36C78619Q0165-003.pdf
PDF 156 KB Posted
- Attached to
- Landscape supplies Riverside NC Base + 4 options
- Solicitation number
- 36C78619Q0165
About this file
36C78619Q0165 Schedule Riverside Landscaping.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78619D0124-000.docx | DOCX document | |
| 36C78619Q0165-000.docx | DOCX document | |
| 36C78619Q0165-002.pdf | ||
| 36C78619Q0165-001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RIVERSIDE LANDSCAPING MATERIALS
SCHEDULE
The schedule price shall be all-inclusive of materials, shipping and delivery to complete the Contract Line Items (CLINs). FOB Destination pricing only. Offerors shall enter unit price and total amounts for each CLIN as indicated in the schedule. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid price and the total of the CLINs will be recomputed accordingly.
CONTRACT PERIOD: May 1, 2019 through April 30, 2020
CLIN ITEM QTY UNIT UNIT PRICE TOTAL PRICE
(MAX QTY)
Landscape Supplies
Amended topsoil 60/25/10/5 sandy loam/fir shavings/compost/manure
450 Cubic Yard- Dump Loads $ $
0002 Premium red dyed mulch 1” to 3” 1,072 Cubic Yard-
Dump Loads $ $
0003 Southwest brown crushed rock ¾” minus 426 TON- Dump
Loads $ $
0004 3/8” birds eye pea gravel 500 TON- Dump Loads $ $
0005 Playground sand 120 Ton-Dump Loads $ $
TOTAL 0001 $
CONTRACT PERIOD: May 1, 2020 through April 30, 2021
CLIN ITEM QTY UNIT UNIT PRICE TOTAL PRICE
(MAX QTY)
Landscape Supplies
Amended topsoil 60/25/10/5 sandy loam/fir shavings/compost/manure
450 Cubic Yard- Dump Loads $ $
1002 Premium red dyed mulch 1” to 3” 1,072 Cubic Yard-
Dump Loads $ $
1003 Southwest brown crushed rock ¾” minus 426 TON- Dump
Loads $ $
1004 3/8” birds eye pea gravel 500 TON- Dump Loads $ $
1005 Playground sand 120 Ton-Dump
TOTAL 1001 $
CONTRACT PERIOD: May 1, 2021 through April 30, 2022
Amended topsoil 60/25/10/5 sandy loam/fir shavings/compost/manure
450 Cubic Yard- Dump Loads $ $
2002 Premium red dyed mulch 1” to 3” 1,072 Cubic Yard-
Dump Loads $ $
2003 Southwest brown crushed rock ¾” minus 426 TON- Dump
Loads $ $
2004 3/8” birds eye pea gravel 500 TON- Dump Loads $ $
2005 Playground sand 120 Ton-Dump
TOTAL 2001 $
CONTRACT PERIOD: May 1, 2022 through April 30, 2023
Amended topsoil 60/25/10/5 sandy loam/fir shavings/compost/manure
450 Cubic Yard- Dump Loads $ $
3002 Premium red dyed mulch 1” to 3” 1,072 Cubic Yard-
Dump Loads $ $
3003 Southwest brown crushed rock ¾” minus 426 TON- Dump
Loads $ $
3004 3/8” birds eye pea gravel 500 TON- Dump Loads $ $
3005 Playground sand 120 Ton-Dump
TOTAL 3001 $
CONTRACT PERIOD: May 1, 2023 through April 30, 2024
Amended topsoil 60/25/10/5 sandy loam/fir shavings/compost/manure
450 Cubic Yard- Dump Loads $ $
4002 Premium red dyed mulch 1” to 3” 1,072 Cubic Yard-
Dump Loads $ $
4003 Southwest brown crushed rock ¾” minus 426 TON- Dump
Loads $ $
4004 3/8” birds eye pea gravel 500 TON- Dump Loads $ $
4005 Playground sand 120 Ton-Dump
TOTAL 4001 $
SUMMARY TOTALS ESTIMATED TOTALS
BASE YEAR: May 1, 2019 through April 30, 2020 $
OPTION YEAR 1: May 1, 2020 through April 30, 2021 $
OPTION YEAR 2: May 1, 2021 through April 30, 2022 $
OPTION YEAR 3: May 1, 2022 through April 30, 2023 $
OPTION YEAR 4: May 1, 2023 through April 30, 2024 $
Total Base and all Option Years Estimated Cost: $
NOTE: The quantities given are only estimates of materials to be delivered. The Contractor shall be paid only for orders placed by the COR and actually provided.