36C78620Q0035-001.pdf
PDF Posted
- Solicitation number
- 36C78620Q0035
About this file
This document is a combined synopsis and solicitation for janitorial services at the Long Island National Cemetery. The solicitation seeks quotations for cleaning administration buildings, maintenance buildings, and public restrooms totaling approximately 5,500 square feet of space. Services include vacuuming, mopping, dusting, trash removal, restroom cleaning, and other janitorial tasks to be performed daily between the hours of 4:30 PM and 10:00 PM on weekdays and 4:30 PM to 10:00 PM on weekends for the public restrooms. The period of performance is for a base year from the date of award through September 30, 2020 with four one-year option periods. The solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses and responses are due by September 17, 2019. The award will be made to the responsible offeror providing the best value based on price and past performance.
36C78620Q0035 Bid Schedule - Ground Maintenance _Cypress Hill NC.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78620Q0035-0001001.pdf | ||
| 36C78620Q0035-0001002.pdf | ||
| 36C78620Q0035-0001000.docx | DOCX document | |
| 36C78620Q0035-0001002.pdf | ||
| 36C78620Q0035-0001000.docx | DOCX document | |
| 36C78620Q0035-0001001.pdf | ||
| 36C78620Q0035-004.pdf | ||
| 36C78620Q0035-000.docx | DOCX document | |
| 36C78620Q0035-003.docx | DOCX document | |
| 36C78620Q0035-002.pdf | ||
| 36C78620Q0035-001.pdf | ||
| 36C78620Q0035-000.docx | DOCX document | |
| 36C78620Q0035-002.pdf | ||
| 36C78620Q0035-003.docx | DOCX document | |
| 36C78620Q0035-004.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CYPRESS HILLS NATIONAL CEMETERY and UNION & MOUNT OF VICTORY PLOTS BASE YEAR: From October 1, 2019 or From Date of Award thru September 30, 2020
CLIN Description Est.
Qty
Unit Unit Cost Total Cost
Mow 18 acres of turf to include collection & removal of leaves, debris / trash and cleaning of sidewalks, driveways & parking areas.
33 JB $_______ $__________
Trim approximately 18,590 Headstones (in conjunction with every mowing)
33 JB $_______ $__________
0003 Edge curbs & walkways (every other week) 16 JB $_______ $__________
Clean all headstones (18,590) before Memorial Day using D2 biological solution headstone cleaner
18,590 EA $_______ $__________
Fall Leaf Cleanup: Cleanup and removal of leaves, leaf debris & branches. This leaf cleanup will commence October 15th and occur weekly through December 30th (weather permitting) with all leaves being removed from the cemetery. One additional weekly cleanup will commence March 15th and be completed before the start of the mowing season.
12 JB $_______ $__________
Repair Sunken Graves: Sunken graves will be filled with approved select backfill and tamped with a power / pneumatic tamper within 2” of established grade of the surrounding gravesites. The tamping process will occur both before and after the topsoil is added. Clean topsoil will be added to bring the gravesite to established grade. Sufficient excess soil shall also be provided to account for forced settling and compacting of the filled gravesites. Sunken graves to be repaired will be identified by the COR
100 EA $_______ $__________
Tree Pruning / Trimming / Removal: Pruning of trees identified by the COR with all debris being chipped or removed from cemetery premises by the Contractor.
Removal of trees identified by the COR will include grinding of stump, removal of grindings, backfilling stump cavity with clean topsoil, tamping and seeding.
200 HR $_______ $__________
Snow Removal of Roads, Sidewalks, Steps, Building Entrances & Walkways: Snow removal from all roads, steps, sidewalks (including sidewalk along the entire front of the cemetery that borders Jamaica Avenue), including areas around the cemetery lodge. Removal process will include the application of calcium chloride to all sidewalks and steps and rock salt on all asphalt roads which will be provided by the cemetery. (Material will be provided by the cemetery)
10 JB $_______ $__________
Raising & Lowering of United States Flag (On An As Needed Basis) : Upon Presidential proclamation or by direction of the New York State Governor for any specific occasion or occurrence calling for the flag to be lowered at half-staff, the Contractor will lower the flag for the specified time determined and then raise it to full staff upon completion of the designated time.
12 JB $_______ $__________
$__________Total Estimated Cost:
Option YR 1 PoP - October 1, 2020 thru September 30, 2021
CLIN Description Est.
Qty
Unit Unit Cost Total Cost
Mow 18 acres of turf to include collection & removal of leaves, debris / trash and cleaning of sidewalks, driveways & parking areas.
