36C78619R0065-005.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
National Cemetery Administration, multiple award task order contract (MATOC) for Continental District
Solicitation number
36C78619R0065
Issued by

About this file

36C78619R0065 J-8_Contractor Cost Estimate Worksheet.xlsx

View the file

Other files

File Type Posted
36C78619D0156-004.docx DOCX document
36C78619D0155-001.docx DOCX document
36C78619D0154-001.docx DOCX document
36C78619D0153-001.docx DOCX document
36C78619R0065-0001003.pdf PDF
36C78619R0065-0001002.pdf PDF
36C78619R0065-0001001.xlsx XLSX spreadsheet
36C78619R0065-0001000.docx DOCX document
36C78619R0065-004.pdf PDF
36C78619R0065-007.xlsx XLSX spreadsheet
36C78619R0065-002.pdf PDF
36C78619R0065-006.xlsx XLSX spreadsheet
36C78619R0065-003.pdf PDF
36C78619R0065-001.docx DOCX document
36C78619R0065-000.docx DOCX document
36C78619R0065-000.docx DOCX document
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DescriptionUnitCost/Unit# UnitsTotal CostRemarks
Offeror shall use and edit to fit each Demonstration Project
General Conditions
Project set-upL.S.$0.000$0.00
CoordinationL.S.$0.000$0.00
General DemolitionL.S.$0.000$0.00
Selective demo. GWB / Act ceilingSF$0.000$0.00
Selective demo. of floor fin and floor prep.SF$0.000$0.00
Selective demo. WallsEach$0.000$0.00
Selective demolition & salvageEach$0.000$0.00
Job supervision and misc. laborWeek$0.000$0.00
Mobilization / DemobilizationJob$0.000$0.00
Division 2 - Site Construction
$0.000$0.00
Division 3 - Concrete
Concrete floor trenching and infillL.S.$0.000$0.00
Concrete floor prep., flash patchL.S.$0.000$0.00
Division 4 - Masonry
$0.000$0.00
Division 5 - Metals
Misc. equipment supportsL.S.$0.000$0.00
Modification to Metal Window frameEach$0.000$0.00
Division 6 - Wood and Plastic
Misc. blocking, framingL.S.$0.000$0.00
Chair RailLF$0.000$0.00
Blocking for CaseworkL.S.$0.000$0.00
Wood Trim (At Tech Station)LF$0.000$0.00
Plywood and wood trim (at Lockers)LF$0.000$0.00
Coat RodEach$0.000$0.00
Div. 7 -Therm, Moisture Protection
FirestoppingLF$0.000$0.00
Joint sealantsLF$0.000$0.00
Division 8 - Doors and Windows
New Door and Mtl. FrameEach$0.000$0.00
New Lead-lined door and frame assemblyEach$0.000$0.00
Modifications to existing lead windowsEach$0.000$0.00
Division 9 - Finishes
Acoustical ceiling tileSF$0.000$0.00
Existing Wall PatchingSF$0.000$0.00
Metal stud, gyp.board assembliesLF$0.000$0.00
GWB over exist framingLF$0.000$0.00
PaintSF$0.000$0.00
Vinyl BoarderLF$0.000$0.00
Resilient baseLF$0.000$0.00
Sheet Vinyl flooring and accessoriesSF$0.000$0.00
CarpetYr$0.000$0.00
Division 10 - Specialties
Hospital Curtain and TrackLF$0.000$0.00
Toilet and Bath AccessoriesEach$0.000$0.00
Casework Base and WallLF$0.000$0.00
CountertopsLF$0.000$0.00
Countertops with supportsLF$0.000$0.00
P. Lam ShelvingLF$0.000$0.00
Med. CabinetEach$0.000$0.00
LockersEach$0.000$0.00
Wall HooksL.S.$0.000$0.00
White BoardEach$0.000$0.00
Division 11 - Equipment
$0.000$0.00
Division 12 - Furnishings
-$0.000$0.00

Division 13 - Special Construction

Division 14 - Conveying Systems

Division 15 - Mechanical (General)
General Conditions and AdministrationLS$0.000$0.00
Allowance-$0.000$0.00
Division 15 - Mechanical (Plumbing)
RemovalsLS$0.000$0.00
FixturesEach$0.000$0.00
Medical Gas EquipmentEach$0.000$0.00
Plumbing PipeLS$0.000$0.00
Plumbing InsulationLS$0.000$0.00
Medical Gas PipingLS$0.000$0.00
Medical Gas TestingLS$0.000$0.00
Division 15 - Mechanical (HVAC)
RemovalsLS$0.000$0.00
Computer Room A/C % HumidifierEach$0.000$0.00
Electric Reheat CoilsEach$0.000$0.00
Fan Coil UnitEach$0.000$0.00
DuctworkLS$0.000$0.00
RGD'sEach$0.000$0.00
HVAC InsulationLS$0.000$0.00
Temperature ControlsLS$0.000$0.00
Test and BalanaceLS$0.000$0.00
Division 15 - Mechanical (Fire Protection)
Remove exist. fire sprinkler protectionLS$0.000$0.00
Extend exist. fire sprinkler protectionSQ.FT$0.000$0.00
Division 16 - Electrical
General Conditions and Administration-$0.000$0.00
Allowance-$0.000$0.00
Wiring DevicesEach$0.000$0.00
Wiring Device CircuitingEach$0.000$0.00
Light Fixtures & CircuitingEach$0.000$0.00
Specialty Light Fixtures & CircuitingEach$0.000$0.00
Relocate Panel board & circuitsEach$0.000$0.00
Relocate Nurse CallLS$0.000$0.00
Telephone / DataEach$0.000$0.00
Cath Equipment Connections & FeederLS$0.000$0.00
HVAC Equipment ConnectionsLS$0.000$0.00
DemolitionLS$0.000$0.00
General Construction Subtotal$0.00
Mechanical, Electrical, Plumbing Subtotal$0.00

Total Base Construction Cost $0.00

Overhead0%$0.00
Profit0%$0.00
Bonding (If applicable)0%$0.00

Total Estimated Construction Cost $0.00

&8B & J Multi Services

Relace Water Main&"Arial,Bold"Estimated Construction
Cost Worksheet&8VA-528-07-RP-0135

Project # 528A8-04-808

Sheet2 Total Cost

General Conditions$5,626.40
General Construction$31,263.98
Design Fees (15%)$8,439.60
MEP$25,000.00
Total$70,329.98
General Contactor P & O (15%)$10,549.50
Total$80,879.48
Contingency (10%)$8,087.95
Total Construction Budget$88,967.42
Total Area (SF)775.00
Cost/SF$114.80

Sheet3