About this file

36C78619R0064 J-8_Contractor Cost Estimate Worksheet.xlsx

View the file

Other files for this federal contract opportunity

Other files attached to National Cemetery Administration, multiple award task order contract (MATOC) for Pacific District, newest first.
File Type Posted
36C78619R0064-0001000.docx DOCX document
36C78619R0064-003.pdf PDF
36C78619R0064-006.xlsx XLSX spreadsheet
36C78619R0064-007.xlsx XLSX spreadsheet
36C78619R0064-004.pdf PDF
36C78619R0064-001.docx DOCX document
36C78619R0064-002.pdf PDF
36C78619R0064-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DescriptionUnitCost/Unit# UnitsTotal CostRemarks
Offeror shall use and edit to fit each Demonstration Project
General Conditions
Project set-upL.S.$0.000$0.00
CoordinationL.S.$0.000$0.00
General DemolitionL.S.$0.000$0.00
Selective demo. GWB / Act ceilingSF$0.000$0.00
Selective demo. of floor fin and floor prep.SF$0.000$0.00
Selective demo. WallsEach$0.000$0.00
Selective demolition & salvageEach$0.000$0.00
Job supervision and misc. laborWeek$0.000$0.00
Mobilization / DemobilizationJob$0.000$0.00
Division 2 - Site Construction
$0.000$0.00
Division 3 - Concrete
Concrete floor trenching and infillL.S.$0.000$0.00
Concrete floor prep., flash patchL.S.$0.000$0.00
Division 4 - Masonry
$0.000$0.00
Division 5 - Metals
Misc. equipment supportsL.S.$0.000$0.00
Modification to Metal Window frameEach$0.000$0.00
Division 6 - Wood and Plastic
Misc. blocking, framingL.S.$0.000$0.00
Chair RailLF$0.000$0.00
Blocking for CaseworkL.S.$0.000$0.00
Wood Trim (At Tech Station)LF$0.000$0.00
Plywood and wood trim (at Lockers)LF$0.000$0.00
Coat RodEach$0.000$0.00
Div. 7 -Therm, Moisture Protection
FirestoppingLF$0.000$0.00
Joint sealantsLF$0.000$0.00
Division 8 - Doors and Windows
New Door and Mtl. FrameEach$0.000$0.00
New Lead-lined door and frame assemblyEach$0.000$0.00
Modifications to existing lead windowsEach$0.000$0.00
Division 9 - Finishes
Acoustical ceiling tileSF$0.000$0.00
Existing Wall PatchingSF$0.000$0.00
Metal stud, gyp.board assembliesLF$0.000$0.00
GWB over exist framingLF$0.000$0.00
PaintSF$0.000$0.00
Vinyl BoarderLF$0.000$0.00
Resilient baseLF$0.000$0.00
Sheet Vinyl flooring and accessoriesSF$0.000$0.00
CarpetYr$0.000$0.00
Division 10 - Specialties
Hospital Curtain and TrackLF$0.000$0.00
Toilet and Bath AccessoriesEach$0.000$0.00
Casework Base and WallLF$0.000$0.00
CountertopsLF$0.000$0.00
Countertops with supportsLF$0.000$0.00
P. Lam ShelvingLF$0.000$0.00
Med. CabinetEach$0.000$0.00
LockersEach$0.000$0.00
Wall HooksL.S.$0.000$0.00
White BoardEach$0.000$0.00
Division 11 - Equipment
$0.000$0.00
Division 12 - Furnishings
-$0.000$0.00

Division 13 - Special Construction

Division 14 - Conveying Systems

Division 15 - Mechanical (General)
General Conditions and AdministrationLS$0.000$0.00
Allowance-$0.000$0.00
Division 15 - Mechanical (Plumbing)
RemovalsLS$0.000$0.00
FixturesEach$0.000$0.00
Medical Gas EquipmentEach$0.000$0.00
Plumbing PipeLS$0.000$0.00
Plumbing InsulationLS$0.000$0.00
Medical Gas PipingLS$0.000$0.00
Medical Gas TestingLS$0.000$0.00
Division 15 - Mechanical (HVAC)
RemovalsLS$0.000$0.00
Computer Room A/C % HumidifierEach$0.000$0.00
Electric Reheat CoilsEach$0.000$0.00
Fan Coil UnitEach$0.000$0.00
DuctworkLS$0.000$0.00
RGD'sEach$0.000$0.00
HVAC InsulationLS$0.000$0.00
Temperature ControlsLS$0.000$0.00
Test and BalanaceLS$0.000$0.00
Division 15 - Mechanical (Fire Protection)
Remove exist. fire sprinkler protectionLS$0.000$0.00
Extend exist. fire sprinkler protectionSQ.FT$0.000$0.00
Division 16 - Electrical
General Conditions and Administration-$0.000$0.00
Allowance-$0.000$0.00
Wiring DevicesEach$0.000$0.00
Wiring Device CircuitingEach$0.000$0.00
Light Fixtures & CircuitingEach$0.000$0.00
Specialty Light Fixtures & CircuitingEach$0.000$0.00
Relocate Panel board & circuitsEach$0.000$0.00
Relocate Nurse CallLS$0.000$0.00
Telephone / DataEach$0.000$0.00
Cath Equipment Connections & FeederLS$0.000$0.00
HVAC Equipment ConnectionsLS$0.000$0.00
DemolitionLS$0.000$0.00
General Construction Subtotal$0.00
Mechanical, Electrical, Plumbing Subtotal$0.00

Total Base Construction Cost $0.00

Overhead0%$0.00
Profit0%$0.00
Bonding (If applicable)0%$0.00

Total Estimated Construction Cost $0.00

&8B & J Multi Services

Relace Water Main&"Arial,Bold"Estimated Construction
Cost Worksheet&8VA-528-07-RP-0135

Project # 528A8-04-808

Sheet2 Total Cost

General Conditions$5,626.40
General Construction$31,263.98
Design Fees (15%)$8,439.60
MEP$25,000.00
Total$70,329.98
General Contactor P & O (15%)$10,549.50
Total$80,879.48
Contingency (10%)$8,087.95
Total Construction Budget$88,967.42
Total Area (SF)775.00
Cost/SF$114.80

Sheet3