36C78619R0024 0006 36C78619R0024 0006.docx

View the file

Other files

File Type Posted
36C78619C0049-000.docx DOCX document
36C78619R0024-0004001.pdf PDF
36C78619R0024-0004000.docx DOCX document
36C78619R0024-0003001.pdf PDF
36C78619R0024-0003000.docx DOCX document
36C78619R0024-0003002.pdf PDF
36C78619R0024-0002000.docx DOCX document
36C78619R0024_0001.docx DOCX document
DB_Wage_General_Decision_Number_KY180137_10052018_KY137.pdf PDF
181214_Mill_Springs_861-009_Final_Drawings.pdf PDF
CONTRACTOR_RELEASE_OF_CLAIMS.pdf PDF
Past_Performance_Questionaire.pdf PDF
36C78619R0024.docx DOCX document
181214_Mill_Springs_861-009_Final_Specifications.pdf PDF
36C78619R0024_1.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION

OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM

INISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 3

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO

MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 02-13-2019

TBD

861-009 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 75 Barrett Heights Road, Suite 309 Stafford VA 22556 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 75 Barrett Heights Road, Suite 309 Stafford VA 22556 To all Offerors/Bidders

36C78619R0024 01-03-2019

X X X

NO CHANGE

A. This modification is written to inform all prospective offers of the governemnt responses to questions received (see page 2).

B. The receipt of offers closing date is NOT extended.

C. The government is fully aware that our vendor portal website experience problems reference to this solliciation closing d ate, it's currently being worked and will be ready for acceptance on date indicated.

D. The government recognizes that there is no amendment number 0005 associated to this requirement.

D. The government recognizes that there is no amendment number 0005 associated to this requirement.

XXXXXXXXXXXXX LAST ITEM ALL OTHER TERMS AND CONDITIONS REMAINS UNCHANGED. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

CONTINUATION PAGE

AMENDMENT NO. 0006 36C78619R0024 DATED: February 13, 2019 MILL SPRINGS NATIONAL CEMETERY – This amendment supports government FINAL response to all questions received against subject requirement.

QUESTION 1: Would you like the proposals to be submitted in one (1) file (Technical and Price combined) or in two (2) separate files (Technical and Price in separate files) via the Vendor Portal? GOVERNMENT RESPONSE: Technical and Price must be provided in separate files each not combined into one file via vendor portal.

QUESTION 2: The front page of the Specifications show a Task Order No. that is different than what is shown on the Solicitation. Please clarify which is the correct Solicitation number. GOVERNMENT RESPONSE: So noted, the official solicitation number for the advertisement of subject requirement is 36C78619R0024.

QUESTION 3: In “Factor 1 Past Performance” of the Solicitation, it states that “The offeror shall provide sufficient project details with their technical proposal to demonstrate experience with at least three (3) construct projects of similar size, scope, and using similar materials and methods over the past five (5) years.” However, on the Past Performance Questionnaire that we are to use, it sates “Offerors must list at least three (3) within the past three years for evaluation.” Please clarify if past performance projects presented in our proposals must be within the last five (5) years or the last three (3) years GOVERNMENT RESPONSE: The solicitation requires that each prospective offeror must provide documentation that supports past performance of similar projects within five (5) years.

QUESTION 4: What is the Historic Site mentioned on the drawings? What are the specific limitations or special requirements of this historic site as there is nothing specifically mentioned in the specifications? GOVERNMENT RESPONSE: Historic area is outside the Construction limits as shown on Sheet X-101. Refer to Construction Phasing Note #5.

QUESTION 5: In regards to the fencing at the back of the new site where the timber guardrail ends, the drawings call for aluminum fencing. Is this fencing supposed to be the 4’ decorative black aluminum fencing or 6’chainlink fencing, as it is unclear? Please clarify. The Government provided a response to a similar question to this one in Amendment 3, however, they didn’t answer the question. Please clarify if the “Aluminum Fence” that lines the retaining wall on C-101 is to be Chain Link fencing or Decorative fencing. GOVERNMENT RESPONSE: Limits Aluminum Fencing (Detail 2 /L-505) along the south and west of the site is shown on Sheets L-101 and A-201. Fencing called out on Sheet C-101 is to be Aluminum Fencing (2/L-505).

QUESTION 6: As stated on the drawings, the contractor is to remove the parts of the existing fence around two (2) sides of the cemetery and install new fencing around the new expansion. According to the drawings, there will be parts of the cemetery that will not be entirely contained by fencing. Is it the intention of the NCA to leave areas of the cemetery uncontained? Or is there to be fencing installed all the way around the new expansion and old part of the cemetery so that the entire cemetery is fenced in? GOVERNMENT RESPONSE: Limits of new fencing is noted in response to Question 5.

QUESTION 7: If the entire cemetery is to be entirely fenced in after this phase of the expansion is complete, please provide details of the remailing fence line that will be required. GOVERNMENT RESPONSE: We will not be fencing entire site as a part of this project.

QUESTION 8. There are several trees, as shown on the drawings, that are to be removed, however, there are many other remaining trees on the existing western cemetery fence line, which are not shown on drawings V-101 Existing Conditions, that look as though they will be in the way of the new work that is to take place. Are these trees supposed to be removed? Please clarify. GOVERNMENT RESPONSE: Revise Keynote #1 to read “Remove existing fencing and adjacent small caliper trees and vegetation along fence line.”

QUESTION 9: Other than the one (1) tree listed on CD-101, Note 11, that is to be protected during construction and is to remain, are there any other trees that are to be protected? GOVERNMENT RESPONSE: No other trees in the construction work zone designated to be protected.

QUESTION 10: Is it acceptable to assume that if there are no other trees listed on the drawings as being protected or “to remain,” that all other existing trees on the site, within the construction work zone, and that may interfere with the work being performed for this project, can be removed? GOVERNMENT RESPONSE: Within the Phase Limits shown on Sheet X-101 that is correct.

QUESTION 11: Is the temporary fence required to have privacy screen? GOVERNMENT RESPONSE: Privacy screening is to be incorporated into construction fence long project boundary where it abuts the existing cemetery.

QUESTION 12. The specifications require the temporary fence to be within 1" of the ground. Given the change in grade, how much tolerance will we have? GOVERNMENT RESPONSE: Tolerance of 2 inches to 6 inches will be acceptable.

QUESTION 13: Are there any known existing utilities on the new site and/or the existing site? GOVERNMENT RESPONSE: Refer to Note #5 and #6 on Sheet C-101.

QUESTION 14: For example, is there an existing septic system for the existing admin/restrooms building that is currently on site? GOVERNMENT RESPONSE: Remnants of an existing septic field for the demolished house on this property may remain. If encountered it is to be removed.

QUESTION 15: If there are any known utilities, can you please provide the location of said known utilities? GOVERNMENT RESPONSE: Refer to Note #5 and #6 on Sheet C101.

QUESTION 16: There are some existing trees in the line of where the temporary fence is to be placed along the back of the existing cemetery (North side). Do those trees need to be removed to install the temporary fence or can the temporary fence meander around those trees? GOVERNMENT RESPONSE: Fencing can move to avoid conflicts with existing vegetation.

XXXX LAST ITEM ALL OTHER TERMS AND CONDITIONS REMAINS UNCHANGED.XXX

End of Document