36C78620Q0326_1.docx
DOCX document 24 KB Posted
- Solicitation number
- 36C78620Q0326
About this file
This combined synopsis and solicitation requests quotes for the supply of granite, blank niche covers to two national cemeteries. The Department of Veterans Affairs National Cemetery Administration seeks to award a firm-fixed price contract for the supply of 1,700 H1 granite, blank niche covers to Florida National Cemetery and 750 covers to Bay Pines National Cemetery. Quotes are due by May 8, 2020 with delivery required within 30 days of order. The solicitation is set aside for small businesses under NAICS code 327991 for cut stone product manufacturing with a size standard of 500 employees. Quotes will be evaluated with award made to the responsible offeror submitting the lowest priced, technically acceptable offer meeting the standards for product samples and technical approach.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Opportunity Amendment to a Previous Combined Solicitation
PRODUCT SERVICE CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE/TIME/ZONE
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field Contract Opportunity Amendment to a Previous Combined Solicitation FY21 New - MPS Southeast - NEW CONTRACT FOR ON-SITE
INSCRIPTION
SERVICES FOR JACKSONVILLE NATIONAL CEMETERY.
SUBJECT TO AVAILABILITY OF FY 21 FUNDS. COR
P
WILSON..
CO- TBD
22172 36C78620Q0326 K 08-26-2020
1:30 PM
EASTERN TIME, NEW YORK, USA
N
SBA
327991 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 Contracting Officer Marcia Hall Marcia.Hall@va.gov 703-630-9342 Jacksonville National Cemetery 4083 Lannie Rd Jacksonville FL 32218
AMENDMENT #1 TO PREVIOUS COMBINED SYSNOPSIS/SOLICITATION
THIS IS AN AMENDMENT TO A PREVIOUS COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL SERVICES AND PREPARED IN ACCORDANCE WITH THE FORMAT IN FAR SUBPART 12.6 STREAMLINED PROCEDURES FOR EVALUATION AND SOLICITATION FOR COMMERCIAL ITEMS-AS SUPPLEMENTED WITH ADDITIONAL INFORMATION INCLUDED IN THIS NOTICE.
THE PURPOSE OF THIS AMENDMENT IS TO:
1. Post questions and answers 1-5.
Please see the attached pages 3 for the questions and answers.
The solicitation due date remains the same and will NOT be extended.
1.Section 8.2.4 states that the Cemetery POC will decide if the R2 inscriptions are to be done at the gravesite or at the blasting structure. Can we give two different prices for the two different methods? Not only is blasting at the structure is much more cost effective (half the price), it is also safer for the contractor and cemetery visitors. The two different prices can be used for the POC to determine which method is preferred. I know there are some additional costs to have a cemetery employee bring the stone to the structure, but I believe the difference in the inscription cost will outweigh the cost of removing headstones in cremation sections. Headstones in casket sections are pulled during burial anyway.
ANSWER: The cemetery chose the first option as stated: “Inscribed at the gravesite within the cemetery property. Cemetery shall ensure the Contractor has access to the gravesite to perform the inscription operation.”
2. P&G memorials is a small business in Tampa, Florida and in anticipation of this and other on-site inscription contracts have been in talks with a 8a/SDVOSB/TS Facility company also in Tampa. I would like to know if we would be able to put two quotations in for this contract one with just P&G Memorials and another with both companies involved. The two bids will allow the government to determine which arrangement is most beneficial.
ANSWER: Yes you may submit two quote packages.
3. Request to review and remove or modify Section 20.6 I believe that Section 20.6, which requires that the contractor's employees set up the stones for inspection, will cause unnecessary complications and a confusion in who is liable for damage. I propose that the cemetery employees be responsible for both unloading the stones from the supplier and also setting them up for inspection.
Under sections 20.1, 20.2 and 20.3, the cemetery is still in possession of the blank stones and responsible for them until they transfer possession of the stones for inscription to the contractor. 20.7 makes clear that the contractor takes possession and responsibility of the stones AFTER inspection. Therefore, the contractor should not be handling the stones prior to inspection.
ANSWER: Cemetery personnel are responsible for unloading, initial inspection of palleted blanks and signing for the shipment. Cemetery will transfer blanks (it is up to the cemetery what the transfer quantity would be) by completing Appendix B. Appendix B is confirmed by the contractor to ensure the quantity is correct with both parties responsible for final inspection of blanks. Blanks will be unloaded from pallets by the contractor for this transfer inspection with both parties agreeing on inspection and acceptance. Appendix B is signed by the contractor accepting the inspected and approved quantity of blanks which now become their responsibility.
4.Can we use samples stones that have been approved within the last 3 months to qualify for this bid ?
ANSWER: No. You must submit a new sample.
5.Do the samples require lithochrome ?
ANSWER: No