36C78619Q0175-002.pdf

PDF 1 MB Posted

Attached to
36C78619C0061 National Shrine Project Beaufort National Cemetery
Solicitation number
36C78619Q0175
Issued by

About this file

36C78619Q0175 Attachment I - Supporting Documents to Solicitation.pdf

View the file

Other files

File Type Posted
36C78619C0061-000.docx DOCX document
36C78619Q0175-0001001.pdf PDF
36C78619Q0175-0001000.docx DOCX document
36C78619Q0175-004.pdf PDF
36C78619Q0175-005.pdf PDF
36C78619Q0175-003.pdf PDF
36C78619Q0175-000.docx DOCX document
36C78619Q0175-001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Shrine Project / Beaufort National Cemetery

ATTACHMENT I

SUPPORTING DOCUMENTS TO SOLICITATION

Table of Contents Page

HEADSTONE/MARKER REQUIREMENT

TURF RENOVATION REQUIREMENT

BEAUFORT NATIONAL CEMETERY LAYOUT MAP

BEAUFORT NATIONAL CEMETERY ADDITIONAL MAP #1

BEAUFORT NATIONAL CEMETERY ADDITIONAL MAP #2

ELEVATION VIEW OF HEADSTONES

HEADSTONE DETAIL INSTALLATION VIEW

HEADSTONE PLAN OVERHEAD ALIGNMENT

1. HEADSTONE/MARKER REQUIREMENT

C.8 HEADSTONE/MARKER REALIGNMENT, RESETTING, BACKFILL

C.8.1 Overview: This section outlines Upright Headstone/Marker realignment requirements.

Raise, Lower, Realignment, Reset, Clean and Backfill services consist of extracting, resetting, aligning, backfilling and tamping/compacting upright headstones that are already in place which have shifted out of vertical and/or horizontal alignment and plumb, as well as inventorying and assuring accurate placement of gravesites at the National Cemetery. The Contractor shall provide all supervision, professional advice/guidance labor, parts, materials, equipment, and personnel necessary to provide the services defined herein.

C.8.2 Headstone/Marker Locations: Headstone/marker locations requiring adjustment, realignment, resetting and backfill will be provided to the Contractor by the COR after contract award.

C.8.3 Phasing and Work Sequencing: All work is to be accomplished in a sequential manner, with work limited to no more than six (6) burial rows of a section at any given time to minimize overall disruption to the cemetery. Requests to work on more than six (6) rows in a section at one time or move to another section before finishing previous section may be submitted to the

COR for approval. Approval/disapproval will be based on the impact to the cemetery operations and the progress and workmanship of the contractor, as determined by the COR. Work cannot begin in subsequent rows until such time that work has been completed in prior areas. Submit proposed project work schedule sequence for COR review and approval prior to start of project.

C.8.4 Record Keeping and Reporting: The Contractor's Project Manager Designee shall provide the COR(s) with weekly written accurate reports detailing the section and range of graves in that specific week. These lists will be provided on not less than a weekly basis, and shall identify all the above work that took place within the previous seven calendar days. Upon request, the

Project Manager will also provide a plan of action for the upcoming week, regarding headstone/marker locations and specific areas where work is being scheduled to occur.

C.8.5 Upright Headstone Specifications: Raise, lower, realign, reset, and backfill of upright headstones shall be accomplished as follows:

(a) Standard upright marble headstones are approximately 42 inches long, 13 inches wide, 4 inches thick, and weigh approximately 230 pounds. Older Civil War type upright marble headstones are typically around 35-1/2 inches long, 9-1/2 inches wide, 4 inches thick and weigh approximately 140 pounds and 6x6 unknown markers are 24 inches long. COR will provide dimenisons of any other Civil War or other War Era headstone. Contractor will immediately report any pre-existing damage to the COR.

(b) All temporary markers, floral, commemorative, buried permanent floral vases, or other types of decorations and arrangements causing interference with the raise and realignment of upright headstone operation shall be carefully, and in an orderly manner moved from, and per completion of work, moved back to all gravesites by the Contractor. Prior to removal, the

Contractor shall verify the numbering sequence and location of the headstone and associated decorations by using tags and a permanent ink marker indicating from which grave the item was removed.

