36C78619Q0165 Schedule Riverside Landscaping.pdf

View the file

Other files

File Type Posted
36C78619D0124-000.docx DOCX document
36C78619Q0165-000.docx DOCX document
36C78619Q0165-002.pdf PDF
36C78619Q0165-001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RIVERSIDE LANDSCAPING MATERIALS

SCHEDULE

The schedule price shall be all-inclusive of materials, shipping and delivery to complete the Contract Line Items (CLINs). FOB Destination pricing only. Offerors shall enter unit price and total amounts for each CLIN as indicated in the schedule. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid price and the total of the CLINs will be recomputed accordingly.

CONTRACT PERIOD: May 1, 2019 through April 30, 2020

CLIN ITEM QTY UNIT UNIT PRICE TOTAL PRICE

(MAX QTY)

Landscape Supplies

Amended topsoil 60/25/10/5 sandy loam/fir shavings/compost/manure

450 Cubic Yard- Dump Loads $ $

0002 Premium red dyed mulch 1” to 3” 1,072 Cubic Yard-

Dump Loads $ $

0003 Southwest brown crushed rock ¾” minus 426 TON- Dump

Loads $ $

0004 3/8” birds eye pea gravel 500 TON- Dump Loads $ $

0005 Playground sand 120 Ton-Dump Loads $ $

TOTAL 0001 $

CONTRACT PERIOD: May 1, 2020 through April 30, 2021

CLIN ITEM QTY UNIT UNIT PRICE TOTAL PRICE

(MAX QTY)

Landscape Supplies

Amended topsoil 60/25/10/5 sandy loam/fir shavings/compost/manure

450 Cubic Yard- Dump Loads $ $

1002 Premium red dyed mulch 1” to 3” 1,072 Cubic Yard-

Dump Loads $ $

1003 Southwest brown crushed rock ¾” minus 426 TON- Dump

Loads $ $

1004 3/8” birds eye pea gravel 500 TON- Dump Loads $ $

1005 Playground sand 120 Ton-Dump

TOTAL 1001 $

CONTRACT PERIOD: May 1, 2021 through April 30, 2022

Amended topsoil 60/25/10/5 sandy loam/fir shavings/compost/manure

450 Cubic Yard- Dump Loads $ $

2002 Premium red dyed mulch 1” to 3” 1,072 Cubic Yard-

Dump Loads $ $

2003 Southwest brown crushed rock ¾” minus 426 TON- Dump

Loads $ $

2004 3/8” birds eye pea gravel 500 TON- Dump Loads $ $

2005 Playground sand 120 Ton-Dump

TOTAL 2001 $

CONTRACT PERIOD: May 1, 2022 through April 30, 2023

Amended topsoil 60/25/10/5 sandy loam/fir shavings/compost/manure

450 Cubic Yard- Dump Loads $ $

3002 Premium red dyed mulch 1” to 3” 1,072 Cubic Yard-

Dump Loads $ $

3003 Southwest brown crushed rock ¾” minus 426 TON- Dump

Loads $ $

3004 3/8” birds eye pea gravel 500 TON- Dump Loads $ $

3005 Playground sand 120 Ton-Dump

TOTAL 3001 $

CONTRACT PERIOD: May 1, 2023 through April 30, 2024

Amended topsoil 60/25/10/5 sandy loam/fir shavings/compost/manure

450 Cubic Yard- Dump Loads $ $

4002 Premium red dyed mulch 1” to 3” 1,072 Cubic Yard-

Dump Loads $ $

4003 Southwest brown crushed rock ¾” minus 426 TON- Dump

Loads $ $

4004 3/8” birds eye pea gravel 500 TON- Dump Loads $ $

4005 Playground sand 120 Ton-Dump

TOTAL 4001 $

SUMMARY TOTALS ESTIMATED TOTALS

BASE YEAR: May 1, 2019 through April 30, 2020 $

OPTION YEAR 1: May 1, 2020 through April 30, 2021 $

OPTION YEAR 2: May 1, 2021 through April 30, 2022 $

OPTION YEAR 3: May 1, 2022 through April 30, 2023 $

OPTION YEAR 4: May 1, 2023 through April 30, 2024 $

Total Base and all Option Years Estimated Cost: $

NOTE: The quantities given are only estimates of materials to be delivered. The Contractor shall be paid only for orders placed by the COR and actually provided.