TOTAL 3021 $
3022 Structure Maintenance
3022a Clean Columbaria Structures 1 JB $ $
3022b Clean Main Entry Walls and Gates 1 JB $ $
3022c Clean Perimeter Walls, Fences, and Guardrails 1 JB $ $
3022d Maintain Gate Hinges and Automation 1 JB $ $
3022e Clean Rostrum Structure 1 JB $ $
3022f Clean Signage, and Service Seals 1 JB $ $
3022g Clean and Maintain Flag Poles 1 JB $ $
3022h Maintain Exterior and Interior Lighting 12 MO $ $
3022i Clean Buildings Exteriors and Roofs 1 JB $ $
3022j Sand Joints in Unit Pavers at Committal Shelter 1 JB $ $
3022k Provide and Maintain Fire Extinguishers 1 JB $ $
TOTAL 3022 $
3023 Ceremonies
3023a Ceremonies Assist w/ Set-up/Break-down (Memorial Day, and Wreaths Across America)
TOTAL 3023
Total Estimated Cost for Option Year 3: $
OPTION YEAR 4: October 1, 2023 through September 30, 2024
QTY
UNIT UNIT PRICE TOTAL PRICE
4001 Headstone Setting and Alignment
4001a Setting New or Replacement Upright Headstones/ Upright Memorial Markers
100 EA $ $
4001b Setting New or Replacement Flat Markers 260 EA $ $
4001c Headstone Removal, Break-up and Disposal 260 EA $ $
4001d Upright Headstone “Bump & Run” 125 EA $ $
TOTAL 4001 $
4002 Headstone Cleaning and Maintenance
4002a Upright Headstone Cleaning 5,000 EA $ $
4002b Flat Marker Cleaning 1,000 EA $ $
4002c Minor Headstone Cleaning 2,000 EA $ $
TOTAL 4002 $
4003 Headstone Raise, Lower, Re-align & Reset
4003a Raise and Re-align Upright Headstones/Memorial Markers
50 EA $ $
4003b Raise and Re-align Flat Markers 250 EA $ $
TOTAL 4003 $
4004 Gravesite Maintenance
4004a Sunken Grave Repair– Full Casket Gravesite 300 EA $ $
4004b Sunken Grave Repair – Cremain Gravesite 50 EA $ $
TOTAL 4004 $
4005 Columbaria & Memorial Wall Maintenance
4005a Clean Columbaria & Memorial Wall 12 MO $ $
4005b Niche Cover & Memorial Marker Cleaning 2 JB $ $
4005c Maintain Pea Gravel Flower Strips 12 MO $ $
TOTAL 4005 $
4006 Cemetery Grounds Management Plan
4006a Daily, weekly, monthly Grounds Maintenance Schedule showing frequency of all activities for the contract year, including monthly updates.
TOTAL 4006 $
4007 Artificial Turf Maintenance
4007a Inspect, Clean and Groom Turf Fibers 1 JB $ $
4007b Remove Weeds and Litter 12 MO $ $
4007c Replenish Infill 1 JB $ $
4007d Artificial Turf Rejuvenation 1 JB $ $
TOTAL 4007 $
4008 Turf Renovation
4008a Vegetation Removal 20,000 SF $ $
4008b Soil Preparation for Sod 20,000 SF $ $
4008c Turf Renovation by Sod 17,000 SF $ $
4008d Turf Renovation by Seed 3,000 SF $ $
TOTAL 4008 $
4009 Turf Maintenance – Fertilization
4009a Soil Testing and Recommendations 1 EA $ $
4009b Fertilizer Formulated with Pre-Emergent Application 1 JB $ $
4009c Fertilizer Applications 2 JB $ $
4009d Soil Conditioner 1: (Gypsum) 65 Acres @ 1000#/A 2 JB $ $
TOTAL 4009 $
4010 Turf Maintenance – Pest Control
4010a Weed Control – Post Emergent Herbicide 12 MO $ $
4010b Weed Control – Pre-Emergent Herbicide (Second Application)
1 JB $ $
4010c Kikuyugrass/Bermudagrass Control 5 JB $ $
4010d Invertebrate Pest Control 12 MO $ $
4010e Vertebrate Pest Control 12 MO $ $
4010f Repair of Landscape Damaged by Vertebrate Pests 12 MO $ $
4010g Repair and Protection of Irrigation Valve Boxes filled with Soil by Vertebrate Pests
TOTAL 4010 $
4011 Turf Maintenance – Mowing, Trimming & Edging
4011a Cleaning Mowers to remove all Vegetation 12 MO $ $
4011b Mowing – Irrigated Turf 52 JB $ $
4011c Trimming Upright Headstones/Memorial Markers 52 JB $ $
4011d Edging Flat Markers & Clipping Removal 52 JB $ $
4011e Edging Curbs/Sidewalks/Landscape Borders 26 JB $ $