33 JB $_______ $__________
Trim approximately 18,590 Headstones (in conjunction with every mowing)
33 JB $_______ $__________
1003 Edge curbs & walkways (every other week) 16 JB $_______ $__________
Clean all headstones (18,590) before Memorial Day using D2 biological solution headstone cleaner
18,590 EA $_______ $__________
Fall Leaf Cleanup: Cleanup and removal of leaves, leaf debris & branches. This leaf cleanup will commence October 15th and occur weekly through December 30th (weather permitting) with all leaves being removed from the cemetery. One additional weekly cleanup will commence March 15th and be completed before the start of the mowing season.
12 JB $_______ $__________
Repair Sunken Graves: Sunken graves will be filled with approved select backfill and tamped with a power / pneumatic tamper within 2” of established grade of the surrounding gravesites. The tamping process will occur both before and after the topsoil is added. Clean topsoil will be added to bring the gravesite to established grade. Sufficient excess soil shall also be provided to account for forced settling and compacting of the filled gravesites. Sunken graves to be repaired will be identified by the COR
100 EA $_______ $__________
Tree Pruning / Trimming / Removal: Pruning of trees identified by the COR with all debris being chipped or removed from cemetery premises by the Contractor.
Removal of trees identified by the COR will include grinding of stump, removal of grindings, backfilling stump cavity with clean topsoil, tamping and seeding.
200 HR $_______ $__________
Snow Removal of Roads, Sidewalks, Steps, Building Entrances & Walkways: Snow removal from all roads, steps, sidewalks (including sidewalk along the entire front of the cemetery that borders Jamaica Avenue), including areas around the cemetery lodge. Removal process will include the application of calcium chloride to all sidewalks and steps and rock salt on all asphalt roads which will be provided by the cemetery. (Material will be provided by the cemetery)
10 JB $_______ $__________
Raising & Lowering of United States Flag (On An As Needed Basis) : Upon Presidential proclamation or by direction of the New York State Governor for any specific occasion or occurrence calling for the flag to be lowered at half-staff, the Contractor will lower the flag for the specified time determined and then raise it to full staff upon completion of the designated time.
Option YR 2 PoP - October 1, 2021 thru September 30, 2022
CLIN Description Est.
Qty
Unit Unit Cost Total Cost
Mow 18 acres of turf to include collection & removal of leaves, debris / trash and cleaning of sidewalks, driveways & parking areas.
33 JB $_______ $__________
Trim approximately 18,590 Headstones (in conjunction with every mowing)
33 JB $_______ $__________
2003 Edge curbs & walkways (every other week) 16 JB $_______ $__________
Clean all headstones (18,590) before Memorial Day using D2 biological solution headstone cleaner
18,590 EA $_______ $__________
Fall Leaf Cleanup: Cleanup and removal of leaves, leaf debris & branches. This leaf cleanup will commence October 15th and occur weekly through December 30th (weather permitting) with all leaves being removed from the cemetery. One additional weekly cleanup will commence March 15th and be completed before the start of the mowing season.
12 JB $_______ $__________
Repair Sunken Graves: Sunken graves will be filled with approved select backfill and tamped with a power / pneumatic tamper within 2” of established grade of the surrounding gravesites. The tamping process will occur both before and after the topsoil is added. Clean topsoil will be added to bring the gravesite to established grade. Sufficient excess soil shall also be provided to account for forced settling and compacting of the filled gravesites. Sunken graves to be repaired will be identified by the COR
100 EA $_______ $__________
Tree Pruning / Trimming / Removal: Pruning of trees identified by the COR with all debris being chipped or removed from cemetery premises by the Contractor.
Removal of trees identified by the COR will include grinding of stump, removal of grindings, backfilling stump cavity with clean topsoil, tamping and seeding.
200 HR $_______ $__________
Snow Removal of Roads, Sidewalks, Steps, Building Entrances & Walkways: Snow removal from all roads, steps, sidewalks (including sidewalk along the entire front of the cemetery that borders Jamaica Avenue), including areas around the cemetery lodge. Removal process will include the application of calcium chloride to all sidewalks and steps and rock salt on all asphalt roads which will be provided by the cemetery. (Material will be provided by the cemetery)
10 JB $_______ $__________
Raising & Lowering of United States Flag (On An As Needed Basis) : Upon Presidential proclamation or by direction of the New York State Governor for any specific occasion or occurrence calling for the flag to be lowered at half-staff, the Contractor will lower the flag for the specified time determined and then raise it to full staff upon completion of the designated time.
Option YR 3 PoP - October 1, 2022 thru September 30, 2023
CLIN Description Est.
Qty
Unit Unit Cost Total Cost
Mow 18 acres of turf to include collection & removal of leaves, debris / trash and cleaning of sidewalks, driveways & parking areas.
