36C78620B0023 0003.docx

DOCX document 20 KB Posted

Attached to
Z1AZ--Water Service and Irrigation System, Springfield National Cemetery
Solicitation number
36C78620B0023
Issued by

About this file

This document contains an amendment to a solicitation for a water service and irrigation system project at the Springfield National Cemetery. The amendment provides answers to potential offerors' questions to clarify the requirements. The Department of Veterans Affairs intends to award a firm-fixed price contract valued between $1 million and $2 million to install a new water service line connected to the city utility, remove or abandon existing water lines and irrigation systems, install a new backflow preventer and water main lines, and establish a new irrigation system. The work must be completed within 274 calendar days of the notice to proceed. The contract is set aside exclusively for verified service-disabled veteran-owned small businesses. Offerors must register in the System for Award Management and Vendor Information Pages databases. The solicitation will be posted on beta.sam.gov, and amendments will only be issued there rather than being mailed. The contracting officer is Denise Russell and questions may only be submitted electronically.

View the file

Other files

File Type Posted
S07 Abstract of Offerors Springfield NC 36C78620B0023.pdf PDF
36C78620B0023 0006.docx DOCX document
36C78620B0023 0005.docx DOCX document
36C78620B0023 0004.docx DOCX document
36C78620B0023 0002.docx DOCX document
36C78620B0023 0001.docx DOCX document
Springfield National Cemetery - Bid Docs - Specifications.pdf PDF
NCA Springfield Electrical Load Calcs.pdf PDF
Springfield National Cemetery - Bid Docs - Plans.pdf PDF
S02_Attachment-_Contractor Cost Estimate Worksheet_10-8-19.xlsx XLSX spreadsheet
WD MO20200055 5_15_2020 Springfield NC.pdf PDF
36C78620B0023_1.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-24-2020 Amendment Date

879CM3016

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 To all Offerors/Bidders

36C78620B0023

X X X

X

The purpose of this amendment is to post questions and answers.

Please see the attached.

CONTINUATION PAGE

Springfield NCA - Water Service & Irrigation Project RFI Questions

1) Is this a tax-exempt project?

a) No.

2) If tax-exempt, will the Government be providing a tax-exempt certificate to the Prime Contractor for use by subContractors and vendors?

a)

3) Can the Prime Contractors Superintendent be shared across multiple projects or should they be dedicated full-time to this project and this project only?

a) The Contractor is responsible for managing contract personnel, but must meet the contract and OSHA requirement for a certified “competent person” on site whenever work is being done (see below). In the absence of an on-site superintendent during project work, this competent person will be considered the authorized Contractor’s representative in dealing with the Government.

IAW Spec Section 01 00 02-1.1F, “An OSHA certified “competent person” (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general or subContractors are present.”

1) Will the VA provide a spot for the Prime Contractor employee(s) to set up an office or should Contractors include monies for a temp office, utilities, etc.?

a) The Government will work with the Contractor at the initial site visit to identify the location of a Contractor-controlled storage/office area. The Contractor is responsible for all costs to set up, secure, and operate their area, including providing toilets for their employees.

This question is more fully answered in the Specs:

IAW Spec Section 01 00 02-1.6B, D: "Temporary buildings (e.g., storage trailers, office trailers) and utilities may be erected by the Contractor only with the approval of the RE/COR and shall be built with labor and materials furnished by the Contractor without expense to the Government." "Working space and space available for storing materials shall be as determined by the RE/COR with agreement of the Cemetery."

IAW Spec Section 01 00 02-1.16: “Temporary Toilets - Provide ample temporary sanitary toilet accommodations, or when approved by RE/COR provide suitable dry closets where directed.”

IAW Spec Section 01 00 02-1.17, Availability and Use of Utility Services, excerpted:

“The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract.” The following clarifications are included:

1. “Electricity (for Construction and Testing): The Contractor shall meter and pay for electricity required for electric cranes, hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. The Contractor shall install meters at the Contractor's expense. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government.” 2. “Water (for Construction and Testing): Water is available at no cost to the Contractor. If potable water is required, the Contractor may connect to the Cemetery potable water distribution system. The Contractor shall install reduced pressure backflow preventer at each connection at own expense. Where not available or not convenient to connect to the Cemetery distribution system, the Contractor shall supply water via portable/temporary means at his own expense.”

5) Does the NCA anticipate this project will require off hours work?

a) We don't anticipate a requirement for work hours other than a standard 8-hour work day Monday-Friday (specific work hours to be discussed and agreed to by the Contractor and the Government at the initial site visit).

6) If so, what trades/scopes will be required to perform off hours work? a) N/A

7) How long can the water service be down at each building during transition to new line?

a) Per the plans and Specs, the Government requirement is for minimal water outages, in both duration and frequency. All scheduled outages must be requested by the Contractor in writing 10 days in advance per Spec Section 01 00 02-1.6I2. Major utility outages (either to the entire cemetery or occupied buildings) require 15 days written notice per Spec Section 01 00 02-1.6I4.

8) Several civil drawings reference architectural drawings, but none are included in the bid docs. Please provide these.

a) Sheet C104 Keynote 6 incorrectly references Sheets A101 and A103 for details on the irrigation and pump enclosure. Please correct the Bid Plans sheets as follows: 1) Revise Sheet C104 Keynote 6 to reference Sheet I-2.1 for the pump enclosure – it’s a self-enclosed pump.

9) The drawings mention a pump enclosure, but the enclosure isn’t found in the specs or on any of the drawings. Please clarify.

a) The pump enclosure is shown on the plans, Sheet I-2.1. The Spec Section covering it is 32-82-00, Irrigation Pumps.

End of Document