(c) Headstones will be removed from their sockets by using wooden, and or metal clamps. If metal clamps are used the area that contacts the headstone must be protected with a rigid fabric that will prevent damage to, and marking of, the headstone. Clamps may be attached to a Bob Cat or similar Machine to extract headstone from socket. Extreme care will be used not to scratch or damage headstones in any manner. Contractor is responsible for restoring all damages caused to turf and headstones during performance of this work. Headstones are to be raised, realigned, and lowered in the following manner:

(1) All headstones are to be extracted from the socket. ALL sockets are to be re-dug by hand to allow for a 3” perimeter around all sides of the headstone and to a sufficient depth so that a 3" compacted base can be established, allowing the stone to extend out of the ground at a height of 24-26 inches to the top of the arch on the standard headstone (Note: In areas where smaller than standard size headstones may occur, Contractor shall coordinate specified measurements and dimensions of required work with COR.)

(2) Moistened Crushed Limestone Base Material (graded aggregate sizes ranging from crushed fines up to ¼" maximum) will be placed around all sides of the headstones and in the bottom of the socket before being thoroughly tamped to full compaction at each three (3) inch vertical interval, leaving the last 3 inches at the top to have tamped topsoil. The government will not provide any material. The Contractor is required to provide these materials. (Note: Moist Class II Road Base may be considered as an alternate. Contractor shall obtain approval from the COR for any substitute base material).

(3) Straight Rows: Headstones shall be set vertically plumb in all directions, in all cases in a line vertically and laterally, and where possible transversely (coordinate with COR), with headstones of other graves using a top string, a back of headstone string line, and a side of headstone string line. Maximum vertical, lateral, and transverse tolerance of any headstone off the alignment string lines and/or marks shall be 1/8" or less. All measurements and string line set ups shall be taken from established section layout control points, not from previously set headstones, unless otherwise directed by the

COR. In situations whereas there is no monumentation, a top string shall be centered over the arc of the headstone for vertical alignment. The consistency of the row will be used as the medium. At no time, will any headstone be reset in a totally new socket unless otherwise directed by the COR. Raised and realigned headstones in all soil and terrain shall be firmly in place so that headstones are rigid with no give or play.

(4) Irregular Terrain: When sloping and uneven ground conditions exist in burial sections, all headstones and markers will be set at field approved heights and levels using multiple keystones, back strings, top strings, and side strings to provide a flowing transition through uneven terrain. Field guidance will be provided by the COR upon the written request from the Contractor. The established field guidance will overrule the height requirements that will be found in other parts of this specification.

(5) Handling of Headstones: Prior to ANY removal of the existing headstones or makers from any row, the Contractor MUST verify to the COR’s satisfaction that permanent gravesite control monumentation has been established AND approval of the Contractor provided as-built drawings has been obtained IN WRITING from the Contracting

Officer and/or the COR’s.

(6) In cases where headstone sockets need to be realigned/shifted, and/or re-dug, the headstone sockets (holes) to receive headstones shall be dug by hand and/or mechanical devices to a sufficient depth so that 24-26 inches of the headstone is extending from the topsoil level of the sod to the top of the arc on the headstone. Contractor shall not dig a headstone socket wider than twelve (12) inches, twenty (20) inches in length, or exceed a depth of 20 inches that may cause the headstone to settle below height requirement.

(7) The measurements between rows of headstones and headstones within each row may differ from one section to the next, discuss with COR where this is found to occur.

These measurements must be adhered to as closely as possible. Some variances may be allowed to keep a uniform appearance of headstones being aligned. Headstones will be accurately and precisely reinstalled on the correct gravesites with the utilization of temporary grave plotting maps, existing permanent control markers where available and temporary Contractor installed control markers accurately and precisely installed at the ends of each gravesite row.

(8) The realign crew is to start on a row of headstones close to the center of the section to be realigned. Headstones are chosen to be "key" stones. These keystones are ones that are visibly in line with most the rest of the headstones in the row, and are as close as possible to the proper measurements for that section of headstones. "Key" stones are to be chosen and utilized at a maximum of every 10th headstone (or more frequently in areas of rolling terrain). These keystones are then aligned by leveling front and back and side-to-side, and raised or lowered to a height of 24-26(or other measurement designated by COR) inches above topsoil level (this includes topsoil on sod).

Refer to “HEADSTONE” Documents of this attachment.