TOTAL 4011 $
4012 Turf Maintenance – Aerification
4012a Aerification by Core Aerator – All Turf 2 JB $ $
4012b Drill and Fill 1 JB $ $
TOTAL 4012 $
4013 Turf Maintenance – Dethatching
4013a Dethatching (1/13 cemetery turf) 5 acres $ $
TOTAL 4013 $
4014 Tree, Shrub, Planting Bed Maintenance
4014a Shrub and Ground Cover Pruning/Trimming 12 MO $ $
4014b Tree Pruning/Trimming 12 MO $ $
4014c Tree Branch/Limb Disposal 12 MO $ $
4014d Pest Control 2 JB $ $
4014e Planting Bed Tilling 1 JB $ $
4014f Planting Bed Weed Control - Pre-Emergent 1 JB $ $
4014g Planting Bed Weed Control - Post-Emergent / Manual Removal
12 MO $ $
4014h Organic Mulch – Planting Beds, Tree Rings, and Open Ground Areas
1 JB $ $
4014i Inorganic Mulch – Planting Beds, Tree Rings, and Open Ground Areas
1 JB $ $
4014j Planting Bed Edger Maintenance 1 JB $ $
4014k Tree Staking and Maintenance 1 JB $ $
4014l Plant Fertilizing 1 JB $ $
4014m Palm Tree Fertilization 1 JB $ $
4014n Perimeter Landscape Buffer Area Maintenance 12 MO $ $
TOTAL 4014 $
4015 Tree, Shrub & Groundcover Planting
4015a Tree Planting (15 gallon) 4 EA $ $
4015b Shrub Planting (5 gallon) 2 EA $ $
4015c Ground Cover Planting (1 gallon) 10 EA $ $
4015d Annual Color Planting (4” pots) 32 EA $ $
TOTAL 4015 $
4016 Irrigation System Management
4016a Manage and Maintain Irrigation System including Scheduling and Sprinkler Adjustments
12 MO $ $
4016b Irrigation Audit 1 JB $ $
4016c Turf Rotor Pressure Testing 1 JB $ $
4016d Irrigation Schedule 1 EA $ $
TOTAL 4016 $
4017 Irrigation System Scheduled Maintenance
4017a Irrigation Pump Station Maintenance (quarterly) 4 JB $ $
4017b Irrigation Pump Filter Maintenance (quarterly) 4 JB $ $
4017c Weather Station Maintenance 1 JB $ $
4017d Backflow Preventer Testing and Certification 1 EA $ $
4017e Master Valve (Hydrometer) Testing and Calibration 1 EA $ $
4017f Pressure-Regulating Valve Testing 1 JB $ $
4017g Combination (Air & Vacuum Release) Valve Testing 1 JB $ $
4017h Isolation Valve Testing 1 JB $ $
4017i Leak Detection 2 JB $ $
4017j Control System Maintenance 1 JB $ $
4017k Turf Rotor Head Maintenance 1 JB $ $
4017l Spray/MSR/Bubbler Head Maintenance 1 JB $ $
4017m Drip Irrigation System Maintenance 4 JB $ $
TOTAL 4017 $
4018 Irrigation System Maintenance & Repair
4018a Turf Rotor Head Replacement 100 EA $ $
4018b Spray/Multi-Stream Rotary Head Repair 50 EA $ $
4018c Spray/Multi-Stream Rotary Replacement 50 EA $ $
4018d Drip Irrigation Line Repair 10 EA $ $
4018e Drip Filter Repair 2 EA $ $
4018f Electric Valve Repair 25 EA $ $
4018g Electric Valve Replacement 10 EA $ $
4018h Quick Coupling Valve Replacement 10 EA $ $
4018i Decoder Replacement 5 EA $ $
4018j Control Wire Fault Location and Repair 10 EA $ $
4018k Lateral Line Repair 25 EA $ $
4018l Mainline Repair 10 EA $ $
4018m Replace Broken Valve Box and Cover 25 EA $ $
4018n Replace Broken Cover on Valve Box 25 EA $ $
4018o Emergency Irrigation Parts /Repair 1 YR $3,600 $3,600
TOTAL 4018 $
4019 Drainage System Maintenance
4019a Remove debris from Drainage Structures 1 JB $ $
4019b Clean Terrace Drains and Concrete Channels 6 JB $ $
TOTAL 4019 $
4020 Trash & Debris Removal (Waste Management)
4020a Plant Litter Collection and Removal 12 MO $ $
4020b Trash and Debris Collection and Removal 12 MO $ $
4020c Commercial Waste Collection and Disposal 12 MO $ $
TOTAL 4020 $
4021 Pavement Sweeping and Cleaning
4021a Power sweeping of pavements including walkways, assembly area, columbaria courts, roadways, parking lots, driveways, curb lines and gutters.