33 JB $_______ $__________
Trim approximately 18,590 Headstones (in conjunction with every mowing)
33 JB $_______ $__________
3003 Edge curbs & walkways (every other week) 16 JB $_______ $__________
Clean all headstones (18,590) before Memorial Day using D2 biological solution headstone cleaner
18,590 EA $_______ $__________
Fall Leaf Cleanup: Cleanup and removal of leaves, leaf debris & branches. This leaf cleanup will commence October 15th and occur weekly through December 30th (weather permitting) with all leaves being removed from the cemetery. One additional weekly cleanup will commence March 15th and be completed before the start of the mowing season.
12 JB $_______ $__________
Repair Sunken Graves: Sunken graves will be filled with approved select backfill and tamped with a power / pneumatic tamper within 2” of established grade of the surrounding gravesites. The tamping process will occur both before and after the topsoil is added. Clean topsoil will be added to bring the gravesite to established grade. Sufficient excess soil shall also be provided to account for forced settling and compacting of the filled gravesites. Sunken graves to be repaired will be identified by the COR
100 EA $_______ $__________
Tree Pruning / Trimming / Removal: Pruning of trees identified by the COR with all debris being chipped or removed from cemetery premises by the Contractor.
Removal of trees identified by the COR will include grinding of stump, removal of grindings, backfilling stump cavity with clean topsoil, tamping and seeding.
200 HR $_______ $__________
Snow Removal of Roads, Sidewalks, Steps, Building Entrances & Walkways: Snow removal from all roads, steps, sidewalks (including sidewalk along the entire front of the cemetery that borders Jamaica Avenue), including areas around the cemetery lodge. Removal process will include the application of calcium chloride to all sidewalks and steps and rock salt on all asphalt roads which will be provided by the cemetery. (Material will be provided by the cemetery)
10 JB $_______ $__________
Raising & Lowering of United States Flag (On An As Needed Basis) : Upon Presidential proclamation or by direction of the New York State Governor for any specific occasion or occurrence calling for the flag to be lowered at half-staff, the Contractor will lower the flag for the specified time determined and then raise it to full staff upon completion of the designated time.
Option YR 4 PoP - October 1, 2023 thru September 30, 2024
CLIN Description Est.
Qty
Unit Unit Cost Total Cost
Mow 18 acres of turf to include collection & removal of leaves, debris / trash and cleaning of sidewalks, driveways & parking areas.
33 JB $_______ $__________
Trim approximately 18,590 Headstones (in conjunction with every mowing)
33 JB $_______ $__________
4003 Edge curbs & walkways (every other week) 16 JB $_______ $__________
Clean all headstones (18,590) before Memorial Day using D2 biological solution headstone cleaner
18,590 EA $_______ $__________
Fall Leaf Cleanup: Cleanup and removal of leaves, leaf debris & branches. This leaf cleanup will commence October 15th and occur weekly through December 30th (weather permitting) with all leaves being removed from the cemetery. One additional weekly cleanup will commence March 15th and be completed before the start of the mowing season.
12 JB $_______ $__________
Repair Sunken Graves: Sunken graves will be filled with approved select backfill and tamped with a power / pneumatic tamper within 2” of established grade of the surrounding gravesites. The tamping process will occur both before and after the topsoil is added. Clean topsoil will be added to bring the gravesite to established grade. Sufficient excess soil shall also be provided to account for forced settling and compacting of the filled gravesites. Sunken graves to be repaired will be identified by the COR
100 EA $_______ $__________
Tree Pruning / Trimming / Removal: Pruning of trees identified by the COR with all debris being chipped or removed from cemetery premises by the Contractor.
Removal of trees identified by the COR will include grinding of stump, removal of grindings, backfilling stump cavity with clean topsoil, tamping and seeding.
200 HR $_______ $__________
Snow Removal of Roads, Sidewalks, Steps, Building Entrances & Walkways: Snow removal from all roads, steps, sidewalks (including sidewalk along the entire front of the cemetery that borders Jamaica Avenue), including areas around the cemetery lodge. Removal process will include the application of calcium chloride to all sidewalks and steps and rock salt on all asphalt roads which will be provided by the cemetery. (Material will be provided by the cemetery)
10 JB $_______ $__________
Raising & Lowering of United States Flag (On An As Needed Basis) : Upon Presidential proclamation or by direction of the New York State Governor for any specific occasion or occurrence calling for the flag to be lowered at half-staff, the Contractor will lower the flag for the specified time determined and then raise it to full staff upon completion of the designated time.
File details come from the government source that posted it. Updated .