36C78619Q0165-001.pdf
PDF 132 KB Posted
- Attached to
- Landscape supplies Riverside NC Base + 4 options
- Solicitation number
- 36C78619Q0165
About this file
36C78619Q0165 SOW Riverside Landscaping.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78619D0124-000.docx | DOCX document | |
| 36C78619Q0165-000.docx | DOCX document | |
| 36C78619Q0165-002.pdf | ||
| 36C78619Q0165-003.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
RIVERSIDE NATIONAL CEMETERY LANDSCAPE MATERIALS
March 26, 2019
B.1 PLACE OF PERFORMANCE
The Contractor shall provide all materials at Riverside National Cemetery, in dump load delivery, no bag delivery will be accepted. Specific locations for delivery of material and supplies are as follows:
Cemetery Address
Riverside National Cemetery
22495 Van Buren Blvd., Riverside, Ca. 92518 (Located at the end of avenue “A”, in the spoils area beside railroad tracks by 215 freeway. Contact COR upon arrival.
B.2 PRODUCT
All materials will be in accordance with the Description/Specifications/Statement of Work, contained in this contract. National Cemetery Administration National Shrine Commitment Operational Standards and Measures (Version 5.1 July 2014 or the most current version); Handbook 3130: the most current Organizational Assessment and Improvement Guide (OAI). Copies of these documents may be obtained from the Cemetery Director, Peter Young, (Tel.: 951-653-8417).
All landscape materials will be delivered to the respective cemetery as needed, within seven (7) days of order being placed. Orders to be placed by the COR. Orders are anticipated to be placed on a monthly basis.
See product specifications for Amended topsoil and Mulches.
B.3 CONTRACTING OFFICER’S REPRESENTATIVE
Only the COR is authorized to place orders under this requirements contract. COR will be designated by the Contracting Officer with award of the requirements contract and updated as needed.
B.4 SCHEDULE
The schedule price shall be all-inclusive of materials, shipping and delivery to complete the Contract Line Items (CLINs). The schedule shall be for the base and four option years.
End of Statement of Work
B.1 PLACE OF PERFORMANCE
File details come from the government source that posted it.