36C78619R0076-0004000.docx

DOCX document 22 KB Posted

Attached to
36C786-19-C-0157 |CSD Southeast - Ft. Mitchell National Cemetery - Install Well System | Coburn Contractors LLC
Solicitation number
36C78619R0076
Issued by

About this file

36C78619R0076 0004 36C78619R0076 0004.docx

View the file

Other files

File Type Posted
36C78619C0157-000.docx DOCX document
36C78619R0076-0003000.docx DOCX document
36C78619R0076-0002000.docx DOCX document
36C78619R0076-0001000.docx DOCX document
36C78619R0076-005.pdf PDF
36C78619R0076-004.pdf PDF
36C78619R0076-003.pdf PDF
36C78619R0076-006.pdf PDF
36C78619R0076-002.pdf PDF
36C78619R0076-001.docx DOCX document
36C78619R0076-000.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-23-2019 7889-000001 N/A 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 75 Barrett Heights Road, Suite 309 Stafford

VA

22556 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 75 Barrett Heights Road, Suite 309 Stafford

VA

22556 To all Offerors/Bidders

36C78619R0076 06-26-2019

X X X

This amendment written to provide final government responses to RFIs previously received and re-confirmed receipt of proposals due date of August 30, 2019, 1:00pm EDT. See page two (2).

via pending amendment.

XXXXXXXXXXXX LAST ITEM ALL OTHER TERMS AND CONDITIONS REMAINS UNCHANGED.XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

CHARLES A. DANIELS

CONTRACT SPECIALIST

AMENDMENT NO. 0004 36C786-19-R-0076 DATED: August 23, 2019 FORT MITCHELL NATIONAL CEMETERY – This amendment supports government response to all questions received against subject requirement. Note: There will be no further time extension for receipt of proposals, based on government responses.

QUESTION 1: Can the well heads be modified with a water sampling port to get isolated water samples and inspect each of wells to isolate the problem before determining an appropriate course of action? GOVERNMENT RESPONSE: Statement of Work states to abandon both wells.

QUESTION 2: There are no details as to the makeup, design, and depth of the existing wells. What is the depth of each of the two existing wells and when was each put into service? GOVERNMENT RESPONSE: Depth and date of installation are unknown QUESTION 3: The SOW said to abandon two existing wells and drill a single test well, and to install four 7.5 H.P. submersible pump motors. There is no mention of adding a total of four wells. Is the intention to add a total of four wells to the site? GOVERNMENT RESPONSE: Four wells were included as a basis of bid. The Government understands that if additional wells are required (based on the required testing) this would be a in scope modification to the contract. The opposite is also true: if the results of the testing indicate fewer than four wells, a deduct would be required.

QUESTION 4: There is no well design diagram showing the depth or construction of the new wells. What is the design and depth of the new wells supposed to be? GOVERNMENT RESPONSE: The design and depth of the new wells is dependent on the results of the test well and the stated requirements of this project.

QUESTION 5: The SOW states that the existing pump control equipment was sufficient. The existing pump control system is not sufficient as it is controlling the system with Motor Starters that do not have enough expansion spaces to add two new motor starters. Are the motor starters for wells as well as booster pumps to be removed and all equipment replaced with electronic controls and VFD’s which currently there are none? Are VFD’s to be added to control the two 40 HP booster pumps as well as the 5 HP pressure pump which are currently controlled by Motor Starters? GOVERNMENT RESPONSE: The SOW states that the existing pump control equipment is ASSUMED to be sufficient. This is to form a uniform basis of bid. If modifications are required or recommended, this would be a in scope modification to the contract proposed for consideration.

QUESTION 6: The SOW seems to ask to add four new wells onsite but does not identify any locations for these wells to be located, or how the piping is to be routed to the North pump station building. Where should the wells be located and how will the piping and electrical get to the building if new wells are installed? GOVERNMENT RESPONSE: Exact location of the resulting wells shall be field determined in coordination with the Cemetery Director.

QUESTION 7: The well piping that connects to the storage tank at the bottom of the tank has been partially covered with eroded slope sand. There is no mention of where the new manifold should be located and which of the existing inlet ports should be used for the new well system inlets. Where should the manifold be located to be able to connect the new wells to storage tank? GOVERNMENT RESPONSE: The manifold shall be coordinated with the location of the wells and shall also be field determined in coordination with the Cemetery Director and confirmed by administrative contracting officer.

XXX LAST ITEM ALL OTHER TERMS AND CONDITIONS REMAINS UNCHANGED.XXX

End of Document