12 MO $ $
4021b Power washing of pavements including walkways, assembly area, columbaria courts, curb lines and gutters.
TOTAL 4021 $
4022 Structure Maintenance
4022a Clean Columbaria Structures 1 JB $ $
4022b Clean Main Entry Walls and Gates 1 JB $ $
4022c Clean Perimeter Walls, Fences, and Guardrails 1 JB $ $
4022d Maintain Gate Hinges and Automation 1 JB $ $
4022e Clean Rostrum Structure 1 JB $ $
4022f Clean Signage and Service Seals 1 JB $ $
4022g Clean and Maintain Flag Poles 1 JB $ $
4022h Maintain Exterior and Interior Lighting 12 MO $ $
4022i Clean Buildings Exteriors and Roofs 1 JB $ $
4022j Sand Joints in Unit Pavers at Committal Shelter 1 JB $ $
4022k Provide and Maintain Fire Extinguishers 1 JB $ $
TOTAL 4022 $
4023 Ceremonies
4023a Ceremonies Assist w/ Set-up/Break-down (Memorial Day and Wreaths Across America)
TOTAL 4023
Total Estimated Cost for Option Year 4: $
SUMMARY TOTALS ESTIMATED TOTAL
BASE YEAR: October 1, 2019 (or Date of Award) through September 30, 2020 $
OPTION YEAR 1: October 1, 2020 through September 30, 2021 $
OPTION YEAR 2: October 1, 2021 through September 30, 2022 $
OPTION YEAR 3: October 1, 2022 through September 30, 2023 $
OPTION YEAR 4: October 1, 2023 through September 30, 2024 $
Total Base and all Option Years Estimated Cost: $
NOTE: The quantities given are only estimates of work to be performed. The Contractor shall be paid only for services approved by the COR and actually rendered or performed. The Contactor shall meet with the COR at least weekly to plan the work to be performed as indicated on the Cemetery Grounds Management Plan. The COR will provide the Contractor with the interment schedule EA workday. The Contractor shall not be compensated for work unauthorized by the COR.
DESCRIPTION / SPECIFICATIONS / WORK STATEMENT
B.1 BACKGROUND
The Department of Veterans Affairs, National Cemetery Administration, honors Veterans with a final resting place and lasting memorials that commemorate their service to our nation. There are approximately 134 National Cemeteries in 39 states that receive visitors, hold ceremonies and conduct committal services on an ongoing basis.
Because of the special significance and attention our National Cemeteries receive from the public, strict adherence to the following specifications is essential.
B.2 PLACE OF PERFORMANCE
The Contractor shall provide all supervision, labor, equipment, materials and supplies necessary to provide Interment and Grounds Maintenance Services at Fort Rosecrans National Cemetery, hereby known as “the Cemetery”. Specific locations, sizes and services required for the cemeteries are as follows:
Cemetery Address Acreage Required Services
Fort Rosecrans National Cemetery
Cabrillo Highway, San Diego, CA, 92166
77.5 Developed Acres
65 Turf Acres
Headstone Setting and Full Grounds & Facility Maintenance Services
B.3 MAINTENANCE AREAS
The physical area of the contract includes the cemetery proper, structures, paving, and landscaped grounds, maintenance areas, roadways, stormwater facilities, perimeter landscaped areas, and all of its landscape elements.
A portion of the cemetery may be under renovation by another contractor at any time; and specific grounds maintenance activities may be under separate contract with another vendor.
B.4 CONTRACT OBJECTIVES
To use an innovative and creative technical approach to manage the grounds maintenance operation at the Cemetery in order to maintain the high standards of appearance as a National Shrine, in accordance with the National Cemetery Administration National Shrine Commitment Operational Standards and Measures (Version 5.1 July 2014) and standard commercial practices.
B.5 GENERAL REQUIREMENTS & SPECIFICATIONS
SERVICES PROVIDED: The Contractor shall provide all supervision, labor, equipment, materials and supplies necessary to perform the following Cemetery and Grounds Maintenance Services at the Fort Rosecrans National Cemetery. THE CONTRACTOR SHALL PROVIDE THE MANPOWER & RESOURCES NECESSARY TO PERFORM AND
COMPLETE MULTIPLE JOB SIMULTANEOUSLY.
