About this file

36C78619Q0502 0002 36C78619Q0502 0002.docx

View the file

Other files

File Type Posted
36C78620C0210-000.docx DOCX document
36C78619Q0502-0002000.docx DOCX document
36C78619Q0502-0001000.docx DOCX document
36C78619Q0502-0001000.docx DOCX document
36C78619Q0502-006.pdf PDF
36C78619Q0502-001.docx DOCX document
36C78619Q0502-002.pdf PDF
36C78619Q0502-004.pdf PDF
36C78619Q0502-003.pdf PDF
36C78619Q0502-005.pdf PDF
36C78619Q0502-007.xlsx XLSX spreadsheet
36C78619Q0502-007.xlsx XLSX spreadsheet
36C78619Q0502-003.pdf PDF
36C78619Q0502-005.pdf PDF
36C78619Q0502-002.pdf PDF
36C78619Q0502-004.pdf PDF
36C78619Q0502-006.pdf PDF
36C78619Q0502-001.docx DOCX document
36C78619Q0502-000.docx DOCX document
36C78619Q0502-000.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 10-15-2019

789CM3919-16

36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle

VA

22172 To all Offerors/Bidders

36C78619Q0502 09-19-2019

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:

New date is: 10-22-19 NLT 10:00 am MT X The purpose of this amendmnet is to end the Questions and Answer period, provide Government resposes to questions, and extend the quote due date from 10-18-19 to 10-22-19. See Continuation Page for Questions and Government responses.

Jerry L. Hodson Jr.

AMENDMENT-0002, Solicitation 36C78619Q0502 Ft Sam Houston_Irrigation Pond Cleaning Contractor Questions & GOV Responses

1. Can we not drain down the pond and use our divers to dredge the bottom of the pond down to elevation? The pumps would stay in place and could water the grass after working hours every day.

No heavy equipment needed.

We use sediment bags that collect the debris and filter the clean water back in to the pond every day. Sediment bags come in different sizes and can be disposed of daily or weekly depending on the size or amount of sediment removed.

Using divers though could mean more than 7 days needed to do the work but with the water not being drained and usable surly that could be extended.

1. GOV Response: The storage pond needs to be completely drained to allow power washing of the entire liner surface to completely remove the algae, algae residue, and algae spores, as well as to allow dry access to the pump well to clean and power wash the entire pump well and pump intake manifolds and piping to completely remove the algae, algae residue, and algae spores.

Note 1: The irrigation water in the storage pond is reclaimed/recycled waste water from the San Antonio Water System (SAWS) and direct human contact is not allowed.

Note 2: Using sediment bags may be considered with approval by the District engineer. However, if sediment bags are to be considered, we will not allow the filtered pond water from the sediment bags to be drained back into the pond. Draining the sediment bags back into the storage pond would allow the algae and algae spores to be re-introduced back into the storage pond water where they will grow and reproduce again, defeating the purpose of the cleaning.

2. Will you reconsider the use of divers using sediment bags possibly under value engineering VE?

2. GOV Response: See the response to Question #1 above.

3. If a diver can fit in the well is this acceptable?

3. GOV Response: See the response to Question #1 above.

4. There is over 4 million gallons of water, can the water be used over a period of time to irrigate the lawn area or is there a convenient place where the water can be drained?

4. GOV Response: The requirement is to coordinate the draining of the pond with the COR by using the irrigation system pumps to irrigate the cemetery to the point where the irrigation pumps are almost uncovered but not run dry. From there, it is allowable for the remaining water to be pumped using portable pump(s) and widely distributed onto the surrounding landscape to east and southeast of the pond in the wooded area, but not directly into a ditch or waterway system. Contractor shall utilize a piping and/or a sprinkler type system to provide a widely distributed discharge of the pond water with the approval of the COR.

5. Will the Government or the San Antonio water authority do the initial drain down of the pond, Ie. draining to the lowest level just above the intake?

5. GOV Response: See the response to Question #4 above.

6. Once the initial drain down is completed the contractor will be able to dispose of the balance of clean water onsite. Approximately how far from the pond? within 1000 feet?

6. GOV Response: See the response to Question #4 above.

End of Document