This document contains a pre-solicitation notice and related questions and answers for a federal contract opportunity. The Department of Veterans Affairs National Cemetery Administration intends to issue a solicitation on or around December 12, 2019 for a gravesite expansion project at Yellowstone National Cemetery in Laurel, Montana. The estimated value of the contract is between $500,000 and $1,000,000. The opportunity is set aside exclusively for verified Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 237990 and the size standard is $36.5 million. Interested parties must register at both www.vetbiz.gov and www.sam.gov to be eligible for award. The closing date for bids is January 21, 2020 at 2:00pm Eastern Time. The pre-solicitation notice provides relevant details on the requirement and registration requirements, while the questions and answers document clarifies aspects of the solicitation documents and drawings.

36C78620B0001 0001 36C78620B0001 0001.docx

View the file

Other files

File Type Posted
36C78620B0001-0002000.docx DOCX document
36C78620B0001-005.xlsx XLSX spreadsheet
36C78620B0001-001.docx DOCX document
36C78620B0001-004.pdf PDF
36C78620B0001-003.pdf PDF
36C78620B0001-002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

938CM3001

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 To all Offerors/Bidders

36C78620B0001

X X X

Bids still due on 1-21-20 by 2:00pm EST X See Continuation Page for Government Responses to Contractor questions.

Jerry L. Hodson Jr.

Contracting Officer

CONTINUATION PAGE

AMENDMENT-0001, 36C78619B0001

Yellowstone Gravesite Expansion Contractor Questions & GOV Responses

1. Will the NCA hire a Third Party Inspection company and on-site inspector for this project?

1. GOV Response: The contractor is required to hire a third-party Testing Laboratory Services, see specification. The contractor is responsible for QA/QC of the work being performed.

The VA will hire their own construction period inspection service personnel, with one of their duties to provide on-site inspection for the VA of the work that is being performed.

2. 01 00 02-1.6.H Install PVC privacy slats the entire length of fence. IS the requirement Fence Fabric or PVC Slats?

2. GOV Response: Both. The fence fabric is the actual chain-link fencing fabric and then in-filled with PVC privacy slats.

3. 01 00 02-1.12.C.1 Is the certification being referenced just a letter generated by the land surveyor that they have confirmed locations before work can proceed ?

3. GOV Response: Yes, a survey plan and letter confirming the locations and elevations of all built items prior to construction.

4. 03 30 53-3.1.A Is it really necessary to have an Engineer design the formwork on such small footers?

4. GOV Response: No. This requirement can be removed unless deemed necessary by the contractor.

5. Sheet C-201 Note 1- Limestone Caps to Match Existing- Please provide the location of the quarry the existing caps came from. Limestone is different based on the quarry location.

5. GOV Response: The cap stone is, Indiana Oolitic Limestone, color “Silver Buff”.

6. Sheet C-502 Detail 2 Niche Covers- Please provide location of previous vendor OR a more detailed name of the Black Marble so an exact match can be provided.

6. GOV Response: The color of the granite is Absolute Black.

7. Sheet LP-101 Detail 2- In detail it shows a flower watering station next to columbarium. Is this existing or will it need to be added?

7. GOV Response: This is an existing flower watering station. The only new FWS to be installed by the contractor is the one by the IGC section labeled 3 on detail 1/LP101.

8. 32 90 00-1.6.A.2 Has the NCA verified that the native soil is capable of meeting such stringent requirements. These certifications required are not utilized in all parts of the US. Would NCA consider a local soils lab that can make recommendations for best processed planting in that area?

8. GOV Response: The soil from the last project was amended and testing confirmed the soil met the specifications as designed. These are standard NCA requirements for amended soil. The testing laboratory needs to be VA approved and meet laboratory testing specifications. This approved laboratory should be able to make recommendations on soil amendments and conditioners.

9. There are 3 storm-water catch basins shown on C-102, C-103 & C-402 (Keyed Note #9) just east of the New Columbaria walls. The connecting pipe between them appears to connect to an existing inlet north of the Columbaria. There are no details for the inlets given in the plans as to size, construction, etc.

9. GOV Response: The new 6” SD pipe does not connect to an existing inlet. It daylights into the drainage ditch using the storm drain outlet details 4/C-402.

10. On plan sheet C-402, there is a cut section 4/C-402 showing “Top View-HDPE Outlet” (located about mid-page). These cut sections are shown on the Plan View to be located at the East end of the Columbaria walls. Please clarify, as the 4” trench/gravel drains from the Columbaria show to tie into the 6” HDPE storm main drain that also connects the 3 area inlets.

10. GOV Response: The location of the HDPE Outlet is shown as (Keyed Note #6) which is shown daylighting the new 6” SD line into the drainage ditch to the north of the columbarium plaza. They are not located at the east ends of the columbaria walls.

11. Just below cut section 4/C-402, also on plan sheet C-402, is another section 4 – “Storm Drain Outlet”. I am not sure where this is to be used since the 6” storm drain line shows to connect to the existing inlet and not outfall into a ditch.

11. GOV Response: The location of the HDPE Outlet is shown as (Keyed Note #6) which is shown daylighting the new 6” SD line into the drainage ditch to the north of the columbarium plaza. The new 6” SD pipe does not connect to an existing inlet. It daylights into the drainage ditch using the storm drain outlet details 4/C-402.