(9) At the start of work in each burial section, the first row of reset/realigned headstones in each burial section is to be inspected by COR for appearance, spacing, depth, alignment, plumbness, height, accuracy, and smoothness in grade transition. No further setting of headstones shall be done until this first row has been inspected and accepted by the COR. It is the Contractors responsibility to notify the COR 24 hours in advance of when each of these inspections will be needed.

(10) Tape measures and Heavy strings or lines must run along the backs, sides, and tops of these keystones. The Contractor shall mark the lines with the proper measurements for the section being aligned. All remaining headstones in the row are then aligned along the strings front to back and side-to-side even with the measured marks on the line.

Each headstone is leveled and plumbed front to back and side-to-side keeping the back of the headstone along the string and the side of the headstone along the measured mark. Maximum vertical, lateral, and transverse tolerance of any headstone off the alignment string lines and/or marks shall be 1/8", or less. Each headstone is also raised or lowered as necessary to ensure a uniform measurement of 24-26 inches above topsoil level to include topsoil of sod. The headstone is then aligned along the string front to back and side-to-side even with the measured mark on the line. The headstone is leveled and plumbed front to back and side-to-side keeping the back of headstone along the string and the side of the headstone along the measured mark.

(11) The alignment of the headstones shall be checked frequently during this process because the tamping may move the headstone out of level or off the mark on the line.

This process of raising and realigning is repeated for each row of headstones. Upright headstones in all completed work areas shall be firmly set and anchored in place with no movement from forces subjected by the COR.

(12) Any upright headstones broken or damaged by the Contractor shall be reported to the

Cemetery Administrator or COR by close of business each working day in order that the grave can be properly marked. The Contractor shall be responsible for the cost of the headstone replacement. All headstone replacements must be coordinated with the

COR. Any grid or sectional monuments disturbed, displaced or broken shall be replaced by the Contractor at his cost. All grid or sectional monuments disturbed, etc., shall be properly reset by a licensed land surveyor at Contractor's expense. Curbs, roads, walks, turf, trees, utilities, etc. existing above and below the ground that are damaged or disturbed by the Contractor during performance of contract work shall be repaired at the expense of the Contractor. Repairs to the above shall be corrected by the

Contractor within fourteen (14) workdays, unless otherwise agreed to with the COR.

C.8.6 Guaranty: The Contractor shall guaranty all work for a period of one year (365 calendar days) after final inspection and acceptance of the entire project by the Government. Any headstone adjust, realign, reset, and/or backfill workmanship that does not meet the specified requirements (including specified tolerance requirements) at the end of this guaranty period is to be reworked, adjusted, and corrected by the Contractor at no additional cost to the government.

Remainder of all other work related to this project is to be warranted for a period of one (1) year after final acceptance by the government. Work performed under the Guaranty shall be corrected within ten (10) workdays from receipt of notification or as directed by the COR.

C.9 Headstone Cleaning:

The VA is the authority on determining what is clean and what is not clean. The definition of a “clean stone” is that the stone has no dirt lines or watermarks and no visible signs of fungi.

Cleaning will be accomplished with the use of a high-pressure washer (pressure not to exceed

800 PSI) and an acceptable cleaning agent that that does not harm the stone and that is environmentally acceptable. The cleaning will consist of the removal of stains, dirt, grass, or fungi leaving the marker undamaged and in a clean, acceptable condition. Cleaning shall be completed with the use of a high-pressured washer (not to exceed 800 PSI) and an acceptable cleaning agent approved by the COR(s) that doesn’t harm the grave marker and/or turf. The cleaning will consist of the removal of stains, dirt, grass, or fungi leaving the marker undamaged and in an acceptable appearance. Cleaning may be completed either before storage of the markers or after re-installation. If cleaning is accomplished after re-installation, the Contractor shall be responsible for any turf or sod damaged during the cleaning process. The Contractor shall be responsible for any turf or sod damaged during the cleaning process.

2. TURF RENOVATION REQUIREMENT

C.10 Turf Renovation (Gravesite Renovation):

C.10.1 Vegetation Removal: Existing turf is to be sprayed with a short acting herbicide designed to eliminate turf and weeds (i.e. “Round-up” or equivalent). The application shall be applied by a licensed applicator to ensure appropriate rates of application and other State regulated requirements.

