- Solicitation number
- 36C78620Q0186
About this file
36C78620Q0186 0001 36C78620Q0186 0001.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78620Q0186-0001002.pdf | ||
| 36C78620Q0186-0001003.pdf | ||
| 36C78620Q0186-0001001.pdf | ||
| 36C78620Q0186-003.pdf | ||
| 36C78620Q0186-005.pdf | ||
| 36C78620Q0186-002.pdf | ||
| 36C78620Q0186-001.docx | DOCX document | |
| 36C78620Q0186-004.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
851-NRM20-203
36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle
VA
22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle
VA
22172 To all Offerors/Bidders
36C78620Q0186 04-22-2020
X X X
Quotes due 5-7-2020 before 10:00 am MT X The purpose of this Amendment-0001 is to provide Government responses to solicitation questions and to upload three new attachments documents. See continuation page for details.
Q&A period ended 4-21-2020.
Jerry L. Hodson Jr.
Contracting Officer AMENDMENT-0001, Solicitation 36C78620Q0186 Houston_ Reline Main Well & Replace Pump: Contractor Questions & GOV Responses Q&A period has ended as of 4-21-20
1. The engineer has already picked a pump model with design condition for this well. How can we know that the well produce this design condition without a specific capacity test after the liner is installed?
1. GOV Response: The Contractor shall perform a specific capacity drawdown test with the installed equipment.
2. Why are they changing from a line shaft turbine to a submersible turbine? This will require a new discharge head and possible modifications to the flow line.
2. GOV Response: All Offerors shall provide a quote based upon the specified submersible equipment and required discharge head modifications. Offerors may also provide an alternate quote for a vertical line shaft assembly with similar pumping capabilities if they feel it will serve the Government’s best interest; however, the basis of award evaluation will be on the original scope and any changes will be process post-award.
3. What is the current specific capacity of the well?
3. GOV Response: The specific capacity at the time of original well development was 16 gpm/ft @ 975 gpm.
4. Can the most recent television survey be made available to view?
4. GOV Response: The Government does not have the recent video survey. The Contractor shall be required to perform a new video survey to start the project.
5. The spec calls for the liner to be threaded, we usually weld liners in. Will that be excepted?
5. GOV Response: That is acceptable.
6. Can Alloy Machine works be an excepted manufacture for the screen section of the liner?
6. GOV Response: The Government does not require a specific liner manufacturer. Any specific manufacturer named in the SOW was provided as an example of material and construction type, and quality meeting the contract specification. The Contractor shall be required to submit their proposed materials that meet the contract specifications after award.
7. The engineer might want to extent the screen section of the liner 2’ on the top and bottom of the production zone to allow more flow?
7. GOV Response: The length of screen specified was selected to limit the screen entrance velocity to 0.1 ft/sec (based upon the formula ‘transmitting capacity (gpm/ft. of screen) = open area x 0.31’). Since the diameter of the liner will be changing (see RFI question #9), a new sample screen length calculation is provided in the revised SOW. (See Document Attachment: S06_Amendment-0001_Attach-1_REV-1 SOW_Houston_Reline Main Well & Replace Pump)
8. The spec calls for a 6” X 8” K packer. These are typically not used in the Houston area because it doesn’t allow the gravel pack to be replenished.
8. GOV Response: Agree. This requirement has been removed from the revised SOW.
9. The scope of work outlined in the SOW will most likely not be possible. The current 8” ID liner would have to be perfectly straight to be able to fit 6.625” OD line inside. This most likely will not be the case. This also leaves no room for a gravel pack behind the liner. This means the well is going to continue to make sand. We request engineering review of this issue.
9. GOV Response: Agree. The liner diameter has been changed to 4” ID, 4.50” OD and gravel pack added.
10. Also I would advise against using a sonar jet on a well with structural problems. There are other options that might be possible, like using a 4” liner, or setting a steel patch, over the section producing sand. We request engineering review of this issue.
10. GOV Response: Agree. The rehabilitation method has been removed from the revised SOW.
11. An additional wage determination is being added for use against the awarded contract. (See S06_Amendment-0001_Attach-2_WD_HEAVY_Harris County TX20200031_1-3-20)
12. The SOW and REV-1 SOW is missing the damage notations. (See: S06_Amendment-0001_Attach-3_Well Screen Location-Damage Diagram) See attached document: S06_Amendment-0001_Attach-1_REV-1 SOW_Houston_Reline Main Well _ Replace Pump.
See attached document: S06_Amendment-0001_Attach-2_WD_HEAVY_Harris County TX20200031_1-3-20.
See attached document: S06_Amendment-0001_Attach-3_Well Screen Location-Damage Diagram.
End of Document