Services to be provided include the following:
B.5.1 Headstone Setting and Alignment B.5.2 Headstone Cleaning and Maintenance B.5.3 Headstone Raise, Lower, Realign & Reset B.5.4 Gravesite Maintenance B.5.5 Columbaria & Memorial Wall Maintenance B.5.6 Cemetery Grounds Management Plan B.5.7 Artificial Turf Maintenance B.5.8 Turf Renovation B.5.9 Turf Maintenance – Fertilization B.5.10 Turf Maintenance – Pest Control B.5.11 Turf Maintenance – Mowing, Trimming & Edging B.5.12 Turf Maintenance – Aerification B.5.13 Turf Maintenance – Dethatching B.5.14 Tree, Shrub & Planting Bed Maintenance B.5.15 Tree, Shrub & Groundcover Planting B.5.16 Irrigation System Management B.5.17 Irrigation System Scheduled Maintenance B.5.18 Irrigation System Maintenance and Repair B.5.19 Drainage System Maintenance B.5.20 Trash & Debris Removal (Waste Management) B.5.21 Pavement Sweeping and Cleaning B.5.22 Structure Maintenance B.5.23 Ceremonies B.5.24 Contractor Responsibilities B.5.25 Supervision, Work Hours, and Training B.5.26 Government Contacts
B.5.1 HEADSTONE SETTING & ALIGNMENT
A. NCA STANDARDS
1. Definition: Headstones include upright headstones, flat markers, and columbaria niche covers.
2. Headstones are properly installed.
3. Headstones are aligned in accordance with the section plan or historic pattern.
4. Proper height and alignment of EA headstone is maintained.
5. Headstones are clean, free of debris and objectionable accumulations.
B. SCOPE
1. Work consists of setting new or replacement headstones on gravesites and resetting or realigning those already in place that have shifted out of vertical or horizontal alignment. It includes reporting physical defects to the Contracting Officer or his/her authorized representative. Contractor shall align and level-set an estimated 100 upright headstones; and 260 flat markers per year.
C. GENERAL REQUIREMENTS
1. The type of headstone to be used shall be determined by the Contracting Officer Representative
(COR) through direction of the National Cemetery Administration, Central Office (in accordance with the general plan of the cemetery).
2. Headstones shall be installed within five (5) working days of delivery to the Cemetery as weather and soil conditions permit. Headstones shall be cleaned after setting. Cost for cleaning to be included in work for headstone setting.
3. Acceptability. The "Setting & Alignment" of new or replacement headstones is considered "acceptable" when the Contractor clearly evidences compliance in meeting contract requirements.
4. Inspection & Acceptance: Acceptance is defined as the point in time which the COR has determined the work performed is satisfactory. The Government reserves the right to inspect any/all services rendered and either reject or require correction when headstone setting & alignment are not in conformity with contract specifications.
5. Headstones that are set by the Contractor shall maintain the proper height and alignment for a period of 90 days after being initially set. Any settlement or misalignment of headstones during this 90-day period will be corrected by the Contractor at no additional cost to the Government.
The Government may require the contractor to re-perform any non-conforming services at no increase in contract price.
D. PROCEDURE: NEW & REPLACEMENT HEADSTONES
1. The Cemetery is responsible for ordering headstones, checking for proper wording spelling.
2. Headstones are delivered by the vendor to the Cemetery and received by the Cemetery Staff.
Cemetery Staff shall inventory and inspect headstones for damage immediately upon receipt.
Cemetery Staff shall inventory and inspect headstones for proper wording within two (2) days after receipt. Cemetery Staff shall remove glue or crating material from the headstones that has adhered to the surface.
3. In transporting or storage of headstones, they shall be protected from the weather to avoid damage or staining from crating materials. EA stone shall be placed so as to rest flat. If there is any breakage or damage in any form due to the Contractor's handling or negligence, the cost for replacement shall be borne by the Contractor. The COR shall designate a suitable area for storage of the headstones at the Cemetery. Initial inspection shall be accomplished by COR and contractor’s representative upon receipt. Defective headstones shall not be set. Replacement headstone shall be ordered by the Cemetery.
4. Headstones shall be erected in appropriate places within five (5) working days of receipt, or if weather or soil conditions prohibit this time frame, as soon as practicable after receipt. See
“Headstone - Raise, Lower, Realign & Reset” for specific procedures for setting EA type of headstone.
5. Trees or shrubs obstructing headstones shall be noted and the COR shall determine remedial action, and any modification needed for installation of a headstone.