C.10.2 Stripping Topsoil: Strip three (3) inches of topsoil from within limits of work area and remove from work site each day. New topsoil shall be a fertile, friable, natural topsoil of loamy character and characteristic of locality. Topsoil shall be capable of growing healthy horticultural crops of grasses. Stockpile topsoil and protect as directed by COR or designee. Eliminate foreign materials, such as dead grass, weeds, roots, stones, subsoil, frozen clods, and similar foreign materials larger than 25 mm (1 inch) in any dimension from topsoil that will be used in final grading. Topsoil work, such as stripping, stockpiling, and similar topsoil work shall not, under any circumstances, be carried out when soil is wet so that tilth of soil will be destroyed. Topsoil removed from the work area may be stored in a temporary on-site location designated by the

COR(s) until removal from cemetery site at the end of work day.

C.10.3 Lines and Grades: Area must be tilled, graded and compacted to a level to provide a flowing transition through existing terrain (no depression or low line areas). A Registered

Professional Land Surveyor or Registered Civil Engineer, shall establish lines and grades for approval by COR and designee before any sod is laid. Grading shall provide a smooth transition at curbs, trees, planters and uninterrupted drainage flow into existing drains. Contractor shall notify COR or designee of any differences before requesting approval of lines and grades.

Subsequent to establishment of lines and grades and COR or designee approval, Contractor will be responsible for any additional cut and/or fill required to ensure that site is graded to ensure that surface water drainage will drain to existing storm drains and that they are no standing water areas throughout the sections (such as depression and sunken graves).

C.10.4 Filling and Back filling: Do not fill or backfill until all foreign materials have been removed from excavation. For fill and backfill use excavated materials and top soil as applicable.

Do not use unsuitable excavated materials such as topsoil, construction materials and material subject to decomposition, clods of clay and stones larger then 1 inches, organic materials including silts which are unstable, and inorganic materials including silts, too wet to be stable.

C.10.5 Compaction: Compact with approved tamping rollers, sheep-foot rollers, pneumatic tired rollers, steel wheeled rollers, or other approved equipment (hand or mechanized) well suited to soil being compacted. Do not operate mechanized vibratory compaction equipment, which may damage existing liners or caskets. Subgrade must be thoroughly tamped to compaction.

C.10.6 Topsoil: Topsoil shall be a well-graded soil of good uniform quality. It shall be a natural, friable soil representative of productive soils in the vicinity. Topsoil shall be free of admixture of subsoil, foreign matter, objects larger than 25 mm (one inch) in any dimension, toxic substances, weeds and any material or substances that may be harmful to plant growth and shall have a pH value of not less than 6.0 nor more than 7.0. Testing for pH will be required by an approved laboratory. Copies of the pH tests shall be furnished to the COR(s) PRIOR to topsoil being placed. Amend topsoil not meeting the pH range specified by the addition of pH Adjusters.

Top-dress is to be organic matter, weed free consistent with irrigation requirements to promote healthy grass. At least 10 days prior to topsoil delivery, notify the COR or designee of the source(s) from which topsoil is to be furnished. Obtain topsoil from well-drained areas.

C.10.7 Installation of Topsoil: After tilling the soil for bonding of topsoil with the subsoil, spread three (3) inches of topsoil evenly over prepared site. Incorporate topsoil into the subsoil to avoid soil layering. Do not spread topsoil when it is excessively wet or dry. Correct irregularities in finished surfaces to eliminate depressions. Protect finished topsoil areas from damage by vehicular or pedestrian traffic. Complete lawn work only after areas are brought to finished grade. The areas within the drip lines of existing trees are not to be tilled at a depth greater than three inches or backfilled not to exceed four inches from existing grades. Contractor must protect all trees, shrubs and plants. Exceptions must be approved by COR. Incorporate fertilizers and lime into the soil to a depth of at least 100 mm (4 inches) as part of the finish grading operation.

Immediately restore the soil to an even condition before any turf work.

C.10.8 Finish Grading, Sod and Sodding: Complete lawn works only after areas are brought to finished grade (approved by COR) and all vegetation has been eradicated. Sod shall be certified sod as classified in the TPI Guideline Specifications to Turf Grass Sodding. The composition of the grass species in the sod shall be Zoysia grass (Zeon Cultivar). Two applications of fertilizers are required, one prior to sod placement (use a starter fertilizer 5-5-15 at the rate of 1 pound of nitrogen per 1000 square feet) and another application of fertilizer after the first mowing at 1 pound of nitrogen per 1000 square feet. Prior to delivery of sod, the contractor shall have an interim inspection of the work area by the COR(s) and any discrepancies (grading, backfilling, headstone placement, etc.) shall be corrected prior to laying sod in the work area. Sod shall be delivered to the work site no more than one day prior to installation. Contractor shall make all necessary arrangements to protect delivered sod from excessive drying and wind damage. Sod shall be insect, disease and weed free. Sod shall be laid expeditiously without interruption, until the work area is completely sodded. Sod shall be cut and fitted around all flat markers and other obstructions. Sod should only be laid/rolled over bare moist soil with pieces laid in a staggered brick-like pattern and edges fitted tightly together to avoid any open cracks. Rolling and watering thoroughly is required by the contractor to insure good contact with the soil for fast rooting.

C.10.9 Sod around Trees: Care shall be taken not to damage tree roots. New sod will be laid no closer than 36 inches from tree trunk in a circular pattern. In instances where a greater diameter is required due to tree roots, prior approval will be obtained from the COR. Sod is to be installed in a circular pattern away from base of tree and surface root unless otherwise specified by the COR.

C.10.10 Floral vases: After installation of sod, Contractor shall ensure that all floral vases are at their proper and marked locations and are at finished grade. The contractor may have to probe each grave for location of buried vases.

C.10.11 Guaranty: The Contractor shall guarantee all turf work for a period of 90 calendar days after final inspection and acceptance of the entire project by the Government. Any turf work that does not meet the specified requirements at the end of this guaranty period is to be reworked, adjusted, and corrected by the Contractor at no additional cost to the government. Work performed under the Guaranty shall be corrected within ten (10) workdays from receipt of notification or as directed by the COR.

C.11 Turf Establishment Period:

The Turf Establishment Period for each section shall begin no less than 30 days after the last piece of sod is laid in complete sodded section only. After the 30-day establishment period as ended the contractor may call for an inspection of said section by the COR. After inspection and acceptance by the COR, then the turf establishment period will begin and shall be no less than 30 days after COR acceptance. During the Turf Establishment Period the Contractor shall:

C.11.1 Water turf to maintain an adequate supply of moisture within the root zone. Apply water at a moderate rate so as not to displace the mulch or flood the plants and turf. The contractor is responsible for applying one quarter of an inch of water (1/4”) twice a day for a three-week period.

C.11.2 Contractor shall treat sod with a pre-emergence/post-emergence herbicide for weeds as well as treatment for insects and disease. Water, fertilize, over-seed, and perform any other operation necessary to promote the growth of grass.

C.11.3 Replant areas void of turf 0.1 m2 (one square foot) and larger in area.

C.11.4 Mowing will be required by the contractor when grass reaches 77 mm (3 inches) high.

Mow to a 50 mm (2.0 inch) height and take no more than 1/3 of the grass at any mowing.

Contractor will be responsible for the mowing until an acceptable stand of grass is provided and accepted by the government.

C.11.5 The contractor shall not be held accountable or responsible for damage to the renovated areas caused by cemetery personnel or other factors not controlled by the contractor.

C.12 Turf Maintenance Period:

C.12.1 The Contractor shall maintain the area 30 days after the 30-day establishment period has been inspected and accepted by the COR. Maintenance shall include mowing the area when the grass reached a height of 77 mm (3 inches). Mow to a 50 mm (2 inch) height and take no more than 1/3 of the grass at any mowing. Contractor will be responsible for the health of the turf to include weed, insect and disease control and until an acceptable stand of grass is inspected and accepted by the government.

C.12.2 The contractor shall be responsible for the health of the turf until final acceptance by the

COR and make all necessary corrective actions at no expense to the government.

C.12.3 The contractor shall not be held accountable or responsible for damage to the renovated areas caused by cemetery personnel or other factors not controlled by the contractor.

C.12.4 Continue mowing and irrigation until sod is 100% established and accepted by the COR.

Germinated weeds must be eliminated by spraying with a typical three-way broadleaf herbicide combination product or with a post emergence herbicide control of crabgrass or both if necessary to achieve 100% turf grass cover

COMMITTAL

SHELTER

COLUMBARIUM 1

MAINTENANCE/

PUBLIC RESTROOM

GRAVE LOCATOR

SECTIONS FOR STONE

REPLACEMENT

5/9/2018 8:47:03 AM