6. Headstones shall be lifted and transported or set by at least two (2) people unless special one-person lifting devices are approved. Realignment, when consisting merely of straightening the headstone, may be accomplished by one person.
7. Older markers shall be realigned laterally, transversely and diagonally in the same manner as new headstones.
8. Damaged markers shall be identified and immediately brought to the attention of the COR.
Damaged markers and defective/incorrectly inscribed markers on order would be, upon receipt of the new marker, destroyed by the Contractor by means of breaking the marker with a maul or sledge hammer to be totally unreadable. Resultant debris shall be removed from the cemetery grounds in a lawful manner.
9. Replacement marker(s) shall be set within five (5) working days after receipt at the cemetery.
10. The Contractor is responsible for the unloading of headstones from the delivery truck, and the COR is responsible for the initial inspection.
11. The contractor shall report on his/her weekly inspection report to the COR the following:
a. Number of headstones raised and what section _______ (Upright, Flat) ________Section
b. Number of headstones realigned and section
_______ (Upright, Flat) ________Section
12. If there is a problem with realigning a specific marker, a report shall be sent to the COR providing a detailed explanation, the reasons the marker was not realigned.
13. All headstones set by the Contractor shall be warrantied for a period of 90 days; any realignment of headstones during this warranty period shall be at the Contractor’s expense.
14. Adjustment, raising and realigning newly set headstones due to initial settling, improper compaction or Contractor error will not constitute Headstone Raise, Lower, Realign, Reset, Backfill as described in the Price/Cost Schedule and shall be at the Contractor’s expense.
E. REMOVAL OF HEADSTONES
1. This process involves the removal of any headstone associated with a second interment or to gain access to an area within an interment area:
a. The COR, or his/her designee, will identify headstone(s) to be removed.
b. The Contractor shall pull headstone(s) to gain access to the location(s) identified.
c. Once removed, headstones shall not leave the gravesite unless the headstone needs additional inscription work.
d. If additional inscription work is required the Contractor shall relocate removed headstones to the maintenance yard for destruction, or transport them to the inscription yard.
e. Once work is completed in the area, the Contractor shall reset the original or replacement headstone(s) and the 90-day warranty period will begin.
F. DISPOSAL OF HEADSTONES
1. Once the COR or his/her designee has identified a headstone for disposal the Contractor shall take the following actions:
a. Move the headstone to an area of the maintenance yard located out of the view of the general public.
b. Break the headstone into pieces so that the inscriptions are not legible.
c. Bury the broken headstone pieces as directed by the COR.
d. Headstones shall not be used for any purpose other than their intended use.
e. The Contractor shall maintain a log of all disposed headstones. This log shall track the Name, date of disposal and the location of disposed headstone.
G. PRIVATE MARKERS/MONUMENTS
1. The Contractor shall carefully inspect and document the condition of every private marker/monument. The Contractor shall immediately notify the COR in the event a private marker/monument appears to be a safety hazard to employees and/or the public. Any work needed to correct the safety hazard shall be through separate contract.
H. HEADSTONE “BUMP & RUN”
1. Headstone “Bump & Run” is a minor alignment process that does not require the upright headstone to be removed from the original socket. Approximately 125 upright headstones shall require “Bump & Run” EA year.
2. “Bump & Run” shall be accomplished by a two-person team as follows: One person shall use a wood lever (such as a 2x4) or metal pry bar to adjust EA upright headstone to align vertically with adjacent headstones in the same row and column. Care shall be taken to wrap the bar or tool to ensure it does not damage or mar the headstone. A second person shall stand in the same row/column approximately 10 headstones distant to instruct which direction the subject headstone should be adjusted. Once the headstone has been satisfactorily adjusted so it is in alignment with the other headstones in the same row and column, a tamping tool shall be used to tamp around the base of the headstone so soil is compacted sufficiently to prevent shifting.
B.5.2 HEADSTONE CLEANING AND MAINTENANCE
1. Upright markers, flat markers and niche covers are clean, free of debris and objectionable accumulations.
2. Upright markers, flat markers and niche covers are not damaged, marred, or discolored by Contractor operations.
1. Work consists of cleaning all markers as specified by the Contracting Officers Representative
(COR) to remove objectionable material and discoloration, such as accumulations of bird droppings or mud, tire and hose markings, grass stains, residue from trees, fungus, lichens, and other biological activity. There are approximately 88,667 marked gravesites in the Cemetery with approximately 45,032 upright markers; 11,366 flat markers; and 32,269 niche covers.
2. Headstones shall be cleaned prior to Memorial Day and Veteran’s Day and any other times as determined by the Contracting Officers Representative (COR). The natural surfaces shall be retained.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.